Loading...
HomeMy WebLinkAbout2025-02-04 City Council Meeting Packet Meeting location: Edina City Hall Council Chambers 4801 W. 50th St. Edina, MN City Council Meeting Agenda Tuesday, February 4, 2025 7:00 PM Participate in the meeting: Watch the meeting on cable TV or YouTube.com/EdinaTV. Provide feedback during Community Comment by calling 312-535- 8110. Enter access code 2634 670 6544. Password is 5454. Press *3 on your telephone keypad when you would like to get in the queue to speak. A staff member will unmute you when it is your turn to speak. Accessibility Support: The City of Edina wants all residents to be comfortable being part of the public process. If you need assistance in the way of hearing amplification, an interpreter, large-print documents or something else, please call 952-927- 8861 at least 72 hours in advance of the meeting. 1. Call to Order 2. Roll Call 3. Pledge of Allegiance 4. Approval of Meeting Agenda 5. Community Comment During "Community Comment," the Mayor will invite residents to share issues or concerns that are not scheduled for a future public hearing. Items that are on tonight's agenda may not be addressed during Community Comment. Individuals must limit their comments to three minutes. The Mayor may limit the number of speakers on the same issue in the interest of time and topic. Individuals should not expect the Mayor or Council to respond to their comments tonight. The City Manager will respond to questions raised during Community Comments at the next meeting. 5.1. City Manager's Response to Community Comments 6. Adoption of Consent Agenda All agenda items listed on the Consent Agenda will be approved by one motion. There will be no separate discussion of items unless requested to be removed by a Council Member. If removed the item will be considered immediately following the adoption of the Consent Agenda. (Favorable roll call vote of majority of Council Members present to approve, unless otherwise noted in consent item.) 6.1. Minutes: Work Session and Regular, Jan. 21, 2025 6.2. Payment of Claims Page 1 of 647 6.3. Ordinance No. 2025-05: Setting Morningside Water Rates 6.4. Resolution No. 2025-14: Amending 2025 Budget 6.5. Adopt 2025-2030 Capital Improvement Plan 6.6. Request for Purchase: First Due Subscription Renewal 6.7. Joint Powers Agreement with Bureau of Criminal Apprehension 6.8. Request for Purchase: Four Rifle Rated Ballistic Shields 6.9. Request for Purchase: Network Storage Support Renewal 6.10. Request for Purchase: ENG 25-3NB Bredesen Park Restoration 6.11. Request for Purchase: York Avenue Street Lighting Replacement 6.12. Request for Purchase: Change Order #1 for York Ave Pond Improvements Professional Services 6.13. Request for Purchase: Change Order #1 for Braemar Golf Course Restroom Professional Services 6.14. Request for Purchase: I-494 Corridor Commission Annual Membership Dues for 2025 6.15. Traffic Safety Report of December 18, 2024 6.16. Request for Purchase: Braemar Park Ecological Restoration 2025-2028 6.17. Request for Purchase: Fred Richard Park and Braemar Arena Food Service Program and Business Plan, Phase 1 6.18. Approve Out-of-State Travel for Mayor Hovland 6.19. Revised Resolution No. 2025-08: Approving Mayor's Appointment to the Housing & Redevelopment Authority 6.20. Approve Electronic Signature Policy 7. Reports/Recommendations: (Favorable vote of majority of Council Members present to approve except where noted) 7.1. Sketch Plan Review for 5516 Vernon Avenue Page 2 of 647 7.2. Ordinance No. 2025-01: Amending Chapter 8 Concerning the Sale of Inhumanely Bred Animals 8. Commission Correspondence (Minutes and Advisory Communication) 8.1. Minutes: Parks & Recreation Commission Nov. 13, 2024 8.2. Minutes: Transportation Commission, Dec. 19, 2024 9. Manager's Comments 10. Mayor and Council Comments 11. Adjournment Page 3 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Information Meeting: City Council Agenda Number: 5.1 Prepared By: Sharon Allison, City Clerk Item Type: Other Department: Administration Item Title: City Manager's Response to Community Comments Action Requested: Action Requested: None, information only. Information/Background: Responses to questions posed during Community Comment at the last meeting were posted on the City’s website at https://www.edinamn.gov/2051/Responses-to-Community-Comment. City Manager Neal will provide summaries of those responses during the meeting. Supporting Documentation: None Page 4 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.1 Prepared By: Sharon Allison, City Clerk Item Type: Minutes Department: Administration Item Title: Minutes: Work Session and Regular, Jan. 21, 2025 Action Requested: Approve minutes as presented. Information/Background: Supporting Documentation: 1. Minutes: Work Session, Jan. 21, 2025 2. Minutes: Regular, Jan. 21, 2025 Page 5 of 647 Page 1 MINUTES OF THE EDINA CITY COUNCIL WORK SESSION COMMUNITY ROOM, CITY HALL TUESDAY, JANUARY 21, 2025 5:30 P.M. 1.0 CALL TO ORDER Mayor Hovland called the meeting to order at 5:30 p.m. 2.0 ROLL CALL Answering rollcall were Members Agnew, Jackson, Pierce, Risser, and Mayor Hovland. Absent: None Staff in attendance: Scott Neal, City Manager; Ari Lenz, Assistant City Manager; Zoe Johnson, City Management Fellow; Perry Vetter, Parks & Recreation Director; Tracy Petersen, Parks & Recreation Assistant Director; Laura Fulton, Recreation Supervisor; Jeanette Colby, Parks & Recreation Program Coordinator; Pa Thao, Finance Director; Chad Millner, Engineering Director; Jennifer Bennerotte, Communications Director; Derik Otten, Facilities Manager; Cary Teague, Community Development Director; Ryan Browning, I.T. Director; and Sharon Allison, City Clerk. Others in attendance: Arts & Culture Commission Members: Chair Laura Westlund, Vice-Chair Alana Zbaren, Jennifer Faeth, Anne Marie Curtin; and Nick Anhut, Ehlers Senior Municipal Advisor. 3.1 UPDATE ON EDINA ART CENTER COLOCATION AT SOUTHDALE LIBRARY Director Vetter shared the history and the needs of the Edina Art Center; the range of options and opportunity costs that were considered; the colocation benefits and potential partnerships and connections with neighboring parks and trails; the comparable costs of the same type of project in other states; the total project cost of tenant payments over 40 years compared to the other options; a description of the letter of intent from Hennepin County; the phases of project development; the planning of how the facility will be utilized with help from Webb Management, input from the Arts & Culture Commission and the community; and the proposed design renderings. Next steps are to formalize the lease agreement and memorandum of understanding. The Council asked questions and discussed efficiencies of the different type of kilns; and the use and future use of the existing Edina Art Center. The Arts & Culture Commission members shared their excitement and exposure of the Edina Art Center in this shared space which will help to grow the arts community. 3.2 AQUATIC CENTER PUMP ROOM Director Thao and Manager Otten shared the history and issues of the pump room that includes State code compliance updates, the 2021 electrical failure, and the deteriorating state of the pump room. To limit impacts of the aquatic season, the proposed plan would be to build an addition and keep the aquatic center operational. Next steps include completing the construction design phase and calling for bids, but first funding needs to be secured. Advisor Anhut described the options for funding: Edina Special Law, referendum, tax abatement, and HRA public project. The Council asked questions and discussed the different funding options including State legislative bonding and a local option sales tax extension. Assistant City Manager Lenz added that due to the time restrictions and state of the pump room, passing a referendum is significantly limited. Director Thao shared that the HRA public project option would be the most complex. Advisor Anhut explained that the Edina Special Law is not feasible unless a new revenue source can be added. Lenz explained the process of tax abatement and Anhut shared options on how to use the tax abatement with an option to also use temporary bonds. Thao explained the next steps to get an estimated cost to then decide how to fund the project. Page 6 of 647 Minutes/Edina City Council Work Session/January 21, 2025 Page 2 4.0 ADJOURNMENT Mayor Hovland adjourned the meeting at 6:45 p.m. Respectfully submitted, Sharon Allison, City Clerk Minutes approved by Edina City Council, February 4, 2025. James B. Hovland, Mayor Work session audio available. Page 7 of 647 Page 1 MINUTES OF THE REGULAR MEETING OF THE EDINA CITY COUNCIL HELD AT CITY HALL JANUARY 21, 2025 7:00 P.M. I.0 CALL TO ORDER Mayor Hovland called the meeting to order at 7:01 p.m. 2.0 ROLLCALL Answering rollcall were Members Agnew, Jackson, Pierce, Risser, and Hovland. 3.0 PLEDGE OF ALLEGIANCE 4.0 MEETING AGENDA – APPROVED Member Jackson made a motion, seconded by Member Pierce, approving the meeting agenda. Ayes: Agnew, Jackson, Pierce, Risser, Hovland Motion carried. 5.0 COMMUNITY COMMENT Olivia Wegman-Krider, Project Earth, stated that overconsumption is a real issue and encouraged everyone to attend the clothing swap at Edina High School on February 22nd to strive towards meeting the goals set by the Climate Action Plan. Alexander, Project Earth, discussed the Edina Climate Action Plan and how it interested him. He also encouraged citizens to view Edina Better Together to find an area that interests them. Bobby stated that he is the outreach coordinator for the Council of Hindus of North America and thanked the Police for their help during a recent incident that occurred. He pointed out that they live, work, and/or worship here and asked for extra vigilance so there are not any more similar incidents in the future. Janey Westin, 6136 Brookview Avenue, asked that the Council keep the Community Comment portion of the meeting exactly the way it is and not move it to the end of the meeting. 5.1. CITY MANAGER’S RESPONSE TO COMMUNITY COMMENTS City Manager Neal responded to Community Comments from current and past meetings. 