Loading...
HomeMy WebLinkAbout2025-2030 Capital Improvement PlanCity of Edina, Minnesota Capital Improvement Plan 2025-2030 (Adopted December 17th, 2024) Edina City Council Mayor James Hovland Council Member Kate Agnew Council Member Carolyn Jackson Council Member James Pierce Council Member Julie Risser City of Edina Staff City Manager Scott Neal Assistant City Manager Ari Lenz Finance Director Pa Thao Assistant Finance Director Nelly Chick-Brewer Contributing Staff Financial Analyst Mallory Jensvold City Management Fellow Zoe Johnson Table of Contents Introduction 4-23 Overview 4 Organization 5 Vision Edina 6 Budget & Work Plan Process 7 Budget Goals 8 CIP Introduction 9 CIP Process 9-16 Funding Sources & Financing 17-23 Funded Project Data 24-298 Funded Projects by Funding Source 24-36 Funded Projects in Detail Sorted by Department 37-298 Appendices 299-351 Funding TBD Projects by Department 299-301 Funding TBD Projects in Detail Sorted by Department 302-351 3 Introduction The City of Edina has over $550 million invested in capital assets that either need to be maintained or replaced. This number includes things such as land, buildings, roads, water and sewer lines, vehicles and equipment. The Capital Improvement Plan (CIP) is one of several ways that the City supports Vision Edina, the long-term strategic framework of the City. The 2025-2030 Capital Improvements Plan is a six-year, $547 million plan. This is an increase from the 2023-2028 funded $300 million plan. The increase is due to several large capital projects, including improvements to France Avenue Crossing Gallagher & 72nd ($16 million) and Citywide Roof Replacements ($12.5 million), construction of Fire Station 3 ($50 million), Braemar Golf Course Clubhouse ($27 million), Neighborhood Reconstruction projects ($63 million), Storm Water projects ($71 million), Water Utility projects ($68 million), and Sewer projects ($35 million). This plan includes 256 funded projects, a significant increase from 162 projects in the 2023-2028 CIP. This growth can be attributed to a structural change made in the 2023-2028 CIP where only projects with identified funding sources were included in the plan. This is contrasted by previous years’ CIPs where both funded and unfunded projects were included. While unfunded projects are tracked internally for future consideration, the rising number of funded initiatives underscores the growing need to address equipment maintenance, repairs, and expansion of community services. These efforts are critical to ensuring the City's infrastructure and amenities meet the evolving demands of residents. Approximately $280 million is planned for infrastructure projects, $28 million for parks projects, another $32 million is planned for vehicle and equipment replacement, over $188 million for building improvements, $12 million for land improvements, and $7 million for technology. Additionally, The American Rescue Plan Act (ARPA) funding project is nearing the final phase. These federal and state-distributed funds were allocated to provide economic relief in response to the COVID-19 pandemic. The City has primarily directed these resources toward enhancing public amenities and infrastructure at Centennial Lakes Park. Additionally, the Local Option Sales Tax (LOST), approved by voters in November 2022, generates revenue through a half-cent sales tax. This funding supports the implementation of the improvements detailed in the Fred Richards Park Master Plan and the Braemar Park Master Plan. Buildings 35% Equipment & Vehicles 6%Parks 5%Technology 1% Land 2% Infrastructure 51% 2025-2030 CIP Project Costs by Type 4 Organization The City of Edina operates under the Council-Manager form of government. Policy-making and legislative authority are vested in a City Council (Council) consisting of the Mayor and four other members, all elected on a non-partisan basis. The Council is responsible for, among other things, adopting the budget, approving ordinances, appointing committees and hiring the City Manager. Council members serve four-year terms, with two Council members elected every two years. The Mayor also serves a four-year term. The Council and Mayor are elected at large. The City Manager is responsible for carrying out the policies and ordinances of the Council and overseeing the day-to-day operations of the city government. Edina has six “operating” departments which primarily serve the community and four “supporting” departments which primarily work within the City serving operating departments, in addition to the Administration Department which includes the City Manager and Assistant City Manager. RESIDENTS Operating Departments 5 Vision Edina Vision Edina is a long-term strategic framework that aids in community understanding and guidance in important decision making that will impact Edina’s future. The Vision Edina work and publications have been developed through a broad based and inclusive community visioning process conducted in 2014. This framework lays out the City’s vision, and mission. Vision: Edina holds a well-earned reputation as a city of choice. It is the model of a successful, mature, and progressive urban community, that strives to lead in a modern and evolving world. We maintain our heritage and attractiveness, and afford our residents the highest quality of life, while actively embracing the future. The features that define our future community include: Inclusive and Connected Built-to-Scale Development Sustainable Environment Community of Learning Future-Oriented Mission: To provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. Eight key strategic focus areas have emerged through the Vision Edina process. This framework lays out the key issues identified by our community, which we need to focus our attention and resources on over the coming years. Residential Redevelopment Mix Transportation Options Commercial Development Mix Live and Work Educational Focus Population Mix Environmental Stewardship Regional Leadership 6 Budget & Work Plan Process In the City of Edina, the Capital Improvement Plan is part of a comprehensive approach to performance management supporting Vision Edina. The City Council and staff develop a two-year Budget Work Plan that coincides with the operating budget. The operating budget and Capital Improvement Plan processes occur on alternating years. While both the operating budget and CIP will be reviewed every year, much of the planning, focus and effort will occur on a biennial basis. The process begins with identifying the goals, objectives, and actions that will put the City in the best position to achieve the outcomes identified in the City’s strategic plans. Vision Edina (Twenty-year) Comprehensive Plan (Ten-year) Capital Improvement Plan (Five-year) Strategic Policy Budget Work Plan (Two-year) Operating Budget (Two-year) Department Work Plans (Annual) Implementation 7 The following Budget Pillars & Values were identified by the City’s Leadership Team and City Council for the 2024-2025 operating budget cycle: Pillars Budget pillars are two-year broad outcomes to be achieved by the budget. Strong Foundation City infrastructure, facilities, technology, and equipment meets community needs now and in the future. Reliable Service City services enhance the safety, wellbeing, and quality of life experienced in Edina. Livable City City planning fosters healthy, connected, sustainable development that enriches the lives of current and future residents. Better Together City government fosters an inclusive, informed, and engaged community. Values Budget values are beliefs that guide decision making. The values should be considered when making recommendations and asking for council action. Stewardship: We make wise investments that focus on the best long-term value for residents Health: We use Health-in-All Policies to promote and protect the physical, mental, and social wellbeing of all people who live, work, or visit Edina Equity: We provide equitable opportunities for people to participate in their city government and access City institutions, facilities, and services Sustainability: We ensure that our policies, decisions, and plans have a positive impact on people and the planet now and for future generations 8 Capital Improvement Plan Introduction The CIP represents a framework for planning the preservation and expansion of infrastructure, facilities, equipment, and technology while at the same time advancing towards our long-term vision. The CIP serves as a form of policy document that outlines both needs and an expectation that projects will be reprioritized according to timing, changing needs and finances available. The CIP is the first step towards estimating schedules, costs, and sources of revenues to pay for higher priority projects. • The City’s threshold for projects or equipment to be included in the CIP is $20,000. Projects or equipment expected to be under the threshold are instead included in the operating budget. • In the CIP, the definition of a capital asset differs from GAAP financial accounting. The main difference being that the CIP can include maintenance expenditures that do not meet the GAAP definition of a capital asset. • The preparation of a long-range plan requires City staff to make material estimates of project scope, costs of labor and materials, anticipated interest rates, and other items. Many times, these estimates come from staff experience, outsourced published projections, vendor estimates, or a combination of resources. Generally, estimates for earlier years are more precise than later years. Actual results can differ significantly from such estimates. Process For both the CIP and the operating budget, it is the responsibility of City staff to gather information and develop a recommendation for the City Council to consider. City Council’s role is to guide City staff through the process and to formally adopt a CIP near the end of every even- numbered year. After adoption of the Capital Improvement Plan, staff will develop additional recommendations on how to proceed with specific projects. The process includes numerous instances of City Council oversight, including a kickoff meeting to review the process of developing the CIP, multiple reviews of draft CIPs and final approval of the 2025-2030 CIP. The calendar on page 16 provides a more detailed view of the full-year process. 9 Originally launched with the 2021-2026 CIP, the City implemented a formal departmental scoring process that standardizes priorities and functions across departments. The departmental scoring is high, medium, low, defined as: Additionally, a prioritization committee comprised of select staff from all departments provides another level of review and scoring with the criteria outlined below. The asset preservation project created to address immediate facility repair needs also receives semi-annual review and scoring using this criterion. Criteria I – Justification Project justification looks at three different asset categories, which most often coincide with project urgency. Projects are assigned one or multiple categories if applicable. • Health, Safety & Regulatory Compliance: Asset does not meet health and safety standards, has existing code violations, and/or displays safety hazards or structural defects. • Asset Functionality: Asset is no longer functioning properly or is expected to no longer function properly soon. • Expansion and/or Level of Service: Asset improvement or addition will directly impact level of access and/or service output. The projects summarized on the following page were identified as projects that have the most significant justification for funding. 10 Aquatic Center Filter Room Health, Safety & Regulatory Compliance: Aspects of the pool filtration equipment no longer meet the Minnesota state Building Code. Expansion of surge tanks and upgrades to equipment are required. Pathways and maintenance spaces would also be designed for current pool, building, and health codes. Asset Functionality: An assessment was initiated in 2022 after an electrical failure closed the facility during peak season. Critical repairs were made to keep functionality and safety of the pool, but it was determined that additional repairs to existing equipment were not fiscally responsible due to existing conditions that have drastically accelerated wear and degradation of equipment. The pump room structure dates back to 1958 and while additions have been made since then, much of the equipment remains dependent on the original building and piping. It was determined that a new equipment room was needed to ensure sustainability of future investments and replacements. Expansion and/or Level of Service: The new structure allows for not only mechanical and electrical spaces but also the enhancement and increase of square footage above the structure on the pool deck apron. This will provide an opportunity to increase both services and seating areas. Public Works Building Emergency Services Radio Repeater Health, Safety & Regulatory Compliance: As of April of 2020, Minnesota State Statue 7511.7900 Appendix P requires all commercial buildings to have working emergency responder radio coverage within a building. The radio repeater in the Public Works building functions but has some “dead” spots throughout the building that pose reliability concerns. If an emergency was to occur within the space, the city would rely on a functioning unit to ensure public safety needs are met. Replacing the system will ensure that we are able to provide this critical function at a time of crisis. Edinborough Park Pool HVAC Unit Asset Functionality: Over the past 5 years the HVAC unit that supplies cooling to the pool and track area has broken down on four different occasions, most often during winter months. These repairs have cost tens of thousands of dollars and generally require emergency repairs and down-time of the pool and track which significantly and negatively impacts the services and amenities provided to users. 11 Criteria II - Values Our budget values guide decision-making. Each project identifies how it meets our budget values, understanding these core values guide what projects received funding. The projects summarized below were identified as projects that best represent our values regardless of funding status. Stewardship We make wise investments that focus on the best long-term value for residents. Aquatic Center Filter Room The Edina Aquatic Center has operated in its current state since the early 2000’s and has been added onto a number of times. Its current configuration no longer meets today’s pool standards and requirements and as a result must be expanded to do so. The city has researched various options and scenarios that include both complete replacement and refurbishment and determined a hybrid of replacement and refurbished equipment was the most cost-effective approach to this project. Edinborough Park Pool Filter Replacement Replacement of filters that assist with keeping water chemistry levels in safe alignment helps to minimize the need for chemical treatment of pools and other aquatic facilities. These chemicals, while needed for the operation of the pools, can also wreak havoc on pool equipment and structures, therefore, it is crucial to maintain the filters. Regular maintenance and replacement will extend the life of the filters and cut down on the cost of chemical treatments which will intern extend the life of the surrounding and supporting equipment. Edinborough Park Replace Camus Boiler Planned replacement of boilers and mechanical equipment eliminates costly emergency repairs and replacements. When planned correctly, these replacements can be addressed during off-seasons, further reducing the cost and impact on amenity users. Health-In-All Policies We use Health-in-All Policies to promote and protect the physical, mental, and social wellbeing of all people who live, work, or visit Edina. Pedestrian And Bicycle Master Plan Update Walking and biking are important activities that can improve and maintain physical health. Well planned walking and biking routes can also encourage social interaction and improve access to healthy food and activities. An update of the pedestrian and bicycle master plan on a regular basis will evaluate the existing system and make future recommendations that adjust to new construction, land use, and changes in how and where people move. 12 Rosland Park Master Plan Access to green space for physical activity, mental health, and social connection is an integral part of one’s well-being. Park planning will review the current state of Rosland Park and plan for necessary adjustments to improve access to park facilities, equipment, programming and green space. As demographics and density of the population changes, the Rosland Park Master Plan should assess immediate and future needs of park users. These needs may include easier ways to access the park, accessibility of park features and equipment, and updated programming. Edinborough Park Pool Filter Replacement Edinborough Park swimming pool provides access to swimming and aquatic activities for both physical fitness and entertainment. Safe water in the pool is a critically necessary part of operations, and requires daily testing, maintenance and adjustments. Pool filters lose efficacy over time and must be replaced to keep water safe for swimmers and to reduce the time spent by pool operations staff on manually changing the chemistry of the water to ensure safety. Replacement of the existing filters will provide a more consistent and safer experience for swimmers while reducing dedicated amount of staff time spent on water chemistry. Equity We provide equitable opportunities for people to participate in their city government and access City institutions, facilities, and services. Parks Accessibility Improvements Public accessibility improvements, including City of Edina facilities, aligns with the city's equity value by expanding accessibility of programs and services for all to use. All public facilities should be available for all users to access regardless of ability. This project aligns with the ADA Transition Plan and already has CIP funding allocated to address facility needs, grievances, and right of way. Examples of improvements to park accessibility include resurfacing trails, adaptive equipment and new programming to further meet the needs of a diverse and growing community. Rosland Park Master Plan The Rosland Park Master Plan is the first large study to identify overall park and facility needs. Rosland Park has notably aged since inception while daily users continue to increase. Attractions like the Edina Aquatic Center contribute to Rosland Park’s diverse population of daily visitors. As a new pedestrian bridge and aquatic center renovations are being planned, this study would allow for and encourage community engagement in a holistic analysis of the park for new programming, services, and/or facility needs that aim to maximize both recreational and natural resource potential. 13 Centennial Lakes Park Public Wi-Fi The Centennial Lakes Public Wi-Fi project continues efforts to increase accessibility to Wi- Fi throughout the City of Edina. In the 2022 American Community Survey, 36.3% of those with a household income of less than $20,000 reported having no internet subscription, while 13.7% of those with household incomes ranging between $20,000-74,999 also reported no internet subscription. By comparison, 9.7% of Edina residents reported a household income of less than $25,000. In the 2023 Quality of Life Survey provided to Edina residents, 39% of residents rated fiber/home internet connectivity less than good or excellent, a number that increases above 50% for Hispanic and other race groups, and residents 18-54 years old. Reliable public Wi-Fi throughout the city helps Edina community members stay connected to public services, programming, and information, as needed. Sustainability We ensure that our policies, decisions, and plans have a positive impact on people and the planet now and for future generations. Public Works Fleet Bio Diesel Storage Tanks Biodiesel is a low carbon, cost-effective fuel option to reduce emissions from diesel-powered petroleum vehicles. To meet our Climate Action Plan goals to decarbonize municipal fleet vehicles, biodiesel is a cost-effective option for medium- and heavy-duty fleet. This project will allow the City to install a new dedicated biodiesel tank to deliver 100% biodiesel to its existing heavy-duty fleet. It’s anticipated that a 100% biodiesel powered vehicle reduces emissions by almost 75% compared to petroleum diesel. DC Fast Charger To meet the City’s carbon emission reduction goals, we are transitioning light- and medium- duty fleets to battery and plug-in hybrid battery electric vehicles. To fuel these electric vehicles, the City has installed Level 2 charging stations at different City buildings, including dedicated Level 2 chargers for fleet at its Public Works facility. A Level 2 charger often takes multiple hours to fully charge an electric vehicle, whereas a Level 3 charger can provide up to 40 miles of range in about 10 minutes. A dedicated Level 3 charger for fleet vehicles will reduce the downtime for electric fleet vehicles, including public safety vehicles that run 24- hour operations. Edinborough Park Replace Camus Boiler Aging mechanical equipment is inefficient and often costly to maintain and operate; and wasting energy results in higher greenhouse gas emissions which negatively impacts our ability to meet our climate goals. Edinborough Park is one of the City’s highest energy users and replacing its boiler with a more energy-efficient model will result in reduced energy costs and a more comfortable environment for residents and visitors who use the park. 14 Community Engagement We foster an inclusive, informed and engaged community. Rosland Park Master Plan Rosland Park is a destination park which offers pathways for walking, an inclusive playground and a large gathering space. Annually, the picnic shelter has as many as 300 reservations for birthday parties, graduation celebrations and other gatherings. An investment in a master plan could enhance the current positive attributes and plan for future opportunities to be welcoming and engaging for all. Parks Accessibility Improvements Accessibility improvements support overall access to city parks and positively impact recreational programming. As demographics change, conforming to ADA requirements and assessing the needs of the community will provide broader programming and more inclusive city parks. Edina Art Center Design The Edina Art Center opened in 1977 at its current location out of a home built in 1948. For years, the art center has offered programming, an art gallery and gift store. The current facility needs structural work and is not accessible. The city’s potential partnership and design opportunity with the Hennepin County Library will allow the city to offer services in the southeast quadrant while also emphasizing improvements to accessibility and creating a welcoming space. The 2025-2030 CIP is designed to be a financially viable plan for specific infrastructure projects, based on existing and proposed funding availability and policy guidance provided by the City Council. Implementation of this plan occurs when City Council takes action to initiate an individual project. By adopting the CIP, the City Council is providing overall policy guidance on a long-term community investment plan. Implementation of this plan occurs when individual project details are presented to City Council for formal approval and initiation. In addition to consideration of the overall project plan, the CIP serves as a mechanism to highlight policy issues that could significantly impact future capital project funding. These issues are presented as an opportunity for the City Council to provide additional guidance to staff if appropriate. 15 20th Public hearing held for 2025-2030 CIP & 2025 Operating Budget CIP Prioritization Committee Final Review & Recommendations City Council adopts 2025-2030 CIP & 2025 Operating Budget 6th DECEMBER 2023 MAY 2024 CIP staff kickoff JULY 2024 APRIL 2024 JUNE 2024 CIP community engagement begins AUGUST 2024 SEPTEMBER 2024 DECEMBER 2024 19th 2024 – 2025 Budget & Work Plan approved by City Council 10th 17th 29th 20th 17th 3rd Departments submit CIP requests City leaders discuss CIP project prioritization City Council adopts preliminary 2025 levy Draft 2025-2030 CIP presented to City Council during Work Session CIP goal setting during City Council Retreat 17th 18th City Manager final CIP draft review 25th 21st MARCH 2024 31st CIP Prioritization Committee begins project review CIP Prioritization Committee & City Council Site Tours 2024-2025 Capital Improvement Plan Roadmap 16 Funding Sources and Financing Planning for capital improvements requires sound and economic financing. The City of Edina has many options for funding sources and financing. The identified funding method for each improvement is based on the City’s general policies, past practices, and legal and practical considerations. The final selection and scheduling of proposed capital improvements is then based on the ability of the City to draw upon various funds. Many of the funding sources the City uses to pay for CIP projects are restricted to use. Each of these funding sources is examined in more detail in this section. For many of the above funding sources, the City and/or the HRA may decide to sell bonds to pay the upfront costs of a project when cash flows from the project funding sources are not immediately available. For other projects without a dedicated funding source (utility revenues, franchise fees, etc.), one of the few options available to pay for this type of project is a tax levy. Shown below is a strategy whereby an increase in the CIP levy is offset by expiring debt service levies (in green) for City Hall and the Gymnasium. Utility Funds 32% Other Funds 4% HRA Funds, 3% PACS Fund 3% Construction Fund 58% 2025-2030 CIP by Funding Source 17 Debt Service Fund and Construction Fund Levies The strategy of increasing the CIP Levy as other levies expire allows the city to prioritize maintaining physical assets and infrastructure, as is emphasized in City Goal 1: Strong Foundation. In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for physical buildings, plumbing, HVAC and other mechanical systems, components, fixtures and equipment to optimize long-term financial resources and meet sustainability goals. Building improvement projects submitted for the 2023-2028 CIP include maintenance identified through new data collected. The City’s 2025 annual comprehensive budget is approximately $212 million. Much of that budget is spent on operating costs to provide community services. Part of the annual budget also pays for debt service on debt that has already been issued to pay for past projects. The final part of the budget is for capital improvements, which is the focus of this CIP plan. The graphic below is a conceptual diagram of the City’s budget, split between governmental activities and enterprise activities. The areas highlighted in yellow are those that typically have CIP needs. 18 The following tables outline the 2025-2030 CIP expenses by funding source for all planned years. Construction Funds The construction fund contains several revenue streams including levies, special assessments, grants, franchise fees, and bonds, as well as several sub-funds. Edina Consolidated Budget $212M Governmental Funds $128M General Fund $66M Construction Fund $22M Debt Service Fund $25M Special Revenue Funds, including HRA $15M Enterprise Funds $75M Utility Fund $42M Liquor Fund $16M Park Enterprises $17M Internal Service Funds $9M Risk Management $3M Equip. Operations $2M IT $3M Facilities $1M 19 • Bridge Maintenance: Funds from the Public Works budget set aside to be used for bridge maintenance and retaining wall repairs. • Capital Improvement Plan Bonds: In general, bonds are a written promise to pay a specified sum of money at a specified future date along with periodic interest paid at a specified percentage (interest rate). Bonds are typically used for long-term debt. These Capital Improvements Bonds, or general obligation (GO) bonds, are issued to pay for the construction of the Community Health and Safety Center, including Fire Station 2 and Public Health. • Capital Improvement Plan Levy: A plan developed to prioritize expenditures for significant projects and match financing to pay the project costs. The City of Edina prepares a five-year CIP every two years. • Equipment Levy: The Equipment Levy is designed to provide funding for replacing all equipment used for governmental purposes. This levy is projected to increase five percent each year to cover the escalating costs of replacing the general fund equipment, including police cars, snowplows and ambulances. • Grants & Donations: Funding received from a variety of sources, including state and federal, to be used for public infrastructure projects. • Local Option Sales Tax (LOST): A local tax levied on the sale of goods and services to be used for specific purposes by local government. This funding stream was approved by referendum in 2022 to pay for improvements in the Fred Richards Master Plan and the Braemar Arena Master Plan. Cash Reserves 0.2% Bridge Maintenance 0.3% PEG Comcast Fees 0.3% Special Park Improvement Levy 1% Grant/Donation 3%MSA 5% Equipment Replacement Levy 7% CIP Levy 7% Special Street Levy 7% Special Assessment 8% LOST 20% CIP Bonds 42% 2025-2030 Construction Funds by Funding Source 20 • Municipal State Aid (MSA): A city designated street that becomes part of a broader state transportation system. This designation allows the city to receive resources to assist with the construction and maintenance of the street. • PEG Comcast Fees: Fees collected for public, educational & government access channels, used for communications and broadcasting technology. • Special Assessments: The City places a financial lien against a property to recoup the cost of certain improvements or services provided to a property, such as a street or utility improvement or unpaid utility services. • Special Park Improvement Levy: Established in 2023, this levy funds playground equipment replacement and park and recreation facility improvements. • Special Street Levy: Established in 2022, this levy is designed to offset some of the costs associated with street reconstruction, which were previously entirely assessed to property owners. This levy is expected to increase an average of five percent in each of the next 14 years. Utility Enterprise Funds Each utility enterprise fund collects revenue from customers of the specific service. The revenue can be spent on operational, capital and debt service costs of providing the service. Rates are studied and set to ensure revenue meets operating and capital costs into the future. In addition to the funds outlined above, a utility fund collects revenue from all three funds to finance capital infrastructure and equipment replacement for each utility. The total of this fund, for 2025-2030, is $2,735,000. 21 Pedestrian And Cyclist Safety (PACS) Fund This special revenue fund was established in 2013 to account for funds received from gas and electric franchise fees, which the City Council intends to use for pedestrian and cyclist improvements (e.g. sidewalks, paths and trails) included in future street reconstruction projects. Housing And Redevelopment Authority Fund This fund accounts for the activities of the Housing and Redevelopment Authority. In tax increment finance (TIF) districts, property owners pay ad valorem taxes at the full rate levied by the units of local government within the taxing jurisdiction. The HRA is an entity legally separate from the City. However, for financial reporting purposes, the HRA is reported in a special revenue fund as if it were part of the City’s operations. This is done because the members of the City Council serve as HRA commissioners, and its activity is confined to the same geographic borders as the City of Edina. Other Funds These funds have over $21 million in projects in the 2025-2030 CIP, including $7M in the Golf Course Fund and $6.9M in the CAS Fund. 22 • American Rescue Plan Act (ARPA) Fund: A fund set up to track state and local revenue received as a part of the economic stimulus package established to speed up the country’s recovery from the economic and health effects of the COVID-19 pandemic. • Braemar Field Fund: This fund was created in 2013 to account for the revenues and expenses for Braemar Field which was built in 2014. • Conservation and Sustainability (CAS) Fund: This special revenue fund was established in 2015 to account for funds received from gas and electric franchise fees beginning in 2016. The City will use these funds to provide a dedicated funding source for new conservation and sustainability functionality and programs. • E911 (Police Special Revenue) Fund: This special revenue fund was established to account for funds received for specific purposes within the Police Department, including E-911 and forfeiture funds. • Edinborough Park Fund: Edinborough Park’s finances were combined with Centennial Lakes Park in one fund through 2011. A separate fund for each facility was created in budget year 2012. • General Fund: This is the City’s primary operating fund. It records most of the City’s revenues and expenditures from core City operations like Administration, Police, Fire, Parks and Recreation, etc. Any activities that are not specifically reported in a different fund can be found in the General Fund. The General Fund is not used for debt service or capital projects. • Golf Course Fund: This fund was established to account for the City’s golf business when the 18-hole Braemar Golf Couse opened in 1964. Today, the City operates Braemar Golf Course (18-hole championship course), a 9-hole executive course and driving range, an indoor golf dome, and banquet room. • Liquor Fund: This fund accounts for the City’s off-sale liquor business, which Edina first started around 1948. Today, there are three municipally owned liquor stores in Edina. Profits are generally transferred into other City funds. • Public Safety Aid Fund: Fund created in 2023. The 2023 omnibus tax bill included $210 million in onetime public safety aid to cities across the state. This aid cannot be used for must be used to provide public safety. The City received $2,344,327 on December 26,2023. 23 FUNDED PROJECTS BY FUNDING SOURCE 24 Capital Improvement Plan - FUNDED City of Edina, Minnesota PROJECTS BY FUNDING SOURCE 2025 2030thru Total20252026202720282029Source2030Project # Braemar Field Fund P&R25125Braemar Field Turf & Shell Replacement 2,300,0002,300,000 P&R25126Braemar Field Heater 200,000200,000 P&R25127Braemar Field Stormwater Design 75,00075,000 Braemar Field Fund Total 2,575,00075,000 200,000 2,300,000 Bridge Maintenance ENG210616520 Belmore Lane Multi-Tiered Retaining Wall 400,000400,000 ENG250186932 Valley View Road Multi-Tiered Retaining Wall 360,000360,000 ENG25020Dewey Hill Road CP Rail Crossing 35,00035,000 Bridge Maintenance Total 795,000395,000 400,000 CAS Fund: Utility Franchise Fees ENG21062Facility Efficiency Upgrades 3,000,000500,000 500,000 500,000 500,000 500,000 500,000 ENG25001DC Fast Charger 150,000150,000 ENG25079Electric Vehicle Infrastructure & Vehicle Upgrades 600,000100,000 100,000 100,000 100,000 100,000 100,000 FAC25126Photovoltaic & EV Charger Installation 2,225,000575,000 50,000 500,000 1,100,000 FAC25127Fire Station #1 Energy Management Study 500,000500,000 PWK25104Public Works Fleet - Bio Diesel Storage Tanks 375,000375,000 CAS Fund: Utility Franchise Fees Total 6,850,0001,625,000 1,175,000 600,000 650,000 1,100,000 1,700,000 CIP Bonds ENG23041TH Tight Diamond Interchange 4,000,0004,000,000 FAC25103City Wide Roof Replacement 12,500,000800,000 700,000 2,000,000 5,000,000 4,000,000 FAC2510550th & France Streetscapes Improvements 7,400,000400,000 3,000,000 3,000,000 1,000,000 FAC25113Public Works Cold Storage Building Replacement 2,300,0002,300,000 FAC25123Edinborough Park Pool HVAC Unit 350,000350,000 FIR21008Community Health & Safety Center 26,000,00026,000,000 FIR21009Fire Station #3 50,000,00050,000,000 P&R25117Aquatic Center Pool Paint, Equip & Signage Rplcmnt 558,100172,100 286,000 100,000 P&R25119Aquatic Center Filter Room 4,000,0004,000,000 P&R25157Edinborough Park Replace Camus Boiler 70,00070,000 P&R25163New Golf Course Clubhouse 27,000,00027,000,000 CIP Bonds Total 134,178,10035,792,100 6,286,000 55,000,000 6,100,000 31,000,000 25 Total20252026202720282029Source2030Project # Construction Fund: Cable PEG COM25100Replacement of Council Chambers Cameras 40,00040,000 COM25101Cable TV Broadcast Server Replacement 70,00070,000 COM25102Video Production Studio Space 350,000350,000 COM25200Communications Equipment Replacement 70,00070,000 FAC25118Senior Center AV Equipment 55,00055,000 FAC25122City Hall Council Chambers Studio Lighting 300,000300,000 Construction Fund: Cable PEG Total 885,000355,000 140,000 350,000 40,000 Construction Fund: CIP Levy 15-048Normandale Park Shelter Building Replacement 1,040,00040,000 1,000,000 ENG21045City Wide ADA Facility Improvements Level 3&4 1,336,0001,336,000 ENG21051Pamela Park Facility Maintenance 210,000210,000 ENG25021Grandview Parking Ramp ADA Access Route 200,000200,000 ENG25022Grandview Parking Ramp ADA Access Route to Gus Yng 2,000,0002,000,000 FAC23109Arneson Acres Park Facility Improvements 700,000700,000 FAC25101City Wide Card Reader & Fire Alarm Updates 100,000100,000 FAC25114Public Works Space Reconfiguration 850,00075,000 775,000 FAC25115Public Works Access Gates 300,000300,000 FAC25117Public Works BAS & Lighting Upgrades 825,000125,000 700,000 FAC25125City Hall HVAC Equipment Replacement 500,000500,000 FAC25128City Wide ADA Facility Improvements Level 2 300,00050,000 100,000 50,000 100,000 FAC25129Fire Station #1 Living Quarters 500,000500,000 FAC25200Asset Preservation Funding 4,450,000800,000 700,000 700,000 700,000 750,000 800,000 ITS25100CLP Maintenance Fiber 30,00030,000 ITS25101Increase Fiber Capacity to SLP 60,00060,000 P&R21001General Park Asset Equipment Replacement 50,00050,000 P&R21006Athletic Field Improvements 1,050,000350,000 350,000 350,000 P&R21046Normandale Park Playground Equipment 200,000200,000 P&R21047Heights Park Playground Equipment 175,000175,000 P&R25102Highlands Park Shelter Replacement 1,250,0001,250,000 P&R25103Yorktown Park Master Plan 790,00040,000 750,000 P&R25104Chowen Park Playground Improvement 350,000350,000 P&R25105Countryside Playground Replacement 315,000315,000 P&R25106Park Pathways and Parking Project Improvements 525,00025,000 100,000 100,000 100,000 100,000 100,000 P&R25107Parks Accessibility Improvements 525,00025,000 100,000 100,000 100,000 100,000 100,000 P&R25108Utley Park Shelter Replacement 60,00060,000 P&R25110Arneson Park Shelter Replacement 75,00075,000 P&R25111Rosland Park Master Plan 100,000100,000 P&R25130Centennial Lakes Park Public Wi-Fi 40,00040,000 P&R25145Centennial Lakes Entrance Fountain Repair 150,000150,000 P&R25147Centennial Lakes Improvements 800,000800,000 26 Total2026202720282029Source2030Project # 2025 PW22002Annual Deferred Retaining Wall Replacements 750,00050,000 100,000 200,000 200,000 200,000 Construction Fund: CIP Levy Total 20,606,0001,000,000 2,205,000 2,995,000 3,990,000 5,116,000 5,300,000 Construction Fund: Equipment Levy 17-028Braemar Arena Zamboni 400,000200,000 200,000 17-039Centennial Lakes Vehicle Replacement 40,00040,000 ADM25200Administration Equipment Replacement 325,00030,000 85,000 210,000 COM25200Communications Equipment Replacement 40,00040,000 DEV25200Development Equipment Replacement 97,00097,000 ENG25200Engineering Equipment Replacement 631,331150,000 102,631 191,500 64,700 92,500 30,000 FAC25110Facility Asset Maintenance Software 1,044,000300,000 135,000 142,000 150,000 155,000 162,000 FIR25200Fire Equipment Replacement 6,300,292515,300 1,044,845 1,258,995 1,403,395 1,112,350 965,407 ITS25200IT Equipment Replacement 2,340,000440,000 95,000 633,000 500,000 294,000 378,000 P&R21001General Park Asset Equipment Replacement 200,00050,000 50,000 50,000 50,000 P&R23120Park Maintenance Equip Replacement - Vehicles 1,693,750329,300 411,700 234,250 223,500 191,000 304,000 POL25101Patrol Squad Car Addition 60,00060,000 POL25200Police Equipment Replacement 3,052,300330,000 358,000 867,800 588,000 690,000 218,500 PWK23200Public Works Equipment Replacement 4,214,107583,500 830,000 23,000 767,684 1,089,000 920,923 Construction Fund: Equipment Levy Total 20,437,7802,678,100 3,102,176 3,810,545 3,847,279 3,873,850 3,125,830 Construction Fund: Grants/Donations 19-301Wooddale Ave Bridge Historic Rehab 1,500,0001,500,000 ENG23041TH Tight Diamond Interchange 700,000700,000 ENG25001DC Fast Charger 150,000150,000 ENG25026Rosland Park Pedestrian Bridge 6,000,0006,000,000 P&R25126Braemar Field Heater 200,000200,000 Construction Fund: Grants/Donations Total 8,550,000850,000 7,700,000 Construction Fund: MSA 17-01169th Street Roundabout 450,000450,000 19-301Wooddale Ave Bridge Historic Rehab 400,000400,000 ENG23004Benton Avenue A Reconstruction 1,475,2971,475,297 ENG23041TH Tight Diamond Interchange 5,007,4045,007,404 ENG23101Hilary Lane Reconstruction 3,387,9783,387,978 ENG25002Parklawn Avenue A Reconstruction 524,385524,385 ENG25003W 77th Street D Reconstruction 987,078987,078 ENG25023Valley View Rd Fence Replace Sdale Neighborhood 100,000100,000 ENG25028Traffic Signal at Halifax and 50th St 400,000400,000 ENG2502950th over Minnehaha Creek North Retaining Wall 275,000275,000 ENG25030Benton Avenue Over CP Rail Beam Painting 250,000250,000 ENG25031Valley View Road Bridge over CP Rail Beam Painting 250,000250,000 ENG25064West 76th Street A Reconstruction 968,276968,276 27 Total20252026202720282029Source2030Project # Construction Fund: MSA Total 14,475,4185,007,404 400,000 500,000 3,662,978 2,929,739 1,975,297 Construction Fund: Reserves DEV25107City Zoning Ordinance Update 250,000250,000 FAC25113Public Works Cold Storage Building Replacement 300,000300,000 Construction Fund: Reserves Total 550,000550,000 Construction Fund: Special Assess 19-308Prospect Knolls C Reconstruction 1,091,2681,091,268 19-309Prospect Knolls D Reconstruction 332,125332,125 19-310Presidents B Reconstruction 1,129,5461,129,546 19-314Indian Trails A