6.0 CONSENT AGENDA – ADOPTED Member Jackson made a motion, seconded by Member Agnew, approving the consent agenda as follows: 6.1. Approve regular and work session meeting minutes of January 7, 2025 6.2. Approve Claims for Payment for Check Register Pre-List Dated January 3, 2025, totaling $1,413,434.56, Check Register Claims Pre-List Dated January 10, 2025, totaling $1,319,783.58, and Check Register Claims Pre-List Dated December 20, 2024, totaling $2,786,708.02 6.3. Request for Purchase, 2025 Efficient Building Benchmarking Services, awarding the bid to the recommended low bidder, Touchstone IQ at $20,500 6.4. Adopt Resolution No. 2025-12, approving Parking Restrictions 6.5. Approve Traffic Safety Report of October 29, 2024 6.6. Request for Purchase, 2025 Computer Replacements, awarding the bid to the recommended low bidder, HP at $138,790 6.7. Request for Purchase, Security Camera Service and Support Agreement, awarding the bid to the recommended low bidder, Pro-Tec Design at $25,612 6.8. Second Amendment to Site Lease Agreement Page 8 of 647 Minutes/Edina City Council/January 21, 2025 Page 2 6.9. Approve Amendment to Foundational Public Health Responsibilities Services Agreement between Bloomington and Edina 6.10. Approve Amendment to Local Public Health Services Agreement Between Edina and Bloomington 6.11. League of Minnesota Cities Annual Membership Dues 6.12. Approve Ordinance No. 2025-02, Setting Morningside Water Rates Ayes: Agnew, Jackson, Pierce, Risser, Hovland Motion carried. 7.0 SPECIAL RECOGNITIONS AND PRESENTATIONS 7.1. WINTER SALT WEEK JANUARY 27-31, 2025 – PROCLAIMED Mayor Hovland proclaimed January 27-31, 2025, Winter Salt Week in the City of Edina. Water Resources Coordinator Vanderwerff Wilson thanked the Council for recognizing Winter Salt Week and outlined various activities occurring during the week. Sue Nissen with the Hennepin County Chloride Initiative stated that this event has been well received nationwide. Ms. Nissen stated there must be different processes on how to use salt, so she is excited about how this week will present problems and solutions by experts in this area. Member Jackson made a motion, seconded by Member Agnew, approving proclamation declaring January 27-31, 2025, as Winter Salt Week in the City of Edina. Ayes: Agnew, Jackson, Pierce, Risser, Hovland Motion carried. 7.2. ROSLAND PARK PEDESTRIAN BRIDGE UPDATE – PRESENTED Engineering Director Millner presented the project timeline for the Rosland Park pedestrian bridge. Matt Kreilich, Snow Kreilich Architects, presented the draft design for the Rosland Park pedestrian bridge and described the thermally modified wood structure. Ryan Evans, Bolton & Menk, spoke about the challenging elements of the design such as the unique steel truss angles, screening objects from falling to the highway below, challenging fabrication and shipping to the site, and more. Millner presented more renderings of the project and discussed the next steps for the project. The Council asked questions regarding conversations with MnDOT before too much is spent, the cost increase for the stairs, construction timeline, mesh used, longevity of the wood slats, and safety. Millner responded that staff is already in conversation with MnDOT and they are aware of the architectural differences, that because of the unique design of the stairs, the cost is unknown until a fabricator is hired, that construction should take about 3-4 months during the summer, and Kreilich stated the mesh is stainless steel and that the wood should not have to be replaced unless damage is done to it. 8.0 PUBLIC HEARINGS HELD – Affidavits of Notice presented and ordered placed on file. 8.1. RESOLUTION NO. 2025-11, APPROVING THE PRELIMINARY AND FINAL PLAT AND RESOLUTION NO. 2025-10, VACATING PUBLIC UTILITY EASEMENT – ADOPTED Community Development Director Teague presented information regarding the site location, zoning, proposed lots, lot dimensions, and purpose of the request. The Council asked questions regarding why the project was brought to the City Council before the Planning Commission, conservation easements, and the cost to the City. The Council expressed concerns regarding the process being followed. Teague explained that this was a unique situation, and the applicants wanted assurance it would be acceptable to the City before moving forward. Mayor Hovland opened the public hearing at 7:53 p.m. Public Testimony Jim Grotz, 5513 Park Place, addressed the Council. Page 9 of 647 Minutes/Edina City Council/January 21, 2025 Page 3 Lori Grotz, 5513 Park Place, addressed the Council. Andrew Carter, 6012 Pine Grove Road, addressed the Council. Janey Westin, 6136 Brookview Avenue, addressed the Council. Member Agnew made a motion, seconded by Member Jackson, to close the public hearing. Ayes: Agnew, Jackson, Pierce, Risser, Hovland Motion carried. The Council asked questions regarding the special assessment methodology on this property, waiving requirements, legal jeopardy for the City if the resolution was not approved, process, community benefit, and expenses. City Attorney Kendall stated the neighbors felt there was a benefit to their properties and have agreed to pay those assessments accordingly. He stated that it is reasonable for the residents to seek an indication of how it would go before they applied to re-plat the land. Member Agnew introduced and moved adoption of Resolution No. 2025-11, approving the Preliminary and Final Plat, and Resolution 2025-10, Vacating Public Utility Easement. Member Jackson seconded the motion. Ayes: Agnew, Jackson, Pierce, Hovland Nay: Risser Motion carried. 9.0 REPORTS / RECOMMENDATIONS 9.1. RESOLUTION NO. 2025-13 ACCEPTING DONATIONS – ADOPTED Mayor Hovland explained that in order to comply with State Statute; all donations to the City must be adopted by Resolution and approved by four favorable votes of the Council accepting the donations. Member Jackson introduced and moved adoption of Resolution No. 2025-13 accepting various grants and donations. Member Agnew seconded the motion. Ayes: Agnew, Jackson, Pierce, Risser, Hovland Motion carried. 9.2. TRANSPORTATION COMMISSION REPORT ON TRAFFIC SAFETY INFRASTRUCTURE RESEARCH AND RECOMMENDATIONS – AMENDED Transportation Commissioner Grant Wright presented traffic safety infrastructure research and recommendations including what they did, why traffic safety matters, what more can be done, the Drive 25 awareness campaign, quick-build traffic calming solutions, grant programs to fund implementation, and trade- offs. Transportation Planner Scipioni outlined ways to implement traffic safety improvement and presented traffic calming strategies. The Council asked questions regarding seasonal quick-builds, staff time needed to implement these changes, and starting with 49th Street and White Oaks. The Council provided feedback on the awareness of speeds, potential street murals, the importance of the work being done, and the inconsistency of speed signs on Valley View Road. Member Pierce made a motion, seconded by Member Jackson, amending the Transportation Division’s 2025 work plan initiative. Ayes: Agnew, Jackson, Pierce, Risser, Hovland Motion carried. 9.3. SKETCH PLAN FOR 5100 EDEN AVENUE – REVIEWED Community Development Coordinator Lewis discussed the proposed sketch plan for 5100 Eden Avenue and presented information regarding zoning, future land use, Grandview District development framework, Page 10 of 647 Minutes/Edina City Council/January 21, 2025 Page 4 Grandview District transportation study, dimensioned site plan, below-grade parking floors, requirements for the request, completed or approved Grandview developments, and local bus routes. The Council asked questions regarding the variances required, the status of properties surrounding the site, and rezoning. Bob Loken, ESG Architects, discussed the new use proposed for this site as an office space. Matthew Axtmann, ESG Architects, discussed the building orientation, the pocket park, and creating public space for the community. The Council asked questions regarding the context of what might happen to the frontage road, pocket park, number of variances needed, pedestrian entrance, office-commercial site, and the Opus headquarters. Community Development Coordinator Lewis stated that there would be a new frontage road going in along the east side, and there would still be a road connecting that frontage road to Arcadia Avenue, but it is part of the long-term plan and would not be done immediately. The Council provided feedback on the setback variance and alignment with the PCD-2 setback requirements, parking requirements, mixed-use for this project, entrances and trash, and blocking elevation. Nick Murnane, Opus Development Company, stated that they would like to keep the flexibility to see what the market shows. Mr. Murnane discussed the Opus headquarters and what it means to them. Matthew Axtmann discussed the design of the building and the ground-level use. 9.4. ORDINANCE NO. 2025-01, AMENDING CHAPTER 8 CONCERNING THE SALE OF INHUMANELY BRED ANIMALS – FIRST READING GRANTED Council Member Agnew discussed the purpose of the proposed ordinance to prohibit the sale or showcase of inhumanely bred animals. The Council asked questions regarding who would enforce this and what cost would be generated, commercial kennel and breeding facilities in the City, animal boarding facilities, and penalties for violations. City Manager Neal stated that they would not hire additional staff for this ordinance, they would use existing staff. City Manager Neal stated that the Animal Control Officer and Public Health functions would enforce this in the future. City Attorney Kendall discussed the definitions of commercial kennel and breeding facility. The Council provided feedback on the value of creating awareness in addition to having this ordinance. Member Agnew made a motion, seconded by Member Pierce, to grant First Reading to Ordinance No. 2025-01, Amending Chapter 8 Concerning the Sale of Inhumanely Bred Animals. Ayes: Agnew, Jackson, Pierce, Risser, Hovland Motion carried. 10.0 COMMISSION CORRESPONDENCE (MINUTES AND ADVISORY COMMUNICATION) – Received 10.1. MINUTES: TRANSPORTATION COMMISSION, NOVEMBER 21, 2024 10.2. MINUTES: ENERGY AND ENVIRONMENT COMMISSION, DECEMBER 12, 2024 11.0 MANAGER’S COMMENTS – Received 12.0 MAYOR AND COUNCIL COMMENTS – Received Page 11 of 647 Minutes/Edina City Council/January 21, 2025 Page 5 13.0 ADJOURNMENT Member Jackson made a motion, seconded by Member Pierce, to adjourn the meeting at 10:34 p.m. Ayes: Agnew, Jackson, Pierce, Risser, Hovland Motion carried. Respectfully submitted, Sharon Allison, City Clerk Minutes approved by Edina City Council, February 4, 2025. James B. Hovland, Mayor Video Copy of the January 21, 2025, meeting available. Page 12 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.2 Prepared By: Pa Thao, Finance Director Item Type: Claims Department: Finance Item Title: Payment of Claims Action Requested: Approve claims for Payment. Information/Background: Claims information for approval is attached. Supporting Documentation: 1. Check Register Claims Pre-List Dated 01.17.25 TOTAL $2,782,629.87 2. Check Register Claims Pre-List Dated 01.24.25 TOTAL $3,291,129.39 3. Check Register Claims Pre-List Dated 01.24.25 TOTAL $191,463.00 Page 13 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 55 JOURNAL ENTRIES TO BE CREATED FUND SUB FUND DUE TO DUE FR 1000 General 322,967.392100 Police Special Revenue 56.992300 Pedestrian and Cyclist Safety 8,290.152500 Conservation & Sustainability 1,000.002600 Housing & Redvlpmt Authority 50.003000 Debt Service 400.003000 Debt Service 400.004000 Capital Projects 1,340,513.604200 Equipment Replacement 88,533.395200 Braemar Golf Course 21,333.285300 Aquatic Center 287.505400 Edinborough Park 14,038.905500 Braemar Arena 25,638.305700 Centennial Lakes 1,765.525800 Liquor 98,410.145900 Utility Fund 59,582.965900 Utility Fund 550,900.525900 Utility Fund 6,617.115900 Utility Fund 125,928.516000 Risk Management 153.756100 Equipment Operations 35,575.446200 Information Technology 1,098.606300 Facilities Management 1,563.077100 PS Training Facility 517.817200 MN Task Force 1 57,080.229000 Payroll 19,926.729999 Pooled Cash Fund 2,782,629.87 TOTAL 2,782,629.87 2,782,629.87 ** END OF REPORT - Generated by Shirleng Tan Geil ** Page 14 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 1 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503063 01/17/2025 PRTD 142327 56 BREWING LLC 5628150 12/30/2024 20250116 75.00 Invoice: 5628150 75.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev 56 BREWING LLC 5628147 12/30/2024 20250116 108.00 Invoice: 5628147 108.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer 56 BREWING LLC 5628148 12/30/2024 20250116 340.00 Invoice: 5628148 340.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer 56 BREWING LLC 5628149 12/30/2024 20250116 206.00 Invoice: 5628149 206.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503063 TOTAL: 729.00 503064 01/17/2025 PRTD 102774 ASPEN WASTE SYSTEMS OF MINNESOTA S3 406509-20241216 12/16/2024 20250116 1,078.89 Invoice: S3 406509-20241216 12/01/24-12/31/24 short pay prev mo pmt appld late 1,078.89 E ENG98002.MISCELLAN .SERVICES . 4000.CAP.PW.ENG.4080.40801.0000.0000.6103 Faclt CP - Prof Svrs ASPEN WASTE SYSTEMS OF MINNESOTA S1 486677-123124 12/31/2024 20250116 4,574.41 Invoice: S1 486677-123124 50TH & FRANCE RETAIL Acct No. 1 -48667 7 4,574.41 E ENG98002.MISCELLAN .SERVICES . 4000.CAP.PW.ENG.4080.40801.0000.0000.6103 Faclt CP - Prof Svrs ASPEN WASTE SYSTEMS OF MINNESOTA S1 405453-010125 01/01/2025 20250116 3,369.96 Invoice: S1 405453-010125 NOLAN MAINS - COMM WEST 3,369.96 E ENG98004.MISCELLAN .SERVICES . 4000.CAP.PW.ENG.4080.40801.0000.0000.6103 Faclt CP - Prof Svrs ASPEN WASTE SYSTEMS OF MINNESOTA S1 406543-010125 01/01/2025 20250116 10,971.03 Invoice: S1 406543-010125 NOLAN MAINS - COMM EAST 10,971.03 E ENG98004.MISCELLAN .SERVICES . 4000.CAP.PW.ENG.4080.40801.0000.0000.6103 Faclt CP - Prof Svrs CHECK 503064 TOTAL: 19,994.29 503065 01/17/2025 PRTD 136267 BAUHAUS BREW LABS LLC 15283 12/30/2024 20250116 306.00 Invoice: 15283 306.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev Page 15 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 2 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503065 TOTAL: 306.00 503066 01/17/2025 PRTD 101355 BELLBOY CORPORATION 0206261700 12/31/2024 20250116 408.40 Invoice: 0206261700 3.30 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 405.10 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq BELLBOY CORPORATION 0206261600 12/31/2024 20250116 113.65 Invoice: 0206261600 1.65 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 112.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine BELLBOY CORPORATION 0109316800 12/31/2024 20250116 54.77 Invoice: 0109316800 7.77 5800.ENT.LQ.P&R.5810.58101.0000.0000.5515 Sthdl Sell - CGS Other 47.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc BELLBOY CORPORATION 0206257700 12/31/2024 20250116 700.60 Invoice: 0206257700 6.60 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 694.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq BELLBOY CORPORATION 0206257600 12/31/2024 20250116 292.95 Invoice: 0206257600 4.95 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 288.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine CHECK 503066 TOTAL: 1,570.37 503067 01/17/2025 PRTD 100835 ARTISAN BEER COMPANY 3737046 12/31/2024 20250116 2,939.55 Invoice: 3737046 2,939.55 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer ARTISAN BEER COMPANY 3737047 12/31/2024 20250116 30.75 Invoice: 3737047 30.75 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc ARTISAN BEER COMPANY 3737048 12/31/2024 20250116 2,447.93 Invoice: 3737048 2,447.93 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer ARTISAN BEER COMPANY 3737045 12/31/2024 20250116 415.00 Invoice: 3737045 415.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer ARTISAN BEER COMPANY 3737044 12/31/2024 20250116 61.50 Invoice: 3737044 61.50 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc Page 16 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 3 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503067 TOTAL: 5,894.73 503068 01/17/2025 PRTD 160317 ARTINA GROUP 99747 12/19/2024 20250116 191.22 Invoice: 99747 1095 forms and envelopes 191.22 1000.GEN.GG.HRM.1090.10900.0000.0000.6406 HR Gen - SupOther CHECK 503068 TOTAL: 191.22 503069 01/17/2025 PRTD 100050 USPS 22612 01/13/2025 20250116 5,343.31 Invoice: 22612 Postage for Summer "Activities Directory" 4,808.98 1000.GEN.PK.P&R.1600.00000.0000.0000.6235 Park Admin - Postage 534.33 5200.ENT.GC.P&R.5200.52000.0000.0000.6235 Golf Gen - Postage CHECK 503069 TOTAL: 5,343.31 503070 01/17/2025 PRTD 100614 ACE SUPPLY COMPANY INC 304209 12/17/2024 20250117 41.65 Invoice: 304209 E1547TK 41.65 5900.ENT.UT.PWK.5900.59002.0000.0000.6180 Wat Wells - Rep&Maint CHECK 503070 TOTAL: 41.65 503071 01/17/2025 PRTD 161317 ACME TUCKPOINTING & RESTORATION 3934 11/21/2024 20250117 4,730.00 Invoice: 3934 4,730.00 E FAC24101.MISCELLAN . . 4000.CAP.PW.ENG.4080.40801.0000.0000.6710 Faclt CP - Cap Other CHECK 503071 TOTAL: 4,730.00 503072 01/17/2025 PRTD 150881 ADOLPH KIEFER & ASSOCIATES INV00l 474282 12/18/2024 20250117 287.50 Invoice: INV00l 474282 5 Life jackets 287.50 5300.ENT.AQ.P&R.5300.53001.0000.0000.6610 Operations - Saf Equip CHECK 503072 TOTAL: 287.50 503073 01/17/2025 PRTD 145942 ADS ON BOARDS 1291 10/13/2024 20250117 1,800.00 Invoice: 1291 1,800.00 5500.ENT.BA.P&R.5500.55001.0000.0000.6103 Bldg/Grnds - Prof Svrs CHECK 503073 TOTAL: 1,800.00 503074 01/17/2025 PRTD 100575 AMERICAN CYLINDER LLC 221094 12/18/2024 20250117 520.83 Invoice: 221094 WO # 92121/30812 520.83 1000.GEN.PS.FIR.1200.12002.0000.0000.6180 . Repairs and Maintenance Page 17 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 4 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503074 TOTAL: 520.83 503075 01/17/2025 PRTD 161277 AMANDA PIKALA 24CAPF-Pikala 11/21/2024 20250117 1,000.00 Invoice: 24CAPF-Pikala Climate Action Fund e-bike cost-share 1,000.00 2500.SPC.PW.ENG.2500.25004.0000.0000.6103 . Professional Services CHECK 503075 TOTAL: 1,000.00 503076 01/17/2025 PRTD 141960 AMAZON CAPITAL SERVICES 1DJH-XMGC-WC6N 11/27/2024 20250117 1,342.00 Invoice: 1DJH-XMGC-WC6N edina liquor -holiday events 447.33 5800.ENT.LQ.P&R.5800.58001.0000.0000.6122 50th Sell - AdvOther 447.33 5800.ENT.LQ.P&R.5810.58101.0000.0000.6122 Sthdl Sell - AdvOther 447.34 5800.ENT.LQ.P&R.5820.58201.0000.0000.6122 Grnd Sell - AdvOther AMAZON CAPITAL SERVICES 1GQ7-9L37-DXRR 12/17/2024 20250117 8.98 Invoice: 1GQ7-9L37-DXRR 8.98 1000.GEN.PS.POL.1300.13000.0000.0000.6406 Pol Ad Gen - SupOther AMAZON CAPITAL SERVICES 1F76-FYJ9-DYPL 12/17/2024 20250117 52.07 Invoice: 1F76-FYJ9-DYPL 52.07 1000.GEN.GG.DEV.1060.00000.0000.0000.6406 Assessing - SupOther AMAZON CAPITAL SERVICES 1CXT-KQKC-HDFC 12/17/2024 20250117 498.00 Invoice: 1CXT-KQKC-HDFC 498.00 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts AMAZON CAPITAL SERVICES 1V6N-4W4G-V7F7 12/18/2024 20250117 31.51 Invoice: 1V6N-4W4G-V7F7 PW-Admin H CONWELL 31.51 1000.GEN.PW.PWK.1400.14000.0000.0000.6513 . PW Adm Gen - SupOffice AMAZON CAPITAL SERVICES 1RQ6-3M4W-RMG4 12/18/2024 20250117 31.69 Invoice: 1RQ6-3M4W-RMG4 31.69 5700.ENT.CA.P&R.5700.57000.0000.0000.6530 General - ReprParts AMAZON CAPITAL SERVICES 1YP7-LDMT-4X6R 12/19/2024 20250117 40.78 Invoice: 1YP7-LDMT-4X6R 40.78 1000.GEN.PS.POL.1300.13000.0000.0000.6406 Pol Ad Gen - SupOther AMAZON CAPITAL SERVICES 11P1-16HT-4QQL 12/19/2024 20250117 60.25 Invoice: 11P1-16HT-4QQL 60.25 5200.ENT.GC.P&R.5200.52000.0000.0000.6406 Golf Gen - SupOther AMAZON CAPITAL SERVICES 11RP-7GCR-6RNL 12/19/2024 20250117 29.97 Invoice: 11RP-7GCR-6RNL Otterbox handstrap for iPad 29.97 4200.CAP.PS.FIR.4250.42500.0000.0000.6103 Fire ER - Prof Svrs AMAZON CAPITAL SERVICES 143N-HMGG-3GFL 12/19/2024 20250117 46.99 Invoice: 143N-HMGG-3GFL PAR38 Light Bulbs 46.99 5400.ENT.CA.P&R.5400.54001.0000.0000.6406 Operations - SupOther Page 18 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 5 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC AMAZON CAPITAL SERVICES 1PJX-RRJL-X6NJ 12/22/2024 20250117 46.98 Invoice: 1PJX-RRJL-X6NJ 46.98 5900.ENT.UT.PWK.5900.59003.0000.0000.6406 Wat Distr - SupOther AMAZON CAPITAL SERVICES 1P3R-LKN6-4GJ1 12/19/2024 20250117 96.85 Invoice: 1P3R-LKN6-4GJ1 96.85 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts AMAZON CAPITAL SERVICES 1LML-YCWL-3JFY 12/19/2024 20250117 -6.61 Invoice: 1LML-YCWL-3JFY Returned Mousepad -6.61 1000.GEN.GG.DEV.1050.10500.0000.0000.6406 Plan