Reconstruction 671,785671,785 DEV25103France Avenue Branding/Lighting 2,000,0002,000,000 DEV25110HRA Grandview Maintenance District 545,000300,000 40,000 45,000 50,000 55,000 55,000 ENG23001Prospect Knolls A Reconstruction 1,632,1581,632,158 ENG23002Countryside E Reconstruction 782,328782,328 ENG23003Todd Park B Reconstruction 523,709523,709 ENG23004Benton Avenue A Reconstruction 108,997108,997 ENG23101Hilary Lane Reconstruction 302,453302,453 ENG25002Parklawn Avenue A Reconstruction 48,27048,270 ENG25003W 77th Street D Reconstruction 90,86190,861 ENG25005Chowen Park C Reconstruction 1,414,9911,414,991 ENG25006Chowen Park E Reconstruction 878,270878,270 ENG25009Minnehaha Woods B Reconstruction 618,632618,632 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 250,399250,399 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 191,481191,481 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 172,485172,485 ENG25013The Heights A Reconstruction 1,127,0301,127,030 ENG25014The Heights C Reconstruction 939,192939,192 ENG25064West 76th Street A Reconstruction 200,919200,919 ENG25074Parklawn (Parklawn Ct) Reconstruction 87,30187,301 ENG25075Rolling Green Reconstruction 2,505,0502,505,050 ENG25076Minnehaha Woods D Reconstruction 456,609456,609 ENG25077South Cornelia B Reconstruction 3,447,2973,447,297 ENG25078South Cornelia D Reconstruction 3,182,3943,182,394 ENG25100Presidents A Reconstruction 1,946,4511,946,451 Construction Fund: Special Assess Total 26,677,0015,375,997 3,182,852 6,669,132 3,169,423 1,912,171 6,367,426 E911 POL21005Dispatch E911 Call Handling System 550,000550,000 POL25200Police Equipment Replacement 1,053,000475,000 550,000 28,000 E911 Total 1,603,000475,000 550,000 578,000 Edinborough Fund 15-069Edinborough Park Track Air Conditioning 81,00081,000 28 Total20252026202720282029Source2030Project # P&R21012Edinborough Park Fitness Equipment Replacement 26,00026,000 P&R25148Edinborough Park Track Surface Replacement 90,00090,000 P&R25149Edinborough Park Replace Exterior Landscaping 75,00075,000 P&R25150Edinborough Park Loading Dock 50,00050,000 P&R25151Edinborough Park Concession Replacement 24,00024,000 P&R25152Edinborough Park Amphitheater Upgrades 23,50023,500 P&R25153Edinborough Park SE Entry Concrete Replacement 27,00027,000 P&R25154Edinborough Park Locker Replacement 31,00031,000 P&R25155Edinborough Park Truck Replacement 50,00050,000 P&R25156Edinborough Park Pool Filter Replacement 70,00070,000 Edinborough Fund Total 547,500332,500 215,000 Federal ARPA P&R23100CLP & EP Interior and Exterior Public Furniture 40,00040,000 Federal ARPA Total 40,00040,000 General Fund DEV25107City Zoning Ordinance Update 250,000250,000 DEV251092050 Comprehensive Plan 600,000250,000 250,000 100,000 General Fund Total 850,000500,000 250,000 100,000 Golf Course Fund 17-031Braemar Golf Clubhouse Lower Level 100,000100,000 FAC25120Golf Course Audio Visual Replacement 250,000250,000 FAC25124Golf Course Restroom Front 9 400,000400,000 P&R21028Toro 300 Gal Sprayer 85,00085,000 P&R21036Dome Electrical Update 25,00025,000 P&R21043Cart Path Addition Hole #6 & #11 150,000150,000 P&R25160Golf Dome Netting Repairs 250,000100,000 150,000 P&R25162Golf Course Tractor & Mower Replacements 705,000100,000 295,000 160,000 50,000 100,000 P&R25164Golf Course Irrigation Upgrade 225,000225,000 P&R25166Club Car Utility Carts 78,00026,000 26,000 26,000 P&R25167Golf Maintenance Facility Lift Table 20,00020,000 P&R25168Golf Course Restroom Renovation 40,00040,000 P&R25169Golf Course Cold Storage Insulation 60,00060,000 P&R25170Update Well House #2 on Hole #13 75,00075,000 P&R25171Practice Green Enlargement / Academy 9 Pavilion 75,00075,000 P&R25172Driving Range Safety Netting 200,000200,000 P&R25175Golf Course Additional Native Areas 65,00065,000 P&R25176Golf Course New Nursery Green 100,000100,000 P&R25178Cart Path Addition Academy 9 150,000150,000 P&R25180Academy Training Facility 500,000500,000 P&R25182Golf Course Drainage Upgrade 40,00040,000 29 Total2026202720282029Source2030Project # 2025 P&R25183Academy 9 Re-Grass & Irrigation 40,00040,000 P&R25184Green Renovation/Relocation Hole #8 500,000500,000 P&R25185Golf Dome Building Expansion 3,000,0003,000,000 Golf Course Fund Total 7,133,0001,581,000 571,000 1,151,000 3,630,000 100,000 100,000 HRA Fund: 72nd and France TIF DEV25102France Avenue Pedestrian/Bike Crossing 500,000500,000 HRA Fund: 72nd and France TIF Total 500,000500,000 HRA Fund: Centennial Lakes TIF 15-189Gateway Signs 150,00050,000 50,000 50,000 15-225HRA - Promenade Phase V 500,000500,000 17-01169th Street Roundabout 450,000450,000 17-018Valley View Rd Bicycle Facility Improvements 350,000350,000 DEV25100HRA Cahill Business District Branding 300,000300,000 DEV25101HRA City Entrance Markers 100,000100,000 ENG23041TH Tight Diamond Interchange 250,000250,000 ENG25025France Avenue Crossing Gallagher & 72nd 16,000,000500,000 1,500,000 7,000,000 7,000,000 HRA Fund: Centennial Lakes TIF Total 18,100,0001,200,000 2,050,000 7,050,000 7,000,000 450,000 350,000 Liquor Fund FAC23110Liquor Stores Facility Improvements 901,600297,600 324,000 280,000 Liquor Fund Total 901,600297,600 324,000 280,000 Local Option Sales Tax P&R25100Fred Richards Park 16,255,0005,500,000 9,250,000 805,000 700,000 P&R25101Braemar Park & Arena 47,140,00011,850,000 17,320,000 15,820,000 2,150,000 P&R25181Golf Course Parking Lot Upgrade 1,000,0001,000,000 Local Option Sales Tax Total 64,395,00017,350,000 26,570,000 17,625,000 2,850,000 PACS Fund: Utility Franchise Fees 17-072Hwy 169 Frontage Rd/Braemar Blvd Shared-Use Paths 658,420658,420 19-301Wooddale Ave Bridge Historic Rehab 200,000200,000 19-308Prospect Knolls C Reconstruction 319,200319,200 19-334Olinger Boulevard Sidewalk 883,500418,800 464,700 ENG21030McCauley Trail Shared-Use Path Phase 2 392,731392,731 ENG23004Benton Avenue A Reconstruction 109,800109,800 ENG23041TH Tight Diamond Interchange 400,000400,000 ENG23101Hilary Lane Reconstruction 190,400190,400 ENG25002Parklawn Avenue A Reconstruction 172,400172,400 ENG25003W 77th Street D Reconstruction 172,400172,400 ENG25005Chowen Park C Reconstruction 50,00050,000 ENG25006Chowen Park E Reconstruction 158,000158,000 ENG25013The Heights A Reconstruction 295,200295,200 ENG25014The Heights C Reconstruction 295,200295,200 30 Total20252026202720282029Source2030Project # ENG25050Sidewalk Inspection Program 300,00050,000 50,000 50,000 50,000 50,000 50,000 ENG25051Drive 25 Improvements 120,00020,000 20,000 20,000 20,000 20,000 20,000 ENG25052Normandale Road/Viking Drive Bike Lanes 28,20028,200 ENG25053Pedestrian and Bicycle Master Plan Update 100,000100,000 ENG25054Wooddale Avenue Bike Lanes 111,10091,600 19,500 ENG25055McCauley Trail Shared-Use Path 503,000503,000 ENG2505669th Street Bike Lanes 24,40024,400 ENG25057West Shore Drive Bike Boulevard 35,10035,100 ENG25058W 44th St Bike Lanes 18,10018,100 ENG25059Metro Boulevard Bike Lanes 60,90060,900 ENG25060Minnehaha Creek Pedestrian Bridge 1,200,0001,200,000 ENG25061Edina Industrial Boulevard Sidewalk 297,500297,500 ENG25062W 66th Street Sidewalk 476,000476,000 ENG25063Valley View Road Bike Lane Design 50,00050,000 ENG25064West 76th Street A Reconstruction 41,15041,150 ENG25065France Avenue Shared-Use Paths 1,541,300762,900 778,400 ENG25066Lincoln Drive/7th Street/Malibu Drive Sidewalks 419,600419,600 ENG25067West 60th Street Sidewalk 710,500710,500 ENG25068West 77th Street Sidewalk 483,100483,100 ENG25069Benton Avenue Shared-Use Path 730,400730,400 ENG25070West 64th Street Shared-Use Path 422,654422,654 ENG25071Valley View Road Sidewalk 109,100109,100 ENG25072Amundson Avenue Sidewalk 156,100156,100 ENG25073Interlachen Boulevard Shared-Use Path 381,600381,600 ENG25074Parklawn (Parklawn Ct) Reconstruction 27,90027,900 ENG25076Minnehaha Woods D Reconstruction 288,600288,600 ENG25077South Cornelia B Reconstruction 444,150444,150 ENG25100Presidents A Reconstruction 233,000233,000 PACS Fund: Utility Franchise Fees Total 13,610,7051,594,100 2,404,831 3,220,650 2,085,700 1,537,550 2,767,874 Public Safety Aid FAC25121PW Building Emergency Services Radio Repeater 250,000250,000 FIR25200Fire Equipment Replacement 375,200375,200 POL25101Patrol Squad Car Addition 70,00070,000 POL25103Rifle-Rated Ballistic Shields 40,00040,000 POL25107PS Radio Bi-Directional Amplifier (BDA) Rplcmt 25,00025,000 POL25200Police Equipment Replacement 110,000110,000 Public Safety Aid Total 870,200845,200 25,000 Special Park Improvement Levy 17-143Creek Valley Irrigation 50,00050,000 19-763Tingdale Park Playground Replacement 155,000155,000 P&R21003Outdoor Athletic Field Lighting 900,000180,000 180,000 180,000 180,000 180,000 P&R21039Strachauer Park Master Plan Phase II 1,100,0001,100,000 P&R21048Sherwood Park Playground Equipment 150,000150,000 P&R21049Kojetin Park Playground Equipment 165,000165,000 31 Total2026202720282029Source2030Project # 2025 P&R23212York Park Playground Replacement 175,000175,000 P&R25113Fox Meadow Shelter Replacement 55,00055,000 P&R25114Alden Park Playground Replacement 185,000185,000 P&R25118McGuire Park Playground Equipment Replacement. 250,000250,000 P&R25123Off Leash Dog Park Investments 10,00010,000 P&R25134Pamela Park Playground Equipment Replacement 300,000300,000 Special Park Improvement Levy Total 3,495,000405,000 305,000 1,940,000 485,000 180,000 180,000 Special Street Levy 19-308Prospect Knolls C Reconstruction 983,386983,386 19-309Prospect Knolls D Reconstruction 299,292299,292 19-310Presidents B Reconstruction 822,660822,660 19-314Indian Trails A Reconstruction 747,279747,279 ENG23001Prospect Knolls A Reconstruction 1,470,8041,470,804 ENG23002Countryside E Reconstruction 870,245870,245 ENG23003Todd Park B Reconstruction 720,847720,847 ENG23004Benton Avenue A Reconstruction 150,027150,027 ENG23101Hilary Lane Reconstruction 336,442336,442 ENG25002Parklawn Avenue A Reconstruction 82,82782,827 ENG25003W 77th Street D Reconstruction 155,909155,909 ENG25005Chowen Park C Reconstruction 1,947,6301,947,630 ENG25006Chowen Park E Reconstruction 1,208,8741,208,874 ENG25009Minnehaha Woods B Reconstruction 1,061,5191,061,519 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 429,663429,663 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 328,566328,566 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 374,045374,045 ENG25013The Heights A Reconstruction 2,444,0412,444,041 ENG25014The Heights C Reconstruction 2,036,7012,036,701 ENG25074Parklawn (Parklawn Ct) Reconstruction 78,67178,671 ENG25075Rolling Green Reconstruction 2,786,5642,786,564 ENG25076Minnehaha Woods D Reconstruction 783,502783,502 ENG25100Presidents A Reconstruction 1,417,6191,417,619 Special Street Levy Total 21,537,1132,240,279 2,832,153 3,533,843 4,213,793 2,841,986 5,875,059 Utility Fund PWK23201Utilities Equipment Replacement 2,735,000355,000 200,000 677,000 297,000 642,000 564,000 Utility Fund Total 2,735,000355,000 200,000 677,000 297,000 642,000 564,000 Utility Fund: Sewer 15-173Asset Management Software and Equipment 40,00010,000 10,000 10,000 10,000 19-308Prospect Knolls C Reconstruction 573,550573,550 19-309Prospect Knolls D Reconstruction 174,559174,559 19-310Presidents B Reconstruction 998,443998,443 19-314Indian Trails A Reconstruction 392,308392,308 19-335Sanitary Trunk Capacity Expansion York 3,800,0003,800,000 32 Total2026202720282029Source2030Project # 2025 Segs 2-3 19-336Sanitary Trunk Capacity Exp York Seg 4 & Fairview 4,700,0004,700,000 19-340Sanitary Targeted Inflow Reduction Project 130,000130,000 ENG2105572nd Street Sewer Line Upsize 1,600,0001,600,000 ENG23001Prospect Knolls A Reconstruction 686,265686,265 ENG23002Countryside E Reconstruction 391,999391,999 ENG23003Todd Park B Reconstruction 299,187299,187 ENG23004Benton Avenue A Reconstruction 186,198186,198 ENG23009Hilary Lane Sanitary Sewer Lining 300,000300,000 ENG23033Sanitary Trunk Capacity Exp York Avenue Hazelton 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000 ENG23034Sanitary Trunk Capacity Exp York Avenue 69th St W 1,400,0001,400,000 ENG23041TH Tight Diamond Interchange 300,000300,000 ENG23101Hilary Lane Reconstruction 303,883303,883 ENG25002Parklawn Avenue A Reconstruction 103,924103,924 ENG25003W 77th Street D Reconstruction 195,622195,622 ENG25005Chowen Park C Reconstruction 929,616929,616 ENG25006Chowen Park E Reconstruction 577,003577,003 ENG25009Minnehaha Woods B Reconstruction 464,487464,487 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 188,007188,007 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 143,770143,770 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 34,33934,339 ENG25013The Heights A Reconstruction 858,472858,472 ENG25014The Heights C Reconstruction 715,394715,394 ENG25033Nine Mile Village Sanitary Sewer Lining 175,000175,000 ENG25034Olinger Road Sanitary Sewer Replacement 100,000100,000 ENG25064West 76th Street A Reconstruction 165,248165,248 ENG25074Parklawn (Parklawn Ct) Reconstruction 39,89939,899 ENG25075Rolling Green Reconstruction 281,326281,326 ENG25076Minnehaha Woods D Reconstruction 342,836342,836 ENG25077South Cornelia B Reconstruction 1,071,9041,071,904 ENG25078South Cornelia D Reconstruction 957,073957,073 ENG25100Presidents A Reconstruction 1,720,5301,720,530 PWK23010Nine Mile Village Sewer Lining 175,000175,000 PWK23011Olinger Road Dip Replacement: 130 LF + Road Repair 80,00080,000 PWK25105Lift Station Pump and VFD Renewal 180,00030,000 30,000 30,000 30,000 30,000 30,000 Utility Fund: Sewer Total 34,675,8427,708,973 3,694,273 8,585,538 7,149,689 4,233,894 3,303,475 Utility Fund: Storm 15-173Asset Management Software and Equipment 60,00015,000 15,000 15,000 15,000 17-01169th Street Roundabout 100,000100,000 19-301Wooddale Ave Bridge Historic Rehab 400,000400,000 19-308Prospect Knolls C Reconstruction 1,386,9361,386,936 19-309Prospect Knolls D Reconstruction 422,111422,111 33 Total2026202720282029Source2030Project # 2025 19-310Presidents B Reconstruction 1,305,0781,305,078 19-314Indian Trails A Reconstruction 1,038,4751,038,475 19-346CWRMP Model Update 200,000200,000 ENG23001Prospect Knolls A Reconstruction 1,583,4181,583,418 ENG23002Countryside E Reconstruction 850,851850,851 ENG23003Todd Park B Reconstruction 826,220826,220 ENG23004Benton Avenue A Reconstruction 434,318434,318 ENG23010Concord Flood Infrastrucure Project #2 area 10,650,000200,000 950,000 9,500,000 ENG23011Arden & 50th Flood Infrastructure Project #3 Area 650,000200,000 450,000 ENG23012Lake Cornelia and Normandale Park Flood Infras 16,000,00016,000,000 ENG23013France Avenue Crossing (Minnehaha Creek)800,000200,000 600,000 ENG23014Adaptive Level Management Project Ph 2 Minnehaha 2,700,000200,000 2,500,000 ENG23015Adaptive Level Management Project Nine Mile Creek 2,500,0002,500,000 ENG23016Minor Pipe and Grading Project (Citywide)2,500,0002,500,000 ENG23017Chowen and 60th Flood Project 1,100,0001,100,000 ENG23041TH Tight Diamond Interchange 300,000300,000 ENG23101Hilary Lane Reconstruction 1,009,2451,009,245 ENG25002Parklawn Avenue A Reconstruction 226,673226,673 ENG25003W 77th Street D Reconstruction 426,678426,678 ENG25005Chowen Park C Reconstruction 2,460,7762,460,776 ENG25006Chowen Park E Reconstruction 1,527,3781,527,378 ENG25009Minnehaha Woods B Reconstruction 1,282,7071,282,707 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 454,631454,631 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 347,659347,659 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 332,148332,148 ENG25013The Heights A Reconstruction 2,370,7172,370,717 ENG25014The Heights C Reconstruction 1,729,9361,729,936 ENG2502750th St Concrete Curb and Gutter Replacement 55,00055,000 ENG25036CWS 1 - Lake & Pond Sediment Phosphorus Sequest 550,00050,000 100,000 100,000 100,000 100,000 100,000 ENG25037CWS 2 - Targeted Intensive Street Sweeping 100,00010,000 20,000 70,000 ENG25038CWS 3 - Assurance, Monitoring, Lakegrades 215,00040,000 35,000 35,000 35,000 35,000 35,000 ENG25039CWS 4 - Rough Fish Management 190,00030,000 40,000 40,000 40,000 40,000 ENG25040CWS 5 - New Clean Water Infrastructure 150,000150,000 ENG25064West 76th Street A Reconstruction 385,207385,207 ENG25074Parklawn (Parklawn Ct) Reconstruction 110,184110,184 ENG25075Rolling Green Reconstruction 4,009,2434,009,243 ENG25076Minnehaha Woods D Reconstruction 946,760946,760 ENG25077South Cornelia B Reconstruction 2,049,8752,049,875 ENG25078South Cornelia D Reconstruction 1,830,2771,830,277 ENG25100Presidents A Reconstruction 2,248,9282,248,928 Utility Fund: Storm Total 70,816,4296,669,006 6,982,649 11,212,593 16,563,619 20,565,315 8,823,247 34 Total2026202720282029Source2030Project # 2025 Utility Fund: Water 15-162New Water Treatment Plant 5 - Southdale 18,000,00018,000,000 15-173Asset Management Software and Equipment 40,00010,000 10,000 10,000 10,000 19-308Prospect Knolls C Reconstruction 854,577854,577 19-309Prospect Knolls D Reconstruction 260,088260,088 19-310Presidents B Reconstruction 1,413,4941,413,494 19-314Indian Trails A Reconstruction 584,530584,530 19-351Water Main Condition Assessment 955,000150,000 160,000 160,000 165,000 160,000 160,000 19-913Well #7 Rehabilitation 300,000180,000 120,000 19-915Well #11 Rehabilitation and Facility Improvements 240,000120,000 120,000 19-918Well #20 Rehabilitation 180,000180,000 ENG21058Water Supply Grandview Area PH 3 2,500,0002,500,000 ENG21059Water Supply 50th and France 2,000,0002,000,000 ENG21060Water Supply Pentagon Park 1,000,0001,000,000 ENG23001Prospect Knolls A Reconstruction 1,278,1481,278,148 ENG23002Countryside E Reconstruction 584,093584,093 ENG23003Todd Park B Reconstruction 783,583783,583 ENG23004Benton Avenue A Reconstruction 369,875369,875 ENG23035Watermain Rehabilitation (Citywide)1,400,0001,400,000 ENG23036Grandview Area Watermain Improvements PH 2 240,000240,000 ENG23041TH Tight Diamond Interchange 300,000300,000 ENG23101Hilary Lane Reconstruction 786,652786,652 ENG25002Parklawn Avenue A Reconstruction 201,768201,768 ENG25003W 77th Street D Reconstruction 379,800379,800 ENG25005Chowen Park C Reconstruction 2,434,7052,434,705 ENG25006Chowen Park E Reconstruction 1,511,1961,511,196 ENG25009Minnehaha Woods B Reconstruction 692,075692,075 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 492,398492,398 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 376,540376,540 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 51,16451,164 ENG25013The Heights A Reconstruction 2,248,3762,248,376 ENG25014The Heights C Reconstruction 1,873,6471,873,647 ENG25043Chapel Drive Watermain Rehabilitation 300,000300,000 ENG25044Maloney Ave Watermain Rehabilitation 1,000,0001,000,000 ENG25045Watermain Replacement under NMC at 5901 Lincoln Dr 50,00050,000 ENG25046Watermain Replcmnt LB Tr/Shannon Dr/Coventry Way 225,000225,000 ENG25047Heights Neighborhood Watermain Rehabilitation 6,250,0006,250,000 ENG25064West 76th Street A Reconstruction 247,724247,724 ENG25074Parklawn (Parklawn Ct) Reconstruction 59,44959,449 ENG25075Rolling Green Reconstruction 1,676,6781,676,678 ENG25076Minnehaha Woods D Reconstruction 897,902897,902 ENG25077South Cornelia B Reconstruction 1,530,6691,530,669 ENG25078South Cornelia D Reconstruction 2,343,5492,343,549 ENG25100Presidents A Reconstruction 2,435,7532,435,753 35 Total2026202720282029Source2030Project # 2025 FAC25109Fire Station #2 York Ave. Building Demo 500,000500,000 PW23002Well #15 Rehabilitation and Facility Improvements 140,000140,000 PW23004Well #10 Rehabilitation and Facility Improvements 120,000120,000 PW23005Well #12 Rehabilitation and Facility Improvements 180,000180,000 PW23006Well #13 Rehabilitation and Facility Improvements 180,000180,000 PW23007Well #2 Rehabilitation and Facility Improvements 170,000170,000 PW23008Well #6 Rehabilitation and Facility Improvements 180,000180,000 PWK25101Water Meter Radio Receivers 4,970,0001,300,000 880,000 900,000 930,000 960,000 PWK25102Filter Media Replacement 450,000450,000 PWK25103Fiber Installation, Van Valkenburg Tower 160,000160,000 Utility Fund: Water Total 68,398,4337,319,247 5,407,262 5,041,877 27,891,136 11,728,207 11,010,704 GRAND TOTAL 546,788,121102,141,506 77,347,196 131,042,178 90,503,617 63,310,712 82,442,912 36 FUNDED PROJECTS IN DETAIL SORTED BY DEPARTMENT 37 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Sharon Allison 2025 2030thru Department Administration Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as furniture and election equiment, among other items. 2025: Furniture - Voter Registration 2026: Furniture - Administration 2027: Furniture - Planning & Assessing Furniture - General Project #ADM23200 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of furniture and election equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Useful LifeProject Name Administration Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$325,000 Total2025 2026 2027 2028 2029Expenditures 2030 325,00030,000 85,000 210,000Vehicles and Equipment 30,000 85,000 210,000 325,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 325,00030,000 85,000 210,000Construction Fund: Equipment Levy 30,000 85,000 210,000 325,000Total 38 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description The Edina Promenade, a dedicated route for pedestrians and bicyclists on public right-of-way currently terminates at 70th Street. It is intended to be extended incrementally when individual properties are redeveloped. Ultimately, the North Extension will create a non-motorized route from 70th Street to Highway 62. It may be necessary to acquire public easements on some private properties to complete this project. ENVIRONMENTAL CONSIDERATIONS: The purpose of the Promenade and the North Extension is to provide a safe and convenient route for bicyclists and pedestrians. The route can be used for both recreational and commuting purposes as a healthier and cleaner alternative than driving. Project #15-225 Justification The Edina Promenade pathway originated in the 2007 Promenade Urban Design Plan. The North Extension supports Objective #2 (Transportation Options) in Vision Edina. This project will provide new alternatives to better connect the residential neighborhoods and employment center located north of 66th Street and north of Highway 62 to commercial businesses in the Greater Southdale area. Useful LifeProject Name HRA - Promenade Phase V Category Land Type Expand or enhance Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000HRA Fund: Centennial Lakes TIF 500,000 500,000Total 39 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Cary Teague 2025 2030thru Department Comm. Dev. and HRA Description Replacement of equipment according to the equipment replacement schedule. This includes essential departmental vehicles and other miscellanous equipment. 2030: 2010 Focus 2020 Chevrolet Bolt 2018 Toyota Prius II Project #DEV23100 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of department vehicles and other equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Development Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$97,000 Total2025 2026 2027 2028 2029Expenditures 2030 97,000Vehicles and Equipment 97,000 97,000Total97,000 Total2025 2026 2027 2028 2029Funding Sources 2030 97,000Construction Fund: Equipment Levy 97,000 97,000Total97,000 40 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Develop a brand for the district. Borders of the district would be 70th on the north, Cahill Road on the west, the City border on the south and Highway 100 on the east. Project #DEV25100 Justification Asset Functionality Community Engagement: Would involve businesses within the district. Useful LifeProject Name HRA Cahill Business District Branding Category Land Type New Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000HRA Fund: Centennial Lakes TIF 300,000 300,000Total 41 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Install entrance markers at key entrances to the City. Project #DEV25101 Justification Asset Functionality Useful LifeProject Name HRA City Entrance Markers Category Land Type Expand or enhance Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000HRA Fund: Centennial Lakes TIF 100,000 100,000Total 42 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Provide a safe pedestrian crossing either under or above France Avenue in the 7200 Block of France. Project #DEV25102 Justification Health, Safety & Regulatory Compliance Stewardship, Race & Equity: Provides a safe crossing across France Avenue. Community Engagement: Better together Useful LifeProject Name France Avenue Pedestrian/Bike Crossing Category Infrastructure Type New Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000HRA Fund: 72nd and France TIF 500,000 500,000Total 43 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Work with the business to develop branding along France Avenue. Project #DEV25103 Justification Justification - Asset Functionality Community Engagement - Work with businesses and property owners that will fund the project. Health in All Policies - Create a more walkable France Avenue. Stewardship - Creates a more walkable area in the future. Contributes to the economic viability in the area. Budget Impact/Other Useful LifeProject Name France Avenue Branding/Lighting Category Infrastructure Type New Total Project Cost:$2,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,000,0002,000,000Construction 2,000,000 2,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,000,0002,000,000Construction Fund: Special Assess 2,000,000 2,000,000Total 44 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Cary Teague 2025 2030thru Department Comm. Dev. and HRA Description Update the City' Zoning Ordinance based on recommendations from the Zoning Audit, Planning Commission and City Council. Project #DEV25107 Justification Health, Safety & Regulatory Compliance Sustainability - Provides clarity of zoning regulations for residents, staff, land owners and developers. Zoning regulations influence the built environment. Community Engagement - Community Engagement would be important for this project. Public processes for land use regulation is housed in the zoning ordinance. Race and Equity - Review ordinance through the lens of race and equity. Budget Impact/Other Useful LifeProject Name City Zoning Ordinance Update Category Land Type New Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000250,000 250,000Planning and Design 250,000 250,000 500,000Total Total20252026202720282029Funding Sources 2030 250,000250,000General Fund 250,000250,000Construction Fund: Reserves 250,000 250,000 500,000Total 45 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Addison Lewis 2025 2030thru Department Comm. Dev. and HRA Description Comprehensive Plan Update. Required every 10 years. Project #DEV25109 Justification "Health, Safety & Regulatory Compliance Sustainability - Sets a guide for the City for the next 10 years Community Engagement - Yes. Community Engagement is extensive with Comprehensive Plan updates. Including resident and business owner working group(s), numerous public meetings and ending with two public hearings. Entire process takes 2-3 years and every Edina Commission is involved. Health in all policies - Provides a guide for the built environment in Edina for the next 20 years. Race & Equity - Public process is to be determined. Staff, consultants and working group will seek inclusion from all of Edina. Including targeting of groups and areas in City that have no previously participated in comprehensive planning. Stewardship - The Comprehensive Plan should assist in future decision making for the next 10 years. This project includes all of the City's commissions." Useful LifeProject Name 2050 Comprehensive Plan Category Land Type New Total Project Cost:$600,000 Total2025 2026 2027 2028 2029Expenditures 2030 600,000250,000 250,000 100,000Planning and Design 250,000 250,000 100,000 600,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 600,000250,000 250,000 100,000General Fund 250,000 250,000 100,000 600,000Total 46 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Improvements and ongoing maintenance of landscaping areas in the Grandview District. Cost assessed to property owners. Project #DEV25110 Justification Asset Functionality Budget Impact/Other Useful LifeProject Name HRA Grandview Maintenance District Category Buildings Type Expand or enhance Total Project Cost:$545,000 Total2025 2026 2027 2028 2029Expenditures 2030 545,000300,000 40,000 45,000 50,000 55,000Construction 55,000 300,000 40,000 45,000 50,000 55,000 545,000Total55,000 Total2025 2026 2027 2028 2029Funding Sources 2030 545,000300,000 40,000 45,000 50,000 55,000Construction Fund: Special Assess 55,000 300,000 40,000 45,000 50,000 55,000 545,000Total55,000 47 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as cameras, broadcasting equipment, and graphics systems, among other items. 2026: Tightrope Server 2028: Council Chamber Cameras - Sony HD PTZ Replacement Chambers Cameras - 2 Sony HD PTZ Project #COM23100 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of communications technology, broadcasting equipment and other miscellaneous equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Communications Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$110,000 Total2025 2026 2027 2028 2029Expenditures 2030 110,00070,000 40,000Vehicles and Equipment 70,000 40,000 110,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Construction Fund: Equipment Levy 70,00070,000Construction Fund: Cable PEG 70,000 40,000 110,000Total 48 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of robotic cameras in the Council Chambers due to end of useful life. Project #COM25100 Justification Asset Functionality Sustainability - This replacement equipment is not anticipated to increase energy and resource usage over what we currently use. Community Engagement - This equipment is used for a lot of community engagement-related projects. The videos produced with the equipment support community engagement and help to inform people in and around Edina. Health in all policies - This equipment will not have a negative impact on health-related items, and could certainly be used to help promote health and wellness initiatives in the future. Race & Equity - This equipment is used to promote and support race & equity initiatives of the City. Stewardship - This replacement equipment will help the City continue to provide useful, high-quality video content that benefits all who live and work in Edina. Useful LifeProject Name Replacement of Council Chambers Cameras Category Equipment and Vehicles Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Construction Fund: Cable PEG 40,000 40,000Total 49 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of Tightrope Cablecast server. This server send the Edina TV video content to Comcast cable. Project #COM25101 Justification Asset Functionality Sustainability - It is not anticipated that this replacement server will negatively impact energy efficiency or usage. Community Engagement - This equipment is used to produce and deliver community engagement-related content. Health in all policies - This equipment could be used used to produce and deliver health-related content. Race & Equity - This equipment is used to produce and deliver race & equity-related content. Stewardship - This equipment benefits all who live and work in Edina by delivering valuable information via the Edina TV cable channel. Useful LifeProject Name Cable TV Broadcast Server Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$70,000 Total2025 2026 2027 2028 2029Expenditures 2030 70,00070,000Vehicles and Equipment 70,000 70,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 70,00070,000Construction Fund: Cable PEG 70,000 70,000Total 50 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Design and construction of a new video production studio space within a City facility. Project #COM25102 Justification Expansion and/or Level of Service Sustainable - This project would be designed and built in a way that promotes energy efficiency where possible. Community Engagement - This project would enhance community engagement efforts by providing a high-quality space to produce video content that will engage and educate community members about a variety of topics. Health in alll policies - This project could be used to create video content that promotes health-related initiatives. Race & Equity - This project could be used to create video content that promotes race & equity-related initiatives. Stewardship - This project would significantly streamline and improve the City's video production work, allowing for more content to be created, which would benefit those who live and work in Edina. Useful LifeProject Name Video Production Studio Space Category Equipment and Vehicles Type New Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 350,000350,000Vehicles and Equipment 350,000 350,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 350,000350,000Construction Fund: Cable PEG 350,000 350,000Total 51 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project includes the design of Southdale Water Plant. This plant will filter water from wells 5, 18, and potentially future well 21. ENVIRONMENTAL CONSIDERATIONS: Consideration is made in the design for overall operating costs from energy and chemicals. Stormwater features will provide aesthetics, treatment and recharge. Project #15-162 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name New Water Treatment Plant 5 - Southdale Category Infrastructure Type Horizon Total Project Cost:$18,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 18,000,00018,000,000Construction 18,000,000 18,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 18,000,00018,000,000Utility Fund: Water 18,000,000 18,000,000Total 52 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project continues to update and improve our current asset management system software and associated equipment to be more interactive with the public and mobile with City Staff. The current system contains map and condition assessment information on all infrastructure assets such as water, sanitary, storm, transportation, traffic and electrical systems. Software systems connect the EdinaToGo citizen request application with Cityworks asset management software and ESRI geographical information system software. Public works crews use tablets to assess and record infrastructure condition, create and fulfill service requests and work orders. ENVIRONMENTAL CONSIDERATIONS: Efficiency in management and operations allows more work with less trips and effort. Project #15-173 Justification Expansion and/or Level of Service The need is emphasized in the 2018 Edina Comprehensive Plan to "evaluate and employ technological advancements to provide city services" and to "provide a level of City services that sets Edina apart from other communities." Useful LifeProject Name Asset Management Software and Equipment Category Technology Type Replace or repair Total Project Cost:$140,000 Total2025 2026 2027 2028 2029Expenditures 2030 140,00035,000 35,000 35,000 35,000Software 35,000 35,000 35,000 35,000 140,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00015,000 15,000 15,000 15,000Utility Fund: Storm 40,00010,000 10,000 10,000 10,000Utility Fund: Water 40,00010,000 10,000 10,000 10,000Utility Fund: Sewer 35,000 35,000 35,000 35,000 140,000Total 53 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Engineering Description A gateway sign is often the first impression people have of a city, development, business park or other public place. A well planned and executed gateway sign is important because it gives an immediate sense of a brand and denotes a sense of pride and caring, and makes visitors feel welcome. One entrance sign was installed at the 66th and York Intersection. This project would develop a plan on locations to continue installing gateway signs. The City’s Branding Committee and the Communications Department recommend the placement of "Welcome to Edina" gateway signs. ENVIRONMENTAL CONSIDERATIONS: Gateway signs need to be lighted to continue communicating the brand 24-hours a day. Solar lights could be considered to reduce electrical load. Project #15-189 Justification Expansion and/or Level of Service One of the City Leadership Priorities in the 2012 Work Plan was "Improve Communications Tools." One of the objectives toward meeting that goal is to implement branding standards. One of the City Leadership Priorities in the 2014 Work Plan is "Development and renewal of commercial and residential areas is essential to the on- going health of the city." Gateway signs that better reflect the City's brand will contribute to the renewal of those places. Useful LifeProject Name Gateway Signs Category Infrastructure Type New Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,00050,000 50,000 50,000Construction 50,000 50,000 50,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,00050,000 50,000 50,000HRA Fund: Centennial Lakes TIF 50,000 50,000 50,000 150,000Total 54 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The scope of this project is to construct a roundabout on W 69th Street to allow vehicles to turn left into Southdale Center at its westerly entrance from 69th Street. Currently left turns at this location are prohibited. Other related intersection improvements, such as improved geometric design at the entrances to Southdale Center and The Galleria along with pedestrian and bicycle improvements, are also anticipated as part of this project. Project #17-011 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name 69th Street Roundabout Category Infrastructure Type Expand or enhance Total Project Cost:$1,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 450,000450,000Construction Fund: MSA 450,000450,000HRA Fund: Centennial Lakes TIF 100,000100,000Utility Fund: Storm 1,000,000 1,000,000Total 55 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description The project involves the installation of buffered bike lanes on Valley View Road between West 64th Street and West 66th Street. This facility was proposed in the 2018 Pedestrian and Bicycle Master Plan and the work will be coordinated with MnDOT ENVIROMENTAL CONISDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #17-018 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Valley View Rd Bicycle Facility Improvements Category Infrastructure Type New Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 350,000Construction350,000 350,000Total350,000 Total2025 2026 2027 2028 2029Funding Sources 2030 350,000HRA Fund: Centennial Lakes TIF 350,000 350,000Total350,000 56 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of shared-use paths on the East Frontage Road of Highway 169 between Valley View Road and West 78th Street and on Braemar Boulevard between the East Frontage Road and Hilary Lane. These new paths will connect to existing facilities on Valley View Road and West 78th Street, a proposed facility on Hilary Lane, and will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONISDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #17-072 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Hwy 169 Frontage Rd/Braemar Blvd Shared-Use Paths Category Infrastructure Type New Total Project Cost:$658,420 Total2025 2026 2027 2028 2029Expenditures 2030 658,420Construction658,420 658,420Total658,420 Total2025 2026 2027 2028 2029Funding Sources 2030 658,420PACS Fund: Utility Franchise Fees 658,420 658,420Total658,420 57 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Wooddale Avenue Bridge over Minnehaha Creek is a Historic Bridge in need of rehabilitation. Specifically the wing walls and the bridge railings are deteriorating and need replacement. Because of the historic designation, the State Historic Preservation Office and HPC need to approve a plan of treatment. ENVIRONMENTAL CONSIDERATIONS: The plan of treatment will be reviewed with a sustainability lens. Project #19-301 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the structure, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Wooddale Ave Bridge Historic Rehab Category Infrastructure Type Replace or repair Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,100,000 400,000Construction 2,100,000 400,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Construction Fund: MSA 400,000400,000Utility Fund: Storm 1,500,0001,500,000Construction Fund: Grants/Donations 200,000200,000PACS Fund: Utility Franchise Fees 2,100,000 400,000 2,500,000Total 58 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Lee Valley Circle, Fleetwood Drive, Lanham Lane, Kemrich Drive, Tara Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-308 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls C Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$5,208,917 Total2025 2026 2027 2028 2029Expenditures 2030 5,208,9175,208,917Construction 5,208,917 5,208,917Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,091,2681,091,268Construction Fund: Special Assess 1,386,9361,386,936Utility Fund: Storm 854,577854,577Utility Fund: Water 573,550573,550Utility Fund: Sewer 319,200319,200PACS Fund: Utility Franchise Fees 983,386983,386Special Street Levy 5,208,917 5,208,917Total 59 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Weston Circle and Village Drive(public only?)) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-309 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls D Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$1,488,175 Total2025 2026 2027 2028 2029Expenditures 2030 1,488,1751,488,175Construction 1,488,175 1,488,175Total Total2025 2026 2027 2028 2029Funding Sources 2030 332,125332,125Construction Fund: Special Assess 422,111422,111Utility Fund: Storm 260,088260,088Utility Fund: Water 174,559174,559Utility Fund: Sewer 299,292299,292Special Street Levy 1,488,175 1,488,175Total 60 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (2nd Street South, Belmore Lane, Van Buren Avenue, Harrison Avenue, Tyler Avenue, Tyler Court) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-310 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Presidents B Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$5,669,221 Total2025 2026 2027 2028 2029Expenditures 2030 5,669,2215,669,221Construction 5,669,221 5,669,221Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,129,5461,129,546Construction Fund: Special Assess 1,305,0781,305,078Utility Fund: Storm 1,413,4941,413,494Utility Fund: Water 998,443998,443Utility Fund: Sewer 822,660822,660Special Street Levy 5,669,221 5,669,221Total 61 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West Trail, Samuel Road, Sioux Trail, Sally Lane and Iroquois Circle) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-314 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Indian Trails A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$3,434,377 Total2025 2026 2027 2028 2029Expenditures 2030 3,434,3773,434,377Construction 3,434,377 3,434,377Total Total2025 2026 2027 2028 2029Funding Sources 2030 671,785671,785Construction Fund: Special Assess 1,038,4751,038,475Utility Fund: Storm 584,530584,530Utility Fund: Water 392,308392,308Utility Fund: Sewer 747,279747,279Special Street Levy 3,434,377 3,434,377Total 62 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of Olinger Boulevard between Vernon Avenue and Tracy Avenue. This sidewalk will connect to existing sidewalks on Vernon Avenue, Olinger Road, Sun Road, Colonial Way, and Tracy Avenue. This project was proposed in the 2014 Active Routes to School Plan and the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #19-334 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name Olinger Boulevard Sidewalk Category Infrastructure Type New Total Project Cost:$883,500 Total2025 2026 2027 2028 2029Expenditures 2030 883,500418,800 464,700Construction 418,800 464,700 883,500Total Total2025 2026 2027 2028 2029Funding Sources 2030 883,500418,800 464,700PACS Fund: Utility Franchise Fees 418,800 464,700 883,500Total 63 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017). The project builds off CIP 15-147 that included two phases, one in 2017 and in 2020. The project area includes York Avenue north of the Promenade. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Project #19-335 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goal. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Sanitary Trunk Capacity Expansion York Segs 2-3 Category Infrastructure Type Expand or enhance Total Project Cost:$3,800,000 Total2025 2026 2027 2028 2029Expenditures 2030 3,800,0003,800,000Construction 3,800,000 3,800,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 3,800,0003,800,000Utility Fund: Sewer 3,800,000 3,800,000Total 64 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) The project builds off of CIP 15-147 that included two phases, one in 2017 and another planned for 2019. The project area includes York Avenue north of 66th, and 69th Street between Barrie Rd and York. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. COST CONSIDERATIONS: This project qualifies for potential TIF/HRA funding. If Southdale TIF generates additional revenue, in its closing years, funding could be directed to this project. Project #19-336 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Seg 4 & Fairview Category Infrastructure Type Expand or enhance Total Project Cost:$4,700,000 Total2025 2026 2027 2028 2029Expenditures 2030 4,700,0004,700,000Construction 4,700,000 4,700,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 4,700,0004,700,000Utility Fund: Sewer 4,700,000 4,700,000Total 65 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will use flow metering and groundwater data to target areas with high potential for groundwater infiltration and flood inflow for investigation and elimination of cross connections and leak points. Inflow of storm and ground water into the sanitary sewer system uses up system capacity, increases the risk of back flow, and wastes money and natural resources to convey and treat. A variety of methods such as in-home inspection, smoke testings, dye testing, and video will be used to identify and eliminate sources of inflow in the targeted area. Cost effective interventions will be designed and implemented in the following year. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. COST CONSIDERATIONS: Reduction of inflow and infiltration reduces metered flow which determines the City share of Met Council regional system expense. Project #19-340 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Sanitary Targeted Inflow Reduction Project Category Infrastructure Type Replace or repair Total Project Cost:$130,000 Total2025 2026 2027 2028 2029Expenditures 2030 130,000Construction130,000 130,000Total130,000 Total2025 2026 2027 2028 2029Funding Sources 2030 130,000Utility Fund: Sewer 130,000 130,000Total130,000 66 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description A major update to the Comprehensive Water Resources Management Plan (CWRMP) is required to incorporate the Flood Risk Reduction Strategy (CIP item 19-341) and Clean Water Strategy (CIP item 19-342). The Flood Risk Reduction Strategy and corresponding major amendment are complete. This CIP item in 2024 would be for the Clean Water Strategy piece ENVIRONMENTAL CONSIDERATIONS: This would incorporate the aforementioned strategies into the existing CWRMP. Project #19-346 Justification The CWRMP lays out a framework for developing the Flood Risk Reduction Strategy and Clean Water Strategy. These would be considered major amendments to the plan. Useful LifeProject Name CWRMP Model Update Category Infrastructure Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Planning and Design 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Utility Fund: Storm 200,000 200,000Total 67 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description Since September 2014, it has been standard practice to assess water main pipe conditions in project areas of future street reconstruction. The non- invasive water main testing provides us with more data about the condition of our water main system similar to closed circuit televising does for sanitary sewer trunk pipes. This data, plus water main break data proves to be a powerful tool in determining where to spend our water main funds to get the greatest value to our water main system. Assessments typically occur two years in advance of a neighborhood reconstruction project and include approximately 20,000 linear feet of watermain per year. ENVIRONMENTAL CONSIDERATIONS: The watermain condition data allows us to only replace the pipes that need it with this infrastructure replacement cycle. By getting the most life out of the existing watermain pipes, we are reducing the need for new resources where they are not needed. This lowers our potential carbon footprint and uses only the necessary resources to provide the level of service required. Project #19-351 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Water Main Condition Assessment Category Infrastructure Type Replace or repair Total Project Cost:$1,120,000 Total2025 2026 2027 2028 2029Expenditures 2030 955,000150,000 160,000 160,000 165,000 160,000Planning and Design 160,000 150,000 160,000 160,000 165,000 160,000 955,000Total160,000 Total2025 2026 2027 2028 2029Funding Sources 2030 955,000150,000 160,000 160,000 165,000 160,000Utility Fund: Water 160,000 150,000 160,000 160,000 165,000 160,000 955,000Total160,000 68 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a shared-use path on the east side of McCauley Trail between Indian Hills Road and Gleason Road. This facility will connect to existing pedestrian and bicycle infrastructure on Gleason Road and will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21004 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name McCauley Trail Shared-Use Path Phase 2 Category Infrastructure Type New Total Project Cost:$392,731 Total2025 2026 2027 2028 2029Expenditures 2030 392,731392,731Construction 392,731 392,731Total Total2025 2026 2027 2028 2029Funding Sources 2030 392,731392,731PACS Fund: Utility Franchise Fees 392,731 392,731Total 69 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will support Hennepin County's France Avenue at I-494 improvement project. This project includes the construction of new shared- use paths on both sides of France Avenue between Minnesota Drive and West 76th Street. These facilities will connect to existing sidewalks on France Avenue, Minnesota drive and West 76th Street. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21006 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name France Avenue Shared-Use Paths Category Infrastructure Type New Total Project Cost:$1,541,300 Total2025 2026 2027 2028 2029Expenditures 2030 1,541,300762,900 778,400Construction 762,900 778,400 1,541,300Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,541,300762,900 778,400PACS Fund: Utility Franchise Fees 762,900 778,400 1,541,300Total 70 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of sidewalks on Lincoln Drive between Maloney Avenue and 7th Street, 7th Street between Lincoln Drive and Highway 169, and Malibu Drive between Lincoln Drive and Park Terrace. These sidewalks will connect to the existing sidewalk on Maloney Avenue and will provide residents in the Presidents and Parkwood Knolls neighborhoods with a safe walking connection to Van Valkenburg Park. These sidewalks were proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21007 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Lincoln Drive/7th Street/Malibu Drive Sidewalks Category Infrastructure Type New Total Project Cost:$419,600 Total2025 2026 2027 2028 2029Expenditures 2030 419,600419,600Construction 419,600 419,600Total Total2025 2026 2027 2028 2029Funding Sources 2030 419,600419,600PACS Fund: Utility Franchise Fees 419,600 419,600Total 71 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on West 60th Street between France Avenue and Xerxes Avenue. This sidewalk will connect to existing sidewalks on France Avenue, Beard Avenue and Xerxes Avenue and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21013 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name West 60th Street Sidewalk Category Infrastructure Type New Total Project Cost:$710,500 Total2025 2026 2027 2028 2029Expenditures 2030 710,500Construction710,500 710,500Total710,500 Total2025 2026 2027 2028 2029Funding Sources 2030 710,500PACS Fund: Utility Franchise Fees 710,500 710,500Total710,500 72 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on the north side of West 77th Street between Normandale Road and Parklawn Avenue. This sidewalk will connect to the existing sidewalk on Parklawn Avenue and will support transit riders along West 77th Street. This sidewalk was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21014 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name West 77th Street Sidewalk Category Infrastructure Type New Total Project Cost:$483,100 Total2025 2026 2027 2028 2029Expenditures 2030 483,100483,100Construction 483,100 483,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 483,100483,100PACS Fund: Utility Franchise Fees 483,100 483,100Total 73 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves construction of a shared-use path on Benton Avenue between Hansen Road and Normandale Road. This path will connect to existing sidewalks on Normandale Road, Hansen Road and Benton Avenue, and will support transit riders along Benton Avenue. This path will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21015 Justification The City strives to improve mobility for residents, visitors and businesses through a multi-modal transportation system that accommodates pedestrians, bicyclists, transit users and motorists. This ideal is reflected in the Comprehensive Plan, the Living Streets Plan, the Active Routes to School Plan and the Pedestrian and Bicycle Master Plan. Walking and biking infrastructure promotes equity, safety and convenience and provides meaningful opportunities for active living and better health. Useful LifeProject Name Benton Avenue Shared-Use Path Category Infrastructure Type New Total Project Cost:$730,400 Total2025 2026 2027 2028 2029Expenditures 2030 730,400730,400Construction 730,400 730,400Total Total2025 2026 2027 2028 2029Funding Sources 2030 730,400730,400PACS Fund: Utility Franchise Fees 730,400 730,400Total 74 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves construction of a shared-use path on the south side of West 64th Street between West Shore Drive and West 66th Street. This path will connect to existing sidewalks on West 66th Street, the Edina Aquatic Center, the Edina Art House, Rosland Park, and the pedestrian bridge over Highway 62. This path will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21016 Justification The City strives to improve mobility for residents, visitors and businesses through a multi-modal transportation system that accommodates pedestrians, bicyclists, transit users and motorists. This ideal is reflected in the Comprehensive Plan, the Living Streets Plan, the Active Routes to School Plan and the Pedestrian and Bicycle Master Plan. Walking and biking infrastructure promotes equity, safety and convenience and provides meaningful opportunities for active living and better health. Useful LifeProject Name West 64th Street Shared-Use Path Category Infrastructure Type New Total Project Cost:$422,654 Total2025 2026 2027 2028 2029Expenditures 2030 422,654Construction422,654 422,654Total422,654 Total2025 2026 2027 2028 2029Funding Sources 2030 422,654PACS Fund: Utility Franchise Fees 422,654 422,654Total422,654 75 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on the south side of Valley View Road between Chapel Lane and Antrim Road. This sidewalk will connect to existing sidewalks on Valley View Road and Antrim Road, and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21017 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Valley View Road Sidewalk Category Infrastructure Type New Total Project Cost:$109,100 Total2025 2026 2027 2028 2029Expenditures 2030 109,100109,100Construction 109,100 109,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 109,100109,100PACS Fund: Utility Franchise Fees 109,100 109,100Total 76 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on Amundson Avenue between Cahill Road and West 70th Street. This sidewalk will connect to existing sidewalks on the Cahill Road and West 70th Street, to the Nine Mile Creek Regional Trail and to the future Canadian Pacific Rail Regional Trail. This sidewalk was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21018 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Amundson Avenue Sidewalk Category Infrastructure Type New Total Project Cost:$156,100 Total2025 2026 2027 2028 2029Expenditures 2030 156,100Construction156,100 156,100Total156,100 Total2025 2026 2027 2028 2029Funding Sources 2030 156,100PACS Fund: Utility Franchise Fees 156,100 156,100Total156,100 77 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a shared-use path on Interlachen Boulevard between Blake Road and Mirror Lakes Drive. This path will connect to existing pedestrian and bicycle infrastructure on Blake Road, Interlachen Boulevard and Mirror Lakes Drive, and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21019 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Interlachen Boulevard Shared-Use Path Category Infrastructure Type New Total Project Cost:$381,600 Total2025 2026 2027 2028 2029Expenditures 2030 381,600381,600Construction 381,600 381,600Total Total2025 2026 2027 2028 2029Funding Sources 2030 381,600381,600PACS Fund: Utility Franchise Fees 381,600 381,600Total 78 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Washington Avenue South, Adams Avenue, Jefferson Ave South, Madison Avenue South, Monroe Avenue South, Jackson Avenue South, Van Buren Avenue South, Harrison Avenue South, Tyler Avenue South, Tyler Court, 2nd Street South, Belmore Lane, 3rd Street South) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21021 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Presidents A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$10,002,281 Total2025 2026 2027 2028 2029Expenditures 2030 10,002,28110,002,281Construction 10,002,281 10,002,281Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,946,4511,946,451Construction Fund: Special Assess 2,248,9282,248,928Utility Fund: Storm 2,435,7532,435,753Utility Fund: Water 1,720,5301,720,530Utility Fund: Sewer 233,000233,000PACS Fund: Utility Franchise Fees 1,417,6191,417,619Special Street Levy 10,002,281 10,002,281Total 79 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Parklawn Court from Parklawn Avenue to the cul-de-sac. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21023 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Parklawn (Parklawn Ct) Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$403,404 Total2025 2026 2027 2028 2029Expenditures 2030 403,404403,404Construction 403,404 403,404Total Total2025 2026 2027 2028 2029Funding Sources 2030 87,30187,301Construction Fund: Special Assess 110,184110,184Utility Fund: Storm 59,44959,449Utility Fund: Water 39,89939,899Utility Fund: Sewer 27,90027,900PACS Fund: Utility Franchise Fees 78,67178,671Special Street Levy 403,404 403,404Total 80 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Annaway Drive, Bywood West, Crescent Terrace, Mait Lane, Merilane, Paddock Road, Rolling Green Parkway) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21024 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Rolling Green Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$11,258,861 Total2025 2026 2027 2028 2029Expenditures 2030 11,258,86111,258,861Construction 11,258,861 11,258,861Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,505,0502,505,050Construction Fund: Special Assess 4,009,2434,009,243Utility Fund: Storm 1,676,6781,676,678Utility Fund: Water 281,326281,326Utility Fund: Sewer 2,786,5642,786,564Special Street Levy 11,258,861 11,258,861Total 81 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Halifax Lane, Woodland Circle) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21025 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Minnehaha Woods D Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$3,716,209 Total2025 2026 2027 2028 2029Expenditures 2030 3,716,2093,716,209Construction 3,716,209 3,716,209Total Total2025 2026 2027 2028 2029Funding Sources 2030 456,609456,609Construction Fund: Special Assess 946,760946,760Utility Fund: Storm 897,902897,902Utility Fund: Water 342,836342,836Utility Fund: Sewer 288,600288,600PACS Fund: Utility Franchise Fees 783,502783,502Special Street Levy 3,716,209 3,716,209Total 82 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Andover Road, Claremore Drive, Dunham Drive, Ellsworth Drive, Fondell Drive, Gilford Drive, Kellogg Avenue, Oaklawn Avenue, West 72nd Street, West Shore Drive, Wooddale Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21026 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name South Cornelia B Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$8,543,895 Total2025 2026 2027 2028 2029Expenditures 2030 8,543,8958,543,895Construction 8,543,895 8,543,895Total Total2025 2026 2027 2028 2029Funding Sources 2030 3,447,2973,447,297Construction Fund: Special Assess 2,049,8752,049,875Utility Fund: Storm 1,530,6691,530,669Utility Fund: Water 1,071,9041,071,904Utility Fund: Sewer 444,150444,150PACS Fund: Utility Franchise Fees 8,543,895 8,543,895Total 83 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Cornelia Drive, Glouchester Avenue, Heatherton Trail, Bristol Boulevard, Lynmar Lane, Mavelle Drive, Sandell Avenue, Hazelton Road, West 72nd Street) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21027 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name South Cornelia D Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$8,313,293 Total2025 2026 2027 2028 2029Expenditures 2030 8,313,293Construction8,313,293 8,313,293Total8,313,293 Total2025 2026 2027 2028 2029Funding Sources 2030 3,182,394Construction Fund: Special Assess 3,182,394 1,830,277Utility Fund: Storm 1,830,277 2,343,549Utility Fund: Water 2,343,549 957,073Utility Fund: Sewer 957,073 8,313,293Total8,313,293 84 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Hilary Lane from Braemar Boulevard to Gleason Road. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG21028 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Hilary Lane Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$6,317,053 Total2025 2026 2027 2028 2029Expenditures 2030 6,317,053190,400 6,126,653Construction 190,400 6,126,653 6,317,053Total Total2025 2026 2027 2028 2029Funding Sources 2030 3,387,9783,387,978Construction Fund: MSA 302,453302,453Construction Fund: Special Assess 1,009,2451,009,245Utility Fund: Storm 786,652786,652Utility Fund: Water 303,883303,883Utility Fund: Sewer 190,400190,400PACS Fund: Utility Franchise Fees 336,442336,442Special Street Levy 190,400 6,126,653 6,317,053Total 85 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated West 76th Street from Parklawn Avenue to France Avenue. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG21030 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name West 76th Street A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$2,008,524 Total2025 2026 2027 2028 2029Expenditures 2030 2,008,5242,008,524Construction 2,008,524 2,008,524Total Total2025 2026 2027 2028 2029Funding Sources 2030 968,276968,276Construction Fund: MSA 200,919200,919Construction Fund: Special Assess 385,207385,207Utility Fund: Storm 247,724247,724Utility Fund: Water 165,248165,248Utility Fund: Sewer 41,15041,150PACS Fund: Utility Franchise Fees 2,008,524 2,008,524Total 86 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Engineering Description This project will continue to build electric vehicle charging infrastructure and provide support for fleet improvements to change to electric vehicles. Electrification of vehicles is happening as costs lower and mileage range continues to grow. Electric vehicles provide to lower GHG emissions and improve air quality with zero tailpipe emissions. One of the top hurdles to EV adoption is the lack of charging infrastructure to "fuel" up the vehicle. To support EV adoption, the City will need to make investments in EV infrastructure. ENVIRONMENTAL CONSIDERATIONS: Supporting electric vehicle infrastructure and fleet replacements provides an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21040 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained facilities provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goal. Useful Life 10Project Name Electric Vehicle Infrastructure & Vehicle Upgrades Category Equipment and Vehicles Type Replace or repair Total Project Cost:$600,000 Total2025 2026 2027 2028 2029Expenditures 2030 600,000100,000 100,000 100,000 100,000 100,000Vehicles and Equipment 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 600,000100,000 100,000 100,000 100,000 100,000CAS Fund: Utility Franchise Fees 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 87 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Engineering Description In our continuing efforts to provide an accessible environment for residents, visitors and employees, the City completed an ADA inventory to understand areas of need. The inventory conducted an evaluation for compliance with applicable laws, codes and design guidelines pertaining to accessibility. ENVIRONMENTAL CONSIDERATIONS: Facility improvements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21045 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project is the implementation of the mission statement and the budget work plan goal. Useful LifeProject Name City Wide ADA Facility Improvements Level 3&4 Category Buildings Type Replace or repair Total Project Cost:$1,336,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,336,0001,336,000Construction 1,336,000 1,336,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,336,0001,336,000Construction Fund: CIP Levy 1,336,000 1,336,000Total 88 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs near Lift Station #6 along 72nd Street. The pipe is undersized and requires more capacity. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21055 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multimodal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. Useful LifeProject Name 72nd Street Sewer Line Upsize Category Infrastructure Type Replace or repair Total Project Cost:$1,600,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,600,0001,600,000Construction 1,600,000 1,600,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,600,0001,600,000Utility Fund: Sewer 1,600,000 1,600,000Total 89 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description The project is included in the Water Supply Plan to better distribute water out from Water Treatment Plant #6. This project will install new watermain along Vernon Avenue connecting to 52nd Street. The project will start near the Grandview Parking Ramp. Project #ENG21058 Justification The City’s mission statement "is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Water Supply Grandview Area PH 3 Category Infrastructure Type Replace or repair Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,500,0002,500,000Utility Fund: Water 2,500,000 2,500,000Total 90 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description The project is included in the Water Supply Plan to improve fire flows and circulation in the northeast area of the City Project #ENG21059 Justification Useful LifeProject Name Water Supply 50th and France Category Infrastructure Type Replace or repair Total Project Cost:$2,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,000,000Construction2,000,000 2,000,000Total2,000,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,000,000Utility Fund: Water 2,000,000 2,000,000Total2,000,000 91 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description Project #ENG21060 Justification Useful LifeProject Name Water Supply Pentagon Park Category Infrastructure Type Replace or repair Total Project Cost:$1,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,000,000Construction1,000,000 1,000,000Total1,000,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,000,000Utility Fund: Water 1,000,000 1,000,000Total1,000,000 92 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The multi-tiered retaining wall has a history of small area failures. Each failure requires a small contract with a vendor to patch together at the location of the failure. This project will remove and replace the entire wall with a large modular block wall system. ENVIRONMENTAL CONSIDERATIONS: The retaining wall is due for a complete replacement. A complete replacement with a more structurally sound retaining wall system will greatly reduce time and resources needed to complete small, frequent repairs to the existing wall. Project #ENG21061 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, retaining walls, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goals. Useful LifeProject Name 6520 Belmore Lane Multi-Tiered Retaining Wall Category Infrastructure Type Replace or repair Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Construction 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Bridge Maintenance 400,000 400,000Total 93 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 70th Street, Antrim Court, Antrim Road, Antrim Terrace, Down Road, Dublin Circle, Dublin Road, Kerry Road, Lee Valley Road, Shannon Drive, Tralee Drive, Wexford Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23001 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$6,650,793 Total2025 2026 2027 2028 2029Expenditures 2030 6,650,7936,650,793Construction 6,650,793 6,650,793Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,632,1581,632,158Construction Fund: Special Assess 1,583,4181,583,418Utility Fund: Storm 1,278,1481,278,148Utility Fund: Water 686,265686,265Utility Fund: Sewer 1,470,8041,470,804Special Street Levy 6,650,793 6,650,793Total 94 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Gate Park Road, Johnson Drive, Ridge Park Road, Warden Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23002 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Countryside E Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$3,479,516 Total2025 2026 2027 2028 2029Expenditures 2030 3,479,516Construction3,479,516 3,479,516Total3,479,516 Total2025 2026 2027 2028 2029Funding Sources 2030 782,328Construction Fund: Special Assess 782,328 850,851Utility Fund: Storm 850,851 584,093Utility Fund: Water 584,093 391,999Utility Fund: Sewer 391,999 870,245Special Street Levy 870,245 3,479,516Total3,479,516 95 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 48th Street, West 49th Street, Edinbrook Lane, Millpond Place, Westbrook Lane) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23003 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Todd Park B Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$3,153,546 Total2025 2026 2027 2028 2029Expenditures 2030 3,153,5463,153,546Construction 3,153,546 3,153,546Total Total2025 2026 2027 2028 2029Funding Sources 2030 523,709523,709Construction Fund: Special Assess 826,220826,220Utility Fund: Storm 783,583783,583Utility Fund: Water 299,187299,187Utility Fund: Sewer 720,847720,847Special Street Levy 3,153,546 3,153,546Total 96 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Benton Avenue from Tracy Avenue to Hansen Road. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG23004 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Benton Avenue A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$2,834,512 Total2025 2026 2027 2028 2029Expenditures 2030 2,834,512Construction2,834,512 2,834,512Total2,834,512 Total2025 2026 2027 2028 2029Funding Sources 2030 1,475,297Construction Fund: MSA 1,475,297 108,997Construction Fund: Special Assess 108,997 434,318Utility Fund: Storm 434,318 369,875Utility Fund: Water 369,875 186,198Utility Fund: Sewer 186,198 109,800PACS Fund: Utility Franchise Fees 109,800 150,027Special Street Levy 150,027 2,834,512Total2,834,512 97 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project rehabilitates sanitary sewer adjacent to the Braemar Golf Course. This area of sanitary sewer has high levels in inflow and infiltration (I & I) or unnecessary clean water entering the system. Pipe and manholes will be lined where needed to reduce I & I. ENVIRONMENTAL CONSIDERATIONS: Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG23009 Justification The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts. Useful LifeProject Name Hilary Lane Sanitary Sewer Lining Category Infrastructure Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Utility Fund: Sewer 300,000 300,000Total 98 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Concord and Golf Terrace Neighborhoods, This project follows the 2022(Draft) Local Surface Water Management Plan. Project #ENG23010 Justification ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Useful LifeProject Name Concord Flood Infrastrucure Project #2 area Category Infrastructure Type New Total Project Cost:$10,650,000 Total2025 2026 2027 2028 2029Expenditures 2030 10,650,000200,000 950,000 9,500,000Construction 200,000 950,000 9,500,000 10,650,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 10,650,000200,000 950,000 9,500,000Utility Fund: Storm 200,000 950,000 9,500,000 10,650,000Total 99 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Arden Park and Country Club Neighborhoods, This project need is discussed in the 2022(Draft) Local Surface Water Management Plan and informed by further staff evaluation of options to divert and add capacity for flood flow on 50th Street. Other opportunities for flood risk reduction will be evaluated. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23011 Justification This project is included in the 2022 Local water management plan in concept. 2027 and 2028 costs are placeholders for review and design work ahead of a 2029+ construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Arden & 50th Flood Infrastructure Project #3 Area Category Infrastructure Type New Total Project Cost:$5,150,000 Total2025 2026 2027 2028 2029Expenditures 2030 650,000200,000 450,000Construction 200,000 450,000 650,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 650,000200,000 450,000Utility Fund: Storm 200,000 450,000 650,000Total 100 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Lake Cornelia and Normandale Park Neighborhoods, This project follows the 2022(Draft) Local Surface Water Management Plan and will require further evaluation of options to reduce flood risk. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23012 Justification Useful LifeProject Name Lake Cornelia and Normandale Park Flood Infras Category Infrastructure Type Horizon Total Project Cost:$16,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 16,000,00016,000,000Construction 16,000,000 16,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 16,000,00016,000,000Utility Fund: Storm 16,000,000 16,000,000Total 101 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Minnehaha Woods and Pamela Park Neighborhoods, This project proposes the increase in flood carrying capacity of the France Avenue Minnehaha crossing that drives flood risk in very large storm events. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Project #ENG23013 Justification 2027 and 2028 costs are placeholders for review and design work ahead of a 2029+ construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name France Avenue Crossing (Minnehaha Creek)Category Infrastructure Type New Total Project Cost:$6,800,000 Total2025 2026 2027 2028 2029Expenditures 2030 800,000200,000 600,000Construction 200,000 600,000 800,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 800,000200,000 600,000Utility Fund: Storm 200,000 600,000 800,000Total 102 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing flood control smart infrastructure into existing lift station and flow control features across a part of the City. ENVIRONMENTAL CONSIDERATIONS: Adaptive Level management retrofits take minimal materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23014 Justification This project is included in the 2022 Local water management plan in concept and follows the flood risk reduction strategy. 2025 costs are placeholders for review and design work ahead of a 2027 construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Adaptive Level Management Project Ph 2 Minnehaha Category Infrastructure Type New Total Project Cost:$2,700,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,700,000200,000 2,500,000Construction 200,000 2,500,000 2,700,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,700,000200,000 2,500,000Utility Fund: Storm 200,000 2,500,000 2,700,000Total 103 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing flood control smart infrastructure into existing lift station and flow control features across a part of the City. ENVIRONMENTAL CONSIDERATIONS: Adaptive Level management retrofits take minimal materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23015 Justification This project is included in the 2022 Local water management plan in concept and follows the flood risk reduction strategy. 2023 cost is for review and design work ahead of a 2025 construction. Capital estimates will be further evaluated and included in the next CIP. Useful LifeProject Name Adaptive Level Management Project Nine Mile Creek Category Infrastructure Type New Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,500,0002,500,000Utility Fund: Storm 2,500,000 2,500,000Total 104 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing pipe and graded overflows to better pass flow waters where there are minor downstream tradeoffs. Project #ENG23016 Justification This project bundles a variety of minor grading and pipe projects from the 2022 Local water management plan. The 2024 costs are for review and design work ahead of a 2026 construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Minor Pipe and Grading Project (Citywide)Category Infrastructure Type New Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,500,0002,500,000Utility Fund: Storm 2,500,000 2,500,000Total 105 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Chowen Park and Strachauer Park Neighborhoods, This project need is discussed in the 2022 Local Surface Water Management Plan and informed by further staff evaluation of options to divert and add capacity for flood flow on 60th and France Avenue Project #ENG23017 Justification Useful LifeProject Name Chowen and 60th Flood Project Category Infrastructure Type Horizon Total Project Cost:$1,100,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,100,000Construction1,100,000 1,100,000Total1,100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,100,000Utility Fund: Storm 1,100,000 1,100,000Total1,100,000 106 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) and the York Avenue Sanitary Sewer Extension (SEH Engineering 2019) Project #ENG23033 Justification ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Avenue Hazelton Category Infrastructure Type Expand or enhance Total Project Cost:$14,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000Construction 200,000 2,000,000 500,000 5,000,000 1,200,000 8,900,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000Utility Fund: Sewer 200,000 2,000,000 500,000 5,000,000 1,200,000 8,900,000Total 107 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) and the York Avenue Sanitary Sewer Extension (SEH Engineering 2019) Project #ENG23034 Justification ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Avenue 69th St W Category Infrastructure Type Expand or enhance Total Project Cost:$1,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,400,0001,400,000Construction 1,400,000 1,400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,400,0001,400,000Utility Fund: Sewer 1,400,000 1,400,000Total 108 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will replace, repair and rehabilitate watermain, gate valves,hydrants or service lines in areas that experience high reported breaks or component failure or are found to be near the end of their expected lifespan though maintenance records and nondestructive testing. One project area meeting this criteria for a standalone water main rehabilitation is the Heights Neighborhood. Project scope and limits to be determined based on scale of issue and current construction costs ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce water leaks reduce pumping costs and associated energy use, and reduce future capital and infrastructure need both locally and in the regional production system. Project #ENG23035 Justification The City’s mission statement "is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Watermain Rehabilitation (Citywide)Category Infrastructure Type Replace or repair Total Project Cost:$1,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,400,0001,400,000Construction 1,400,000 1,400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,400,0001,400,000Utility Fund: Water 1,400,000 1,400,000Total 109 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description As part of the 2012 Water Treatment Plant #6 design and construction and the 2018 Water Plan Update, the water distribution system in the Grandview Area is in need of improvements. The WTP #6 is unable to produce at full capacity because of a lack of pipe size in the distribution system. The project would install new watermain pipe from Arcadia Avenue to Grange Road along Vernon Avenue and 50th Street. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce water leaks reduce pumping costs and associated energy use, and reduce future capital and infrastructure need both locally and in the regional production system. Project #ENG23036 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Grandview Area Watermain Improvements PH 2 Category Infrastructure Type Replace or repair Total Project Cost:$240,000 Total2025 2026 2027 2028 2029Expenditures 2030 240,000240,000Construction 240,000 240,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 240,000240,000Utility Fund: Water 240,000 240,000Total 110 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project involves the reconstruction of 50th Street from Grange Road to east of Dale Street. The project was discussed as part of the 4917 Eden Avenue redevelopment project. It will install traffic safety improvements. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, upgrading public utilities (watermain, sanitary sewer, and storm sewer) and pedestrian and traffic facility improvements. Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops Roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible Project #ENG23041 Justification The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Budget Impact/Other Useful Life 50Project Name TH Tight Diamond Interchange Category Infrastructure Type Replace or repair Total Project Cost:$11,257,404 Total2025 2026 2027 2028 2029Expenditures 2030 11,257,40411,257,404Construction 11,257,404 11,257,404Total Total2025 2026 2027 2028 2029Funding Sources 2030 5,007,4045,007,404Construction Fund: MSA 250,000250,000HRA Fund: Centennial Lakes TIF 300,000300,000Utility Fund: Storm 700,000700,000Construction Fund: Grants/Donations 300,000300,000Utility Fund: Water 300,000300,000Utility Fund: Sewer 400,000400,000PACS Fund: Utility Franchise Fees 4,000,0004,000,000CIP Bonds 11,257,404 11,257,404Total 111 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as vehicles, surveying and inspection tools, and technology, among other items. 2025: 2013 Nissan Leaf 2013 Ford F150 2012 GMC Sierra 2500 HD 2026: 2016 GMC Sierra Pickup 1500 4x4 2019 Mitsubishi Outlander 2027: Department Furniture 2017 GMC Sierra WT 2006 JLG PSESLIFT 2017 Ford Explorer 2028: 2016 Tennant M30 or S30 Power Sweeper 2029: 2017 Toyota Prius II 2017 GMC Sierra Pickup 2030: GS18i and CS20 GPS Unit and Controller Project #ENG23200 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of department vehicles, surveying and inspection tools, and technology allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Engineering Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$631,331 Total2025 2026 2027 2028 2029Expenditures 2030 631,331150,000 102,631 191,500 64,700 92,500Vehicles and Equipment 30,000 150,000 102,631 191,500 64,700 92,500 631,331Total30,000 Total2025 2026 2027 2028 2029Funding Sources 2030 631,331150,000 102,631 191,500 64,700 92,500Construction Fund: Equipment Levy 30,000 150,000 102,631 191,500 64,700 92,500 631,331Total30,000 112 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Engineering Description The project is the city’s first, city-owned fast charging station. The station will be located at Edina Public Works and Park Maintenance Facility, providing support for Edina’s growing electric fleet. Project #ENG25001 Justification Expansion and/or Level of Service Sustainability:Adding more electric vehicles to the City’s fleet is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emissions. Fast charging supports electric vehicle adoption by providing quick, convenient charging. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of electric vehicle charging infrastructure. Focusing on city fleet, this project does not contain an engagement component. Health in All Policies: Electric vehicles are zero-emission vehicles, meaning there are no harmful tailpipe emissions that negatively impact air quality. Race & Equity: Charging stations located across the community create equitable access to infrastructure. Stewardship: The cost to charge vehicles is decreasing and is already more cost-effective per mile to charge a vehicle when compared to gas- powered vehicles. Useful Life 10Project Name DC Fast Charger Category Equipment and Vehicles Type New Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Vehicles and Equipment 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Construction Fund: Grants/Donations 150,000150,000CAS Fund: Utility Franchise Fees 300,000 300,000Total 113 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Parklawn Avenue from West 76th Street to West 77th Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG25002 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Parklawn Avenue A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$1,360,247 Total2025 2026 2027 2028 2029Expenditures 2030 1,360,2471,360,247Construction 1,360,247 1,360,247Total Total2025 2026 2027 2028 2029Funding Sources 2030 524,385524,385Construction Fund: MSA 48,27048,270Construction Fund: Special Assess 226,673226,673Utility Fund: Storm 201,768201,768Utility Fund: Water 103,924103,924Utility Fund: Sewer 172,400172,400PACS Fund: Utility Franchise Fees 82,82782,827Special Street Levy 1,360,247 1,360,247Total 114 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated West 77th Street from Parklawn Avenue to France Avenue. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG25003 Justification Expansion and/or Level of Service Sustainability:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name W 77th Street D Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$2,408,348 Total2025 2026 2027 2028 2029Expenditures 2030 2,408,3482,408,348Construction 2,408,348 2,408,348Total Total2025 2026 2027 2028 2029Funding Sources 2030 987,078987,078Construction Fund: MSA 90,86190,861Construction Fund: Special Assess 426,678426,678Utility Fund: Storm 379,800379,800Utility Fund: Water 195,622195,622Utility Fund: Sewer 172,400172,400PACS Fund: Utility Franchise Fees 155,909155,909Special Street Levy 2,408,348 2,408,348Total 115 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 55th Street, West 56th Street, West 57th Street, Abbott Avenue, York Avenue, Zenith Avenue) within the project area. This includes replacing the entire pavement surface, repair / replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25005 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Chowen Park C Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$9,237,718 Total2025 2026 2027 2028 2029Expenditures 2030 9,237,7189,237,718Construction 9,237,718 9,237,718Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,414,9911,414,991Construction Fund: Special Assess 2,460,7762,460,776Utility Fund: Storm 2,434,7052,434,705Utility Fund: Water 929,616929,616Utility Fund: Sewer 50,00050,000PACS Fund: Utility Franchise Fees 1,947,6301,947,630Special Street Levy 9,237,718 9,237,718Total 116 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 57th Street, Beard Avenue, Chowen Avenue, Drew Avenue, Ewing Avenue) within the project area. This includes replacing the entire pavement surface, repair / replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25006 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Chowen Park E Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$5,860,721 Total2025 2026 2027 2028 2029Expenditures 2030 5,860,7215,860,721Construction 5,860,721 5,860,721Total Total2025 2026 2027 2028 2029Funding Sources 2030 878,270878,270Construction Fund: Special Assess 1,527,3781,527,378Utility Fund: Storm 1,511,1961,511,196Utility Fund: Water 577,003577,003Utility Fund: Sewer 158,000158,000PACS Fund: Utility Franchise Fees 1,208,8741,208,874Special Street Levy 5,860,721 5,860,721Total 117 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Brookview Avenue, Park Place, Woodcrest Drive, Woodland Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25009 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Minnehaha Woods B Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$4,119,420 Total2025 2026 2027 2028 2029Expenditures 2030 4,119,4204,119,420Construction 4,119,420 4,119,420Total Total2025 2026 2027 2028 2029Funding Sources 2030 618,632618,632Construction Fund: Special Assess 1,282,7071,282,707Utility Fund: Storm 692,075692,075Utility Fund: Water 464,487464,487Utility Fund: Sewer 1,061,5191,061,519Special Street Levy 4,119,420 4,119,420Total 118 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description Pamela Park B (Peacedale Avenue)This project involves the reconstruction and rehabilitation of local street Peacedale Avenue from the Highway 62 frontage road to West 62nd Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25010 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Pamela Park B (Peacdale Avenue) Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$1,815,098 Total2025 2026 2027 2028 2029Expenditures 2030 1,815,0981,815,098Construction 1,815,098 1,815,098Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,399250,399Construction Fund: Special Assess 454,631454,631Utility Fund: Storm 492,398492,398Utility Fund: Water 188,007188,007Utility Fund: Sewer 429,663429,663Special Street Levy 1,815,098 1,815,098Total 119 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Halifax Avenue from the Highway 62 frontage road to West 62nd Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25011 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Pamela Park C (Halifax Avenue) Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$1,388,016 Total2025 2026 2027 2028 2029Expenditures 2030 1,388,0161,388,016Construction 1,388,016 1,388,016Total Total2025 2026 2027 2028 2029Funding Sources 2030 191,481191,481Construction Fund: Special Assess 347,659347,659Utility Fund: Storm 376,540376,540Utility Fund: Water 143,770143,770Utility Fund: Sewer 328,566328,566Special Street Levy 1,388,016 1,388,016Total 120 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Washington Avenue from Valley View Road to the City limits north of Valley View Road, which is a shared street with the City of Eden Prairie. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25012 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Braemar Hills E (Washington Avenue) Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$964,181 Total2025 2026 2027 2028 2029Expenditures 2030 964,181Construction964,181 964,181Total964,181 Total2025 2026 2027 2028 2029Funding Sources 2030 172,485Construction Fund: Special Assess 172,485 332,148Utility Fund: Storm 332,148 51,164Utility Fund: Water 51,164 34,339Utility Fund: Sewer 34,339 374,045Special Street Levy 374,045 964,181Total964,181 121 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 66th Street, Cahill Lane, Cahill Road, Galway Drive, Hillside Lane, Limerick Lane) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25013 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name The Heights A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$9,343,836 Total2025 2026 2027 2028 2029Expenditures 2030 9,343,836Construction9,343,836 9,343,836Total9,343,836 Total2025 2026 2027 2028 2029Funding Sources 2030 1,127,030Construction Fund: Special Assess 1,127,030 2,370,717Utility Fund: Storm 2,370,717 2,248,376Utility Fund: Water 2,248,376 858,472Utility Fund: Sewer 858,472 295,200PACS Fund: Utility Franchise Fees 295,200 2,444,041Special Street Levy 2,444,041 9,343,836Total9,343,836 122 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 66th Street, West 68th Street, Grace Terrace, Hillside Circle, Hillside Court, Lois Lane, Susan Avenue, Tracy Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25014 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name The Heights C Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$7,590,070 Total2025 2026 2027 2028 2029Expenditures 2030 7,590,070Construction7,590,070 7,590,070Total7,590,070 Total2025 2026 2027 2028 2029Funding Sources 2030 939,192Construction Fund: Special Assess 939,192 1,729,936Utility Fund: Storm 1,729,936 1,873,647Utility Fund: Water 1,873,647 715,394Utility Fund: Sewer 715,394 295,200PACS Fund: Utility Franchise Fees 295,200 2,036,701Special Street Levy 2,036,701 7,590,070Total7,590,070 123 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description The multi-tiered retaining wall has a history of small area failures. Each failure requires a small contract with a vendor to patch together at the location of the failure. This project will remove and replace the entire wall with a large modular block wall system. Project #ENG25018 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name 6932 Valley View Road Multi-Tiered Retaining Wall Category Infrastructure Type Replace or repair Total Project Cost:$360,000 Total2025 2026 2027 2028 2029Expenditures 2030 360,000360,000Construction 360,000 360,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 360,000360,000Bridge Maintenance 360,000 360,000Total 124 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The material around the railroad tracks along Dewey Hill Road that provides a smooth transition from the street pavement over the railroad tracks is starting to fail. The city is responsible for providing the materials to CP Rail for their crews to install. Project #ENG25020 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Dewey Hill Road CP Rail Crossing Category Infrastructure Type Replace or repair Total Project Cost:$35,000 Total2025 2026 2027 2028 2029Expenditures 2030 35,00035,000Construction 35,000 35,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 35,00035,000Bridge Maintenance 35,000 35,000Total 125 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create an ADA pedestrian access route from the new Grandview Pedestrian Bridge across the top level of the Grandview Parking Ramp. It will create a route for users to access Jerry’s Tower that has an elevator. The elevator would be accessible during normal business hours. Coordination with Jerry’s Enterprise is needed to discuss the impact of losing 16 parking stalls and maintenance and operations responsibilities. Project #ENG25021 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Grandview Parking Ramp ADA Access Route Category Infrastructure Type New Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Construction 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Construction Fund: CIP Levy 200,000 200,000Total 126 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create an ADA pedestrian access route from the new Grandview Pedestrian Bridge across the top level of the Grandview Parking Ramp. It will create a route for users to access Jerry’s Tower that has an elevator. The elevator would be accessible during normal business hours. Coordination with Jerry’s Enterprise is needed to discuss the impact of losing 16 parking stalls and maintenance and operations responsibilities. Project #ENG25022 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Grandview Parking Ramp ADA Access Route to Gus Yng Category Infrastructure Type New Total Project Cost:$2,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,000,0002,000,000Construction 2,000,000 2,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,000,0002,000,000Construction Fund: CIP Levy 2,000,000 2,000,000Total 127 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace 2,500 linear feet of 8-ft tall wood fence that is at the end of its useful life. The fence was installed in 1994. It has many trees, shrubs and other vegetation growing in and around it that increases the difficulty of replacement. Project #ENG25023 Justification Expansion and/or Level of Service Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects continue to provide a physical barrier between private property and the vehicle traveled way. This separation creates a safter environment for the individual property owners. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 25Project Name Valley View Rd Fence Replace Sdale Neighborhood Category Infrastructure Type Replace or repair Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Construction Fund: MSA 100,000 100,000Total 128 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create a pedestrian connection under France Avenue between Gallagher Drive and 72nd Street. It will extend into potential development projects on both the east and west sides of France Avenue. It will provide much safer pedestrian access on the east and west sides of France Avenue to Centennial Lakes Park and the Cornelia Neighborhood. Project #ENG25025 Justification Expansion and/or Level of Service Sustainability:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name France Avenue Crossing Gallagher & 72nd Category Infrastructure Type New Total Project Cost:$16,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 16,000,000500,000 1,500,000 7,000,000 7,000,000Construction 500,000 1,500,000 7,000,000 7,000,000 16,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 16,000,000500,000 1,500,000 7,000,000 7,000,000HRA Fund: Centennial Lakes TIF 500,000 1,500,000 7,000,000 7,000,000 16,000,000Total 129 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Project #ENG25026 Justification Health, Safety & Regulatory Compliance Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Rosland Park Pedestrian Bridge Category Infrastructure Type New Total Project Cost:$6,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 6,000,0006,000,000Construction 6,000,000 6,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 6,000,0006,000,000Construction Fund: Grants/Donations 6,000,000 6,000,000Total 130 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace 1,300 linear feet of concrete curb and gutter in the 50th and France District along 50th Street between Halifax Avenue and France Avenue. The curb is at the end of its useful life. This work will be coordinated with a mill and overlay project. Project #ENG25027 Justification Expansion and/or Level of Service Sustainability:The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name 50th St Concrete Curb and Gutter Replacement Category Infrastructure Type Replace or repair Total Project Cost:$55,000 Total2025 2026 2027 2028 2029Expenditures 2030 55,00055,000Construction 55,000 55,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 55,00055,000Utility Fund: Storm 55,000 55,000Total 131 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The traffic signal poles and bolt connections to the structural foundations are rusting and are nearing the end of their useful life. This project will install a new traffic control signal system. Project #ENG25028 Justification Health, Safety, and Regulatory Compliance Sustainability:The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Traffic Signal at Halifax and 50th St Category Infrastructure Type Replace or repair Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Construction 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Construction Fund: MSA 400,000 400,000Total 132 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The retaining wall along the north side of the 50th Street Bridge over Minnehaha Creek is starting to separate from the structure. This project will remove and replace the retaining wall. Project #ENG25029 Justification Health, Safety and Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name 50th over Minnehaha Creek North Retaining Wall Category Infrastructure Type Replace or repair Total Project Cost:$275,000 Total2025 2026 2027 2028 2029Expenditures 2030 275,000275,000Construction 275,000 275,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 275,000275,000Construction Fund: MSA 275,000 275,000Total 133 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Benton Ave Bridge over CP Rail has maintenance needs. The beams under the deck are due for painting to extend the life of the structure. Project #ENG25030 Justification Health, Safety & Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Benton Avenue Over CP Rail Beam Painting Category Infrastructure Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000Construction250,000 250,000Total250,000 Total2025 2026 2027 2028 2029Funding Sources 2030 250,000Construction Fund: MSA 250,000 250,000Total250,000 134 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Valley View Bridge over CP Rail has maintenance needs. The beams under the deck are due for painting to extend the life of the structure. Project #ENG25031 Justification Health, Safety & Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Valley View Road Bridge over CP Rail Beam Painting Category Infrastructure Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000Construction250,000 250,000Total250,000 Total2025 2026 2027 2028 2029Funding Sources 2030 250,000Construction Fund: MSA 250,000 250,000Total250,000 135 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will cure in place line 3,400 linear feet of clay sanitary sewer pipe. This type of trenchless rehabilitation technology only needs access to the manholes for installation. It does not require large scale open cutting operations. It builds a long-term structural pipe within the existing pipe. Project #ENG25033 Justification Expansion and/or Level of Service Sustainability: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Nine Mile Village Sanitary Sewer Lining Category Infrastructure Type Replace or repair Total Project Cost:$175,000 Total2025 2026 2027 2028 2029Expenditures 2030 175,000175,000Construction 175,000 175,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 175,000175,000Utility Fund: Sewer 175,000 175,000Total 136 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace approximately 130 linear feet of sanitary sewer pipe that has settled and created a sag in the pipe. The sag slows flow and collects debris. The pipe will be replaced by open cut method and along with impacted street pavements Project #ENG25034 Justification Expansion and/or Level of Service Sustainability: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Olinger Road Sanitary Sewer Replacement Category Infrastructure Type Replace or repair Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Utility Fund: Sewer 100,000 100,000Total 137 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description "This project will use iron and aluminum chemical additions to sequester the sediment phosphorus that causes algae blooms and fuels lake and creek water quality impairments. The project will work citywide in priority watersheds. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible.Decades of urban development and runoff have lead to waterbodies with nutrient rich sediment. The sediment phosphorus fuels aerobic and anerobic decay of accumulated biomass and leads to low oxygen levels and phosphorus release into the water column that impairing waters. This project begins restore ecological processes by resetting the sequestering the sediment phosphorus. " Project #ENG25036 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 1 - Lake & Pond Sediment Phosphorus Sequest Category Infrastructure Type New Total Project Cost:$550,000 Total2025 2026 2027 2028 2029Expenditures 2030 550,00050,000 100,000 100,000 100,000 100,000Installation/Maintenance 100,000 50,000 100,000 100,000 100,000 100,000 550,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 550,00050,000 100,000 100,000 100,000 100,000Utility Fund: Storm 100,000 50,000 100,000 100,000 100,000 100,000 550,000Total100,000 138 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description "This project will prevent pollution at and near their source on the roads draining to priority waters. Targeted intensive street sweeping is one of the most effective interventions cities can make to promote clean waters. Cleaner streets = cleaner water. The project will work citywide in priority watersheds. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. Urban development with curb and gutter speeds water and accumulated pollutants like sediment, phosphorus and nitrogen downstream to waters where it accumulates causing water quality impairments. Sweeping removes the pollutants at and near their source before they have a chance to break down and make their way into waters." Project #ENG25037 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 2 - Targeted Intensive Street Sweeping Category Infrastructure Type New Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,00010,000 20,000 70,000Installation/Maintenance 10,000 20,000 70,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,00010,000 20,000 70,000Utility Fund: Storm 10,000 20,000 70,000 100,000Total 139 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description This project will coordinate with local watersheds and/or the Met Council to expand the network of monitoring for trends in waterbody health.The work is an implementation step of the Clean Water Strategy (CWS) the values and goals of which include;City actions align to do the most good towards measurable, desirable clean water outcomes leveraging creativity and innovation.•The city uses an iterative ‘build, test, learn’ model to make progress.•The city uses a systems approach in its implementation to consider cumulative benefits.•Clean water goals are pursued with consideration for multiple benefits and available resources.By tracking trends in close partnership with local water agencies, the City can better align and target its work for greater effect. Project #ENG25038 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 3 - Assurance, Monitoring, Lakegrades Category Infrastructure Type New Total Project Cost:$215,000 Total2025 2026 2027 2028 2029Expenditures 2030 215,00040,000 35,000 35,000 35,000 35,000Installation/Maintenance 35,000 40,000 35,000 35,000 35,000 35,000 215,000Total35,000 Total2025 2026 2027 2028 2029Funding Sources 2030 215,00040,000 35,000 35,000 35,000 35,000Utility Fund: Storm 35,000 40,000 35,000 35,000 35,000 35,000 215,000Total35,000 140 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description This project will control rough fish like carp and hybrid goldfish to reduce their harmful effects on clean water. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. Rough fish feed and stir up bottom sediments releasing accumulated pollutants into the water column causing algae blooms and water quality impairments. Project #ENG25039 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 4 - Rough Fish Management Category Infrastructure Type New Total Project Cost:$190,000 Total2025 2026 2027 2028 2029Expenditures 2030 190,00030,000 40,000 40,000 40,000Installation/Maintenance 40,000 30,000 40,000 40,000 40,000 190,000Total40,000 Total2025 2026 2027 2028 2029Funding Sources 2030 190,00030,000 40,000 40,000 40,000Utility Fund: Storm 40,000 30,000 40,000 40,000 40,000 190,000Total40,000 141 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will mitigate pollution in the stormwater systems draining to priority waters. While not as cost competitive as some of the in- waterbody and pollution control work in CWS 1,2, and 4, Clean water infrastructure can work in combination with these practices to further reduce water pollutants.The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. The project will work citywide in priority watersheds. Urban development with curb and gutter speeds water and accumulated pollutants like sediment, phosphorus and nitrogen downstream to waters where it accumulates causing water quality impairments. Clean water infrastructure intercepts the water, and filters, settles, or adsorbs pollutants to sequester them so they can be removed by a maintenance action and properly disposes or reuses them. Project #ENG25040 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 5 - New Clean Water Infrastructure Category Infrastructure Type New Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Utility Fund: Storm 150,000 150,000Total 142 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will rehabilitate approximately 1,200 linear feet of watermain pipe along Chapel Drive between Chapel Lane and Antrim Road. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. Project #ENG25043 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Chapel Drive Watermain Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Utility Fund: Water 300,000 300,000Total 143 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description The project will rehabilitate approximately 4,000 linear feet of watermain pipe along Maloney Avenue between Washington Avenue and Blake Road. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. This work may be combined with the Presidents Neighborhood Street Reconstruction Project. Project #ENG25044 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Maloney Ave Watermain Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$1,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,000,0001,000,000Utility Fund: Water 1,000,000 1,000,000Total 144 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Project #ENG25045 Justification The project will replace approximately 175 linear feet of watermain pipe under Nine Mile Creek between residential properties on the north and commercial properties on the south. The pipe is failing and needs replacement. The adjacent properties will need to provide access for the project. Useful LifeProject Name Watermain Replacement under NMC at 5901 Lincoln Dr Category Infrastructure Type Replace or repair Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Construction 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Utility Fund: Water 50,000 50,000Total 145 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace approximately 1150 linear feet of watermain pipe between Long Brake Trail, Shannon Drive and Coventry Way. The pipes are located behind residential properties in green space and storm water management areas. The pipes are failing and need replacement. The adjacent properties will need to provide access for the project. Project #ENG25046 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Watermain Replcmnt LB Tr/Shannon Dr/Coventry Way Category Infrastructure Type Replace or repair Total Project Cost:$225,000 Total2025 2026 2027 2028 2029Expenditures 2030 225,000225,000Construction 225,000 225,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 225,000225,000Utility Fund: Water 225,000 225,000Total 146 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will rehabilitate approximately 25,000 linear feet of watermain pipe within the Heights Neighborhood. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. Project #ENG25047 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Heights Neighborhood Watermain Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$6,250,000 Total2025 2026 2027 2028 2029Expenditures 2030 6,250,0006,250,000Construction 6,250,000 6,250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 6,250,0006,250,000Utility Fund: Water 6,250,000 6,250,000Total 147 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will include repair or replacement of public sidewalks and pedestrian curb ramps maintained by the City of Edina. This project supports the City’s ADA Transition Plan. Project #ENG25050 Justification Health, Safety & Regulatory Compliance Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Sidewalk Inspection Program Category Infrastructure Type Replace or repair Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,00050,000 50,000 50,000 50,000 50,000Installation/Maintenance 50,000 50,000 50,000 50,000 50,000 50,000 300,000Total50,000 Total2025 2026 2027 2028 2029Funding Sources 2030 300,00050,000 50,000 50,000 50,000 50,000PACS Fund: Utility Franchise Fees 50,000 50,000 50,000 50,000 50,000 50,000 300,000Total50,000 148 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will provide funding for roadway improvements that seek to reduce vehicle speeds and improve safety for pedestrians and cyclists. Such improvements may include curb extensions, medians, refuge islands, or dynamic display speed signs. Specific projects will be determined by staff based on observed data, traffic safety requests, and with input from the Traffic Safety Committee and the Transportation Commission. Project #ENG25051 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Drive 25 Improvements Category Infrastructure Type Replace or repair Total Project Cost:$120,000 Total2025 2026 2027 2028 2029Expenditures 2030 120,00020,000 20,000 20,000 20,000 20,000Construction 20,000 20,000 20,000 20,000 20,000 20,000 120,000Total20,000 Total2025 2026 2027 2028 2029Funding Sources 2030 120,00020,000 20,000 20,000 20,000 20,000PACS Fund: Utility Franchise Fees 20,000 20,000 20,000 20,000 20,000 20,000 120,000Total20,000 149 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves implementing a road diet on Normandale Road between 77th Street and Viking Drive and on Viking Drive between Normandale Road and Computer Avenue. The reallocation of right-of-way will provide space to add on-street bicycle facilities. This work will be implemented as part of a scheduled pavement maintenance project. Project #ENG25052 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Normandale Road/Viking Drive Bike Lanes Category Infrastructure Type New Total Project Cost:$28,200 Total2025 2026 2027 2028 2029Expenditures 2030 28,20028,200Construction 28,200 28,200Total Total2025 2026 2027 2028 2029Funding Sources 2030 28,20028,200PACS Fund: Utility Franchise Fees 28,200 28,200Total 150 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves updating the City’s Pedestrian and Bicycle Master Plan, which guides the development of the Edina’s multi-modal transportation network. This project will involve hiring a consultant to assist with community engagement, coordinating meetings with staff and officials, reviewing existing policies and best-practices, and developing recommendations. Project #ENG25053 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Pedestrian and Bicycle Master Plan Update Category Infrastructure Type Replace or repair Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000PACS Fund: Utility Franchise Fees 100,000 100,000Total 151 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves upgrading the existing bike lanes on Wooddale Avenue between 50th Street and Valley View Road. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Valley View Road and Wooddale Avenue. Project #ENG25054 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Wooddale Avenue Bike Lanes Category Infrastructure Type New Total Project Cost:$111,100 Total2025 2026 2027 2028 2029Expenditures 2030 111,10091,600 19,500Construction 91,600 19,500 111,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 111,10091,600 19,500PACS Fund: Utility Franchise Fees 91,600 19,500 111,100Total 152 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a shared-use path on McCauley Trail between Post Lane and Indian Hills Trail. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on McCauley Trail and proposed facilities on McCauley Trail and Indian Hills Trail. Project #ENG25055 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name McCauley Trail Shared-Use Path Category Infrastructure Type New Total Project Cost:$503,000 Total2025 2026 2027 2028 2029Expenditures 2030 503,000503,000Construction 503,000 503,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 503,000503,000PACS Fund: Utility Franchise Fees 503,000 503,000Total 153 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves implementing a road diet on 69th Street between France Avenue and York Avenue. The reallocation of right-of-way will provide space to add on-street bicycle facilities. This work will be implemented as part of a scheduled pavement maintenance project. Project #ENG25056 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name 69th Street Bike Lanes Category Infrastructure Type New Total Project Cost:$24,400 Total2025 2026 2027 2028 2029Expenditures 2030 24,40024,400Construction 24,400 24,400Total Total2025 2026 2027 2028 2029Funding Sources 2030 24,40024,400PACS Fund: Utility Franchise Fees 24,400 24,400Total 154 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a bike boulevard on West Shore Drive between 66th Street and 70th Street. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 70th Street and proposed facilities on 66th Street and West Shore Drive. Project #ENG25057 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name West Shore Drive Bike Boulevard Category Infrastructure Type New Total Project Cost:$35,100 Total2025 2026 2027 2028 2029Expenditures 2030 35,10035,100Construction 35,100 35,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 35,10035,100PACS Fund: Utility Franchise Fees 35,100 35,100Total 155 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of bike lanes on 44th Street between France Avenue and Grimes Avenue. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 44th Street and Grimes Avenue. Project #ENG25058 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name W 44th St Bike Lanes Category Infrastructure Type New Total Project Cost:$18,100 Total2025 2026 2027 2028 2029Expenditures 2030 18,10018,100Construction 18,100 18,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 18,10018,100PACS Fund: Utility Franchise Fees 18,100 18,100Total 156 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of bike lanes on Metro Boulevard between 70th Street and Edina Industrial Boulevard. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 70th Street and 72nd Street. Project #ENG25059 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Metro Boulevard Bike Lanes Category Infrastructure Type New Total Project Cost:$60,900 Total2025 2026 2027 2028 2029Expenditures 2030 60,90060,900Construction 60,900 60,900Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,90060,900PACS Fund: Utility Franchise Fees 60,900 60,900Total 157 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the replacement of an existing pedestrian bridge over Minnehaha Creek between Beard Avenue and Beard Court. This project will create a fully accessible pedestrian and bicycle bridge connecting the Creek Knoll and Chowen Park neighborhoods. Project #ENG25060 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Minnehaha Creek Pedestrian Bridge Category Infrastructure Type New Total Project Cost:$1,200,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,200,0001,200,000Construction 1,200,000 1,200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,200,0001,200,000PACS Fund: Utility Franchise Fees 1,200,000 1,200,000Total 158 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of Edina Industrial Boulevard between Bush Lake Road and Metro Boulevard. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Metro Boulevard and Edina Industrial Boulevard. Project #ENG25061 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Edina Industrial Boulevard Sidewalk Category Infrastructure Type New Total Project Cost:$297,500 Total2025 2026 2027 2028 2029Expenditures 2030 297,500297,500Construction 297,500 297,500Total Total2025 2026 2027 2028 2029Funding Sources 2030 297,500297,500PACS Fund: Utility Franchise Fees 297,500 297,500Total 159 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of 66th Street between Ridgeview Drive and Josephine Avenue. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Ridgeview Drive, 66th Street and Normandale Road. Project #ENG25062 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternative - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name W 66th Street Sidewalk Category Infrastructure Type New Total Project Cost:$476,000 Total2025 2026 2027 2028 2029Expenditures 2030 476,000476,000Construction 476,000 476,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 476,000476,000PACS Fund: Utility Franchise Fees 476,000 476,000Total 160 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves hiring a consultant to design bicycle facilities on Valley View Road between 64th Street and 66th Street underneath the Highway 62 overpass. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Valley View Road and proposed facilities on 66th Street. Project #ENG25063 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Valley View Road Bike Lane Design Category Infrastructure Type New Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,000Construction50,000 50,000Total50,000 Total2025 2026 2027 2028 2029Funding Sources 2030 50,000PACS Fund: Utility Franchise Fees 50,000 50,000Total50,000 161 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This proejct would provide for the lining of a neighborhood that experiences a significant amount of inflow and infiltration into the sanitary sewer system ENVIRONMENTAL CONSIDERATIONS: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Project #PW23010 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protectthe health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Nine Mile Village Sewer Lining Category Infrastructure Type Replace or repair Total Project Cost:$175,000 Total2025 2026 2027 2028 2029Expenditures 2030 175,000175,000Construction 175,000 175,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 175,000175,000Utility Fund: Sewer 175,000 175,000Total 162 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project will replace 130 LF of sewer main on Olinger Boulevard. This dip in the sewer line collects debris and does not allow the sewer to flow properly which leads to potential blockages of the sewer. ENVIRONMENTAL CONSIDERATIONS: As mentioned in the description, there is a large dip in the sewer at this location. Since there is not free flowing sewage at this location, solids tend to settle out and create potential for blockages. This section of sewer needs to cleaned more frequently thereby creating addition trips and fuel usage. Project #PW23011 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Olinger Road Dip Replacement: 130 LF + Road Repair Category Infrastructure Type Replace or repair Total Project Cost:$80,000 Total2025 2026 2027 2028 2029Expenditures 2030 80,00080,000Construction 80,000 80,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 80,00080,000Utility Fund: Sewer 80,000 80,000Total 163 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description In our continuing efforts to provide an accessible environment for residents, visitors and employees, the City completed an ADA inventory to understand areas of need. The inventory conducted an evaluation for compliance with applicable laws, codes and design guidelines pertaining to accessibility. This project will begin to address the recommendations prioritized for completion in 3-8 years. ENVIRONMENTAL CONSIDERATIONS: Facility improvements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21044 Justification See Summary of Facilities Improvements. Useful LifeProject Name City Wide ADA Facility Improvements Level 2 Category Buildings Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,00050,000 100,000 50,000Construction 100,000 50,000 100,000 50,000 300,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 300,00050,000 100,000 50,000Construction Fund: CIP Levy 100,000 50,000 100,000 50,000 300,000Total100,000 164 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals. Project #ENG21051 Justification See Summary of Facilities Improvements. Useful LifeProject Name Pamela Park Facility Maintenance Category Buildings Type Replace or repair Total Project Cost:$210,000 Total2025 2026 2027 2028 2029Expenditures 2030 210,000210,000Construction 210,000 210,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 210,000210,000Construction Fund: CIP Levy 210,000 210,000Total 165 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Facilities Description This project will create funding to build new buildings more sustainable and replace failing mechanical systems with more energy efficient systems. These actions reduce energy use and greenhouse gas emissions. ENVIRONMENTAL CONSIDERATIONS: Major facility mechanical equipment replacements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21062 Justification See Summary of Facilities Improvements Useful Life 50Project Name Facility Efficiency Upgrades Category Buildings Type Replace or repair Total Project Cost:$3,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 3,000,000500,000 500,000 500,000 500,000 500,000Construction 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000Total500,000 Total2025 2026 2027 2028 2029Funding Sources 2030 3,000,000500,000 500,000 500,000 500,000 500,000CAS Fund: Utility Franchise Fees 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000Total500,000 166 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description Kitchen cabinets and remodel, exterior doors, gas furnace, swinging doors, painting, carpeting, new greenhouse, interior doors museum, museum carpet, mau maintence area, museum exterior windows and doors, museum stucco ceiling, museum roof, and basement wall paint, museum lights, maintenance roof, walls, casework and lights, painting, restroom accessories, ceramic tile, wood treatments, vct, concrete sealing, plaster, ceiling tile, exhst systems, electric controls, pa system, OH doors, partitions, water htrs, fire alarm system, security system, exit signs, batteries, restroom accessories, frp walls, 2025 - Museum Sprinkler, staining, 2026 - Museum restroom fixture, water distribution,cooler,maintenance bldg,custodial sinks, and restroom plumbing, electric feeder, exit signs, concrete sealing, water distribution Project #FAC23109 Justification See Summary of Facilities Improvements. Useful LifeProject Name Arneson Acres Park Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$700,000 Total2025 2026 2027 2028 2029Expenditures 2030 700,000700,000Installation/Maintenance 700,000 700,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 700,000700,000Construction Fund: CIP Levy 700,000 700,000Total 167 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project will provide upgrades to fire alarm systems for planned centralized monitoring and location services to 911 dispatch.This project will expand card reader access devices to additional buildings and spaces." Project #FAC25101 Justification Expansion and/or Level of Service Useful LifeProject Name City Wide Card Reader & Fire Alarm Updates Category Buildings Type Expand or enhance Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Construction Fund: CIP Levy 100,000 100,000Total 168 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description This project involves a scheduled replacement of roofs of city owned buildings. Many of the roofs are nearing the end of their useful life and if not addressed failure is likely causing damage to property and possible downtime for portions of city operations. Schedule replacement allows for planning of disruption to building and surroundings and can lessen the likelihood of critical system failures. In 2023 a consultant was retained to inspect and evaluate the roofing system on all buildings. The report detailed the conditions outlining the needs for repairs and total replacements indicating both remaining life expectancy and estimated costs. A roof photovoltaic (PV) feasibility study was conducted in 2023 researching possible solar arrays with planned replacements. If installed and planned together the probability of damage to the roofing during installation of PV systems is minimized. This also allows the city to time future replacement of both systems to happen simultaneously. The PV systems are submitted under a separate project. Roofs 2025 #1 Public Works Building Offices $800,000 2026 #2 Fire Station #1 $600,000 2027 #3 Edinborough Park $2,000,000 Roofs w/ PV 2026 #1 York Ave. Liquor $450,000 2026 #2 Pamela Park $100,000 2029 #3 SMPSTG $500,000 2030 #4 Public Works Building Shops $4,000,000 Project #FAC25103 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Wide Roof Replacement Category Buildings Type Replace or repair Total Project Cost:$12,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 12,500,000800,000 700,000 2,000,000 5,000,000Construction 4,000,000 800,000 700,000 2,000,000 5,000,000 12,500,000Total4,000,000 Total2025 2026 2027 2028 2029Funding Sources 2030 12,500,000800,000 700,000 2,000,000 5,000,000CIP Bonds 4,000,000 800,000 700,000 2,000,000 5,000,000 12,500,000Total4,000,000 169 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jon Darsow 2025 2030thru Department Facilities Description "This project involves a multi-faceted approach to repairs and maintenance within the 50th and France Special Services District also referred to as “50th & France ” . The 50th & France District is a high-quality commercial and residential community asset that has seen numerous private developments and public improvements over the years giving it a unique and complex history. The majority of the district’s streetscape improvements were either reconstructed or newly installed in 1990. Kimley Horn & Associates have conducted a number of assessments over the past decade highlighting needed repairs and improvements in the district. The most recent of which in 2021 identified over $6M of items needing attention. This includes the street and pedestrian lighting, granite-cladding to raised planters, at grade foundation plantings, street trees planted in pits with tree grates, public fountain, benches, trash receptacles, and concrete paver sidewalks. These items are amplified by the new development in the area such as Nolan Mains and the Carillon Building. Investments in the city owned property are needed to ensure these items don’t fall into further dismay discouraging future development and investments in the area. 2025-$400,000 planning2026 --$3.0M--Phase 12027 --$3.0M--Phase 22029--$1.0M--Phase 3" Project #FAC25105 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name 50th & France Streetscapes Improvements Category Land Type Replace or repair Total Project Cost:$7,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 7,400,000400,000 3,000,000 3,000,000 1,000,000Installation/Maintenance 400,000 3,000,000 3,000,000 1,000,000 7,400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 7,400,000400,000 3,000,000 3,000,000 1,000,000CIP Bonds 400,000 3,000,000 3,000,000 1,000,000 7,400,000Total 170 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description This project would renovate and update the living quarters in Fire Station 231. Project #FAC25108 Justification Asset Functionality Useful LifeProject Name Fire Station #1 Living Quarters Category Buildings Type Replace or repair Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000Installation/Maintenance 500,000 500,000Total500,000 Total2025 2026 2027 2028 2029Funding Sources 2030 500,000Construction Fund: CIP Levy 500,000 500,000Total500,000 171 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Zuly Marquez 2025 2030thru Department Facilities Description This project involves the demolition of Fire Station #2, York Ave, and assumes the building is removed and site left as pad ready. No other modifications to building or site amenities are included. Project #FAC25109 Justification Asset Functionality Useful LifeProject Name Fire Station #2 York Ave. Building Demo Category Buildings Type Replace or repair Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Installation/Maintenance 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000Utility Fund: Water 500,000 500,000Total 172 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project involves the replacement of software used to track the overall condition of city owned facilities. In addition to indexing the buildings this software would allow the city to process work orders for planned preventative maintenance, routine and emergency repairs to building components and other areas of the city like utility and infrastructure components, park playground structures, natural resource areas and enterprise sites. The software used to conduct the study in 2018 no longer meets the operational requirements of buildings as it does allow for tracking of resources spent on maintenance and repairs. Purchase of software is a lump sum price and will require an annual maintenance agreement." Project #FAC25110 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. Useful LifeProject Name Facility Asset Maintenance Software Category Technology Type Replace or repair Total Project Cost:$1,044,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,044,000300,000 135,000 142,000 150,000 155,000Installation/Maintenance 162,000 300,000 135,000 142,000 150,000 155,000 1,044,000Total162,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,044,000300,000 135,000 142,000 150,000 155,000Construction Fund: Equipment Levy 162,000 300,000 135,000 142,000 150,000 155,000 1,044,000Total162,000 173 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "A structural engineering review in 2020 of the existing cold storage discovered damage to the building structure. Repairs were made to extend the useful life, but the extent was deemed temporary, the reviewing consultant recommended complete replacement in 2-5 years. $200,000 for planning $2,300,000 for new building " Project #FAC25113 Justification Asset Functionality Useful LifeProject Name Public Works Cold Storage Building Replacement Category Buildings Type Replace or repair Total Project Cost:$2,600,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Planning and Design 2,300,0002,300,000Installation/Maintenance 300,000 2,300,000 2,600,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,300,0002,300,000CIP Bonds 300,000300,000Construction Fund: Reserves 300,000 2,300,000 2,600,000Total 174 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Reconfigure office spaces within Public Works to meet current and future staffing needs. As staffing increases to meet the needs of essential functions for the City, the office spaces for staff will require updates and reconfiguration as well. Many of these building are over-occupied with multiple staff using spaces that were once designed for storage or ancillary functions like copy rooms. Renovations allows the city to maximize within spaces while also providing flexible work spaces to attract prospective employees and align with current trends in work-flex and office policies. Expansion of Parking Lot also needed. " Project #FAC25114 Justification Expansion and/or Level of Service Useful LifeProject Name Public Works Space Reconfiguration Category Buildings Type Expand or enhance Total Project Cost:$850,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Planning and Design 775,000775,000Construction 75,000 775,000 850,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 850,00075,000 775,000Construction Fund: CIP Levy 75,000 775,000 850,000Total 175 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace access gates in 2 locations at Public Works Building. Existing gates have reached the end of their useful life and require extensive maintenance and financial resources. These gates provide essential security and access control to the complex, when broken can affect the cities ability to provide essential services like utility repairs, snow management and ice-treatments and fueling services for public safety equipment of police and fire. " Project #FAC25115 Justification Asset Functionality Useful LifeProject Name Public Works Access Gates Category Buildings Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Installation/Maintenance 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Construction Fund: CIP Levy 300,000 300,000Total 176 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description Existing Building Automation System (BAS) components has reached the end of its useful life. These systems provide control over the HVAC systems in the building and allow for building optimization during heat and cooling events. In addition the lighting systems in the building also need to be replaced as they are also nearing end of life. Project #FAC25117 Justification Asset Functionality Sustainability - Updated BAS & Lighting systems will reduce energy consumption and loss throughout the building. Thus lowering the carbon footprint of the building. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Public Works BAS & Lighting Upgrades Category Buildings Type Replace or repair Total Project Cost:$825,000 Total2025 2026 2027 2028 2029Expenditures 2030 125,000125,000Planning and Design 700,000700,000Installation/Maintenance 125,000 700,000 825,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 825,000125,000 700,000Construction Fund: CIP Levy 125,000 700,000 825,000Total 177 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace existing AV equipment throughout space. Equipment is used for programming in space by city staff, residents and paid programming. Quote produced in 2023" Project #FAC25118 Justification Expansion and/or Level of Service Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Senior Center AV Equipment Category Technology Type Replace or repair Total Project Cost:$55,000 Total2025 2026 2027 2028 2029Expenditures 2030 55,00055,000Installation/Maintenance 55,000 55,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 55,00055,000Construction Fund: Cable PEG 55,000 55,000Total 178 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description This project involves the design and replacement of the Audio Visual Systems at Braemar Golf Course. Includes both meeting rooms in basement and minor changes to banquet area. Project #FAC25120 Justification Asset Functionality Useful LifeProject Name Golf Course Audio Visual Replacement Category Equipment and Vehicles Type New Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000250,000Vehicles and Equipment 250,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000250,000Golf Course Fund 250,000 250,000Total 179 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project involves the replacement of the emergency radio repeater/booster in the Public Works Building. The system provides signal boost to emergency services personal inside the building during an emergency and is vital to their ability to communicate.The existing system was damaged a number of years ago and is no longer functioning. " Project #FAC25121 Justification Health, Safety & Regulatory Compliance Useful LifeProject Name PW Building Emergency Services Radio Repeater Category Equipment and Vehicles Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000250,000Installation/Maintenance 250,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000250,000Public Safety Aid 250,000 250,000Total 180 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Design Services to replace existing studio lighting in City Council Chambers. System is standalone from rest of building lighting and will remain so. Project includes design fees only to allow for a budget to be set in subsequent CIP. Facilities would lead project with support from Communications. " Project #FAC25122 Justification Asset Functionality Justification - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall Council Chambers Studio Lighting Category Equipment and Vehicles Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Installation/Maintenance 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Construction Fund: Cable PEG 300,000 300,000Total 181 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Existing HVAC unit servicing Edinborough Park Pool area has reached the end of useful life. Mechanical failures in early 2024 resulted in a repair bill in excess of $15,000. This unit has a history of requiring major repairs similar to this over the past 3-5 years.$100K for design services, $250K for equipment and installation. " Project #FAC25123 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment Useful LifeProject Name Edinborough Park Pool HVAC Unit Category Equipment and Vehicles Type Replace or repair Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 350,000350,000Installation/Maintenance 350,000 350,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 350,000350,000CIP Bonds 350,000 350,000Total 182 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jon Darsow 2025 2030thru Department Facilities Description "This project will install a new comfort station facility near hole 6. Facilities along with Braemar staff identified an area in the front 9 portion of the golf course where a much needed comfort station could be easily located. The amount included in the CIP is meant to be a match to funding from the Golf Course. " Project #FAC25124 Justification Expansion and/or Level of Service Sustainability - The new comfort station will possibly utilize solar power for all electrical and water heating needs. Useful LifeProject Name Golf Course Restroom Front 9 Category Parks Type Expand or enhance Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Construction 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Golf Course Fund 400,000 400,000Total 183 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace 2 existing HVAC condensing units servicing city hall. These units provide necessary refrigeration to keep the building comfortable during cooling season. The existing units have reached the end of their useful life and need replacement. Preparations for the replacement will happen concurrently with the re-roofing of the building in 2024. " Project #FAC25125 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall HVAC Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Installation/Maintenance 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000Construction Fund: CIP Levy 500,000 500,000Total 184 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description A roof photovoltaic (PV) feasibility study was conducted in 2023 researching possible solar arrays and Electric Vehicle (EV) charging stations for both private and public use. The study reviewed all city buildings, parking ramps, and large parking surface lots taking into consideration possible array size, energy generation, and required infrastructure upgrades and made recommendations on ideal sites. The installation of the PV & EV systems should align with the replacement of any roofing or parking lots to minimize disruption and avoid costly retrofitting of systems. PV 2026 #1 York Ave Liquor $225,000 2026 #2 Pamela Park $300,000 2028 #3 Senior Center $500,000 2029 #4 SMPSTF $500,000 EV 2030 #1 City Hall $600,000 Lvl. 3 Fast Charger 2030 #2 SMPSTF $500,000 Lvl 2 chargers Project #FAC25126 Justification Expansion and/or Level of Service Sustainability:This project supports Climate Action Plan Strategy BE 7: Achieve 25% municipal building thermal “fuel switching"" from on-site fossil fuel combustion to less carbon intensive, or carbon neutral sources by 2030. Adding more electric vehicles to the City’s fleet is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emissions. Fast charging supports electric vehicle adoption by providing quick, convenient charging. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of electric vehicle charging infrastructure. Focusing on city fleet, this project does not contain an engagement component. Health in All Policies: Electric vehicles are zero-emission vehicles, meaning there are no harmful tailpipe emissions that negatively impact air quality. Race & Equity: Charging stations located across the community create equitable access to infrastructure. Stewardship: The cost to charge vehicles is decreasing and is already more cost-effective per mile to charge a vehicle when compared to gas- powered vehicles Useful LifeProject Name Photovoltaic & EV Charger Installation Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$2,225,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,225,000575,000 50,000 500,000Vehicles and Equipment 1,100,000 575,000 50,000 500,000 2,225,000Total1,100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,225,000575,000 50,000 500,000CAS Fund: Utility Franchise Fees 1,100,000 575,000 50,000 500,000 2,225,000Total1,100,000 185 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description The project will continue the process of making our buildings more efficient by conducting an evaluation of entire building systems across the cities portfolio. These studies review performance or MEP systems as well as those of that create the building envelope replacing inefficient system with newer technology. These types of projects are co-led by Facilities and Sustainability and work directly with building occupants and staff involved in the operations of the space. Project #FAC25127 Justification Asset Functionality Useful LifeProject Name Fire Station #1 Energy Management Study Category Buildings Type Replace or repair Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Planning and Design 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000CAS Fund: Utility Franchise Fees 500,000 500,000Total 186 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description A portion of the current CIP levy will be held in reserve at the beginning of each year to address unforeseen or unplanned repairs that must be made. The intent is that the money will be used to lessen the impact on facilities and enterprise sites operating funds, better helping those responsible for the site to make sound decisions on proper repairs vs. band-aid solutions. The CIP committee will meet periodically each year to review the available funds against any items that may have come up, or when possible how those funds can be used to expand other programs or projects that didn’t make the initial funding list. Project #FAC25200 Justification See Summary of Facilities Improvements. Useful LifeProject Name Asset Preservation Funding Category Buildings Type Replace or repair Total Project Cost:$4,450,000 Total20252026202720282029Expenditures2030 4,450,000800,000 700,000 700,000 700,000 750,000Construction 800,000 800,000 700,000 700,000 700,000 750,000 4,450,000Total800,000 Total20252026202720282029Funding Sources 2030 4,450,000800,000 700,000 700,000 700,000 750,000Construction Fund: CIP Levy 800,000 800,000 700,000 700,000 700,000 750,000 4,450,000Total800,000 187 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Zuly Marquez 2025 2030thru Department Fire Description For several years, the Edina Fire Department has been responding to an increasing number of emergency medical calls for service. The area of town with the greatest growth and concentration of medical calls is the southeast quadrant of the city, south of the Crosstown and east of Minnesota Highway 100. The Fire Department currently operates Fire Station 2 on York Avenue next to the Southdale YMCA. Staffed with two Firefighter/Paramedics, Fire Station 2 is not large enough to provide the level of services needed in the southeast quadrant in the future. The land is also too small to build the size of station needed to best serve the community. On May 4, 2022, City Council gave approval for the City to enter into a purchase agreement for the property at 4401 West 76th Street for the purposes of building a new fire station. City Council authorized financing for up to $39 million of general obligation bonds for the land acquisition and construction of the fire station project. Project #FIR21008 Justification Relocation and construction of Fire Station No. 2 near the southeast corner of the Southdale Center in Edina is imperative to the city’s attempt at addressing the major call density in that part of the city; as well as expands the capability of offering mutual aid assistance on a regional scale. As a provider of ambulance-based life support services in Hennepin County, Edina Fire Department must also meet Hennepin County Ordinance 9, Emergency Medical Services. This ordinance requires among other things that the department achieve a travel time of 10 minutes to 80% of the community for a city like Edina, with increase call for assistance within and outside of city limits these travel times will prove to become more challenging without the relocation of Fire Station 2. It should also be noted that more than 1/3 of the response zone for Station 2 is in Richfield; moving the station north and west of the current location will better center it and move it closer to growing areas of the community. Housing and the population of the Southdale area has increased significantly in recent years. The Greater Southdale District Plan, adopted by the city on December 18, 2018, reports that the population of this area grew 28% from 2000 to 2018, compared to an overall 9% population growth citywide over the same period. The Greater Southdale area, formerly used for primarily commercial purposes, has been transitioning in recent years to more multi-family housing with new commercial on first floor. The increased demand for fire and advanced life support ambulances also coincides with continued growth of the M-Health Fairview Southdale Hospital campus. Over the past 20 years, the hospital has nearly doubled in size from 395,000 sq ft in 2001 to 720,000 sq ft in 2021. Finally, the Greater Southdale District Plan also reports a larger percentage of older residents in this area than citywide. Aging demographics can be linked to an increase in the calls for emergency medical response in the Southdale area. Budget Impact/Other Useful LifeProject Name Community Health & Safety Center Category Buildings Type New Total Project Cost:$26,000,000 Total20252026202720282029Expenditures2030 26,000,00026,000,000Construction 26,000,000 26,000,000Total Total20252026202720282029Funding Sources 2030 26,000,00026,000,000CIP Bonds 26,000,000 26,000,000Total 188 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Slama 2025 2030thru Department Fire Description Plan for the continued growth in the northeast quadrant of the city. It is anticipated that in 5-10 years there will be a need for a station in the general location of City Hall to support the need for improved ALS and fire response in the northern quadrants of the City. The Five Bugles Design report recommended the: - Acquisition of 2-4 acres of land for Proposed Station No. 3 near City Hall. - Construction of proposed Station No. 3 as needed (assumed to be required in next 5-10 years). Project #FIR21009 Justification In 2018, the Fire Department hired Five Bugles Design to conduct a response time and station location study. The final report was submitted to City Council in January 2019.The report recommended adding Fire Station 3 in the next 5 - 10 years. The new fire station would be approximately 13,400 sq. ft consisting of 3 bays, sleeping accommodations for 5 - 6 personnel. This 24-hour station would be capable of housing one ALS ambulance crew and one engine company and space for a utility/staff vehicle. Budget Impact/Other Useful LifeProject Name Fire Station #3 Category Buildings Type New Total Project Cost:$50,000,000 Total20252026202720282029Expenditures2030 50,000,00050,000,000Construction 50,000,000 50,000,000Total Total20252026202720282029Funding Sources 2030 50,000,00050,000,000CIP Bonds 50,000,000 50,000,000Total 189 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Slama 2025 2030thru Department Fire Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as fire trucks, ambulances, safety equipment, emergency medical equipment and technology, among other items. 2025 Equipment Levy: 2016 Ford F350 Ambulance/Fire Truck Debt Payment 2019A GO Bond 2015 Toyota Prius C 2015 Toyota Prius C 2015 Toyota Prius C 2015 Toyota Prius C 2025 Public Safety Aid: Mobile Air Cart Response LUCAS 2 Chest Compression Device Respirator Fit Tester Machine Thermal Imager EOC IT Equipment Hub Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator 2026 Equipment Levy: Equip Cert Payment Ultrasound Devices Ambulance/Fire Truck Debt Payment 2019A GO Bond 2027 Equipment Levy: 2018 Chevrolet Tahoe 2018 Chevrolet Tahoe Equip Cert Payment Fire Protective Gear Dryer Ambulance/Fire Truck Debt Payment 2019A GO Bond Warning Siren #6 - Gleason/Dewey Hill Warning Siren #9 -7235 France Ave. Warning Siren #4 - 5300 Blake Rd Warning Siren #5 - 6250 Hansen Rd Warning System Siren (#2 - 4201 W.44th St.) 2028 Equipment Levy: 2018 Chevrolet Tahoe 2018 Chevrolet Tahoe Equip Cert Payment Station Alerting Ambulance/Fire Truck Debt Payment 2019A GO Bond 2016 Toyota Prius C 2016 Toyota Prius C 2018 Toyota Prius C 2018 Toyota Prius C 2029 Equipment Levy: Project #FIR25200 Useful LifeProject Name Fire Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$6,675,492 190 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Slama 2025 2030thru Department Fire LUCAS 2 Chest Compression Device LUCAS 2 Chest Compression Device LUCAS 2 Chest Compression Device Equip Cert Payment Station 1 &2 Floor Scrubber Ambulance/Fire Truck Debt Payment 2019A GO Bond Warning Siren #3 - 7200 Metro Blvd 2030 Equipment Levy: Equip Cert Payment Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of fire safety equipment, emergency and medical equipment and vehicles allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenenace costs low. Budget Impact/Other Total2025 2026 2027 2028 2029Expenditures 2030 6,675,492890,500 1,044,845 1,258,995 1,403,395 1,112,350Vehicles and Equipment 965,407 890,500 1,044,845 1,258,995 1,403,395 1,112,350 6,675,492Total965,407 Total2025 2026 2027 2028 2029Funding Sources 2030 6,300,292515,300 1,044,845 1,258,995 1,403,395 1,112,350Construction Fund: Equipment Levy 965,407 375,200375,200Public Safety Aid 890,500 1,044,845 1,258,995 1,403,395 1,112,350 6,675,492Total965,407 191 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project involves replacement of the Normandale Park shelter building with a more modern design similar to Countryside and Pamela Park. Normandale Park is a 10 acre neighborhood park. Staff would complete a master plan of Normandale Park is 2027 and recommends the replacement of the playground in 2028. ENVIRONMENTAL CONSIDERATIONS: Replacing this building will upgrade the lighting and heating systems with more energy efficient equipment. Project #15-048 Justification The Normandale Park shelter building was designed and build in the 1970ss and no longer meets resident's needs and expectations. A park building assessment was completed in conjunction with the Parks, Recreation & Trails Strategic Plan and the shelter building was assessed to be in poor condition. The building requires extensive maintenance, is poorly insulated, and visually intimidating with no windows, and was recommended for scheduled replacement. Useful LifeProject Name Normandale Park Shelter Building Replacement Category Buildings Type Replace or repair Total Project Cost:$1,040,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,040,00040,000 1,000,000Construction 40,000 1,000,000 1,040,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,040,00040,000 1,000,000Construction Fund: CIP Levy 40,000 1,000,000 1,040,000Total 192 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Creek Valley park is an active park within our parks system, with two soccer fields that are utilized by private athletic leagues and the Edina Public School system. The current system is 35 years old, and is due for replacement. We are unable to secure parts for this system, uses an excess amount of water and is not efficient. It is important to note that the athletic fields are on school district property but we maintain them. Project #17-143 Justification This is a part of our City Work plan to maintain optimum field operations. Useful LifeProject Name Creek Valley Irrigation Category Parks Type Replace or repair Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Vehicles and Equipment 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Special Park Improvement Levy 50,000 50,000Total 193 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Tingdale Park. Project #19-763 Justification See Summary of Playground Improvements Useful LifeProject Name Tingdale Park Playground Replacement Category Parks Type Replace or repair Total Project Cost:$155,000 Total2025 2026 2027 2028 2029Expenditures 2030 155,000155,000Vehicles and Equipment 155,000 155,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 155,000155,000Special Park Improvement Levy 155,000 155,000Total 194 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project includes the repair and replacement of general park and recreation park assets and infrastructure. Final evaluation of the amenity will be made in order to continue replacement of park equipment prior to scheduled replacement to ensure improvements are made as needed. This includes items such as tennis, basketball and other hard court repair and replacement; fencing for tennis, softball and baseball; replacement of hockey rinks, basketball standards as well as other property in the open such as benches, tables, drinking fountains and trash receptacles. Regular repair and replacement of these amenities will extend the life of these facilities. ENVIRONMENTAL CONSIDERATIONS: Per city policy staff will incorporate the use of recycled materials in products as available to offset these replacements. Project #P&R21001 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. This is part of our City Work Plan to maintain optimum facility operations. Useful LifeProject Name General Park Asset Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,00050,000 50,000 50,000 50,000Construction 50,000 50,000 50,000 50,000 50,000 250,000Total50,000 Total20252026202720282029Funding Sources 2030 200,00050,000 50,000 50,000Construction Fund: Equipment Levy 50,000 50,00050,000Construction Fund: CIP Levy 50,000 50,000 50,000 50,000 250,000Total50,000 195 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project schedules the repair and replacement of existing outdoor athletic lighting for fields and rinks. This project does not expand lighting to areas that currently does not have lights. Project #P&R21003 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. This is part of our City Work Plan to maintain optimum facility operations. Useful LifeProject Name Outdoor Athletic Field Lighting Category Infrastructure Type Replace or repair Total Project Cost:$900,000 Total2025 2026 2027 2028 2029Expenditures 2030 900,000180,000 180,000 180,000 180,000Installation/Maintenance 180,000 180,000 180,000 180,000 180,000 900,000Total180,000 Total2025 2026 2027 2028 2029Funding Sources 2030 900,000180,000 180,000 180,000 180,000Special Park Improvement Levy 180,000 180,000 180,000 180,000 180,000 900,000Total180,000 196 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project would improve the field condition and enhancements for programmed athletic fields in Edina Parks. Improvements would increase field drainage, field health, player safety, and sustainability. Improvement would increase field reliability for associations and users as well as improved participant experience. Project #P&R21006 Justification This field could support more youth athletics activities if the conditions are improved. Useful LifeProject Name Athletic Field Improvements Category Parks Type Replace or repair Total Project Cost:$1,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,050,000350,000 350,000Construction 350,000 350,000 350,000 1,050,000Total350,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,050,000350,000 350,000Construction Fund: CIP Levy 350,000 350,000 350,000 1,050,000Total350,000 197 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project includes master planning for Strachauer Park, a 4.5 acre neighborhood park. This project is the second phase of implementation for the Strachauer Park Master Plan. This phase includes the removal and relocation of the park shelter. Design for this phase will incorporate park and programming requirements as well as community feedback. Project #P&R21039 Justification The shelter building was assessed to be in poor condition. The building requires extensive maintenance. Useful LifeProject Name Strachauer Park Master Plan Phase II Category Parks Type Expand or enhance Total Project Cost:$1,100,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,100,0001,100,000Construction 1,100,000 1,100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,100,0001,100,000Special Park Improvement Levy 1,100,000 1,100,000Total 198 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Normandale Park. Project #P&R21046 Justification See Summary of Playground Improvements Useful LifeProject Name Normandale Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Vehicles and Equipment 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Construction Fund: CIP Levy 200,000 200,000Total 199 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Heights Park. Project #P&R21047 Justification See Summary of Playground Improvements Useful LifeProject Name Heights Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$175,000 Total2025 2026 2027 2028 2029Expenditures 2030 175,000175,000Vehicles and Equipment 175,000 175,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 175,000175,000Construction Fund: CIP Levy 175,000 175,000Total 200 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Sherwood Park. Project #P&R21048 Justification See Summary of Playground Improvements Useful LifeProject Name Sherwood Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Vehicles and Equipment 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Special Park Improvement Levy 150,000 150,000Total 201 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Kojetin Park. Project #P&R21049 Justification See Summary of Playground Improvements Useful LifeProject Name Kojetin Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$165,000 Total2025 2026 2027 2028 2029Expenditures 2030 165,000165,000Vehicles and Equipment 165,000 165,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 165,000165,000Special Park Improvement Levy 165,000 165,000Total 202 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Replacement of and update to outdoor and indoor public facing furniture. Many of the amenities are outdated, mismatched and have no draw to users. Earlier this year, new outdoor furniture was installed at the Golf Course and at the Aquatic Center and was welcomed and positively received. $40,000 for furniture at Centennial Lakes Park and $25,000 for furniture at Edinborough Park. Project #P&R23100 Justification Replacement of and update to outdoor and indoor public facing furniture at these two locations will benefit users and visitors to each location. Useful LifeProject Name CLP & EP Interior and Exterior Public Furniture Category Equipment and Vehicles Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Federal ARPA 40,000 40,000Total 203 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Replace equipment according to the equipment replacement schedule. The Parks Maintenance Department has almost $2 million of equipment covered under this program. Types of equipment include small machinery, mowers, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025: 2008 Ford Ranger 2013 GMC Sierra 60" turf Sweeper 2010 Terex Track Loader 2011 Ford XLT Ranger 4x4 2013 Chevrolet Silverado 2500HD 2026: 2013 Chevrolet Silverado 2500HD Toro Groundsmaster 5910 2015 John Deere 1570 Mower 2011 Ford Ranger 2013 F-450 2015 Ford F250 2010 Farm King Snowblower 2014 John Deere X540 Tractor 2015 Toro 2Master 2027: 2016 Toro SandPro 2040Z 2009 Silverado 1500 2017 Exmark Lazer Mower 2017 Bobcat 5600 2016 Toro GTX Workman 2006 Jacovsen Truck Cart 2028: GPS Line Marking System Toro Groundmaster 3500 Mower 2016 Chevrolet Colorado 2016 Polaris Ranger ATV 2004 John Deere Tractor 2029: 2015 Land Pride Mower 4216 2011 Freightliner M2106 2030: 2010 Vermeer Brush Chipper 2015 John Deere 5115M Tractor Groundsmaster 3280-D Mower Groundsmaster 3280-D Mower 2020 Ford F550 Project #P&R23120 Useful LifeProject Name Park Maintenance Equip Replacement - Vehicles Category Equipment and Vehicles Type Replace or repair Total Project Cost:$1,693,750 204 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs low but most importantly allows us to keep maintaining our parks to high standards. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of the Park Maintenance division without a reliable fleet. Total2025 2026 2027 2028 2029Expenditures 2030 1,693,750329,300 411,700 234,250 223,500 191,000Vehicles and Equipment 304,000 329,300 411,700 234,250 223,500 191,000 1,693,750Total304,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,693,750329,300 411,700 234,250 223,500 191,000Construction Fund: Equipment Levy 304,000 329,300 411,700 234,250 223,500 191,000 1,693,750Total304,000 205 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project replaces the existing playground structure and safety surface at Alden Park. Project #P&R23203 Justification See Summary of Playground Improvements. Useful LifeProject Name Alden Park Playground Replacement Category Parks Type Replace or repair Total Project Cost:$185,000 Total2025 2026 2027 2028 2029Expenditures 2030 185,000185,000Vehicles and Equipment 185,000 185,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 185,000185,000Special Park Improvement Levy 185,000 185,000Total 206 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at McGuire Park. Project #P&R23206 Justification See Summary of Playground Improvements Useful LifeProject Name McGuire Park Playground Equipment Replacement.Category Parks Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000250,000Vehicles and Equipment 250,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000250,000Special Park Improvement Levy 250,000 250,000Total 207 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project will provide for infrastructure enhancements at the Van Valenburg dog park. Project #P&R23207 Justification The dog park at Van Valkenburg is in need of repairs and for the provision of water for park users. Useful LifeProject Name Off Leash Dog Park Investments Category Parks Type Expand or enhance Total Project Cost:$10,000 Total2025 2026 2027 2028 2029Expenditures 2030 10,00010,000Construction 10,000 10,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 10,00010,000Special Park Improvement Levy 10,000 10,000Total 208 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Pamela Park. Project #P&R23208 Justification See Summary of Playground Improvements Useful LifeProject Name Pamela Park Playground Equipment Replacement Category Parks Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Vehicles and Equipment 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Special Park Improvement Levy 300,000 300,000Total 209 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at York Park. Project #P&R23212 Justification See summary of Playground Improvements. Useful LifeProject Name York Park Playground Replacement Category Parks Type Replace or repair Total Project Cost:$175,000 Total2025 2026 2027 2028 2029Expenditures 2030 175,000175,000Vehicles and Equipment 175,000 175,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 175,000175,000Special Park Improvement Levy 175,000 175,000Total 210 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description "Fred Richards Park, 4400 Parklawn Ave., is being created from the former Fred Richards Executive Golf Course, which closed in 2014. It alsoincludes what was formerly known as Lake Edina Park. The 43-acre site, almost double the size of Centennial Lakes Park, will become a multi-use park for a variety of year-round activities.Fred Richards Park will subtly divide into sections, providing different experiences for people and nature:(1)Central Green with pickleball courts, basketball courts, lawn games area, stage/pavilion area, clubhouse renovation, landscaping, turf and walkways, parking and access via West 77th Street, lighting, signs and infrastructure.(2)The Nature Bank with native vegetation restoration and establishment, trees and shrubs, play nodes, wildlife habitat structures, boardwalk and trail, seating, signs and infrastructure.