Gen - SupOther AMAZON CAPITAL SERVICES 1T1P-34JH-HG1V 12/20/2024 20250117 27.44 Invoice: 1T1P-34JH-HG1V 27.44 1000.GEN.PW.PWK.1400.14000.0000.0000.6513 . PW Adm Gen - SupOffice AMAZON CAPITAL SERVICES 1HH1-FJLK-FHNN 12/20/2024 20250117 55.35 Invoice: 1HH1-FJLK-FHNN Oshlun SBR-140030 14-Inch 30 Tooth FTG Saw Blade 1 55.35 1000.GEN.PS.FIR.1200.12000.0000.0000.6406 Fire Gen - SupOther AMAZON CAPITAL SERVICES 1YP7-LDMT-CG6Y 12/20/2024 20250117 22.99 Invoice: 1YP7-LDMT-CG6Y 22.99 1000.GEN.PK.P&R.1700.17006.0000.0000.6406 Bldg Maint - SupOther AMAZON CAPITAL SERVICES 167Y-VHVQ-4J74 12/23/2024 20250117 60.93 Invoice: 167Y-VHVQ-4J74 Keybaks, Box Cutters 60.93 5400.ENT.CA.P&R.5400.54001.0000.0000.6556 Operations - Tool&Acces AMAZON CAPITAL SERVICES 1YCL-YT73-1HJL 12/23/2024 20250117 153.63 Invoice: 1YCL-YT73-1HJL NYE Parties Art Supplies and Storage Bins 153.63 5400.ENT.CA.P&R.5400.54001.0000.0000.6406 Operations - SupOther AMAZON CAPITAL SERVICES 1D14-CMJD-7HR3 12/23/2024 20250117 249.94 Invoice: 1D14-CMJD-7HR3 BFreeman Monitors 249.94 1000.GEN.PW.ENG.1500.00000.0000.0000.6409 . Eng Gen - SupComp AMAZON CAPITAL SERVICES 1KL1-PHQ4-4WQL 12/23/2024 20250117 169.98 Invoice: 1KL1-PHQ4-4WQL iPad case and pencil for HLillie 169.98 5200.ENT.GC.P&R.5200.52000.0000.0000.6409 Golf Gen - SupComp AMAZON CAPITAL SERVICES 1QJP-WJDD-N9MW 01/02/2025 20250117 56.99 Invoice: 1QJP-WJDD-N9MW 56.99 2100.SPC.PS.POL.2100.00000.0000.0000.6406 E911 - SupOther CHECK 503076 TOTAL: 3,076.71 503077 01/17/2025 PRTD 101874 ANCOM TECHNICAL CENTER 125483 12/17/2024 20250117 423.55 Invoice: 125483 APX RSM W/Ear Jack (SALE only) 423.55 1000.GEN.PS.FIR.1200.12000.0000.0000.6406 Fire Gen - SupOther Page 19 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 6 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503077 TOTAL: 423.55 503078 01/17/2025 PRTD 118491 APPLE INC MB43582543 12/17/2024 20250117 699.00 Invoice: MB43582543 iPad for Chief Milburn 699.00 1000.GEN.PS.POL.1330.00000.0000.0000.6160 . Investigat - Sftwr&Data CHECK 503078 TOTAL: 699.00 503079 01/17/2025 PRTD 151756 ARBEITER BREWING COMPANY LLC 17372 12/27/2024 20250117 168.00 Invoice: 17372 168.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503079 TOTAL: 168.00 503080 01/17/2025 PRTD 103220 ASCAP 100006504427 12/20/2024 20250117 445.00 Invoice: 100006504427 2025 LICENSE FEE (ACCT# 500578854) 445.00 5700.ENT.CA.P&R.5700.57000.0000.0000.6105 General - Dues&Sub CHECK 503080 TOTAL: 445.00 503081 01/17/2025 PRTD 100634 ASPEN EQUIPMENT CO SWO044005-1 12/20/2024 20250117 4,498.67 Invoice: SWO044005-1 4,498.67 6100.ISF.PW.PWK.6100.61015.0000.0000.6180 Utl Equip - Rep&Maint CHECK 503081 TOTAL: 4,498.67 503082 01/17/2025 PRTD 106304 ASPEN MILLS INC 345417 12/20/2024 20250117 1,005.27 Invoice: 345417 PO# HILLARD- UNIFORM 1,005.27 1000.GEN.PS.FIR.1200.12000.0000.0000.6203 . Fire Gen - Uniforms ASPEN MILLS INC 345422 12/20/2024 20250117 1,005.27 Invoice: 345422 PO# GONSIOR- UNIFORM 1,005.27 1000.GEN.PS.FIR.1200.12000.0000.0000.6203 . Fire Gen - Uniforms CHECK 503082 TOTAL: 2,010.54 503083 01/17/2025 PRTD 119465 ASSOCIATION OF MINNESOTA COUNTIES 71088 12/18/2024 20250117 670.00 Invoice: 71088 LPHA - LPHA 2025 Annual Dues 670.00 1000.GEN.PS.FIR.1220.12200.0000.0000.6105 PH Gen - Dues&Sub CHECK 503083 TOTAL: 670.00 503084 01/17/2025 PRTD 102972 AT&T 539462 12/04/2024 20250117 95.00 Invoice: 539462 Tower Search Requested by: DET NICOLE FREDERICK, 2 95.00 1000.GEN.PS.POL.1330.00000.0000.0000.6160 . Investigat - Sftwr&Data Page 20 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 7 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503084 TOTAL: 95.00 503085 01/17/2025 PRTD 160974 BENJAMIN D SASS 162 12/21/2024 20250117 797.28 Invoice: 162 797.28 6100.ISF.PW.PWK.6100.61005.0000.0000.6103 Police Eq - Prof Svrs CHECK 503085 TOTAL: 797.28 503086 01/17/2025 PRTD 100643 BARR ENGINEERING CO 23271898.01 - 31 12/18/2024 20250117 848.50 Invoice: 23271898.01 - 31 Sanitary Lift Station 6 Constr 848.50 E ENG21040.CONSTRUCTN.CONSULTING. 5900.ENT.00.PWK.5910.00000.0000.0000.1605 Sew BS - PurchCIP BARR ENGINEERING CO 23271913.01 - 18 12/19/2024 20250117 3,513.00 Invoice: 23271913.01 - 18 Clean Water Strategy Prof Serv 3,513.00 E ENG22506.CONST.STRM. . 4000.CAP.PW.ENG.4080.40800.0000.0000.6103 Eng CP - Prof Svrs BARR ENGINEERING CO 23272052.00 - 9 12/24/2024 20250117 5,321.00 Invoice: 23272052.00 - 9 Professional Services York Ave 5,321.00 5900.ENT.UT.ENG.5920.59205.0000.0000.6103 Stm EngSrv - Prof Svrs BARR ENGINEERING CO 23271869.03 - 21 12/19/2024 20250117 550.00 Invoice: 23271869.03 - 21 Morningside Flood Landscape R 550.00 E ENG21032.CONSTRUCTN.CONSULTING. 5900.ENT.00.PWK.5920.00000.0000.0000.1605 Stm BS - PurchCIP CHECK 503086 TOTAL: 10,232.50 503087 01/17/2025 PRTD 126847 BERRY COFFEE COMPANY 1037989 12/17/2024 20250117 1,059.09 Invoice: 1037989 1,059.09 5500.ENT.BA.P&R.5500.55002.0000.0000.5510 Concession - CGS CHECK 503087 TOTAL: 1,059.09 503088 01/17/2025 PRTD 160302 BIO-TEC EMERGENCY SERVICES LLC 133837 12/21/2024 20250117 150.00 Invoice: 133837 150.00 1000.GEN.PS.POL.1300.13000.0000.0000.6180 Pol Ad Gen - Rep&Maint CHECK 503088 TOTAL: 150.00 Page 21 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 8 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503089 01/17/2025 PRTD 124534 BLACKSTONE CONTRACTORS LLC 2318-3 12/13/2024 22300060 20250117 1,492.22 Invoice: 2318-3 Mill Pond Harvester Access Ramp Replacement 746.11 1000.GEN.PK.P&R.1700.17007.0000.0000.6103 Pths & HS - Prof Svrs 746.11 5900.ENT.UT.ENG.5920.59209.0000.0000.6103 Stm Milpnd - Prof Svrs CHECK 503089 TOTAL: 1,492.22 503090 01/17/2025 PRTD 132444 BOLTON & MENK INC 0352276 12/17/2024 20250117 2,000.00 Invoice: 0352276 Smart Salting Trainings 2024 Project No: 24X.13657 2,000.00 1000.GEN.PW.PWK.1400.14001.0000.0000.6104 . Gen Mntce - Conf&Schls CHECK 503090 TOTAL: 2,000.00 503091 01/17/2025 PRTD 101010 BORDER STATES INDUSTRIES INC 929583965 12/17/2024 20250117 7.50 Invoice: 929583965 P.O.#: E 0318 MR 7.50 5700.ENT.CA.P&R.5700.57001.0000.0000.6180 CLP Park - Rep&Maint BORDER STATES INDUSTRIES INC 929583951 12/17/2024 20250117 185.24 Invoice: 929583951 P.O.#: E2378NS 185.24 1000.GEN.PW.ENG.1550.15500.0000.0000.6406 Faclt Gen - SupOther CHECK 503091 TOTAL: 192.74 503092 01/17/2025 PRTD 105367 BOUND TREE MEDICAL LLC 85594525 12/17/2024 20250117 2,586.46 Invoice: 85594525 PO 153 Adapter, Multi, Standard 15 mm ID x 22 mm O 2,586.46 1000.GEN.PS.FIR.1200.12000.0000.0000.6510 Fire Gen - SupFrstAid BOUND TREE MEDICAL LLC 85596147 12/19/2024 20250117 38.21 Invoice: 85596147 ISO-GARD HEPA STRAIGHT 38.21 1000.GEN.PS.FIR.1200.12000.0000.0000.6510 Fire Gen - SupFrstAid CHECK 503092 TOTAL: 2,624.67 503093 01/17/2025 PRTD 119351 BOURGET IMPORTS 213707 12/27/2024 20250117 892.00 Invoice: 213707 12.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 880.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine BOURGET IMPORTS 213706 12/27/2024 20250117 342.00 Invoice: 213706 6.00 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 336.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine CHECK 503093 TOTAL: 1,234.00 Page 22 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 9 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503094 01/17/2025 PRTD 117040 BOYER FORD TRUCKS INC 095P12974 12/20/2024 20250117 46.96 Invoice: 095P12974 46.96 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts BOYER FORD TRUCKS INC 095S7516 12/20/2024 20250117 1,681.52 Invoice: 095S7516 1,681.52 6100.ISF.PW.PWK.6100.61004.0000.0000.6180 PW Equip - Rep&Maint BOYER FORD TRUCKS INC 098P16969 12/20/2024 20250117 70.74 Invoice: 098P16969 70.74 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts BOYER FORD TRUCKS INC 095P12961 12/20/2024 20250117 89.58 Invoice: 095P12961 89.58 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts BOYER FORD TRUCKS INC 098P16984 12/23/2024 20250117 21.92 Invoice: 098P16984 21.92 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts CHECK 503094 TOTAL: 1,910.72 503095 01/17/2025 PRTD 124291 BREAKTHRU BEVERAGE MINNESOTA WINE 118966782 12/04/2024 20250117 12,314.99 Invoice: 118966782 89.70 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 12,225.29 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq BREAKTHRU BEVERAGE MINNESOTA WINE 119342703 12/27/2024 20250117 727.90 Invoice: 119342703 5.75 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 722.15 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq BREAKTHRU BEVERAGE MINNESOTA WINE 119342704 12/27/2024 20250117 1,739.50 Invoice: 119342704 11.50 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 1,728.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine BREAKTHRU BEVERAGE MINNESOTA WINE 119396023 12/31/2024 20250117 92.15 Invoice: 119396023 1.15 5800.ENT.LQ.P&R.5810.58101.0000.0000.5515 Sthdl Sell - CGS Other 91.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc CHECK 503095 TOTAL: 14,874.54 503096 01/17/2025 PRTD 124529 BREAKTHRU BEVERAGE MINNESOTA BEER 119369024 12/30/2024 20250117 948.95 Invoice: 119369024 948.95 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc BREAKTHRU BEVERAGE MINNESOTA BEER 119370221 12/30/2024 20250117 402.80 Page 23 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 10 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC Invoice: 119370221 402.80 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369025 12/30/2024 20250117 922.00 Invoice: 119369025 922.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369026 12/30/2024 20250117 2,136.70 Invoice: 119369026 2,136.70 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369664 12/30/2024 20250117 2,162.30 Invoice: 119369664 2,162.30 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369662 12/30/2024 20250117 944.75 Invoice: 119369662 944.75 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc BREAKTHRU BEVERAGE MINNESOTA BEER 119369666 12/30/2024 20250117 287.50 Invoice: 119369666 287.50 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369665 12/30/2024 20250117 2,156.80 Invoice: 119369665 2,156.80 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369663 12/30/2024 20250117 461.50 Invoice: 119369663 461.50 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq BREAKTHRU BEVERAGE MINNESOTA BEER 119369658 12/30/2024 20250117 807.20 Invoice: 119369658 807.20 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369661 12/30/2024 20250117 1,020.00 Invoice: 119369661 1,020.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369657 12/30/2024 20250117 2,397.40 Invoice: 119369657 2,397.40 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119369659 12/30/2024 20250117 2,307.90 Invoice: 119369659 2,307.90 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer BREAKTHRU BEVERAGE MINNESOTA BEER 119402562 12/31/2024 20250117 5,765.65 Invoice: 119402562 33.45 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 5,732.20 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq Page 24 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 11 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC BREAKTHRU BEVERAGE MINNESOTA BEER 119369660 12/30/2024 20250117 764.90 Invoice: 119369660 764.90 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc CHECK 503096 TOTAL: 23,486.35 503097 01/17/2025 PRTD 160549 BETTER BEV CO LLC INV/2024/01916 12/27/2024 20250117 96.00 Invoice: INV/2024/01916 96.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev CHECK 503097 TOTAL: 96.00 503098 01/17/2025 PRTD 100648 BERTELSON BROTHERS INC WO-1325585-1 12/09/2024 20250117 5.65 Invoice: WO-1325585-1 Calendar Refill 5.65 1000.GEN.GG.COM.1040.10400.0000.0000.6406 Comm Gen - SupOther BERTELSON BROTHERS INC PRO-112-1 12/17/2024 20250117 118.00 Invoice: PRO-112-1 Edinborough Park NYE Parties 118.00 5400.ENT.CA.P&R.5400.54001.0000.0000.6406 Operations - SupOther CHECK 503098 TOTAL: 123.65 503099 01/17/2025 PRTD 119455 CAPITOL BEVERAGE SALES LP 3083329 01/10/2025 20250117 293.25 Invoice: 3083329 293.25 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc CAPITOL BEVERAGE SALES LP 3083330 01/10/2025 20250117 2,818.60 Invoice: 3083330 2,818.60 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503099 TOTAL: 3,111.85 503100 01/17/2025 PRTD 144099 CELLEBRITE INC INVUS278308 12/10/2024 20250117 14,200.00 Invoice: INVUS278308 Cellebrite Software Annual (12/24 to 12/25) 14,200.00 1000.GEN.PS.POL.1330.00000.0000.0000.6105 Investigat - Dues&Sub CHECK 503100 TOTAL: 14,200.00 503101 01/17/2025 PRTD 103300 CENTER FOR ENERGY AND ENVIRONMENT 25710 12/18/2024 20250117 50.00 Invoice: 25710 MONTHLY SERVICING FEE - NOVEMBER 50.00 E DEV22110.MISCELLAN . . 2600.SPC.GG.DEV.2600.26002.0000.0000.6102 . HRA HIA - Contr Svrs CHECK 503101 TOTAL: 50.00 Page 25 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 12 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503102 01/17/2025 PRTD 105497 CENTRAL ROOFING COMPANY 37553 12/10/2024 20250117 1,680.00 Invoice: 37553 Rook Leak Repairs 1,680.00 5400.ENT.CA.P&R.5400.54001.0000.0000.6103 Operations - Prof Svrs CHECK 503102 TOTAL: 1,680.00 503103 01/17/2025 PRTD 142533 CADD ENGR SUPPLY INC INV168861 12/19/2024 20250117 279.00 Invoice: INV168861 po# JON 209.25 1000.GEN.PW.ENG.1500.00000.0000.0000.6406 Eng Gen - SupOther 69.75 1000.GEN.PW.PWK.1400.14000.0000.0000.6406 PW Adm Gen - SupOther CHECK 503103 TOTAL: 279.00 503104 01/17/2025 PRTD 101264 CHESTER LATAWIEC JUNIOR S21318 12/19/2024 20250117 648.00 Invoice: S21318 PUBLIC WORKS 12/1-12/18; ENG 12/1-12/18 108.00 1000.GEN.PW.ENG.1540.15400.0000.0000.6610 . Elec Gen - Saf Equip 100.00 2300.SPC.PW.ENG.2300.23004.0000.0000.6406 Safety - SupOther 336.00 1000.GEN.PW.PWK.1400.14001.0000.0000.6610 Gen Mntce - Saf Equip 104.00 1000.GEN.PK.P&R.1700.17006.0000.0000.6610 Bldg Maint - Saf Equip CHECK 503104 TOTAL: 648.00 503105 01/17/2025 PRTD 160939 CIGNA HEALTH AND LIFE INSURANCE C 12-2024 12/20/2024 20250117 2,805.73 Invoice: 12-2024 12-2024 Cigna Acc-CI-Hospital 2,805.73 9000.000.00.000.0000.00000.0000.0000.2033 . Payroll BS - Acdtl&Crit CHECK 503105 TOTAL: 2,805.73 503106 01/17/2025 PRTD 142028 CINTAS CORPORATION 4215301724 12/20/2024 20250117 33.68 Invoice: 4215301724 33.68 6300.ISF.PW.ENG.6300.63001.0000.0000.6511 PW Fac - SupCustod CINTAS CORPORATION 4215430668 12/23/2024 20250117 78.60 Invoice: 4215430668 Sales Tax Exemption 78.60 5500.ENT.BA.P&R.5500.55001.0000.0000.6230 Bldg/Grnds - SrvCntrcts CINTAS CORPORATION 4215430650 12/23/2024 20250117 84.06 Invoice: 4215430650 84.06 5200.ENT.GC.P&R.5200.52000.0000.0000.6103 Golf Gen - Prof Svrs CINTAS CORPORATION 4215430654 12/23/2024 20250117 130.77 Invoice: 4215430654 130.77 7100.CUS.PS.FIR.7100.71001.0000.0000.6103 Main Bldng - Prof Svrs CHECK 503106 TOTAL: 327.11 Page 26 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 13 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503107 01/17/2025 PRTD 101837 CITY OF EDINA COM-3102 11/12/2024 20250117 100.00 Invoice: COM-3102 telephone and internet 100.00 7100.CUS.PS.FIR.7100.71001.0000.0000.6188 Main Bldng - Telephone CHECK 503107 TOTAL: 100.00 503108 01/17/2025 PRTD 100087 CITY OF SAINT PAUL IN60948 12/02/2024 20250117 5,742.85 Invoice: IN60948 St Paul FIRE Dept MNTF1 Confined Space Class 10/24 5,742.85 7200.CUS.PS.FIR.7200.00000.0000.0000.6406 MN TF 1 - SupOther CHECK 503108 TOTAL: 5,742.85 503109 01/17/2025 PRTD 101227 COFFEE MILL INC 0270189-IN 12/23/2024 20250117 761.00 Invoice: 0270189-IN 761.00 5700.ENT.CA.P&R.5700.57000.0000.0000.5510 General - CGS CHECK 503109 TOTAL: 761.00 503110 01/17/2025 PRTD 120433 COMCAST 0023973-01/25 01/03/2025 20250117 9.32 Invoice: 0023973-01/25 Cable TV Account number 8772 10 614 0023973 9.32 1000.GEN.GG.ADM.1010.10100.0000.0000.6103 Admin Gen - Prof Svrs CHECK 503110 TOTAL: 9.32 503111 01/17/2025 PRTD 161261 COMPASS PEER GROUPS LLC CPG-11.01.24-2 11/01/2024 20250117 1,600.00 Invoice: CPG-11.01.24-2 2025 MEMBERSHIP-Ari 1,600.00 1000.GEN.GG.ADM.1010.10100.0000.0000.6105 Admin Gen - Dues&Sub CHECK 503111 TOTAL: 1,600.00 503112 01/17/2025 PRTD 143187 CONQUER NINJA GYMS 0201 11/06/2024 20250117 784.00 Invoice: 0201 Intro to Ninja 11/6/24 - 12/18/24 784.00 1000.GEN.PK.P&R.1610.16105.0000.0000.6103 Prtnr Prog - Prof Svrs CHECK 503112 TOTAL: 784.00 503113 01/17/2025 PRTD 100699 CULLIGAN SOFTWATER SERVICE COMPAN 114X00844809 12/31/2024 20250117 134.15 Invoice: 114X00844809 134.15 5200.ENT.GC.P&R.5200.52000.0000.0000.6103 Golf Gen - Prof Svrs CULLIGAN SOFTWATER SERVICE COMPAN 114X00747101 12/31/2024 20250117 40.60 Invoice: 114X00747101 40.60 7100.CUS.PS.FIR.7100.71001.0000.0000.6406 Main Bldng - SupOther CULLIGAN SOFTWATER SERVICE COMPAN 114X00802609 12/31/2024 20250117 357.00 Page 27 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 14 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC Invoice: 114X00802609 01/01/25 - 01/31/25 BOTTLE-FREE COOLER RENTAL SERV 357.00 1000.GEN.PS.POL.1300.13000.0000.0000.6406 Pol Ad Gen - SupOther CHECK 503113 TOTAL: 531.75 503114 01/17/2025 PRTD 103799 CURBSIDE LANDSCAPE & IRRIGATION 301023 12/05/2024 20250117 160.00 Invoice: 301023 298302 12/04/2024: SIDEWALK SNOW REMOVAL TRACE-3" 160.00 5400.ENT.CA.P&R.5400.54001.0000.0000.6103 Operations - Prof Svrs CURBSIDE LANDSCAPE & IRRIGATION 302550 12/21/2024 20250117 1,244.00 Invoice: 302550 Snow removal 1,244.00 5400.ENT.CA.P&R.5400.54001.0000.0000.6103 Operations - Prof Svrs CHECK 503114 TOTAL: 1,404.00 503115 01/17/2025 PRTD 102195 DAY INVESTMENTS LLC P77333890 11/01/2024 20250117 501.15 Invoice: P77333890 Cust PO#: 7501 hunter s 7738495888 501.15 5500.ENT.BA.P&R.5500.55001.0000.0000.6180 Bldg/Grnds - Rep&Maint CHECK 503115 TOTAL: 501.15 503116 01/17/2025 PRTD 100718 DELEGARD TOOL COMPANY 442671/1 12/17/2024 20250117 781.68 Invoice: 442671/1 PO# S5500RP 781.68 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts DELEGARD TOOL COMPANY 443843/1 12/23/2024 20250117 129.94 Invoice: 443843/1 PO# A 1549JV 129.94 1000.GEN.PW.PWK.1400.14001.0000.0000.6556 Gen Mntce - Tool&Acces CHECK 503116 TOTAL: 911.62 503117 01/17/2025 PRTD 100730 DORSEY & WHITNEY LLP 4033607 12/06/2024 20250117 4,035.00 Invoice: 4033607 Roth 457 Attorney Invoice 4,035.00 1000.GEN.GG.HRM.1090.10900.0000.0000.6103 HR Gen - Prof Svrs CHECK 503117 TOTAL: 4,035.00 503118 01/17/2025 PRTD 129718 DREW'S CONCESSIONS LLC 3071 12/18/2024 20250117 1,391.45 Invoice: 3071 1,391.45 5500.ENT.BA.P&R.5500.55002.0000.0000.5510 Concession - CGS CHECK 503118 TOTAL: 1,391.45 503119 01/17/2025 PRTD 132810 ECM PUBLISHERS INC 1027073 12/05/2024 20250117 167.44 Invoice: 1027073 Dec 17 PH 7250 France Ave 167.44 1000.GEN.GG.ADM.1020.10202.0000.0000.6120 Lic & Perm - AdvLegal Page 28 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 15 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC ECM PUBLISHERS INC 1027074 12/05/2024 20250117 177.30 Invoice: 1027074 Dec 17 PH 5805 Mail Lane 177.30 1000.GEN.GG.ADM.1020.10202.0000.0000.6120 Lic & Perm - AdvLegal ECM PUBLISHERS INC 1018109 10/03/2024 20250117 111.15 Invoice: 1018109 Nov 6 PH Cannabis Zoning Amend 111.15 1000.GEN.GG.ADM.1020.10202.0000.0000.6120 Lic & Perm - AdvLegal ECM PUBLISHERS INC 1018108 10/03/2024 20250117 135.85 Invoice: 1018108 Oct 15 PH Bush CUP 135.85 1000.GEN.GG.ADM.1020.10202.0000.0000.6120 Lic & Perm - AdvLegal CHECK 503119 TOTAL: 591.74 503120 01/17/2025 PRTD 105906 EGAN COMPANY JC364726N001 12/18/2024 20250117 1,829.15 Invoice: JC364726N001 JOB# 364726 City of Edina Service Lateral Relocate 1,829.15 E ENG98001.MISCELLAN .REPAIRS . 4000.CAP.PW.ENG.4080.40801.0000.0000.6180 Faclt CP - Rep&Maint CHECK 503120 TOTAL: 1,829.15 503121 01/17/2025 PRTD 160062 ELM CREEK BREWING COMPANY E-7670 12/27/2024 20250117 205.00 Invoice: E-7670 205.