(3)Great Lawn and Loop with a pedestrian bridge restoration and new trail, great lawn area with high-quality drainage, picnic pavilion, traditionaland bike playgrounds, lighting, seating, signs and infrastructure." Project #P&R25100 Justification Expansion and/or Level of Service Useful LifeProject Name Fred Richards Park Category Parks Type Expand or enhance Total Project Cost:$16,255,000 Total2025 2026 2027 2028 2029Expenditures 2030 16,255,0005,500,000 9,250,000 805,000 700,000Construction 5,500,000 9,250,000 805,000 700,000 16,255,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 16,255,0005,500,000 9,250,000 805,000 700,000Local Option Sales Tax 5,500,000 9,250,000 805,000 700,000 16,255,000Total 211 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description "At 500 acres, Braemar Park, 6364 John Harris Drive, is the largest recreational space in Edina. It is home to Braemar Golf Course, Braemar GolfDome, Braemar Arena, Braemar Field, Courtney Fields and the South Metro Public Safety Training Facility.While most of the land in Braemar Park already is in use, several opportunities for improvements were identified and explored starting in 2017 with the help of resident input at community meetings and through online surveys.The Braemar Park Master Plan balances the most-sought amenities with the park's environmental and natural resource needs. It includes an estimated $8.1 million in improvements, including: walking trails, mountain biking trails, cross-country skiing trails, pickleball and platform tennis courts, baseball complex improvements, wayfinding signs and trail connections, natural resource restoration, improved parking and access to Braemar Golf Course, Braemar Arena and Courtney Fields.Braemar Arena is home to Edina High School, the Edina Hockey Association, Breakaway Academy and the Braemar-City of Lakes Figure Skating Club. Braemar Arena is one of the busiest ice arenas in the entire state; approximately 500,000 annual visits are recorded there from residents of 158 Minnesota communities, 12 states and one other country. The project covers $13.5 million in capital rehabilitation improvements in Braemar Arena’s operating infrastructure, including: dasherboard and glass safety system replacements, flooring replacements, ice refrigeration system and delivery replacements, heat and boiler replacements for all rinks, electrical system replacements for all rinks, window and roofing replacements and repairs, hot water system replacements, domestic water distribution system replacements, sanitary system and fixture replacements, locker room rehabilitation, restroom rehabilitation, permafrost removal in East Rink, energy efficiency improvements and insulation, ADA route and walkwayimprovements, ADA door and access improvements, ADA restroom improvements, ADA viewing and seating improvements, waterproofing and moisture control, fire protection and security improvement." Project #P&R25101 Justification Expansion and/or Level of Service Useful LifeProject Name Braemar Park & Arena Category Buildings Type Expand or enhance Total Project Cost:$47,140,000 Total2025 2026 2027 2028 2029Expenditures 2030 47,140,00011,850,000 17,320,000 15,820,000 2,150,000Planning and Design 11,850,000 17,320,000 15,820,000 2,150,000 47,140,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 47,140,00011,850,000 17,320,000 15,820,000 2,150,000Local Option Sales Tax 11,850,000 17,320,000 15,820,000 2,150,000 47,140,000Total 212 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project involves the replacement of Highland Park shelter building. Highlands Park was the city's first implemented park improvement project. Fields and landscaping were completed in 1960 and the shelter facility was built in the 1970s. This shelter is in poor condition and no longer meets resident's needs. This building is poorly insulated, and lacks windows, making it unwelcoming, therefore serving limited functions. Project #P&R25102 Justification Asset Functionality","Expansion and/or Level of Service Sustainability - New shelter would exceed sustainability goals and initiatives. Stewardship - Replacing the shelter reduces future costs of maintenance. Useful LifeProject Name Highlands Park Shelter Replacement Category Parks Type Replace or repair Total Project Cost:$1,250,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,250,000Installation/Maintenance 1,250,000 1,250,000Total1,250,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,250,000Construction Fund: CIP Levy 1,250,000 1,250,000Total1,250,000 213 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Yorktown Park located in the Promenade neighborhood bordering Richfield is one of Edina's smallest parks. With the relocation of Fire Station 2, currently house on this parkland, this small area park requires a study to determine vision and future needs. This study would evaluate existing recreational features including skate park, community gardens, and regional trail link. This would require collaboration with Three Rivers and City of Richfield to incorporate trail needs and recreational linkages to Adams Hill Park. Project #P&R25103 Justification Expansion and/or Level of Service Sustainability - Master Plan process ensures sustainability and project longevity by reducing project waste. This process promotes smart and strategic growth. Community Engagement - This project would engage community on collaboration level to create park infrastructure and amenities that support community needs. Useful LifeProject Name Yorktown Park Master Plan Category Parks Type Expand or enhance Total Project Cost:$790,000 Total2025 2026 2027 2028 2029Expenditures 2030 790,00040,000Planning and Design 750,000 40,000 790,000Total750,000 Total2025 2026 2027 2028 2029Funding Sources 2030 790,00040,000Construction Fund: CIP Levy 750,000 40,000 790,000Total750,000 214 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Chowen Park. Project #P&R25104 Justification Asset Functionality Stewardship - Replacing the playground equipment will reduce staff time spent on repairs and improve safety. Useful LifeProject Name Chowen Park Playground Improvement Category Parks Type Replace or repair Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 350,000Installation/Maintenance 350,000 350,000Total350,000 Total2025 2026 2027 2028 2029Funding Sources 2030 350,000Construction Fund: CIP Levy 350,000 350,000Total350,000 215 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Countryside Park. Project #P&R25105 Justification Expansion and/or Level of Service","Asset Functionality Stewardship - Replacing the playground equipment will reduce staff time spent on repairs and improve safety. Useful LifeProject Name Countryside Playground Replacement Category Parks Type Replace or repair Total Project Cost:$315,000 Total2025 2026 2027 2028 2029Expenditures 2030 315,000315,000Vehicles and Equipment 315,000 315,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 315,000315,000Construction Fund: CIP Levy 315,000 315,000Total 216 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Pathway and parking replacement and enhancements for park projects. These projects will evaluate capacity, site conditions, and accessibility needs for parks. Project #P&R25106 Justification Expansion and/or Level of Service","Asset Functionality Useful LifeProject Name Park Pathways and Parking Project Improvements Category Parks Type Replace or repair Total Project Cost:$525,000 Total2025 2026 2027 2028 2029Expenditures 2030 525,00025,000 100,000 100,000 100,000 100,000Construction 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 525,00025,000 100,000 100,000 100,000 100,000Construction Fund: CIP Levy 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 217 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Continue to evaluate and identify accessibility barriers within parks and recreational programming. Improvements may include surfacing, pathways, signage, and other needs. Project #P&R25107 Justification Health, Safety & Regulatory Compliance Useful LifeProject Name Parks Accessibility Improvements Category Parks Type Expand or enhance Total Project Cost:$525,000 Total2025 2026 2027 2028 2029Expenditures 2030 525,00025,000 100,000 100,000 100,000 100,000Planning and Design 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 525,00025,000 100,000 100,000 100,000 100,000Construction Fund: CIP Levy 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 218 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Project includes replacement and enhancement of existing picnic shelter to accommodate user needs and accessibility. Project #P&R25108 Justification Asset Functionality Useful LifeProject Name Utley Park Shelter Replacement Category Parks Type Replace or repair Total Project Cost:$60,000 Total2025 2026 2027 2028 2029Expenditures 2030 60,00060,000Installation/Maintenance 60,000 60,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00060,000Construction Fund: CIP Levy 60,000 60,000Total 219 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Replacement of existing Picnic Pavilion and garden gathering space. Maintenance and repairs have extended useful life of exiting shelter but a new structure would increase accessibility and useful functions. Design and accommodations will include integration of community, garden council, and historic society needs. Project #P&R25110 Justification Asset Functionality Useful LifeProject Name Arneson Park Shelter Replacement Category Parks Type Replace or repair Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Installation/Maintenance 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Construction Fund: CIP Levy 75,000 75,000Total 220 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Rosland Park located off crosstown in the heart of Edina embodies the profile of a special use park. Home of the Edina Aquatic Center and Edina Art Center it provides vital services to Edina and the community as a whole. With changes to the Art Center and identified upgrades for the Aquatic Center, this park requires evaluation and community input for its long term goals and vision. This park contains one of a kind Edina offering such as an inclusive playground, disc golf course, fishing pier, pickleball courts, and sand volleyball. A study would help determine how community and recreational trends can be incorporated into future project plans. Project #P&R25111 Justification Expansion and/or Level of Service Sustainability - The most recent park plan was done in 1958 and project and amenities have been added beyond these features. To ensure park sustainability and longevity it is important to assess existing needs and incorporate future needs. Planning helps eliminate waste in the form of both materials and time, reducing disturbances to residents and natural resources. Community Engagement - This project allow for a full community engagement and full collaboration on the future of Rosland Park. Engagement would include neighbors, residents, users, commissioners, and city council. Engagement will ensure features meet needs and are accessible. Health in all policies - A long term plan for Rosland Park will help to maximize its recreational potential as well as its health benefits. Features that maximize physical and mental health can be incorporated, as well as natural resource benefits. Race & Equity - This plan will review and evaluate all barriers to the current Rosland Park programming and also integrate opportunities in a new design. Stewardship - This projects plan will allow for long term growth and decision making within the park. It will accommodate phasing and smart growth. Useful LifeProject Name Rosland Park Master Plan Category Parks Type Expand or enhance Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Planning and Design 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Construction Fund: CIP Levy 100,000 100,000Total 221 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This project includes the replacement of the picnic shelter for Fox Meadow Park. The existing structure will need to be removed and a new structure installed that meet community and site needs. Project #P&R25113 Justification Asset Functionality Useful LifeProject Name Fox Meadow Shelter Replacement Category Parks Type Replace or repair Total Project Cost:$55,000 Total2025 2026 2027 2028 2029Expenditures 2030 55,00055,000Construction 55,000 55,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 55,00055,000Special Park Improvement Levy 55,000 55,000Total 222 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Aquatic Center Description 2025 - Furniture Replacement, Electronic Signage Replacement Every year the Edina Aquatic Center has nearly 100,000 member and guest visits. For their comfort, we provide chaise lounge chairs on both sides of the 50 meter pool and surrounding the zero depth pool. Previously, there were 380 lounge chairs and in recent years we have had to discard 5-7 chairs per season because they were beyond repair, leaving us with about 350 lounge chairs. The capacity of the facility is 1,000 people and frequently, every chair we have is in use. The current chairs are made of a steel frame and thick vinyl straps and range from 15-20 years old. Given the high volume of patrons and as the chairs age, more and more straps are breaking and are not able to be repaired. We have systematically removed lounge chairs from the deck when two or more straps are broken to ensure the safety of our guests. In addition, many of our older guests have difficulty sitting down and getting up from the chairs because they are so low to the ground and have requested more upright chairs to be available for their use. Complete replacement would take place over a three year period. We are missing a valuable opportunity to promote our facility to the high volume of traffic in the 66th Street and Valley View area and an electronic sign would provide that. 2026 - Pool Painting & Concession Equipment Main pool and zero depth pool painting.The main pool and zero depth pool require painting every 3 years. Replace aging concession equipment to improve operational efficiency and reduce energy costs. 2029 - Pool Painting Project #P&R25117 Justification Expansion and/or Level of Service Sustainability - Current equipment is more than 18 years old and new equipment will use less energy. Community Engagement - Fast, efficient concession sales are critical to a positive patron experience and to achieving the budget of the Aquatic Center. Race and Equity - Everyone will benefit when the operation runs smoothly and the wait time is shorter. Useful LifeProject Name Aquatic Center Pool Paint, Equip & Signage Rplcmnt Category Equipment and Vehicles Type Replace or repair Total Project Cost:$558,100 Total2025 2026 2027 2028 2029Expenditures 2030 558,100172,100 286,000 100,000Vehicles and Equipment 172,100 286,000 100,000 558,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 558,100172,100 286,000 100,000CIP Bonds 172,100 286,000 100,000 558,100Total 223 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Parks: Aquatic Center Description Based off an existing conditions assessment, initiated after a critical electrical failure and shutdown, the pool pump house facility has extensive repairs needed. To accommodate code upgrades and energy efficiency upgrades a 15% larger facility is required. Project needs include pump apparatus, electrical supply and distribution, new surge tanks, water treatment system, and code compliance upgrades. Project #P&R25119 Justification Asset Functionality Sustainabilty - Upgrades to facility would include energy efficiencies. A solar study will also be initiated. Useful LifeProject Name Aquatic Center Filter Room Category Buildings Type Replace or repair Total Project Cost:$4,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 4,000,0004,000,000Installation/Maintenance 4,000,000 4,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 4,000,0004,000,000CIP Bonds 4,000,000 4,000,000Total 224 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Arena Description New zambonis for Braemar Arena. The renovation and expansion will provide for one but the arena has multiple zambonis that are well beyond their useful life. ENVIRONMENTAL CONSIDERATIONS: The Zamboni is powered by a lithium ion battery. This is the most green technology in the ice resurfacing business. In addition, a self leveling system would be included that would reduce the amount of ice thus reducing the energy used to freeze the ice. Project #17-028 Justification Zamboni's are a necessity to ice arena operations. When a Zamboni ages you will start to see imperfections in the ice due to the machine not operating properly. During the winter months and the Backyard Rink is in operation we use all four Zamboni's, therefore it is very important that all machines are in proper working condition. Useful LifeProject Name Braemar Arena Zamboni Category Equipment and Vehicles Type Replace or repair Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000200,000 200,000Vehicles and Equipment 200,000 200,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000200,000 200,000Construction Fund: Equipment Levy 200,000 200,000 400,000Total 225 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description Replace sports turf and dome fabric shell at Braemar Field. The existing turf is experiencing issues due to stormwater managemennt design and turf is having to be replaced in sections due to this. This will shorten the useful life of the turf. Project #P&R25125 Justification Asset Functionality Sustainability - New turf and fabric shell would provide energy efficiencies. Community Engagement - Field surface and structure will be safe for users. Health in all policies - Safe turf and building envelope will allow users of all ages, youth athletic associations, adults and others to continue to utilize the space for physical activity, community and socialization. Race and equity - Space would be inclusive for all users and continue to be a high-use facility for all of the community. Stewardship - A new turf field and shell allows for efficiencies in maintenance and provide another 15-20 years of use for the facility. Useful LifeProject Name Braemar Field Turf & Shell Replacement Category Land Type Replace or repair Total Project Cost:$2,300,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,300,0002,300,000Installation/Maintenance 2,300,000 2,300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,300,0002,300,000Braemar Field Fund 2,300,000 2,300,000Total 226 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description Purchase and install a second coiled heater for Braemar Field. The existing insulation had to be discarded. In order to maintain a comfortable user temp and to provide a backup, a second coiled heater is recommended. The existing heater is not adequate for the space and is undersized for our dome size. Project #P&R25126 Justification Asset Functionality Sustainability: Adding a second coiled heater would provide a more comfortable environmennt for users and be more energy efficient. Community Engagement: During the winter months, the temp for users and guests would allow for a better overall experience Health in All Policies: A more comfortable temperature inside the dome would provide more opportunities and access for use. The community's older demographic would feel safer in a better temp controlled environment. Race & Equity: A warmer and safer space would allow for great accessiblity and use for walkers, renters, guests and program participants. Stewardship: A second heater would provide a backup if we had a failure with the existing heater and also provide for savings in service and maintenance. Useful LifeProject Name Braemar Field Heater Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Vehicles and Equipment 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Construction Fund: Grants/Donations 200,000200,000Braemar Field Fund 400,000 400,000Total 227 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description The Braemar Field Turf is experiencing numerous sink holes due to the design of the stormwater management system below the field surface. Turf is getting comprised and has been non-usable for weeks at a time due to these issues. A redesign of the system is needed to continue to have safe and playable surface at this site. Project #P&R25127 Justification Asset Functionality, Health, Safety & Regulatory Compliance Sustainability: Stormwater needs to be rerouted so as not to impede underlying system for drainage. Community Engagement: Turf needs to be level and safe for users to be able to utilize. A redesign of the sub surface stormwater system allows the city to continue to provide a year-round facility for play and physical activity. Health in All Policies: Turf surface is needed in order to be able to provide a year-round facility for exercise, play and programming. Race & Equity: Braemar Field provides a community location for all ages and abilities to exercise, play and socialize on a safe surface Stewardship: Providing a long-term solution to the stormwater issue will allow the city to keep a synthetic turf facility available to the public and users on a year-round basis for years to come. Useful LifeProject Name Braemar Field Stormwater Design Category Parks Type New Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Planning and Design 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Braemar Field Fund 75,000 75,000Total 228 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description The 2005 Chevrolet pickup truck at Centennial Lakes was originally scheduled to be replaced in 2015 and again in 2018 but was removed due to funding constraints. Under the vehicle scoring criteria used by the Public Works mechanics, this vehicle is due for replacement. This vehicle is used for plowing the park pathways and ice skating rink in the winter months and for general hauling in the other months. ENVIRONMENTAL CONSIDERATIONS: A new vehicle would offer lower emissions which would help to achieve the City goal of a 25% reduction in emissions by 2025. We would consider both an electric vehicle as well as a hybrid vehicle for this replacement. Project #17-039 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Useful LifeProject Name Centennial Lakes Vehicle Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Construction Fund: Equipment Levy 40,000 40,000Total 229 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Add free public Wi-Fi in center portion of Centennial Lakes Park. Project #P&R25130 Justification Expansion and/or Level of Service Race and Equity - Provide free service to public in highly populated, diverse area of City Stewardship - Contributes to a better connected society. Useful LifeProject Name Centennial Lakes Park Public Wi-Fi Category Parks Type Expand or enhance Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Construction Fund: CIP Levy 40,000 40,000Total 230 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Centennial Lakes Park Description Centennial Lakes Park has a large artistic fountain (seasonal) that greats visitors to the park. The fountain has suffered damaged to its internal components and needs repairs and cleaning to make it operational. Project #P&R25145 Justification Asset Functionality Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Centennial Lakes Entrance Fountain Repair Category Parks Type Replace or repair Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Construction Fund: CIP Levy 150,000 150,000Total 231 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Parks: Centennial Lakes Park Description Centennial Lakes Park improvements as needed. Project #P&R25147 Justification The upkeep of City infrastructure is a key component of the Vision Edina document. Useful LifeProject Name Centennial Lakes Improvements Category Parks Type Expand or enhance Total Project Cost:$800,000 Total2025 2026 2027 2028 2029Expenditures 2030 800,000Construction800,000 800,000Total800,000 Total2025 2026 2027 2028 2029Funding Sources 2030 800,000Construction Fund: CIP Levy 800,000 800,000Total800,000 232 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The track is an area with cardio and strength training equipment that is not air conditioned. It is surrounded by windows that can't be opened. Air conditioning is a basic expectation in this type of space and the lack of air conditioning presents a health and safety concern. Project #15-069 Justification When Edinborough Park was built more than 30 years ago, air conditioning was not installed in the track area. The track is surrounded by windows that cannot be opened. During the summer months temperatures can exceed 90 degrees. Air conditioning in an exercise area is a basic expectation of anyone working out indoors. As noted in Vision Edina one of the strategic actions is "to continue to prioritize amenities that meet the needs of residents of all ages." Exercising at these temperatures can become a safety and health issue for anyone, especially senior citizens using the area. The addition of air conditioning to the track will make the facility a more appealing alternative for the community to enjoy year round. Useful LifeProject Name Edinborough Park Track Air Conditioning Category Buildings Type New Total Project Cost:$81,000 Total2025 2026 2027 2028 2029Expenditures 2030 81,00081,000Vehicles and Equipment 81,000 81,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 81,00081,000Edinborough Fund 81,000 81,000Total 233 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Edinborough Park has 15 pieces of fitness equipment that are in need of replacement. The treadmills, ellipticals, rowers and strength equipment is out of date. Parts and service for these old machines is becoming much more expensive and difficult to find. The track is used by our association partners (Corporate Center, Brookdale Senior Living, Marriott Residence Inn, and Edinborough Townhomes) as well as the Edina Swim Club, our annual members and guests who purchase a daily admission. To maximize the impact of this project, it should be coordinated with replacing the track flooring. Project #P&R21012 Justification Replacing the fitness equipment at Edinborough Park is needed because the equipment is beyond useful life and requires constant maintenance. Marketing Pool & Track memberships at this time is difficult due to the lack of equipment. The Marriott Residence Inn is one of our association partners that pays park maintenance fees and they do not have exercise equipment or a swimming pool. Our agreement with them includes pool and track privileges for their guests. Currently, the selection, condition and availability of the equipment does not meet our standards for quality. In addition, our other association partners also have privileges to use this equipment. With Brookdale Senior Living as another association partner, we could better serve their residents with updated equipment specifically geared towards older adults. Useful LifeProject Name Edinborough Park Fitness Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$26,000 Total2025 2026 2027 2028 2029Expenditures 2030 26,00026,000Vehicles and Equipment 26,000 26,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 26,00026,000Edinborough Fund 26,000 26,000Total 234 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The project would replace the original track surface that is from 1986. The surface is worn down and has areas that are tripping hazards. Project #P&R25148 Justification Health, Safety & Regulatory Compliance, Asset Functionality Health in All Policies: The track provides a safe place for exercise and attracts many senior citizens. Keeping the integrity of the surface is important to reduce trips and falls. Useful LifeProject Name Edinborough Park Track Surface Replacement Category Parks Type Replace or repair Total Project Cost:$90,000 Total2025 2026 2027 2028 2029Expenditures 2030 90,00090,000Construction 90,000 90,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 90,00090,000Edinborough Fund 90,000 90,000Total 235 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The project will replace exterior landscaping that is 38 years old and is esthetically unattractive. It does not represent the first impression that is expected of a City of Edina Facility Project #P&R25149 Justification Expansion and/or Level of Service Useful LifeProject Name Edinborough Park Replace Exterior Landscaping Category Parks Type Replace or repair Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Construction 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Edinborough Fund 75,000 75,000Total 236 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace aging concession equipment to improve operational efficiency and reduce energy costs. Project #P&R25151 Justification Asset Functionality Useful LifeProject Name Edinborough Park Concession Replacement Category Parks Type Replace or repair Total Project Cost:$24,000 Total2025 2026 2027 2028 2029Expenditures 2030 24,00024,000Construction 24,000 24,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 24,00024,000Edinborough Fund 24,000 24,000Total 237 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace sound and lighting systems for performances. Blue tooth connectivity is an expectation for most performers and we do not have that. The lighting gets extremely hot, making it uncomfortable for performers. Project #P&R25152 Justification Asset Functionality Sustainability: Replacing current lighting with LED would realize energy cost savings. Community Engagement: Performances are well attended and upgrading the sounds and lighting would improve the patron experience. Stewardship: The Amphitheater has a long history of community performances and keeping up with modern technology is expected at a City facility. Useful LifeProject Name Edinborough Park Amphitheater Upgrades Category Parks Type Replace or repair Total Project Cost:$23,500 Total2025 2026 2027 2028 2029Expenditures 2030 23,50023,500Construction 23,500 23,500Total Total2025 2026 2027 2028 2029Funding Sources 2030 23,50023,500Edinborough Fund 23,500 23,500Total 238 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Temporary concrete was installed during the plaza reconstruction project and it needs to be replaced with permanent concrete. Project #P&R25153 Justification Health, Safety & Regulatory Compliance Community Engagement: Replacing the concrete ensures the integrity of the walkway and safety for everyone entering the facility. Health in All Policies: Replacing the concrete ensures the integrity of the walkway and safety for everyone entering the facility. Stewardship: This is the main entry to our facility and will ensure safety for everyone entering the facility. Useful LifeProject Name Edinborough Park SE Entry Concrete Replacement Category Parks Type Replace or repair Total Project Cost:$27,000 Total2025 2026 2027 2028 2029Expenditures 2030 27,00027,000Construction 27,000 27,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 27,00027,000Edinborough Fund 27,000 27,000Total 239 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace all lockers in locker room and in the playpark to ensure patrons can safely secure their personal belongings while they are using the facility. Existing lockers do not lock properly and are rusty on the inside leaving residue on patrons belongings. Project #P&R25154 Justification Asset Functionality Health in All Policies: Replacing the locker will provide patrons with a sense of security and safety for their belongings while they are using the facility. Stewardship: The lockers are so old, it's difficult to find replacement parts to make them operational. It tis frustrating to patrons that we have an asset doesn't work. Replacing the metal existing lockers with plastic lockers will increase their useful life. Useful LifeProject Name Edinborough Park Locker Replacement Category Parks Type Replace or repair Total Project Cost:$31,000 Total2025 2026 2027 2028 2029Expenditures 2030 31,00031,000Construction 31,000 31,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 31,00031,000Edinborough Fund 31,000 31,000Total 240 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replacing the 2008 Chevy Silverado (with Tommy Gate) vehicle allows staff to navigate the Edinborough Park campus, as well as hauling items for projects and trips for supplies. Project #P&R25155 Justification Asset Functionality Sustainability: New vehicle will be more fuel efficient than the 2008 model. Community Enagagement: The vehicle will represent the City in a positive and professional manner. Useful LifeProject Name Edinborough Park Truck Replacement Category Parks Type Replace or repair Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Vehicles and Equipment 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Edinborough Fund 50,000 50,000Total 241 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description To continue to meet Health Code requirements, the pool filter needs to be replaced. The pool filter was installed in 2004 and has exceeded its useful life. Parts are no longer available for the model we have. Project #P&R25156 Justification Asset Functionality Sustainability: A new filter could use regenerative media, reducing the frequency of backwashing and saves water. Community Engagement: Replacing the filter ensures that the water will be clean and safe for community members to swim in. Health In All Policies: Replacing the filter ensures that the water will be clean and safe for community members to swim in. Race & Equity: Everyone will benefit from swimming in a clean, safe pool. Stewardship: The filter replacement ensures ongoing operations for our members, community members, swim clubs and other rental groups. Useful LifeProject Name Edinborough Park Pool Filter Replacement Category Parks Type Replace or repair Total Project Cost:$70,000 Total2025 2026 2027 2028 2029Expenditures 2030 70,00070,000Construction 70,000 70,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 70,00070,000Edinborough Fund 70,000 70,000Total 242 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The Camus boiler heats the entire facility and has exceeded its useful life. Project #P&R25157 Justification Asset Functionality Sustainability: The existing boiler is 20 years old and replacing it with a high efficiency model will reduce energy costs. Health In All Policies: The park will be comfortable for all patrons when the boiler is working consistently. Useful LifeProject Name Edinborough Park Replace Camus Boiler Category Parks Type Replace or repair Total Project Cost:$70,000 Total2025 2026 2027 2028 2029Expenditures 2030 70,00070,000Construction 70,000 70,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 70,00070,000CIP Bonds 70,000 70,000Total 243 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The Braemar Clubhouse Lower Level is presently under-utilized because of its floor plan as well as its condition. Restrooms and shower facilities as well as the plumbing infrastructure need to be repaired and renovated. Project #17-031 Justification Renovation is needed to keep facility up to acceptable standards for a premier facility. National Golf Foundation (NGF) reports golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system. Useful LifeProject Name Braemar Golf Clubhouse Lower Level Category Buildings Type Expand or enhance Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000Construction100,000 100,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 100,000Golf Course Fund 100,000 100,000Total100,000 244 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description A second sprayer to help spray fairways and greens. Spraying fairways with the one sprayer we have can take one full week to complete. Ideally, when spraying you want to get it done in two days or less. Would like to be able to spray growth regulator on the fairways to help out with seedheads and slow the growth rate down to possibly mow once a week only. Not only to slow the vertical growth but it also helps horizontal growth to help fill in thinner areas. This smaller sprayer would be better on greens as well with less weight with the tire marks across the greens. ENVIRONMENTAL CONSIDERATIONS: Getting everything sprayed in one or two days rather than a week, the perception would be more ideal not seeing the sprayer out there all the time for a week straight. Project #P&R21028 Justification A visual by the customers not seeing the sprayer out there for a week straight and also better for the consistency of the way the golf course plays. Useful LifeProject Name Toro 300 Gal Sprayer Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$85,000 Total2025 2026 2027 2028 2029Expenditures 2030 85,00085,000Vehicles and Equipment 85,000 85,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 85,00085,000Golf Course Fund 85,000 85,000Total 245 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Addition of cart paths on holes #6 and #11. This will complete the continuous loop of the 18-hole golf course. Project #P&R21043 Justification In strategic alignment with Edina’s mission statement to "offer premier public facilities". Useful LifeProject Name Cart Path Addition Hole #6 & #11 Category Infrastructure Type Expand or enhance Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Golf Course Fund 150,000 150,000Total 246 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The netting that protects the Golf Dome fabric is in disrepair due to the high volume of golf balls that are hit on a daily basis. We have made repairs to the netting each of the last three years. Cost of repairs have ranged between $5,000 and $8,500. A new net design is required to alleviate the constant repairs.Replacement needed to keep facility up to acceptable standards for a premier facility. In strategic alignment with Edina’s mission statement to ""offer premier public facilities"".The National Golf Foundation (NGF) report also confirms justification ""NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are ""living and breathing"" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system Project #P&R25160 Justification Asset Functionality Useful LifeProject Name Golf Dome Netting Repairs Category Parks Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000100,000 150,000Construction 100,000 150,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000100,000 150,000Golf Course Fund 100,000 150,000 250,000Total 247 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replace existing gas mowers for tees and approaches with Hybrid model. Mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. Existing 4 Workman’s are reaching the end of their useful lifespan. Existing 4 Workman’s are reaching the end of their useful lifespan. Kubota or a John Deere tractor with a front end loader would be used year round by removing snow in the winter and other projects throughout the course and in the summer it could be used daily with loading topdressing sand or divot mix and other projects. These tractors are ideal for tractor mounted aerators and we have two of those for only one tractor at the present. With the construction of the new golf course there are many areas that are compacted and these machines could be running spring and fall yearly. Replace fairway mower. Fairway mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. Replace large rough mower. Rough mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. 2025 - Toro 4500 Rough Mower 2026 - Kubota or John Deere Tractor, Toro 3555 Fairway Mowers (2), Toro 4500 Rough Mower 2027 - Toro 3320 Hybrid Triplex Mowers (2), Toro Workman 2028 - Toro Workman 2029 - Toro Workman Project #P&R25162 Justification Asset Functionality. By adding an additional tractor we will be able to save money in the long run. It will also add to the efficiency of golf course operations. Lots of acreage to mow with not much time to stay ahead of play. Adding this mower would help to dedicate one of our older mowers for the practice areas and Academy 9. Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the Useful LifeProject Name Golf Course Tractor & Mower Replacements Category Equipment and Vehicles Type Replace or repair Total Project Cost:$705,000 248 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Total2025 2026 2027 2028 2029Expenditures 2030 705,000100,000 295,000 160,000 50,000 100,000Vehicles and Equipment 100,000 295,000 160,000 50,000 100,000 705,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 705,000100,000 295,000 160,000 50,000 100,000Golf Course Fund 100,000 295,000 160,000 50,000 100,000 705,000Total 249 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Pre-construction costs to design new clubhouse at Braemar Golf Course. The existing clubhouse has exceeded its useful lifespan and is in need of replacement. Evaluation of programming and space needs will be included to determine required square footage. Design will be driven by city goals and values. $2,000,000 Construction costs to build new clubhouse at Braemar Golf Course. The existing clubhouse has exceeded its useful lifespan and is in need of replacement. Evaluation of programming and space needs will be included to determine required square footage. Design will be driven by city goals and values. $25,000,000 Project #P&R25163 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name New Golf Course Clubhouse Category Buildings Type New Total Project Cost:$27,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,000,000Planning and Design 2,000,000 25,000,000Construction25,000,000 27,000,000Total27,000,000 Total2025 2026 2027 2028 2029Funding Sources 2030 27,000,000CIP Bonds 27,000,000 27,000,000Total27,000,000 250 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Add irrigation to areas of the course that were not irrigated in the Master Plan Project. These areas are heavily trafficked and require staff to manually pull around hoses and sprinkler bases which eliminates other tasks needed to be accomplished. Project #P&R25164 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Irrigation Upgrade Category Parks Type Expand or enhance Total Project Cost:$225,000 Total2025 2026 2027 2028 2029Expenditures 2030 225,000225,000Construction 225,000 225,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 225,000225,000Golf Course Fund 225,000 225,000Total 251 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replacement of 6 utility carts. Existing carts are at the end of their useful lifespan. Project #P&R25166 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Club Car Utility Carts Category Equipment and Vehicles Type Replace or repair Total Project Cost:$78,000 Total2025 2026 2027 2028 2029Expenditures 2030 78,00026,000 26,000 26,000Vehicles and Equipment 26,000 26,000 26,000 78,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 78,00026,000 26,000 26,000Golf Course Fund 26,000 26,000 26,000 78,000Total 252 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replace existing lift table. The current one continues to leak hydraulic fluid even after the cylinders have been replaced a few years back. Used daily. Project #P&R25167 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Maintenance Facility Lift Table Category Equipment and Vehicles Type Replace or repair Total Project Cost:$20,000 Total2025 2026 2027 2028 2029Expenditures 2030 20,00020,000Vehicles and Equipment 20,000 20,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 20,00020,000Golf Course Fund 20,000 20,000Total 253 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Comfort station located on hole #15 requires painting, siding replacement and roof repairs. Project #P&R25168 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Restroom Renovation Category Parks Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Construction 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 254 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Insulate the cold storage building that is connected to the main shop to keep it warmer during the winter months so more work can be done out there and also help with longevity of equipment Project #P&R25169 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Cold Storage Insulation Category Buildings Type Expand or enhance Total Project Cost:$60,000 Total2025 2026 2027 2028 2029Expenditures 2030 60,00060,000Construction 60,000 60,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00060,000Golf Course Fund 60,000 60,000Total 255 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Tear down and rebuild. The walls are rotting and have holes in them. Could be used for more storage as well for accessories during the winter months. Project #P&R25170 Justification Asset Functionality Useful LifeProject Name Update Well House #2 on Hole #13 Category Parks Type Replace or repair Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Construction 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Golf Course Fund 75,000 75,000Total 256 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The existing practice green is too small for the number of Juniors and Academy 9 players. The plan is to rebuild and enlarge the green. Also, build a pavilion in the area for people waiting to pick up their children as well as a gathering point for the Academy 9. Project #P&R25171 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Practice Green Enlargement / Academy 9 Pavilion Category Parks Type Expand or enhance Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Construction 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Golf Course Fund 75,000 75,000Total 257 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Driving Range Safety Netting is needed to protect golfers on hole #9 of the Championship Golf Course and hole #1 of the Academy 9 Golf Course from errant shots coming from the driving range. Project #P&R25172 Justification Health, Safety & Regulatory Compliance Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Driving Range Safety Netting Category Parks Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Construction 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Golf Course Fund 200,000 200,000Total 258 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description To be more sustainable and environmentally friendly, we are proposing to add native areas that would save water and enhance wildlife and the use of less emissions. Project #P&R25175 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Additional Native Areas Category Land Type Expand or enhance Total Project Cost:$65,000 Total2025 2026 2027 2028 2029Expenditures 2030 65,00065,000Construction 65,000 65,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 65,00065,000Golf Course Fund 65,000 65,000Total 259 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Build a new nursery green that has the same USGA specs that the existing greens have. Project #P&R25176 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course New Nursery Green Category Land Type New Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Golf Course Fund 100,000 100,000Total 260 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Fill in gaps in cart path to make a continuous loop. Project #P&R25178 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Cart Path Addition Academy 9 Category Parks Type Expand or enhance Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Construction 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Golf Course Fund 150,000 150,000Total 261 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Utilize the Braemar property just south of John Harris Drive (Old #21) to create an Academy Training Facility. Short Course, Teaching Bays, Practice Greens and Instruction area. Project #P&R25180 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Academy Training Facility Category Buildings Type New Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000Golf Course Fund 500,000 500,000Total 262 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description As planned in the Braemar Park Master Plan, reconfigure and replace asphalt to make ADA accessible. Project #P&R25181 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Parking Lot Upgrade Category Parks Type Replace or repair Total Project Cost:$1,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,000,0001,000,000Local Option Sales Tax 1,000,000 1,000,000Total 263 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Drainage upgrades on fairways #6, #11 and #16. Drainage lines to be installed to move water from low laying areas. Project #P&R25182 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Drainage Upgrade Category Parks Type Expand or enhance Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Construction 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 264 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Re-Grass and add irrigation system to the Academy 9 Clubhouse. Project #P&R25183 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Academy 9 Re-Grass & Irrigation Category Parks Type Expand or enhance Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Construction 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 265 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The drainage underneath the green on hole #8 sits lower than the pond so water has a really hard time exiting the green. Also, there is a large bird bath where water can’t exit the surface of the green. When you cut a cup, you can notice the difference in the greens mix compared to other greens. Propose to move the green on the other side of the pond to make it a true par 5. All this work can be completed without disrupting play. You could build the green then once you close in the fall, remove existing green and base and sod it with fairway grass and add fairway to the right of the pond leading up to green. Project #P&R25184 Justification Asset Functionality Useful LifeProject Name Green Renovation/Relocation Hole #8 Category Parks Type Expand or enhance Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000Golf Course Fund 500,000 500,000Total 266 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Dome Description Upgrade electrical capacity at Golf Dome. In future operations, this will facilitate offering an enhanced experience for the golf dome customers including the addition of television monitors to each bay. Project #P&R21036 Justification In strategic alignment with Edina’s mission statement to "offer premier public facilities". Useful LifeProject Name Dome Electrical Update Category Buildings Type Expand or enhance Total Project Cost:$25,000 Total2025 2026 2027 2028 2029Expenditures 2030 25,00025,000Installation/Maintenance 25,000 25,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 25,00025,000Golf Course Fund 25,000 25,000Total 267 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Dome Description Expand the Golf Dome building to include enhanced Food & Beverage offerings. Project #P&R25185 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Dome Building Expansion Category Buildings Type Expand or enhance Total Project Cost:$3,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 3,000,0003,000,000Construction 3,000,000 3,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 3,000,0003,000,000Golf Course Fund 3,000,000 3,000,000Total 268 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Liquor Stores Description Each building component was evaluated to determine needed maintenance and replacements to extend the buildings lifespan. The funding will be used for project design and planning, roof, electrical system repairs, exterior envelope repairs, interior finishes repairs, plumbing system repairs, and replacement of furniture, fixtures and equipment at the three liquor stores. Project #FAC23110 Justification This is a part of our City Work plan to maintain optimum facility operations. Useful LifeProject Name Liquor Stores Facility Improvements Category Buildings Type Replace or repair Total Project Cost:$901,600 Total2025 2026 2027 2028 2029Expenditures 2030 57,60029,600 28,000Planning and Design 71,00071,000Vehicles and Equipment 773,000197,000 296,000 280,000Installation/Maintenance 297,600 324,000 280,000 901,600Total Total2025 2026 2027 2028 2029Funding Sources 2030 901,600297,600 324,000 280,000Liquor Fund 297,600 324,000 280,000 901,600Total 269 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replacement of E911 Call Handling System. Project #POL21005 Justification Between 2014-2016 Edina partnered with Hennepin County, Minneapolis, HCMC, and Allina to deploy a state of the art shared E911 call handling system. The system was forecast to have a service life of approximately 10 years. While it is hoped that ongoing upgrades will extend the service life of this system it is important we plan for potential replacement in 2026. A major system refresh is being completed in 2022 so this replacement has been deferred until 2027. This was previously funded split between both E911 and Equipment Replacement. Useful LifeProject Name Dispatch E911 Call Handling System Category Technology Type Replace or repair Total Project Cost:$550,000 Total2025 2026 2027 2028 2029Expenditures 2030 550,000550,000Software 550,000 550,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 550,000550,000E911 550,000 550,000Total 270 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as squads, safety equipment and technology, among other items. 2025 Equipment Levy: 2018 Dodge Durango 2018 Dodge Durango 2018 Chevrolet Traverse 2018 Jeep Grand Cherokee 2018 Jeep Grand Cherokee Ford Interceptor AWD K8A S 26-215 2025 Public Safety Aid: Mobile Pro Defender Camera System License Plate Readers (ALPR/2017-2020) 2026 Equipment Levy: Speed Measurement Radar Equipment (Stalker Radar) SWAT Team Rifles 2019 Ford Interceptor Utility - Black/Ebony 2019 Toyota RAV4 2019 Toyota Highlander LE Hybrid - Model 6964 2021 Ford F-150 Hybrid 2021 Ford F-150 Hybrid 2026 E911: Dispatch Radio Consoles 2027 Equipment Levy: Computer Forensics Analysis Workstation StarChase Pursuit Intervention System 2020 Ford Explorer 2018 Dodge Grand Caravan 2022 Ford Interceptor Utility 2022 Ford Interceptor Utility 2022 Ford Lightning EV 2020 Ford Explorer (Unmarked) 2020 Toyota Rav4 Hybrid XLE (Unmarked) 2023 Ford Lightning 2023 Ford Lightning 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2027 E911: E911 Call Handling System (CHS-1) 2028 Equipment Levy: License Plate Readers (ALPR/2021) StarChase Pursuit Intervention System 2017 Harley Davidson Motorcycle 2017 Harley Davidson Motorcycle Project #POL23200 Useful LifeProject Name Police Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$4,215,300 271 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Chevy Blazer PPV EV 2024 Chevy Blazer PPV EV 2028 E911: 911 Logging System 2029 Equipment Levy: Patrol Rifles Tasers 2022 Ford Mach E - EV 2022 Toyota Rav4 Hybrid 2022 Toyota Highlander Hybrid 2022 Toyota Highlander Hybrid 2024 Ford Explorer Utility 2024 Dodge Durango Squad 2030 Equipment Levy: Tasers Replacement Program SWAT Vests 2023 Hyundai Santa Fe Hybrid Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of police safety equipment,technology and vehicles allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Total2025 2026 2027 2028 2029Expenditures 2030 4,215,300440,000 833,000 1,417,800 616,000 690,000Vehicles and Equipment 218,500 440,000 833,000 1,417,800 616,000 690,000 4,215,300Total218,500 Total2025 2026 2027 2028 2029Funding Sources 2030 3,052,300330,000 358,000 867,800 588,000 690,000Construction Fund: Equipment Levy 218,500 1,053,000475,000 550,000 28,000E911 110,000110,000Public Safety Aid 440,000 833,000 1,417,800 616,000 690,000 4,215,300Total218,500 272 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description This will add a fully marked patrol squad to the police fleet. A total of (4) patrol officers are being added to the department between 2024-25. An additional squad car is required to accommodate this increased staffing. The cost includes the vehicle, emergency equipment, and upfitting costs. Costs are higher for the initial build of this squad car due to systems that are typically purchased for the entire fleet under other projects. This build includes a mobile radio, radar/LIDAR, first aid/AED equipment, mobile computer, squad mounted weapons, and the in squad video system. ***May be eligible for Public Safety Grant Funding*** Project #POL25101 Justification Expansion and/or Level of Service Sustainability: The Police Department continues to incorporate fully electric (EV) and hybrid vehicles into our fleet. Vehicle procurement for police squads has become very difficult in recent years and the final selection will be based on vehicle availability and balancing the fleet appropriately to assure maximum availability of emergency response vehicles. Community Engagement: Fully marked police vehicles are a highly visible and provide a sense of safety and security in the community. Health in All Policies: An adequate and reliable fleet of emergency response vehicles is essential for our police officers to carry out their job duties. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The police department continues to responsibly manage our fleet to maximize efficiency and minimize cost while prioritizing public safety and employee safety. Useful LifeProject Name Patrol Squad Car Addition Category Equipment and Vehicles Type New Total Project Cost:$130,000 Total2025 2026 2027 2028 2029Expenditures 2030 130,00070,000 60,000Vehicles and Equipment 70,000 60,000 130,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00060,000Construction Fund: Equipment Levy 70,00070,000Public Safety Aid 70,000 60,000 130,000Total 273 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Purchase (4) rifle-rated ballistic shields for Police operations. Police Officers are facing an unprecedented number of threats involving firearms. This continues to evolve to include rifle fire including tragic incidents in 2024 in Burnsville and Minnetonka. Police body armor and existing ballistic shields are not rated to protect against rifle threats. This is essential equipment to protect Police Officers responding to active shooter situations and other firearm threats. Two shields will be placed in our SWAT vehicle and two shields will be deployed in our Patrol Sergeant squads to assure rapid availability in the field. ***May be eligible for Public Safety Grant Funding*** Project #POL25103 Justification Health, Safety & Regulatory Compliance, Expansion and/or Level of Service Sustainability: This project has no immediate sustainability impacts. Community Engagement: The community expects Police Officers to be equipped to immediately respond to violent acts including active shooters and other armed threats that have unfortunately become more common. This equipment assures our officers will be better equipped to intervene more quickly and safely when encountering rifle threats. Health in All Policies: We have an obligation to our employees to provide the equipment necessary to keep them safe. Technology, tactics, and threats rapidly evolve and this investment is critical to keep us properly equipped. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: This is a direct investment in officer safety and wellness as our staff faces increasing hazards in their work. Useful LifeProject Name Rifle-Rated Ballistic Shields Category Equipment and Vehicles Type New Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Public Safety Aid 40,000 40,000Total 274 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace the bi-directional amplifier (BDA) system installed in City Hall. The BDA allows ARMER portable radios used by Police, Fire, and Public Works to function inside of City Hall / Police Department. These systems are critical for public safety and required by code. ARMER radios do not function in several areas of City Hall/Police without an operational BDA. The current BDA was installed in 2016 and is reaching the end of it's useful life. The original infrastructure used by this system including coaxial cables and antennas dates back to 2004. This project will replace the BDA device and replace any antenna/cable infrastructure that does not meet current standards. Project #POL25107 Justification Asset Functionality, Health, Safety & Regulatory Compliance Sustainability: Existing electronic equipment will be recycled properly. Community Engagement: This equipment allows public safety personnel to operate safely and efficiently. This includes protection of City staff and assets. Health in All Policies: This project replaces critical life safety equipment in City Hall/Police Department that is required by code. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: When the original ARMER BDA system (2004) failed in 2016 the department was able to repurpose infrastructure from an abandoned system for legacy cellular devices to significantly reduce the project cost by over $60,000. Proper maintenance has provided a longer than expected service life for the 2016 system. This investment maintains a critical system while continuing to minimize cost. Useful LifeProject Name PS Radio Bi-Directional Amplifier (BDA) Rplcmt Category Equipment and Vehicles Type Replace or repair Total Project Cost:$25,000 Total2025 2026 2027 2028 2029Expenditures 2030 25,00025,000Vehicles and Equipment 25,000 25,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 25,00025,000Public Safety Aid 25,000 25,000Total 275 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well # 7 by repairing or replacing the well pump, motor, and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-913 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #7 Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000180,000 120,000Installation/Maintenance 180,000 120,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000180,000 120,000Utility Fund: Water 180,000 120,000 300,000Total 276 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well # 11 by repairing or replacing the well pump, motor, and other worn equipment. It would also inlcude replacing: 2023 - Exterior doors and Interior doors, roof replacement, painting, gas unit heaters, controls, lighting fixtures, crackfilling/ sealing stucco walls, fire alarm system and sprinklers. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-915 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #11 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$240,000 Total2025 2026 2027 2028 2029Expenditures 2030 240,000120,000Construction 120,000 120,000 240,000Total120,000 Total2025 2026 2027 2028 2029Funding Sources 2030 240,000120,000Utility Fund: Water 120,000 120,000 240,000Total120,000 277 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #20 by repairing or replacing the well pump, motor, and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-918 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #20 Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,000180,000Construction 180,000 180,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 278 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Public Works Description A fiber connection is required to replace the existing wireless connection. This new fiber connection will improve the speed and reliability allowing improvements for computer use and security in the building. Project #ITS25100 Justification Expansion and/or Level of Service Sustainability: This connection will require less network hardware replacement and less power. Stewardship: This connection will cost less over its lifetime and provide better service than the existing wireless connection Useful LifeProject Name CLP Maintenance Fiber Category Technology Type New Total Project Cost:$30,000 Total2025 2026 2027 2028 2029Expenditures 2030 30,00030,000Construction 30,000 30,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 30,00030,000Construction Fund: CIP Levy 30,000 30,000Total 279 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Public Works Description We are nearly out of fiber strands heading north from City Hall to St. Louis Park. Additional strands will be needed for fiber projects in the north end of town as well as projects that need to connect to LOGIS or Hennepin County. This would install a new fiber optic cable with plenty of strands to support operations well into the future. Project #ITS25101 Justification Expansion and/or Level of Service Sustainability: Fiber connections are often the network backbone that supports many types of projects. Stewardship: Fiber connections offer speed and security to all sorts of City projects. Fiber also offers a long service life. Useful LifeProject Name Increase Fiber Capacity to SLP Category Technology Type New Total Project Cost:$60,000 Total2025 2026 2027 2028 2029Expenditures 2030 60,00060,000Construction 60,000 60,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00060,000Construction Fund: CIP Levy 60,000 60,000Total 280 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replacing larger retaining walls citywide. We have a list of needed improvements. Project #PW22002 Justification Retaining wall failures for larger walls completely exhaust our budget and often need to be funded by our bridge maintenance budget causing significant deferred maintenance on our bridges Useful LifeProject Name Annual Deferred Retaining Wall Replacements Category Infrastructure Type Replace or repair Total Project Cost:$750,000 Total2025 2026 2027 2028 2029Expenditures 2030 750,00050,000 100,000 200,000 200,000Construction 200,000 50,000 100,000 200,000 200,000 750,000Total200,000 Total2025 2026 2027 2028 2029Funding Sources 2030 750,00050,000 100,000 200,000 200,000Construction Fund: CIP Levy 200,000 50,000 100,000 200,000 200,000 750,000Total200,000 281 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #15 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23002 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #15 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$140,000 Total2025 2026 2027 2028 2029Expenditures 2030 140,000Construction140,000 140,000Total140,000 Total2025 2026 2027 2028 2029Funding Sources 2030 140,000Utility Fund: Water 140,000 140,000Total140,000 282 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #10 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23004 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #10 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$120,000 Total2025 2026 2027 2028 2029Expenditures 2030 120,000Construction120,000 120,000Total120,000 Total2025 2026 2027 2028 2029Funding Sources 2030 120,000Utility Fund: Water 120,000 120,000Total120,000 283 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #12 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23005 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #12 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,000180,000Construction 180,000 180,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 284 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #20 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23006 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #13 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,000180,000Construction 180,000 180,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 285 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #2 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23007 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #2 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$170,000 Total2025 2026 2027 2028 2029Expenditures 2030 170,000170,000Construction 170,000 170,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 170,000170,000Utility Fund: Water 170,000 170,000Total 286 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #6 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23008 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #6 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,000180,000Construction 180,000 180,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 287 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the annual rehabilitation of a Lift Station by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23009 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protectthe health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Lift Station Pump and VFD Renewal Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,00030,000 30,000 30,000 30,000 30,000Construction 30,000 30,000 30,000 30,000 30,000 30,000 180,000Total30,000 Total2025 2026 2027 2028 2029Funding Sources 2030 180,00030,000 30,000 30,000 30,000 30,000Utility Fund: Sewer 30,000 30,000 30,000 30,000 30,000 30,000 180,000Total30,000 288 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replace equipment according to the equipment replacement schedule. The Public Works Department has almost $10 million of equipment covered under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025 Equipment Levy: 2013 GMC Sierra 2013 GMC Sierra 2004 Clark C25C 51" SnoQuip XX Blower Patch King 6 Ton Patch Box 2015 Ford F350 7433S Case Loader 2026 Equipment Levy: Used 2010 TR MT6 Trackless Tractor L8500 Sterling MT6 Trackless 2027 Equipment Levy: Weiler TT500 Tack Trailer 2027 CIP Bonds - Equip Cert: MT6 Trackless MT1963 2012 International 7400 4x2 Truck Weiler P385 Paver 2015 Western Star 4700SB 2028 Equipment Levy: Equip Cert Payment CAT SW345B 3" Wheel Saw Crafco SS125 Diesel Melter 2002 Allu SM3-23 2018 Ford F550 2016 Ford F550 2017 Ford F350 2029 Equipment Levy: Equip Cert Payment Towmaster T14DT Trailer 2014 Caterpillar 272D Skid Steer MT6 Trackless Sidewalk Machine 2017 Western Star Tandem Axle Truck Hypac C747 Roller 2030 Equipment Levy: Equip Cert Payment Gilcrest Asphalt Tailgate Paver 2017 Caterpillar Skid Steer 2017 Ford F350 2020 Kenworth K370 Truck w/Velocity Patcher Asphalt Trailer Project #PWK23200 Useful LifeProject Name Public Works Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$4,214,107 289 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs low but most importantly allows us to keep maintaining our snow removal in an efficient manner. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of a Public Works Department without a reliable fleet. Total2025 2026 2027 2028 2029Expenditures 2030 4,214,107583,500 830,000 23,000 767,684 1,089,000Vehicles and Equipment 920,923 583,500 830,000 23,000 767,684 1,089,000 4,214,107Total920,923 Total2025 2026 2027 2028 2029Funding Sources 2030 4,214,107583,500 830,000 23,000 767,684 1,089,000Construction Fund: Equipment Levy 920,923 583,500 830,000 23,000 767,684 1,089,000 4,214,107Total920,923 290 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replace equipment according to the equipment replacement schedule. The Public Works and Parks maintenance Department has almost $10 million of equipment covered under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025: 2005 Kohler 300REOZVW 2015 Ford F250 2018 Volvo ECR88D 2026: 1996 Towmaster T12DD Trailer 2006 Thompson 6" water pump 2016 Ford F550 2027: 2007 Bluestar 175 Kw generator 2007 Multiquip Light Plant 2016 Westernstar 4700 Vaccon 2017 Ford F250 2028: 2017 Ford F350 2002 Speco easment machine 2013 Ford F550 2017 GMC Serri 2018 F150 2018 F150 2029: 2004 Katolight D300FJ4 2004 Cat 3456 2003 Cat 400Kw generator 2006 Bluestar BSJ300 300KW generator 2009 Cat 80Kw generator 2019 Ford F150 2019 Ford F150 2030: 2005 Kohler 300 kW generator 2020 Dulevo Sweeper 2020 F150 Project #PWK23201 Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs lower but most importantly allows us to keep maintaining our snow removal in an efficient manner. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of a Public Works Department without a reliable fleet. Useful LifeProject Name Utilities Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$2,735,000 291 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Total2025 2026 2027 2028 2029Expenditures 2030 2,735,000355,000 200,000 677,000 297,000 642,000Vehicles and Equipment 564,000 355,000 200,000 677,000 297,000 642,000 2,735,000Total564,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,735,000355,000 200,000 677,000 297,000 642,000Utility Fund 564,000 355,000 200,000 677,000 297,000 642,000 2,735,000Total564,000 292 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description This for water meter reading migration from AMR to AMI(drive by reading vs. push button real-time). We will be focusing on replacing commercial meters 1 1/2" and bigger in years 1 and 2, as these meters have the most potential for water lost. Years 2-5 will include replacement of residential meters. The replacement of these meters will allow us to fully utilize the AMI system. Project #PWK25101 Justification Expansion and/or Level of Service Sustainability: No fuel consumption for driving meter reading routes. Community Engagement: Expansion/upgrade of existing meter reading network allows for real-time monitoring and control of utility assets. Health in All Policies: Provide the City’s water customers with safe, reliable, high quality potable water supply Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Water Meter Radio Receivers Category Technology Type Expand or enhance Total Project Cost:$4,970,000 Total2025 2026 2027 2028 2029Expenditures 2030 4,970,0001,300,000 880,000 900,000 930,000 960,000Construction 1,300,000 880,000 900,000 930,000 960,000 4,970,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 4,970,0001,300,000 880,000 900,000 930,000 960,000Utility Fund: Water 1,300,000 880,000 900,000 930,000 960,000 4,970,000Total 293 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description Inspect and evaluate existing filter media for possible replacement at Water Treatment Plants #2, #3 and #4. Project #PWK25102 Justification Asset Functionality Sustainability: Proper media depths and material are crucial for efficient water filtration. Health In All Policies: Provide the City’s water customers with safe, reliable, high quality potable water supply Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Filter Media Replacement Category Infrastructure Type Replace or repair Total Project Cost:$450,000 Total2025 2026 2027 2028 2029Expenditures 2030 450,000450,000Construction 450,000 450,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 450,000450,000Utility Fund: Water 450,000 450,000Total 294 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description Extend Fiber network to Van Valkenburg Water Tower(4949 Malibu Dr) Project #PWK25103 Justification Expansion and/or Level of Service Sustainability: Fiber expansion would eliminate the use of current radio communication, lessening electrical load. Community Engagement: Expansion of existing fiber network allows for real-time monitoring and control of utility assets. Health in All Policies: This project will help provide the City’s water customers with safe, reliable, high quality potable water supply. Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Fiber Installation, Van Valkenburg Tower Category Infrastructure Type Expand or enhance Total Project Cost:$160,000 Total2025 2026 2027 2028 2029Expenditures 2030 160,000160,000Construction 160,000 160,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 160,000160,000Utility Fund: Water 160,000 160,000Total 295 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Public Works Description This project will support Edina’s Climate Action Plan by introducing a dedicated 100 percent biodiesel fueling system to support the city’s heavy- duty fleet. The new fuel will require the acquisition of a containment vessel and distribution pumps that will be located at Public Works near existing fuel islands. Modifications to the site including concrete pad and bollards to support the system and electrical infrastructure upgrades. Project #PWK25104 Justification Expansion and/or Level of Service Sustainability: Converting heavy-duty fleet to biodiesel is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emission for city operations. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of biodiesel. Focusing on city fleet, this project does not contain an engagement component but provides the community an opportunity to see the city lead by example. Health in All Policies: Biodiesel vehicles are low-emission vehicles, meaning they have lower harmful tailpipe emissions that negatively impact air quality. This project will result in the consumption of B100 fuel, which has no tailpipe emissions. Race & Equity: Lowering or removing tailpipe emissions from our heavy-duty fleet improves tailpipe emissions which negatively impact low- income and under-served communities at a higher rate. Stewardship: The fueling tank and vehicle retrofit systems will be used by existing heavy-duty vehicles, removing the need to purchase new replacement vehicles, and prolonging the useful life of our existing heavy-duty fleet. Useful LifeProject Name Public Works Fleet - Bio Diesel Storage Tanks Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$375,000 Total2025 2026 2027 2028 2029Expenditures 2030 375,000375,000Vehicles and Equipment 375,000 375,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 375,000375,000CAS Fund: Utility Franchise Fees 375,000 375,000Total 296 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Technology Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as copiers and printers, servers, camera systems and switch batches, among other items. 2025: Citywide Switch Batch 2 IT Storage Replacement Server Replacements ESX 2026: Fire Control Systems at City Hall and PW Ricoh MFP - Building Cisco Access Points Batch 2 (25) 2027: PD & CH Surveillance Cameras City Hall UPS System - Full Replacement Citywide Switch Batch 3 Ricoh MFP - Admin Ricoh MFP - P&R Citywide Switch Batch 4 Squad Car Technology Upgrades City Hall UPS System (Batteries Only) Server Replacements ESX 2028: Cisco Phone System Cisco Access Point batch 3 (21) Citywide Switch Batch 5 Fire Apparatus Tech (TB, iPad & Install) PW UPS (Batteries Only) Cisco Access Point batch 3 (21) Citywide Switch Batch 5 2029: Fire Station 1 Security Fire Station 2 Security Fire Station Camera System Ricoh MFP - Police (1st Floor and 2nd Floor) Citywide Switch Batch 1 (Core and FW) Citywide Access Point Batch 1 (50) 2030: Ricoh MFP - PW Citywide Switch Batch 2 IT Storage Replacement Project #ITS23100 Useful LifeProject Name IT Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$2,340,000 297 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Technology Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of copiers and printers, servers, camera systems and other technology equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Total2025 2026 2027 2028 2029Expenditures 2030 2,340,000440,000 95,000 633,000 500,000 294,000Vehicles and Equipment 378,000 440,000 95,000 633,000 500,000 294,000 2,340,000Total378,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,340,000440,000 95,000 633,000 500,000 294,000Construction Fund: Equipment Levy 378,000 440,000 95,000 633,000 500,000 294,000 2,340,000Total378,000 298 FUNDING TBD PROJECTS BY DEPARTMENT 299 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota PROJECTS BY FUNDING SOURCE 2025 2030thru Total2026202720282029Source2030Project # 2025 Funding TBD 15-049Lewis Park Shelter Building Replacement 900,000900,000 19-946Walnut Ridge Park Facility Improvements 24,00024,000 DEV25104HRA Grandview Commons public space.2,500,0002,500,000 DEV25105HIA Funding 5,000,0002,500,000 2,500,000 DEV25106Cahill Area New District Plan 250,000200,000 50,000 DEV25108HRA Land Acquisition - Affordable Housing 8,000,0005,000,000 3,000,000 ENG21048Yancey Park 22,00022,000 FAC25100City Hall Space Needs Design 56,300,0001,800,000 2,000,000 2,500,000 50,000,000 FAC25102City Hall Deferred Maintenance 12,196,2915,109,023 1,304,651 88,663 5,693,954 FAC25104Golf Course Deferred Maintenance 4,155,7312,025,000 631,000 156,000 8,600 1,335,131 FAC25106Public Works Building Deferred Maintenance 43,918,7112,123,546 1,945,892 38,929,958 919,315 FAC25107Edinborough Park Asset Preservation 13,326,4389,597,163 3,152,615 576,660 FAC25112Fire Station #1 Deferred Maintenance 2,510,3311,251,082 14,525 1,181,490 63,234 FAC25116Edinborough Pool Mechanical and Filter Equipment 250,000125,000 125,000 P&R21052CLP Central Park Trellis 450,000150,000 150,000 150,000 P&R21053CLP Rebuild Retaining Walls 400,000200,000 200,000 P&R23106Aquatic Center Deferred Maintenance 1,261,304600,000 452,000 141,988 5,880 61,436 P&R23116Centennial Lakes Park Deferred Maintenance 1,960,393800,000 956,606 21,732 182,055 P&R25109Trailer Crash Attenuators 35,00035,000 P&R25115Aquatic Center User Feature 2,795,000500,000 470,000 75,000 150,000 100,000 1,500,000 P&R25116Edinborough Pool Resurfacing & Painting 125,000125,000 P&R25120Aquatic Center Changing House Expansion 6,000,0006,000,000 P&R25122Braemar Arena Pickup Truck 50,00050,000 P&R25124Edina Art Center Design, Fixtures, & Equipment 1,300,000250,000 1,050,000 P&R25128Centennial Lakes Park Paddleboat Replacement 40,00020,000 20,000 P&R25129CLP Golf Course Planting & Pond Replacement 210,000150,000 60,000 P&R25131Centennial Lakes Park Outdoor Sound System 150,000150,000 P&R25132Centennial Lakes Park Signage 200,000200,000 P&R25133CLP Amphitheater Maintenance & Bathroom Addition 1,280,00030,000 500,000 750,000 P&R25135Centennial Lakes Park Railings Replacement 200,000100,000 50,000 50,000 P&R25137Centennial Lakes Park Skating Mats 20,00020,000 P&R25138CLP Main Entrance Paver Replacement 100,000100,000 P&R25140Centennial Lakes Park Clubhouse Replacement 750,000750,000 300 Total20252026202720282029Source2030Project # P&R25141CLP Irrigation and Planting Bed Replacement 200,00050,000 50,000 50,000 50,000 P&R25142CLP Walking Path Repair 600,000100,000 100,000 100,000 100,000 100,000 100,000 P&R25143CLP Lawn Game Replacement/Seating Enhancement 50,00050,000 P&R25144Centennial Lakes Park Site Amenities Replacement 80,00040,000 40,000 P&R25146Centennial Lakes Site and Hardscapes Repairs 25,925,2007,000,000 13,500,000 5,425,200 P&R25150Edinborough Park Loading Dock 75,00075,000 P&R25158Edinborough Park Locker Room Upgrade 300,000300,000 P&R25159Edinborough Park Entrance & Visitor 1st Experience 600,000100,000 500,000 P&R25161Permanent Restroom Academy 9 400,000400,000 P&R25173Golf Chemical Fill Station Building/ Wash Pad 300,000300,000 P&R25179Golf Course Maintenance Building Additions/Upgrade 300,000300,000 POL25102Detective Vehicle Addition 55,00055,000 POL25104Special Operations Radio Headsets 20,00020,000 POL25105Special Operations Night Vision Equipment 80,00080,000 POL25106Preliminary Alcohol Breath Test Devices 20,00020,000 POL25108Special Operations Ballistic Helmet Replacement 21,00021,000 Funding TBD Total 195,706,39946,840,814 21,793,289 3,832,988 55,336,323 9,661,785 58,241,200 GRAND TOTAL 195,706,39946,840,814 21,793,289 3,832,988 55,336,323 9,661,785 58,241,200 301 FUNDING TBD PROJECTS IN DETAIL SORTED BY DEPARTMENT 302 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Development of the public space at the old public works site. Project #DEV25104 Justification Justification - Expansion and/or Level of Service Sustainability - Adds a passive park in the area. Community engagement - Aligns with existing approved plans. Health in all policies - Outdoor walking...social recreation. Pedestrian connectivity. Race and Equity - Public space open for all. Useful LifeProject Name HRA Grandview Commons public space.Category Land Type New Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,500,000Planning and Design 2,500,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,500,0002,500,000Funding TBD 2,500,000 2,500,000Total 303 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Stephanie Hawkinson 2025 2030thru Department Comm. Dev. and HRA Description Funding source for homeowners association repairs in townhomes/condominium development. (Like the Edina West). These monies get paid back through assessments. Project #DEV25105 Justification Health, Safety & Regulatory Compliance Sustainability - Helps preserve existing buildngs Race & Equity - Helps preserve affordable housing Stewardship - Assists affordable housing with repairs. Useful LifeProject Name HIA Funding Category Land Type New Total Project Cost:$5,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 5,000,0002,500,000 2,500,000Land Acquisition 2,500,000 2,500,000 5,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 5,000,0002,500,000 2,500,000Funding TBD 2,500,000 2,500,000 5,000,000Total 304 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Cary Teague 2025 2030thru Department Comm. Dev. and HRA Description New/revised study of the Cahill Area office/industrial park. Project #DEV25106 Justification Health, Safety & Regulatory Compliance Justification - Study to determine the future land use in the district. Included goals would be sustainability, built environment, pedestrian movement. Community Engagement - To be determined, but likely would be extensive. Health in all policies - Project will look at pedestrian and bike movement throughout the district to provide better connections. Race & Equity - Examination of appropriate land uses. Stewardship - Project will help shape development and land use in the area for the next 50 years Useful LifeProject Name Cahill Area New District Plan Category Land Type New Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000200,000 50,000Planning and Design 200,000 50,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000200,000 50,000Funding TBD 200,000 50,000 250,000Total 305 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Stephanie Hawkinson 2025 2030thru Department Comm. Dev. and HRA Description Creation of affordable housing to assist the City in meeting its established affordable housing goals with the Metropolitan Council. Project #DEV25108 Justification Health, Safety & Regulatory Compliance Sustainability: Will incorporate per the sustainable buildings policy. Commnunity Enagagement: Alignment with housing chapter in the Comprehensive Plan & the Housing Strategy Task Force. Health in All Policies: Healthy homes criteria with access to transit and local amenities. Race & Equity: Increases the mix of housing options in the City to address diverse housing needs. Stewardship: Additional housing helps toward the issue of an overall lack of housing options in the Twin Cities, especially affordable housing. Useful LifeProject Name HRA Land Acquisition - Affordable Housing Category Land Type New Total Project Cost:$8,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 8,000,0005,000,000 3,000,000Land Acquisition 5,000,000 3,000,000 8,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 8,000,0005,000,000 3,000,000Funding TBD 5,000,000 3,000,000 8,000,000Total 306 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Engineering Description Each building component was evaluated to determine needed maintenance and replacements to extend the buildings lifespan. Maintenance needs and costs increase as buildings age and are required to avoid unnecessary interruptions in operations due to breakdowns of critical components. The following components are recommended for service: 2030 - Interior doors, sealed concrete, water fountain, furnace Stain, restroom accessories, paint, ceramic tile, water htrs, exhaust systems, keyless entry, exit signs, batteries, casework Wooden wall panelsStain, partitions, toilets, exit signs and batteries Project #19-946 Justification See Summary of Facilities Improvements - Funding TBD. Useful LifeProject Name Walnut Ridge Park Facility Improvements Category Buildings Type Replace or repair Total Project Cost:$134,000 Total2025 2026 2027 2028 2029Expenditures 2030 24,000Construction24,000 24,000Total24,000 Total2025 2026 2027 2028 2029Funding Sources 2030 24,000Funding TBD 24,000 24,000Total24,000 307 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Engineering Description Each building component was evaluated to determine needed maintenance and replacements to extend the buildings lifespan. Maintenance needs and costs increase as buildings age and are required to avoid unnecessary interruptions in operations due to breakdowns of critical components. The following components are recommended for service: 2030 - Ext wood panel, restroom accessories, ceramic tile carpet tile, paint, exhst system, keyless entry, stain, Janitor sink, plumbing fixtures, electrical feed, ext stain Project #ENG21048 Justification See Summary of Facilities Improvements - Funding TBD. Useful LifeProject Name Yancey Park Category Buildings Type Replace or repair Total Project Cost:$45,000 Total2025 2026 2027 2028 2029Expenditures 2030 22,000Construction22,000 22,000Total22,000 Total2025 2026 2027 2028 2029Funding Sources 2030 22,000Funding TBD 22,000 22,000Total22,000 308 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description City Hall Phased Renovations This project continues the work outlined in the 2019 & 2023 City Hall Space Needs Study and includes projects to renovate and expand areas of the building that no longer meet the needs of city services. A phased approach for a project of this size and complexity is needed to minimize the impact on building occupants and public. 