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503121 TOTAL: 205.00 503122 01/17/2025 PRTD 134730 EXPLORE EDINA NOV 2023 LODGING TAX12/20/2024 20250117 44,980.15 Invoice: NOV 2023 LODGING TAX 28,027.10 1000.GEN.GG.FIN.1080.00000.0000.0000.4030 Finance - Lodg Tax 11,584.28 1000.GEN.GG.FIN.1080.00000.0000.0000.4030 Finance - Lodg Tax 5,368.77 5400.ENT.CA.P&R.5400.54001.0000.0000.4030 Operations - Lodg Tax CHECK 503122 TOTAL: 44,980.15 503123 01/17/2025 PRTD 100146 ELLIOTT AUTO SUPPLY CO, INC 69-538167 12/17/2024 20250117 69.04 Invoice: 69-538167 GUST. PO# S5500RP 69.04 6100.ISF.PW.PWK.6100.61005.0000.0000.6530 Police Eq - ReprParts ELLIOTT AUTO SUPPLY CO, INC 1-10335923 12/17/2024 20250117 268.24 Invoice: 1-10335923 PO# S5500RP 268.24 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts ELLIOTT AUTO SUPPLY CO, INC 69-538156 12/17/2024 20250117 16.38 Invoice: 69-538156 S5500Rp 16.38 6100.ISF.PW.PWK.6100.61010.0000.0000.6530 Golf Equip - ReprParts Page 29 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 16 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC ELLIOTT AUTO SUPPLY CO, INC 69-538226 12/18/2024 20250117 53.76 Invoice: 69-538226 53.76 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts ELLIOTT AUTO SUPPLY CO, INC 69-538239 12/18/2024 20250117 14.08 Invoice: 69-538239 CUST. PO# S2000JHV 14.08 6100.ISF.PW.PWK.6100.61005.0000.0000.6530 Police Eq - ReprParts ELLIOTT AUTO SUPPLY CO, INC 69-538398 12/19/2024 20250117 7.04 Invoice: 69-538398 CUST. PO# s2000ij 7.04 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts ELLIOTT AUTO SUPPLY CO, INC 69-538096 12/16/2024 20250117 32.13 Invoice: 69-538096 CUST, PO# S2000ij 32.13 6100.ISF.PW.PWK.6100.61010.0000.0000.6530 Golf Equip - ReprParts ELLIOTT AUTO SUPPLY CO, INC 1-10333171 12/16/2024 20250117 10.16 Invoice: 1-10333171 CUST. PO# S2000MB 10.16 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts ELLIOTT AUTO SUPPLY CO, INC 1-10338379 12/18/2024 20250117 88.99 Invoice: 1-10338379 88.99 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts ELLIOTT AUTO SUPPLY CO, INC 69-538448 12/20/2024 20250117 35.30 Invoice: 69-538448 35.30 6100.ISF.PW.PWK.6100.61015.0000.0000.6530 Utl Equip - ReprParts CHECK 503123 TOTAL: 595.12 503124 01/17/2025 PRTD 139752 CTI/USA INC 405094 12/17/2024 20250117 1,349.00 Invoice: 405094 WRISTBANDS, EP 1,349.00 5400.ENT.CA.P&R.5400.54001.0000.0000.6406 Operations - SupOther CHECK 503124 TOTAL: 1,349.00 503125 01/17/2025 PRTD 161052 BLH MOTORS LLC HYCS679683 12/19/2024 20250117 1,128.17 Invoice: HYCS679683 1,128.17 6100.ISF.PW.PWK.6100.61005.0000.0000.6583 Police Eq - Tire&Tube CHECK 503125 TOTAL: 1,128.17 503126 01/17/2025 PRTD 128914 BJKK DEVELOPMENT 36703 08/30/2024 20250117 594.00 Invoice: 36703 198.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.6575 50th Sell - Printing 198.00 5800.ENT.LQ.P&R.5810.58101.0000.0000.6575 Sthdl Sell - Printing 198.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.6575 Grnd Sell - Printing Page 30 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 17 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC BJKK DEVELOPMENT 37069 11/15/2024 20250117 41.00 Invoice: 37069 41.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.6575 Grnd Sell - Printing BJKK DEVELOPMENT 37144 12/14/2024 20250117 38.50 Invoice: 37144 Edina Cocktail 38.50 5800.ENT.LQ.P&R.5810.58101.0000.0000.6575 Sthdl Sell - Printing BJKK DEVELOPMENT 37170 12/11/2024 20250117 67.00 Invoice: 37170 Whiskey Wonderland & Celebration & Parties 67.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.6575 50th Sell - Printing BJKK DEVELOPMENT 37198 12/17/2024 20250117 100.46 Invoice: 37198 "Meet Lindsay" 100.46 1000.GEN.PS.FIR.1210.00000.0000.0000.6575 Build Insp - Printing CHECK 503126 TOTAL: 840.96 503127 01/17/2025 PRTD 999996 Anika Lange 24POLACC12.19AL 12/19/2024 20250117 60.00 Invoice: 24POLACC12.19AL Alcohol Compliance Checks 12.19.24 60.00 1000.GEN.PS.POL.1300.13000.0000.0000.6103 Pol Ad Gen - Prof Svrs CHECK 503127 TOTAL: 60.00 503128 01/17/2025 PRTD 160613 FIDELITY SECURITY LIFE INSURANCE 166557591 12/20/2024 20250118 1,042.15 Invoice: 166557591 12-2024 Eye Med Invoice-actives 1,042.15 9000.000.00.000.0000.00000.0000.0000.2032 . Payroll BS - Vision CHECK 503128 TOTAL: 1,042.15 503129 01/17/2025 PRTD 147181 FALLING BREWERY - BERGMAN LEDGE L E-17523 12/30/2024 20250118 400.00 Invoice: E-17523 400.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev CHECK 503129 TOTAL: 400.00 503130 01/17/2025 PRTD 103600 FERGUSON US HOLDINGS INC 0541529 12/17/2024 20250118 110.00 Invoice: 0541529 110.00 5900.ENT.UT.PWK.5900.59006.0000.0000.6406 Wat MtRead - SupOther FERGUSON US HOLDINGS INC 0541434 12/13/2024 20250118 185.80 Invoice: 0541434 185.80 5900.ENT.UT.PWK.5900.59006.0000.0000.6406 Wat MtRead - SupOther FERGUSON US HOLDINGS INC 0541539 12/17/2024 20250118 12.15 Invoice: 0541539 3" RR GSKT 12.15 5900.ENT.UT.PWK.5900.59006.0000.0000.6406 Wat MtRead - SupOther Page 31 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 18 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC FERGUSON US HOLDINGS INC 0541522 12/17/2024 20250118 664.99 Invoice: 0541522 664.99 5900.ENT.UT.PWK.5900.59006.0000.0000.6406 Wat MtRead - SupOther FERGUSON US HOLDINGS INC 0541540 12/17/2024 20250118 43.87 Invoice: 0541540 43.87 5900.ENT.UT.PWK.5900.59006.0000.0000.6406 Wat MtRead - SupOther FERGUSON US HOLDINGS INC 0539902-1 12/20/2024 20250118 3,266.34 Invoice: 0539902-1 3,266.34 5900.ENT.UT.PWK.5900.59006.0000.0000.6406 Wat MtRead - SupOther FERGUSON US HOLDINGS INC 0541649 12/23/2024 20250118 4,110.60 Invoice: 0541649 VERBAL NATE 2" MACH10 USG 4,110.60 5900.ENT.UT.PWK.5900.59006.0000.0000.6406 Wat MtRead - SupOther FERGUSON US HOLDINGS INC 0541490 12/23/2024 20250118 53.23 Invoice: 0541490 VERBAL DUSTIN SCOTCH CRIMP TOOL 53.23 5900.ENT.UT.PWK.5900.59003.0000.0000.6556 Wat Distr - Tool&Acces CHECK 503130 TOTAL: 8,446.98 503131 01/17/2025 PRTD 104270 FLARE HEATING & AIR CONDITIONING 0057967-IN 12/18/2024 20250118 7,280.00 Invoice: 0057967-IN 7,280.00 1000.GEN.PK.P&R.1700.17006.0000.0000.6530 Bldg Maint - ReprParts CHECK 503131 TOTAL: 7,280.00 503132 01/17/2025 PRTD 136583 FLUID INTERIORS LLC 94397 12/17/2024 20250118 4,400.00 Invoice: 94397 4,400.00 1000.GEN.PW.ENG.1550.15500.0000.0000.6103 Faclt Gen - Prof Svrs CHECK 503132 TOTAL: 4,400.00 503133 01/17/2025 PRTD 102727 FORCE AMERICA DISTRIBUTING LLC IN001-2029527 12/23/2024 20250118 76.85 Invoice: IN001-2029527 76.85 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts CHECK 503133 TOTAL: 76.85 503134 01/17/2025 PRTD 127497 GALLAGHER BENEFIT SERVICES INC 329470 12/16/2024 20250118 425.00 Invoice: 329470 FYE2024 GASB 75 425.00 1000.GEN.GG.FIN.1080.00000.0000.0000.6103 Finance - Prof Svrs CHECK 503134 TOTAL: 425.00 Page 32 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 19 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503135 01/17/2025 PRTD 102456 GALLS PARENT HOLDINGS LLC 029951716 12/17/2024 20250118 594.00 Invoice: 029951716 BALLISTIC HELMET - Bengtson 594.00 1000.GEN.PS.POL.1320.13201.0000.0000.6203 Emgcy Res - Uniforms GALLS PARENT HOLDINGS LLC 029951675 12/17/2024 20250118 132.76 Invoice: 029951675 DutyGuard HT Pullover - Zeise 132.76 1000.GEN.PS.POL.1300.13000.0000.0000.6203 Pol Ad Gen - Uniforms GALLS PARENT HOLDINGS LLC 029951646 12/17/2024 20250118 34.95 Invoice: 029951646 HSG Mini Radio Pouch - Zech 34.95 1000.GEN.PS.POL.1300.13000.0000.0000.6203 Pol Ad Gen - Uniforms GALLS PARENT HOLDINGS LLC 029951642 12/17/2024 20250118 11.99 Invoice: 029951642 Heat Transfer - Ben Anderson 11.99 1000.GEN.PS.POL.1300.13000.0000.0000.6203 Pol Ad Gen - Uniforms GALLS PARENT HOLDINGS LLC 029951644 12/17/2024 20250118 1,744.72 Invoice: 029951644 PO# CNT UNIFORMS 1,744.72 1000.GEN.PS.POL.1320.13201.0000.0000.6203 Emgcy Res - Uniforms GALLS PARENT HOLDINGS LLC 029964059 12/18/2024 20250118 1,391.29 Invoice: 029964059 Point Blank Vest and Carrier - Bengtson 1,391.29 1000.GEN.PS.POL.1300.13000.0000.0000.6203 Pol Ad Gen - Uniforms CHECK 503135 TOTAL: 3,909.71 503136 01/17/2025 PRTD 160347 GUARDIAN FLEET SAFETY LLC 301266 11/07/2024 20250118 6,555.75 Invoice: 301266 5 Chevy Tahoes - Installation of 5 pedestal mounts 6,555.75 1000.GEN.PS.FIR.1200.12000.0000.0000.6406 Fire Gen - SupOther GUARDIAN FLEET SAFETY LLC 301336 11/18/2024 20250118 500.00 Invoice: 301336 500.00 1000.GEN.PS.POL.1300.13000.0000.0000.6180 Pol Ad Gen - Rep&Maint GUARDIAN FLEET SAFETY LLC 301335 11/18/2024 20250118 500.00 Invoice: 301335 500.00 1000.GEN.PS.POL.1300.13000.0000.0000.6180 Pol Ad Gen - Rep&Maint CHECK 503136 TOTAL: 7,555.75 503137 01/17/2025 PRTD 126304 HAPCO POLE PRODUCTS IN0000147006 12/18/2024 20250118 3,241.00 Invoice: IN0000147006 PO: E2158NS 3,241.00 1000.GEN.PW.ENG.1540.15401.0000.0000.6180 Str Lt Reg - Rep&Maint CHECK 503137 TOTAL: 3,241.00 Page 33 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 20 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503138 01/17/2025 PRTD 100797 HAWKINS INC 6933944 12/10/2024 20250118 5,244.90 Invoice: 6933944 water treatment chemicals 5,244.90 5900.ENT.UT.PWK.5900.59005.0000.0000.6545 Wat Treat - Chemicals CHECK 503138 TOTAL: 5,244.90 503139 01/17/2025 PRTD 104375 HOHENSTEINS INC 782779 12/30/2024 20250118 120.00 Invoice: 782779 120.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc HOHENSTEINS INC 782778 12/30/2024 20250118 837.00 Invoice: 782778 837.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer HOHENSTEINS INC 782784 12/30/2024 20250118 360.00 Invoice: 782784 360.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev HOHENSTEINS INC 782785 12/30/2024 20250118 1,607.70 Invoice: 782785 1,607.70 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer HOHENSTEINS INC 782782 12/30/2024 20250118 1,407.60 Invoice: 782782 1,407.60 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer HOHENSTEINS INC 782783 12/30/2024 20250118 108.00 Invoice: 782783 108.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc HOHENSTEINS INC 782781 12/30/2024 20250118 604.50 Invoice: 782781 604.50 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev CHECK 503139 TOTAL: 5,044.80 503140 01/17/2025 PRTD 100417 HORIZON CHEMICAL CO INV90920 11/22/2024 20250118 40,000.00 Invoice: INV90920 FAC24105 20,000.00 1000.GEN.GG.FIN.1080.10801.0000.0000.6713 . Fin Other - CapBldStrc 20,000.00 4000.CAP.PW.ENG.4080.40801.0000.0000.6103 Faclt CP - Prof Svrs CHECK 503140 TOTAL: 40,000.00 503141 01/17/2025 PRTD 160239 HUEBSCH LAUNDRY CO 20360143 11/04/2024 20250118 236.74 Invoice: 20360143 Entrance mats - monthly service (November) 236.74 5400.ENT.CA.P&R.5400.54001.0000.0000.6103 Operations - Prof Svrs HUEBSCH LAUNDRY CO 20367105 12/02/2024 20250118 236.74 Page 34 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 21 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC Invoice: 20367105 Entrance mats - monthly service (December) 236.74 5400.ENT.CA.P&R.5400.54001.0000.0000.6103 Operations - Prof Svrs CHECK 503141 TOTAL: 473.48 503142 01/17/2025 PRTD 129508 IMPACT MAILING OF MINNESOTA INC 215024 12/27/2024 20250118 5,083.95 Invoice: 215024 Monthly 12/1/2024-12/31/2024 5,083.95 5900.ENT.UT.FIN.5900.59000.0000.0000.6103 Wat UB - Prof Svrs CHECK 503142 TOTAL: 5,083.95 503143 01/17/2025 PRTD 146427 LUCID BREWING LLC IN-241792 12/31/2024 20250118 93.00 Invoice: IN-241792 93.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer LUCID BREWING LLC IN-241793 12/31/2024 20250118 450.00 Invoice: IN-241793 450.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev CHECK 503143 TOTAL: 543.00 503144 01/17/2025 PRTD 100814 INDELCO PLASTICS CORPORATION INV499255 12/17/2024 20250118 49.80 Invoice: INV499255 PO# WELL 16 49.80 5900.ENT.UT.PWK.5900.59002.0000.0000.6530 Wat Wells - ReprParts INDELCO PLASTICS CORPORATION INV499556 12/18/2024 20250118 401.93 Invoice: INV499556 PO# S5500RP 401.93 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts CHECK 503144 TOTAL: 451.73 503145 01/17/2025 PRTD 131548 INNOVATIVE OFFICE SOLUTIONS LLC IN4724819 12/20/2024 20250118 246.44 Invoice: IN4724819 246.44 7100.CUS.PS.FIR.7100.71001.0000.0000.6511 Main Bldng - SupCustod CHECK 503145 TOTAL: 246.44 503146 01/17/2025 PRTD 100828 JERRY'S ENTERPRISES INC 79245 12/17/2024 20250118 10.60 Invoice: 79245 10.60 5900.ENT.UT.PWK.5900.59002.0000.0000.6406 Wat Wells - SupOther JERRY'S ENTERPRISES INC 79252 12/18/2024 20250118 11.96 Invoice: 79252 PO # 252162 11.96 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts JERRY'S ENTERPRISES INC 79248 12/18/2024 20250118 17.09 Invoice: 79248 Page 35 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 22 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 17.09 5900.ENT.UT.PWK.5900.59003.0000.0000.6406 Wat Distr - SupOther JERRY'S ENTERPRISES INC 79259 12/19/2024 20250118 26.99 Invoice: 79259 26.99 1000.GEN.PW.PWK.1400.14006.0000.0000.6556 Snow Rem - Tool&Acces JERRY'S ENTERPRISES INC 79266 12/20/2024 20250118 6.74 Invoice: 79266 6.74 1000.GEN.PW.PWK.1400.14006.0000.0000.6406 Snow Rem - SupOther CHECK 503146 TOTAL: 73.38 503147 01/17/2025 PRTD 161144 JIXXIE 2192 12/30/2024 20250118 480.00 Invoice: 2192 480.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev JIXXIE 2191 12/30/2024 20250118 618.00 Invoice: 2191 618.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev JIXXIE 2190 12/30/2024 20250118 696.00 Invoice: 2190 696.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev CHECK 503147 TOTAL: 1,794.00 503148 01/17/2025 PRTD 100835 JOHNSON BROTHERS LIQUOR CO 2696708 12/27/2024 20250118 33.40 Invoice: 2696708 1.40 5800.ENT.LQ.P&R.5820.58201.0000.0000.5515 Grnd Sell - CGS Other 32.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc JOHNSON BROTHERS LIQUOR CO 2696704 12/27/2024 20250118 196.80 Invoice: 2696704 2.80 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 194.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq JOHNSON BROTHERS LIQUOR CO 2696707 12/27/2024 20250118 2,934.75 Invoice: 2696707 14.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 2,920.75 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq JOHNSON BROTHERS LIQUOR CO 2696709 12/27/2024 20250118 166.20 Invoice: 2696709 4.20 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 162.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq JOHNSON BROTHERS LIQUOR CO 2696705 12/27/2024 20250118 687.90 Invoice: 2696705 7.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 680.90 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine Page 36 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 23 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC JOHNSON BROTHERS LIQUOR CO 2696706 12/27/2024 20250118 427.00 Invoice: 2696706 7.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 420.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine JOHNSON BROTHERS LIQUOR CO 2696710 12/27/2024 20250118 616.40 Invoice: 2696710 8.40 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 608.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine JOHNSON BROTHERS LIQUOR CO 2696702 12/27/2024 20250118 930.85 Invoice: 2696702 5.60 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 925.25 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq JOHNSON BROTHERS LIQUOR CO 2696701 12/27/2024 20250118 324.20 Invoice: 2696701 4.20 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 320.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq JOHNSON BROTHERS LIQUOR CO 2696703 12/27/2024 20250118 85.40 Invoice: 2696703 1.40 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 84.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine JOHNSON BROTHERS LIQUOR CO 2696700 12/27/2024 20250118 285.82 Invoice: 2696700 2.80 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 283.02 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine JOHNSON BROTHERS LIQUOR CO 2696696 12/27/2024 20250118 464.80 Invoice: 2696696 2.80 5800.ENT.LQ.P&R.5800.58001.0000.0000.5512 50th Sell - CGS Liq 462.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq JOHNSON BROTHERS LIQUOR CO 2696694 12/27/2024 20250118 252.55 Invoice: 2696694 2.80 5800.ENT.LQ.P&R.5800.58001.0000.0000.5512 50th Sell - CGS Liq 249.75 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq JOHNSON BROTHERS LIQUOR CO 2696699 12/27/2024 20250118 154.40 Invoice: 2696699 1.40 5800.ENT.LQ.P&R.5800.58001.0000.0000.5512 50th Sell - CGS Liq 153.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq JOHNSON BROTHERS LIQUOR CO 2696695 12/27/2024 20250118 402.80 Invoice: 2696695 2.80 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 400.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine JOHNSON BROTHERS LIQUOR CO 2696697 12/27/2024 20250118 405.60 Page 37 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 24 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC Invoice: 2696697 5.60 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 400.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine JOHNSON BROTHERS LIQUOR CO 2696698 12/27/2024 20250118 129.40 Invoice: 2696698 1.40 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 128.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine JOHNSON BROTHERS LIQUOR CO 2697651 12/28/2024 20250118 634.50 Invoice: 2697651 10.50 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 624.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine CHECK 503148 TOTAL: 9,132.77 503149 01/17/2025 PRTD 161152 K.A. WITTT CONSTRUCTION R-023814-000 10/25/2024 20250118 66,209.00 Invoice: R-023814-000 Strachauer Park Sitework Impro 66,209.00 E P&R23211.CONSTRUCTN. . 4000.CAP.PK.P&R.4090.00000.0000.0000.6710 P&R CP - Cap Other CHECK 503149 TOTAL: 66,209.00 503150 01/17/2025 PRTD 101696 KEY ENTERPRISES LLC 2024ci-15148 11/01/2024 20250118 12,698.66 Invoice: 2024ci-15148 Braemar Golf-MGA Advertising 12,698.66 5200.ENT.GC.P&R.5200.52000.0000.0000.6122 Golf Gen - AdvOther KEY ENTERPRISES LLC 2024-142042 12/03/2024 20250118 3,000.00 Invoice: 2024-142042 MGA Perform - Programmatic Display Advertising 3,000.00 5200.ENT.GC.P&R.5200.52000.0000.0000.6122 Golf Gen - AdvOther CHECK 503150 TOTAL: 15,698.66 503151 01/17/2025 PRTD 160539 KRAUS-ANDERSON CONSTRUCTION COMPA 67708 11/30/2024 20250118 1,204,089.81 Invoice: 67708 Community Health & Safety Cent 1,204,089.81 E FIR21008.CONSTRUCTN. . 4000.CAP.PS.FIR.4050.00000.0000.0000.6713 Fire CP - CapBldStrc CHECK 503151 TOTAL: 1,204,089.81 503152 01/17/2025 PRTD 138301 KRIS ENGINEERING INC 40759 12/23/2024 20250118 3,473.75 Invoice: 40759 3,473.75 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts Page 38 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 25 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503152 TOTAL: 3,473.75 503153 01/17/2025 PRTD 151024 LA DONA SBC 7557 12/27/2024 20250118 78.00 Invoice: 7557 78.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503153 TOTAL: 78.00 503154 01/17/2025 PRTD 101220 LANO EQUIPMENT INC 01-1125110 12/17/2024 20250118 677.25 Invoice: 01-1125110 PO: S5374JHV 677.25 6100.ISF.PW.PWK.6100.61009.0000.0000.6530 Pk Mant Eq - ReprParts LANO EQUIPMENT INC 01-1125520 12/19/2024 20250118 1,139.78 Invoice: 01-1125520 1,139.78 6100.ISF.PW.PWK.6100.61009.0000.0000.6583 Pk Mant Eq - Tire&Tube LANO EQUIPMENT INC 01-1125519 12/19/2024 20250118 1,360.22 Invoice: 01-1125519 1,360.22 6100.ISF.PW.PWK.6100.61009.0000.0000.6583 Pk Mant Eq - Tire&Tube LANO EQUIPMENT INC 01-1125784 12/20/2024 22400086 20250118 43,245.35 Invoice: 01-1125784 2024 Metal Pless Blade 43,245.35 1000.GEN.PW.PWK.1400.14003.0000.0000.6530 Overlay Pr - ReprParts LANO EQUIPMENT INC 01-1125771 12/20/2024 22400078 20250118 88,503.42 Invoice: 01-1125771 2024 Kabota M4 tractor and attachments 88,503.42 4200.CAP.PK.P&R.4290.00000.0000.0000.6711 P&R ER - CapVh&Equp LANO EQUIPMENT INC 01-1125769 12/20/2024 20250118 1,300.00 Invoice: 01-1125769 rental order # 70747 winter rental 12/19/24 to1/19 1,300.00 E ENG98001.MISCELLAN .EQUIPMENT . 4000.CAP.PW.ENG.4080.40801.0000.0000.6180 Faclt CP - Rep&Maint CHECK 503154 TOTAL: 136,226.02 503155 01/17/2025 PRTD 145377 LEADSONLINE LLC 414806 10/15/2024 20250118 4,620.00 Invoice: 414806 2025 INVESTIGATION SYSTEM SERVICE RENEWAL 4,620.00 1000.GEN.PS.POL.1330.00000.0000.0000.6105 Investigat - Dues&Sub CHECK 503155 TOTAL: 4,620.00 503156 01/17/2025 PRTD 128234 LEFFLER PRINTING COMPANY 22473 08/13/2024 20250118 13,515.00 Invoice: 22473 Fall "Activities Directory" - Printing 13,515.00 1000.GEN.PK.P&R.1600.00000.0000.0000.6575 Park Admin - Printing Page 39 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 26 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503156 TOTAL: 13,515.00 503157 01/17/2025 PRTD 135867 LIBATION PROJECT 81310 12/27/2024 20250118 240.04 Invoice: 81310 4.00 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 236.04 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine LIBATION PROJECT 81309 12/27/2024 20250118 122.00 Invoice: 81309 2.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 120.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine CHECK 503157 TOTAL: 362.04 503158 01/17/2025 PRTD 100858 LOGIS 98008-1 11/13/2024 20250118 9,605.84 Invoice: 98008-1 City Fiber Expansion - ARPA 9,605.84 5900.ENT.UT.PWK.5900.59003.0000.0000.6180 Wat Distr - Rep&Maint CHECK 503158 TOTAL: 9,605.84 503159 01/17/2025 PRTD 160548 LUCE LINE BREWING CO LLC E-3361 01/02/2025 20250118 140.00 Invoice: E-3361 140.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer LUCE LINE BREWING CO LLC E-3360 01/02/2025 20250118 140.00 Invoice: E-3360 140.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev CHECK 503159 TOTAL: 280.00 503160 01/17/2025 PRTD 123848 LVC COMPANIES INC 158076 12/17/2024 20250118 9,158.00 Invoice: 158076 9,158.00 E ENG98001.MISCELLAN .REPAIRS . 