2024/5 –Design & Pre-Construction $300K—17-790 Meet with user groups ideas and needs outlined in 2023 space needs document. Work would include design services for phase 1 & 2 of projects outlined below. Phase 1 2025-26--Renovation $1.5M Project would renovate the 2nd floor Administration area, utilizing opportunities created by relocation of election equipment to new storage space in the building basement. This would allow departments currently scattered around in building to be consolidated to new grouping areas and provide much needed spaces of various sizes to conduct meetings, prayer and meditative spaces, and nursing areas. Phase 1a-2025/26 Pre-Construction $500K Perform investigative testing and site fit services for a new Civic Campus. Proposed project would encompass new Fire Station %233 and expansion of Police Department & Administrative services. Budget & schedule for proposed building could be set at this phase. Phase 2 2026/27—Renovation $2.5M Continuation of Phase 1 consolidation of departments would allow current office Parks and Rec. area to be converted into flexible meeting & conference rooms. These rooms would be available to both staff and public for use and a recommendation of the 2019 Space Needs Study. Police-renovation to both 1st & 2nd floor for better operational flow & staffing additions. Phase 3a 2029/30 Horizon TBD Minor expansion near current Mayors Conference room for additional meeting spaces. Phase 3b 2029/30-Horizon TBD Civic Campus Design Phase. Build upon information gathered in phase 1a. Project #FAC25100 Justification Expansion and/or Level of Service Sustainability: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Community Engagement: Additional conference room space would add options for community gathering not currently available in the space. Health in All Policies: Gender inclusive restrooms, lactation space are health policies. Race & Equity: Inclusion elements such as gender inclusive restrooms, prayer and lactation space for the public would be proposed in the project. Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall Space Needs Design Category Buildings Type Expand or enhance Total Project Cost:$56,300,000 Total2025 2026 2027 2028 2029Expenditures 2030 56,300,0001,800,000 2,000,000 2,500,000Planning and Design 50,000,000 1,800,000 2,000,000 2,500,000 56,300,000Total50,000,000 309 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Total2025 2026 2027 2028 2029Funding Sources 2030 56,300,0001,800,000 2,000,000 2,500,000Funding TBD 50,000,000 1,800,000 2,000,000 2,500,000 56,300,000Total50,000,000 310 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Values entered into 2025 include all outstanding deferred maintenance costs from 2017- 2025" Project #FAC25102 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Community Engagement - Additional conference room space would add options for community gathering not currently available in the space. Health in All Policies - Gender inclusive restrooms, lactation space are health policies. Race & Equity - Inclusion elements such as gender inclusive restrooms, prayer and lactation space for the public would be proposed in the project. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall Deferred Maintenance Category Buildings Type Replace or repair Total Project Cost:$12,196,291 Total2025 2026 2027 2028 2029Expenditures 2030 12,196,2915,109,023 1,304,651 88,663 5,693,954Installation/Maintenance 5,109,023 1,304,651 88,663 5,693,954 12,196,291Total Total2025 2026 2027 2028 2029Funding Sources 2030 12,196,2915,109,023 1,304,651 88,663 5,693,954Funding TBD 5,109,023 1,304,651 88,663 5,693,954 12,196,291Total 311 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Values entered into 2025 include all outstanding deferred maintenance costs from 2017- 2025" Project #FAC25104 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Golf Course Deferred Maintenance Category Buildings Type Replace or repair Total Project Cost:$4,155,731 Total2025 2026 2027 2028 2029Expenditures 2030 4,155,7312,025,000 631,000 156,000 8,600 1,335,131Installation/Maintenance 2,025,000 631,000 156,000 8,600 1,335,131 4,155,731Total Total2025 2026 2027 2028 2029Funding Sources 2030 4,155,7312,025,000 631,000 156,000 8,600 1,335,131Funding TBD 2,025,000 631,000 156,000 8,600 1,335,131 4,155,731Total 312 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. " Project #FAC25106 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Public Works Building Deferred Maintenance Category Buildings Type Replace or repair Total Project Cost:$43,918,711 Total2025 2026 2027 2028 2029Expenditures 2030 43,918,7112,123,546 1,945,892 38,929,958 919,315Installation/Maintenance 2,123,546 1,945,892 38,929,958 919,315 43,918,711Total Total2025 2026 2027 2028 2029Funding Sources 2030 43,918,7112,123,546 1,945,892 38,929,958 919,315Funding TBD 2,123,546 1,945,892 38,929,958 919,315 43,918,711Total 313 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Values entered into 2025 include all outstanding deferred maintenance costs from 2017- 2025" Project #FAC25107 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Edinborough Park Asset Preservation Category Equipment and Vehicles Type Replace or repair Total Project Cost:$13,326,438 Total2025 2026 2027 2028 2029Expenditures 2030 13,326,4389,597,163 3,152,615 576,660Installation/Maintenance 9,597,163 3,152,615 576,660 13,326,438Total Total2025 2026 2027 2028 2029Funding Sources 2030 13,326,4389,597,163 3,152,615 576,660Funding TBD 9,597,163 3,152,615 576,660 13,326,438Total 314 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Values entered into 2025 include all outstanding deferred maintenance costs from 2017- 2025" Project #FAC25112 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Fire Station #1 Deferred Maintenance Category Buildings Type Replace or repair Total Project Cost:$2,510,331 Total2025 2026 2027 2028 2029Expenditures 2030 2,510,3311,251,082 14,525 1,181,490 63,234Installation/Maintenance 1,251,082 14,525 1,181,490 63,234 2,510,331Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,510,3311,251,082 14,525 1,181,490 63,234Funding TBD 1,251,082 14,525 1,181,490 63,234 2,510,331Total 315 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Assessment, preventative maintenance, and planned replacement to equipment critical to indoor pool operations,. Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Project #FAC25116 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Edinborough Pool Mechanical and Filter Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000125,000 125,000Installation/Maintenance 125,000 125,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000125,000 125,000Funding TBD 125,000 125,000 250,000Total 316 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Replacement of the Lewis Park shelter building based on space needs and community engagement. Evaluation of programming and space needs will be included to determine required square footage. Design will be driven by city goals and values. " Project #15-049 Justification The Lewis Park shelter building was designed and built in the 1970's and no longer meets residents' needs. The building requires extensive maintenance and is recommended for scheduled replacement. Useful LifeProject Name Lewis Park Shelter Building Replacement Category Buildings Type Replace or repair Total Project Cost:$900,000 Total20252026202720282029Expenditures2030 900,000900,000Construction 900,000 900,000Total Total20252026202720282029Funding Sources 2030 900,000900,000Funding TBD 900,000 900,000Total 317 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Trailer crash attenuators can reduce the impact due to an accident that could occur while work vehicles are performing tasks on roadways. Trailer mounted attenuators can be towed by a variety of vehicles in Park Maintenance an Public Works. Project #P&R25109 Justification Health, Safety & Regulatory Compliance Useful LifeProject Name Trailer Crash Attenuators Category Equipment and Vehicles Type New Total Project Cost:$35,000 Total2025 2026 2027 2028 2029Expenditures 2030 35,00035,000Vehicles and Equipment 35,000 35,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 35,00035,000Funding TBD 35,000 35,000Total 318 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Aquatic Center Description In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals. Project #P&R23106 Justification See Summary of Facilities Improvements. Useful LifeProject Name Aquatic Center Deferred Maintenance Category Infrastructure Type Replace or repair Total Project Cost:$1,261,304 Total2025 2026 2027 2028 2029Expenditures 2030 1,261,304600,000 452,000 141,988 5,880 61,436Installation/Maintenance 600,000 452,000 141,988 5,880 61,436 1,261,304Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,261,304600,000 452,000 141,988 5,880 61,436Funding TBD 600,000 452,000 141,988 5,880 61,436 1,261,304Total 319 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Aquatic Center Description "Existing user feature require refurbishment and replacement. These features are unique to the Edina Aquatic Center and used to draw visitors to the park. Replace Shipwreck Zipline & Diving boards $500,000Site User Amenities $470,000Flow-rider Surf Simulator $100,000Slide Tower Stairs Painting $75,000Water Slide repainting--gel coating $150,000Site User Amenities $470,000Replace Zero Depth Play Structure $1,500,000" Project #P&R25115 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Aquatic Center User Feature Category Parks Type Replace or repair Total Project Cost:$2,795,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,795,000500,000 470,000 75,000 150,000 100,000Installation/Maintenance 1,500,000 500,000 470,000 75,000 150,000 100,000 2,795,000Total1,500,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,795,000500,000 470,000 75,000 150,000 100,000Funding TBD 1,500,000 500,000 470,000 75,000 150,000 100,000 2,795,000Total1,500,000 320 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Aquatic Center Description Re-surfacing and painting of indoor pool to maintain surface and integrity of pool. Project #P&R25116 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Edinborough Pool Resurfacing & Painting Category Parks Type Replace or repair Total Project Cost:$125,000 Total2025 2026 2027 2028 2029Expenditures 2030 125,000125,000Installation/Maintenance 125,000 125,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 125,000125,000Funding TBD 125,000 125,000Total 321 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Parks: Aquatic Center Description This project request is for funding modern amenity upgrades for user experience and services. Facility upgrades would include a new admissions and entry, concessions area, ADA pathway upgrades, expanded pool deck and group area, gender neutral and family restroom upgrades. This project would increase safety, accessibility, and user experience. Project #P&R25120 Justification Expansion and/or Level of Service Sustainability - Upgrades to mechanical and plumbing systems would be included. This renovation would be subject to Edina Sustainable Building Policy. Solar feasibility would be included. Community Engagement - The Aquatic center sees 75,000 visitors a day. Project upgrades would allow for better wayfinding and experience. Upgrades would increase regional and youth exposure to water safety. Health in all polilcies - Improvements such as shade structures and healthier concession options would provide health benefits. Race and equity - Increased accessibility and wayfinding would promote use by public transit and pedestrian access. Useful LifeProject Name Aquatic Center Changing House Expansion Category Buildings Type Expand or enhance Total Project Cost:$6,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 6,000,0006,000,000Construction 6,000,000 6,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 6,000,0006,000,000Funding TBD 6,000,000 6,000,000Total 322 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Arena Description Replace 2009 pickup truck Project #P&R25122 Justification Asset Functionality Sustainability: Current vehicle is not fuel efficient. Community Engagement: Vehicle allows staff to use throughout the arena, dome and parking areas as well as for hauling, projects and trips for supplies if needed. Health in All Policies: New vehicle allows staff to be more efficient in job functions and improve customer service for users and guests. Race & Equity: New vehicles allows for the city to maintain play spaces that are safe, accessible and welcoming for all. Stewardship: New vehicle reduces maintenance, fuel and staff time. Useful LifeProject Name Braemar Arena Pickup Truck Category Equipment and Vehicles Type Replace or repair Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Vehicles and Equipment 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Funding TBD 50,000 50,000Total 323 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Remove dying trees and stumps and replacing with a pergola system and seating. Trees are currently a hazard. Project #P&R21052 Justification The upkeep of City infrastructure is a key component of the Vision Edina document. This trellis system would replace an area that is on the decline and turn it into an asset. Useful LifeProject Name CLP Central Park Trellis Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$450,000 Total2025 2026 2027 2028 2029Expenditures 2030 450,000150,000 150,000Construction 150,000 150,000 150,000 450,000Total150,000 Total2025 2026 2027 2028 2029Funding Sources 2030 450,000150,000 150,000Funding TBD 150,000 150,000 150,000 450,000Total150,000 324 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Centennial Lakes Park has over two dozen stone retaining walls of various lengths and heights, all of which are over 20 years old. Many of these walls are in need of restoration beyond the normal repairs we are able to do ourselves. There is about 1,200 square feet of wall throughout the park that needs to be restored. The project would involve demolition of existing wall sections, restoration of the wall using existing and new stone, and adding new landscape fabric and backfill for drainage. ENVIRONMENTAL CONSIDERATIONS: We will be reusing as much of our existing natural stone as possible as we rebuild the walls. Project #P&R21053 Justification The upkeep of City infrastructure is a key component of Vision Edina. The walls are showing signs of stress and will need to be repaired or will eventually collapse. Useful LifeProject Name CLP Rebuild Retaining Walls Category Parks Type Replace or repair Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000200,000 200,000Construction 200,000 200,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000200,000 200,000Funding TBD 200,000 200,000 400,000Total 325 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Centennial Lakes Park Description In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals. Project #P&R23116 Justification See Summary of Facilities Improvements. Useful LifeProject Name Centennial Lakes Park Deferred Maintenance Category Infrastructure Type Replace or repair Total Project Cost:$1,960,393 Total2025 2026 2027 2028 2029Expenditures 2030 1,960,393800,000 956,606 21,732 182,055Installation/Maintenance 800,000 956,606 21,732 182,055 1,960,393Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,960,393800,000 956,606 21,732 182,055Funding TBD 800,000 956,606 21,732 182,055 1,960,393Total 326 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace six paddleboats purchased in 2007-2015. Project #P&R25128 Justification Asset Functionality Health in all policies - Encourage exercise and socialization Useful LifeProject Name Centennial Lakes Park Paddleboat Replacement Category Parks Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00020,000 20,000Vehicles and Equipment 20,000 20,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00020,000 20,000Funding TBD 20,000 20,000 40,000Total 327 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description 2028 - Repair four ponds along the golf course that are leaking. 2029 - Replace Boulder Pond along south end of the Park. Project #P&R25129 Justification Asset Functionality Sustainability - Reduce water use. Replace current water feature with landscape elements to reduce water use. Community Engagement - Feature will be safe for enjoyment by all park visitors Race & Equity - Space would be inclusive for all users of the community. Health in all policies - Ponds are on putting course and encourage exercise and socialization. Provide space for socialization and gathering. Stewardship - Reduce maintenance costs to repair amenities. Useful LifeProject Name CLP Golf Course Planting & Pond Replacement Category Parks Type Replace or repair Total Project Cost:$210,000 Total2025 2026 2027 2028 2029Expenditures 2030 210,000150,000 60,000Installation/Maintenance 150,000 60,000 210,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 210,000150,000 60,000Funding TBD 150,000 60,000 210,000Total 328 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace outdoor speakers throughout the Park. Project #P&R25131 Justification Asset Functionality Community Engagement: Entire system would function, providing music throughout park for people to enjoy Stewardship: Patrons often comment on the uniqueness of having music throughout the park. Specific to Centennial Lakes Park Useful LifeProject Name Centennial Lakes Park Outdoor Sound System Category Parks Type Replace or repair Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000Construction150,000 150,000Total150,000 Total2025 2026 2027 2028 2029Funding Sources 2030 150,000Funding TBD 150,000 150,000Total150,000 329 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Finish replacement of outdoor signage throughout park. $150,000 of ARPA Funds were allocated in 2023-2024 and design was completed along with some replacement. Project #P&R25132 Justification Health, Safety & Regulatory Compliance Community Engagement - Finish updating wayfinding signage throughout park to provide better user experience. Race and Equity - Updated signage to serve entire population using the park. Useful LifeProject Name Centennial Lakes Park Signage Category Parks Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Vehicles and Equipment 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Funding TBD 200,000 200,000Total 330 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description 2026 - Exterior Envelope Repairs and Replacements 2028 - Addition of bathrooms at the amphitheater 2030 - Replace, repair and paint amphitheater roof and structure. Replace A/V equipment Project #P&R25133 Justification Expansion and/or Level of Service, Asset Functionality Community Engagement: Provide restroom for park users utilizing the amphitheater. Feature will be safe for enjoyment by all park visitors Race & Equity: Provide enhancement of service at park with diverse audience. Useful LifeProject Name CLP Amphitheater Maintenance & Bathroom Addition Category Parks Type Replace or repair Total Project Cost:$1,280,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 780,00030,000Installation/Maintenance 750,000 30,000 500,000 1,280,000Total750,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,280,00030,000 500,000Funding TBD 750,000 30,000 500,000 1,280,000Total750,000 331 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace railings throughout park in poor condition Project #P&R25135 Justification Health, Safety & Regulatory Compliance","Asset Functionality Community Engagement - Replacement of broken and worn railings will provide safer walking experience for 500,000 visitors Stewardship - Reduce maintenance costs to repair worn railings. Useful LifeProject Name Centennial Lakes Park Railings Replacement Category Parks Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000100,000 50,000 50,000Installation/Maintenance 100,000 50,000 50,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000100,000 50,000 50,000Funding TBD 100,000 50,000 50,000 200,000Total 332 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace rubber flooring used during skating season. Project #P&R25137 Justification Asset Functionality Useful LifeProject Name Centennial Lakes Park Skating Mats Category Parks Type Replace or repair Total Project Cost:$20,000 Total2025 2026 2027 2028 2029Expenditures 2030 20,000Vehicles and Equipment 20,000 20,000Total20,000 Total2025 2026 2027 2028 2029Funding Sources 2030 20,000Funding TBD 20,000 20,000Total20,000 333 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace pavers in main park entry. Project #P&R25138 Justification Health, Safety & Regulatory Compliance, Asset Functionality Community Engagement: Replacement of worn pavers and concrete will provide safer walking experience for 500,000 visitors Health in All Policies: Replacement of worn pavers and concrete will provide safer walking experience for 500,000 visitors Useful LifeProject Name CLP Main Entrance Paver Replacement Category Parks Type Replace or repair Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000Construction100,000 100,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 100,000Funding TBD 100,000 100,000Total100,000 334 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace and enhance the clubhouse at Centennial Lakes Park. Add restrooms and outdoor seating area to the structure. Project #P&R25140 Justification Asset Functionality","Health, Safety & Regulatory Compliance","Expansion and/or Level of Service Community Engagement - Replace building at popular attraction in park that has 500,000 visitors each year. Health in all policies - Provide covered seating space for socialization and restrooms for easier accessibility. Useful LifeProject Name Centennial Lakes Park Clubhouse Replacement Category Parks Type Replace or repair Total Project Cost:$750,000 Total2025 2026 2027 2028 2029Expenditures 2030 750,000750,000Installation/Maintenance 750,000 750,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 750,000750,000Funding TBD 750,000 750,000Total 335 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace irrigation systems throughout park that are not functioning or require extensive maintenance. Replace landscape in area of irrigation replacement. Project #P&R25141 Justification Asset Functionality Sustainability - Replace broken irrigation systems with more efficient technology. Stewardship - Reduce maintenance costs to repair 30 year old irrigation systems. Useful LifeProject Name CLP Irrigation and Planting Bed Replacement Category Parks Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,00050,000 50,000 50,000 50,000Installation/Maintenance 50,000 50,000 50,000 50,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,00050,000 50,000 50,000 50,000Funding TBD 50,000 50,000 50,000 50,000 200,000Total 336 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Repair concrete walking paths throughout the 1.4 mile loop at Centennial Lakes Park and .75 miles on Edina Promenade. Remove paver inlays where appropriate. Project #P&R25142 Justification Health, Safety & Regulatory Compliance","Asset Functionality Community Engagement - Repair damaged concrete walking paths will provide safer walking experience for 500,000 visitors Health in all policies - Project will increase safety of walking paths, encouraging exercise and socialization Race and equity - Removal of paver inlays will improve walking and riding experience. Increase safety at popular, diverse park. Stewardship - 500,000 users utilize Centennial Lakes Park every year. The condition and safety of the walking paths is essential to a positive experience. This project will enhance the public pathways and encourage people to exercise. Useful LifeProject Name CLP Walking Path Repair Category Parks Type Replace or repair Total Project Cost:$600,000 Total2025 2026 2027 2028 2029Expenditures 2030 600,000100,000 100,000 100,000 100,000 100,000Installation/Maintenance 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 600,000100,000 100,000 100,000 100,000 100,000Funding TBD 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 337 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace Scottish Links with seating area for park users. Project #P&R25143 Justification Expansion and/or Level of Service Sustainability - "Remove bent grass that requires significant maintenance and replace with native plantings and seating areas. " Community Engagement - Remove paying amenity with free amenity. Health in all policies - Provide space for socialization and gathering. Race and equity - Remove paying amenity with free amenity that promotes community. Stewardship - Remove grass that requires a high level of resources and maintenance and replace with seating area for all park users to enjoy. Useful LifeProject Name CLP Lawn Game Replacement/Seating Enhancement Category Parks Type Expand or enhance Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Installation/Maintenance 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Funding TBD 50,000 50,000Total 338 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace worn swinging benches, trellis, drinking fountains, and garbage cans Project #P&R25144 Justification Health, Safety & Regulatory Compliance","Asset Functionality Race and Equity - Replace worn amenities at park with diverse audience. Stewardship - Reduce maintenance costs to repair amenities. Useful LifeProject Name Centennial Lakes Park Site Amenities Replacement Category Parks Type Replace or repair Total Project Cost:$80,000 Total2025 2026 2027 2028 2029Expenditures 2030 80,00040,000 40,000Installation/Maintenance 40,000 40,000 80,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 80,00040,000 40,000Funding TBD 40,000 40,000 80,000Total 339 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description A site evaluation of Centennial Lakes Park was conducted in 2021 to review all exterior hardscapes and park infrastructure. Including sidewalks, benches and railings, irrigation systems, and site specific lighting. The report provided by Kimley-Horn & associates identified 3 priorities of repairs throughout the parkHigh--Items in critical or near critical need for replacement $7.0MMed--Items less critical with 5-10 years of life expectance $13.5MLow--Items deemed non-critical 10+ years of life expectance $5.5MAs these items were not previously tracked or reported in CIP plans they lacked major funding for replacement and should be included in this and future CIP projects as deferred maintenance. Project #P&R25146 Justification Asset Functionality Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Centennial Lakes Site and Hardscapes Repairs Category Parks Type Replace or repair Total Project Cost:$25,925,200 Total2025 2026 2027 2028 2029Expenditures 2030 25,925,2007,000,000 13,500,000Construction 5,425,200 7,000,000 13,500,000 25,925,200Total5,425,200 Total2025 2026 2027 2028 2029Funding Sources 2030 25,925,2007,000,000 13,500,000Funding TBD 5,425,200 7,000,000 13,500,000 25,925,200Total5,425,200 340 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Edinborough Park Description Expand loading dock area for additional trash enclosure space. Includes repairs to loading dock surfaces. Repairs to exterior lighting at South entrance- $50,000 Project #P&R25150 Justification Asset Functionality Sustainability: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment Useful LifeProject Name Edinborough Park Loading Dock Category Parks Type Expand or enhance Total Project Cost:$125,000 Total2025 2026 2027 2028 2029Expenditures 2030 125,00050,000 75,000Construction 50,000 75,000 125,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Edinborough Fund 75,00075,000Funding TBD 50,000 75,000 125,000Total 341 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Upgrade the locker rooms to become ADA compliant. Project #P&R25158 Justification Health, Safety & Regulatory Compliance, Expansion and/or Level of Service Health in All Policies: The existing locker rooms (toilets, showers and sinks) do not meet ADA requirements and limits access for some patrons. Useful LifeProject Name Edinborough Park Locker Room Upgrade Category Parks Type Expand or enhance Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Funding TBD 300,000 300,000Total 342 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Edinborough Park Description Enhance dated and damaged areas of East drive up entrance at Edinborough Park. Area will require new concrete sidewalks, pedestrian lighting and landscaping. Existing entrance was constructed in 1990's and components are failing.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Project #P&R25159 Justification Asset Functionality Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Edinborough Park Entrance & Visitor 1st Experience Category Parks Type Replace or repair Total Project Cost:$600,000 Total2025 2026 2027 2028 2029Expenditures 2030 600,000100,000 500,000Construction 100,000 500,000 600,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 600,000100,000 500,000Funding TBD 100,000 500,000 600,000Total 343 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Remove temporary/portable restroom on Academy 9 Golf Course and replace with permanent structure. Project #P&R25161 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Permanent Restroom Academy 9 Category Parks Type New Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Construction 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Funding TBD 400,000 400,000Total 344 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description This was included in the building study plan. At this time, we have a “closet” for chemical storage and how we fill our sprayer is not up to OSHA standards. A separate building for chemical storage and proper loading and mixing with proper containment is proposed. A recycled wash pad is also being proposed. Project #P&R25173 Justification Health, Safety & Regulatory Compliance Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Chemical Fill Station Building/ Wash Pad Category Parks Type Expand or enhance Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Funding TBD 300,000 300,000Total 345 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Additions/Upgrades to Breakroom, add an Office and expand Main Shop. Current space is inadequate for growth of facility. Project #P&R25179 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Maintenance Building Additions/Upgrade Category Buildings Type Expand or enhance Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Funding TBD 300,000 300,000Total 346 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description This will add a unmarked detective car to the police fleet. A new Detective position was authorized in the 2024 budget with a total of six new positions in 2024-25. Detectives are assigned an unmarked police vehicle to carry out their job duties. Open positions in the department have allowed us to defer this addition until 2025. The cost includes the vehicle, emergency equipment, and upfitting costs. Costs are higher for the initial build of this police vehicle due to systems that are typically purchased for the entire fleet under other projects. This build includes a mobile radio, first aid/AED equipment, and a patrol rifle. ***May be eligible for Public Safety Grant Funding*** Project #POL25102 Justification Expansion and/or Level of Service Sustainability: The Police Department continues to incorporate fully electric (EV) and hybrid vehicles into our fleet. Typically we utilize hybrid vehicles for unmarked Detective cars. Vehicle procurement has become very difficult in recent years and the final selection will be based on vehicle availability. Community Engagement: Police vehicles are essential for officers to carry out their job duties. Health in All Policies: An adequate and reliable fleet of emergency response vehicles is essential for our police officers to carry out their job duties. Race & Equity: Promotes accessibility of police services to all members of the community Stewardship: The police department continues to responsibly manage our fleet to maximize efficiency and minimize cost while prioritizing public safety and employee safety. Useful LifeProject Name Detective Vehicle Addition Category Equipment and Vehicles Type New Total Project Cost:$55,000 Total2025 2026 2027 2028 2029Expenditures 2030 55,00055,000Vehicles and Equipment 55,000 55,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 55,00055,000Funding TBD 55,000 55,000Total 347 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace (15) SWAT team radio headsets. Radio headsets allow SWAT team operators and paramedics to communicate effectively during special operations. Existing headsets are over 10 years old, are no longer serviceable, and require replacement. This is essential safety equipment required for SWAT operations. This items should be added to the Equipment Replacement Schedule. ***May be eligible for Public Safety Grant Funding*** Project #POL25104 Justification Health, Safety & Regulatory Compliance, Asset Functionality Sustainability: Existing equipment will be properly recycled. Community Engagement: Properly equipping our SWAT team assures effective and efficient police response to any situation in the community. Health in All Policies: We have an obligation to our employees to provide the equipment necessary to keep them safe. Technology, tactics, and threats rapidly evolve and this investment is critical to keep our SWAT team properly equipped. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The SWAT team has extended the life of existing equipment to over 10 years through proper maintenance and repair. Replacing the equipment now is essential for officer safety and effective SWAT operations. Useful LifeProject Name Special Operations Radio Headsets Category Equipment and Vehicles Type Replace or repair Total Project Cost:$20,000 Total2025 2026 2027 2028 2029Expenditures 2030 20,00020,000Vehicles and Equipment 20,000 20,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 20,00020,000Funding TBD 20,000 20,000Total 348 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace (11) night vision units, IR aiming, and mounting hardware for SWAT team. Night vision equipment is used in SWAT Special Operations when operating in dark conditions indoors or out. The current SWAT night vision equipment is 20 years old and was acquired at the time through a donation. This equipment is long past its useful service life and requires replacement. This item should be added to the equipment replacement schedule. ***May be eligible for Public Safety Grant Funding*** Project #POL25105 Justification Health, Safety & Regulatory Compliance, Asset Functionality Sustainability: Existing equipment will be recycled properly. Community Engagement: Properly equipping our SWAT team assures effective and efficient police response to any situation in the community. Health in All Policies: We have an obligation to our employees to provide the equipment necessary to keep them safe. Technology, tactics, and threats rapidly evolve and this investment is critical to keep our SWAT team properly equipped. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The SWAT team has extended the life of existing equipment for 20 years through proper maintenance and repair. Replacing the equipment now is essential for officer safety and effective SWAT operations. Useful LifeProject Name Special Operations Night Vision Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$80,000 Total2025 2026 2027 2028 2029Expenditures 2030 80,00080,000Vehicles and Equipment 80,000 80,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 80,00080,000Funding TBD 80,000 80,000Total 349 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace preliminary breath test (PBT) devices used in the field for a preliminary measurement of blood alcohol concentration. These devices are used in the enforcement of DWI and other alcohol related offenses. They are also used in medical situations to assess cases of extreme intoxication or unknown substance influence. PBT units are in all patrol squads and assigned to SROs in the schools. The existing units are more than 15 years old and have reached the end of their useful life. Project #POL25106 Justification Health, Safety & Regulatory Compliance, Asset Functionality Sustainability: Existing equipment will be recycled properly. Consideration will be given to products that minimize waste. Community Engagement: Equipment allows officers to efficiently carry out their duties in traffic enforcement and provide more effective medical care. Health in All Policies: This equipment is necessary to assist police in addressing alcohol related issues in the community including the threats to public safety from intoxicated drivers. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The department has long extended the life of existing equipment through proper maintenance and repair. Product selection will give consideration to reliability and serviceability to again minimize future replacement. Useful LifeProject Name Preliminary Alcohol Breath Test Devices Category Equipment and Vehicles Type Replace or repair Total Project Cost:$20,000 Total2025 2026 2027 2028 2029Expenditures 2030 20,00020,000Vehicles and Equipment 20,000 20,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 20,00020,000Funding TBD 20,000 20,000Total 350 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace ballistic helmets for SWAT officers and paramedics. This is a required replacement of existing personal safety equipment. Costs have increased over the years bringing this to the level of CIP, it should be added to the equipment replacement schedule moving forward. Project #POL25108 Justification Health, Safety & Regulatory Compliance, Asset Functionality Sustainability: Existing equipment will be recycled properly. Consideration will be given to products that minimize waste. Community Engagement: Properly equipping our SWAT team assures effective and efficient police response to any situation in the community. Health in All Policies: This is essential personal safety equipment necessary to operate a SWAT team. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The SWAT team repairs and maintains all equipment to maximize effective service life. Replacing the equipment is essential for officer safety and effective SWAT operations. Useful LifeProject Name Special Operations Ballistic Helmet Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$21,000 Total2025 2026 2027 2028 2029Expenditures 2030 21,00021,000Vehicles and Equipment 21,000 21,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 21,00021,000Funding TBD 21,000 21,000Total 351