4000.CAP.PW.ENG.4080.40801.0000.0000.6180 Faclt CP - Rep&Maint LVC COMPANIES INC 158160 12/18/2024 20250118 8,083.00 Invoice: 158160 ARDEN PARK 8,083.00 1000.GEN.PK.P&R.1700.17006.0000.0000.6180 Bldg Maint - Rep&Maint LVC COMPANIES INC 158162 12/18/2024 20250118 1,526.00 Invoice: 158162 COUNTRYSIDE PARK 1,526.00 1000.GEN.PK.P&R.1700.17006.0000.0000.6180 Bldg Maint - Rep&Maint LVC COMPANIES INC 158420 12/20/2024 20250118 2,644.34 Invoice: 158420 Well #6 2,644.34 5900.ENT.UT.PWK.5900.59002.0000.0000.6180 Wat Wells - Rep&Maint Page 40 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 27 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC LVC COMPANIES INC 158442 12/20/2024 20250118 1,914.00 Invoice: 158442 WTP #6 1,914.00 5900.ENT.UT.PWK.5900.59002.0000.0000.6180 Wat Wells - Rep&Maint LVC COMPANIES INC 158441 12/20/2024 20250118 6,729.00 Invoice: 158441 Arneson Acres House 6,729.00 1000.GEN.PK.P&R.1700.17006.0000.0000.6180 Bldg Maint - Rep&Maint CHECK 503160 TOTAL: 30,054.34 503161 01/17/2025 PRTD 160574 JEAN, SANDRA 17/2024 12/17/2024 20250118 600.00 Invoice: 17/2024 New plant install (14 plants) 600.00 5400.ENT.CA.P&R.5400.54001.0000.0000.6541 Operations - TrFlwShrb CHECK 503161 TOTAL: 600.00 503162 01/17/2025 PRTD 103409 KELBRO COMPANY 3105466 12/30/2024 20250118 83.84 Invoice: 3105466 4.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.5515 50th Sell - CGS Other 79.84 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc KELBRO COMPANY 3105948 01/02/2025 20250118 192.05 Invoice: 3105948 4.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.5515 Grnd Sell - CGS Other 188.05 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc KELBRO COMPANY 3106018 01/02/2025 20250118 116.78 Invoice: 3106018 4.00 5800.ENT.LQ.P&R.5810.58101.0000.0000.5515 Sthdl Sell - CGS Other 112.78 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc CHECK 503162 TOTAL: 392.67 503163 01/17/2025 PRTD 101029 JM ACQUISITION LLC S407521-IN 12/17/2024 20250118 96.00 Invoice: S407521-IN FREIGHT ONLY P.O. TimZ. GH delivery/Tom S 96.00 1000.GEN.PK.P&R.1700.17003.0000.0000.6103 GH & Hort - Prof Svrs CHECK 503163 TOTAL: 96.00 503164 01/17/2025 PRTD 161031 LUKE LEBLANC 25EP0010 01/15/2025 20250119 200.00 Invoice: 25EP0010 PERFORMANCE, EDINBOROUGH PARK 200.00 5400.ENT.CA.P&R.5400.54000.0000.0000.6103 Admin - Prof Svrs CHECK 503164 TOTAL: 200.00 Page 41 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 28 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503165 01/17/2025 PRTD 103216 MINNEAPOLIS FINANCE DEPARTMENT 431-0005.300-01/25 01/02/2025 20250119 13,814.85 Invoice: 431-0005.300-01/25 Morningside Water (11/30/2024-12/30/2024) 13,814.85 5900.ENT.UT.PWK.5900.59003.0000.0000.6601 Wat Distr - Wtr Purch CHECK 503165 TOTAL: 13,814.85 503166 01/17/2025 PRTD 139927 CITY OF ROCHESTER MN RFD-12/24-2 12/23/2024 20250119 9,729.07 Invoice: RFD-12/24-2 MN-TF1 OT/BF REIMBURSEMENT REQUEST 9,729.07 7200.CUS.PS.FIR.7200.00000.0000.0000.6406 MN TF 1 - SupOther CHECK 503166 TOTAL: 9,729.07 503167 01/17/2025 PRTD 139927 CITY OF ROCHESTER MN RFD-12/24-3 12/23/2024 20250119 13,045.71 Invoice: RFD-12/24-3 MN-TF1 OT/BF REIMBURSEMENT REQUEST 13,045.71 7200.CUS.PS.FIR.7200.00000.0000.0000.6406 MN TF 1 - SupOther CHECK 503167 TOTAL: 13,045.71 503168 01/17/2025 PRTD 100087 CITY OF SAINT PAUL IN61289 12/23/2024 20250119 27,918.59 Invoice: IN61289 OCT & NOV MNTF1 FIRE PROTECTION SERV. 27,918.59 7200.CUS.PS.FIR.7200.00000.0000.0000.6406 MN TF 1 - SupOther CHECK 503168 TOTAL: 27,918.59 503169 01/17/2025 PRTD 130477 MCDONALD DISTRIBUTING COMPANY 785202 01/02/2025 20250119 153.25 Invoice: 785202 153.25 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc MCDONALD DISTRIBUTING COMPANY 785201 01/02/2025 20250119 68.00 Invoice: 785201 68.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer MCDONALD DISTRIBUTING COMPANY 784832 01/02/2025 20250119 338.00 Invoice: 784832 338.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer MCDONALD DISTRIBUTING COMPANY 784838 01/02/2025 20250119 280.00 Invoice: 784838 280.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer MCDONALD DISTRIBUTING COMPANY 784834 01/02/2025 20250119 201.25 Invoice: 784834 201.25 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc MCDONALD DISTRIBUTING COMPANY 786406 01/09/2025 20250119 -29.25 Invoice: 786406 -29.25 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer Page 42 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 29 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503169 TOTAL: 1,011.25 503170 01/17/2025 PRTD 120433 COMCAST 0007539-01/25 01/08/2025 20250119 1,093.86 Invoice: 0007539-01/25 Account no. 8772 10 789 0007539 1,093.86 E FIN21500.MISCELLAN .BB-COM . 1000.GEN.GG.FIN.1080.10801.0000.0000.6103 . Fin Othr - Prof Svrs CHECK 503170 TOTAL: 1,093.86 503171 01/17/2025 PRTD 120433 COMCAST 0540232-01/25 01/08/2025 20250119 150.35 Invoice: 0540232-01/25 Account number 8772 10 614 0540232 150.35 E ENG98001.MISCELLAN .TELEPHONE . 4000.CAP.PW.ENG.4080.40801.0000.0000.6188 Faclt CP - Telephone CHECK 503171 TOTAL: 150.35 503172 01/17/2025 PRTD 160716 VOGEL TRAFFIC SERVICES INC 076261 12/20/2024 20250119 3,700.00 Invoice: 076261 PO# C-1542-DS 3,700.00 1000.GEN.PW.PWK.1400.14007.0000.0000.6103 Trfc Safty - Prof Svrs CHECK 503172 TOTAL: 3,700.00 503173 01/17/2025 PRTD 160412 MKM BRANDS INC 358 12/21/2024 20250119 940.50 Invoice: 358 940.50 5500.ENT.BA.P&R.5500.55002.0000.0000.5510 Concession - CGS CHECK 503173 TOTAL: 940.50 503174 01/17/2025 PRTD 161297 REAL BIG BANDS 25EP0007 01/02/2025 20250119 200.00 Invoice: 25EP0007 PERFORMANCE, EDINBOROUGH PARK 200.00 5400.ENT.CA.P&R.5400.54000.0000.0000.6103 Admin - Prof Svrs CHECK 503174 TOTAL: 200.00 503175 01/17/2025 PRTD 102426 HALE, WILLIAM 25EP0011 01/15/2025 20250119 250.00 Invoice: 25EP0011 PERFORMANCE, EDINBOROUGH PARK 250.00 5400.ENT.CA.P&R.5400.54000.0000.0000.6103 Admin - Prof Svrs CHECK 503175 TOTAL: 250.00 Page 43 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 30 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503176 01/17/2025 PRTD 103085 HENNEPIN COUNTY 2024-25 Truth in Tax01/08/2025 20250119 8,149.58 Invoice: 2024-25 Truth in Tax 2024-25 Truth in Tax 8,149.58 1000.GEN.GG.FIN.1080.00000.0000.0000.6406 Finance - SupOther CHECK 503176 TOTAL: 8,149.58 503177 01/17/2025 PRTD 161318 ISPIRI LLC 100 12/18/2024 20250119 350.00 Invoice: 100 Sip Collective 350.00 5800.ENT.LQ.P&R.5830.58300.0000.0000.6406 Ecom AdGe - SupOther CHECK 503177 TOTAL: 350.00 503178 01/17/2025 PRTD 100835 PHILLIPS WINE & SPIRITS 6904187 12/27/2024 20250119 308.80 Invoice: 6904187 2.80 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 306.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq PHILLIPS WINE & SPIRITS 6904188 12/27/2024 20250119 308.80 Invoice: 6904188 2.80 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 306.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine PHILLIPS WINE & SPIRITS 6904186 12/27/2024 20250119 136.40 Invoice: 6904186 1.40 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 135.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq PHILLIPS WINE & SPIRITS 6904185 12/27/2024 20250119 146.80 Invoice: 6904185 2.80 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 144.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine PHILLIPS WINE & SPIRITS 6904184 12/27/2024 20250119 941.80 Invoice: 6904184 15.40 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 926.40 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine CHECK 503178 TOTAL: 1,842.60 503179 01/17/2025 PRTD 100864 MACQUEEN EQUIPMENT LLC P61785 12/20/2024 20250119 797.79 Invoice: P61785 797.79 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts MACQUEEN EQUIPMENT LLC P61798 12/23/2024 20250119 1,101.71 Invoice: P61798 1,101.71 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts Page 44 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 31 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503179 TOTAL: 1,899.50 503180 01/17/2025 PRTD 122878 MARTTI, DOROTHEA J 300 12/21/2024 20250119 330.00 Invoice: 300 "Agenda: Edina" Hosting Fee 330.00 1000.GEN.GG.COM.1040.10402.0000.0000.6103 Video Pro - Prof Svrs CHECK 503180 TOTAL: 330.00 503181 01/17/2025 PRTD 122554 MATHESON TRI-GAS INC 0030781900 12/21/2024 20250119 310.11 Invoice: 0030781900 HRCX 400 CYLXGNTFEE 310.11 1000.GEN.PS.FIR.1200.12000.0000.0000.6510 Fire Gen - SupFrstAid MATHESON TRI-GAS INC 0030782338 12/21/2024 20250119 77.07 Invoice: 0030782338 HRXX 400 CYLXGNTFEE 77.07 1000.GEN.PS.FIR.1200.12000.0000.0000.6510 Fire Gen - SupFrstAid CHECK 503181 TOTAL: 387.18 503182 01/17/2025 PRTD 103944 MOBILE HEALTH SERVICES LLC 46692 12/16/2024 20250119 775.00 Invoice: 46692 775.00 1000.GEN.PS.POL.1300.13000.0000.0000.6175 Pol Ad Gen - EmpExams CHECK 503182 TOTAL: 775.00 503183 01/17/2025 PRTD 146040 MEGA BEER LLC IN-19345 12/27/2024 20250119 208.50 Invoice: IN-19345 208.50 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503183 TOTAL: 208.50 503184 01/17/2025 PRTD 101483 MENARDS 16135 12/17/2024 20250119 1,394.10 Invoice: 16135 PO# C1410JP 1,394.10 1000.GEN.PW.PWK.1400.14006.0000.0000.6406 Snow Rem - SupOther MENARDS 16137 12/17/2024 20250119 13.01 Invoice: 16137 PO# C1440 jp 13.01 1000.GEN.PW.PWK.1400.14001.0000.0000.6406 Gen Mntce - SupOther MENARDS 16136 12/17/2024 20250119 -116.00 Invoice: 16136 RETURN 1 6X6 CEDAR ROUGH SAWN -116.00 1000.GEN.PW.PWK.1400.14006.0000.0000.6406 Snow Rem - SupOther MENARDS 16422 12/23/2024 20250119 38.95 Invoice: 16422 PURCHASE ORDER# golf 38.95 5200.ENT.GC.P&R.5200.52000.0000.0000.6406 Golf Gen - SupOther MENARDS 16430 12/23/2024 20250119 20.42 Page 45 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 32 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC Invoice: 16430 PURCHASE ORDER# 1551 20.42 1000.GEN.PW.PWK.1400.14001.0000.0000.6180 Gen Mntce - Rep&Maint CHECK 503184 TOTAL: 1,350.48 503185 01/17/2025 PRTD 161010 MEND COLLABORATIVE EDN2401-009 01/02/2025 20250119 14,003.25 Invoice: EDN2401-009 Lincoln and Londonderry Small 14,003.25 1000.GEN.GG.DEV.1050.10500.0000.0000.6103 Plan Gen - Prof Svrs CHECK 503185 TOTAL: 14,003.25 503186 01/17/2025 PRTD 102507 METRO VOLLEYBALL OFFICIALS ASSOCI 2574 12/19/2024 20250119 340.00 Invoice: 2574 VOLLEYBALL 12/11 & 12/18 340.00 1000.GEN.PK.P&R.1610.16100.0000.0000.6103 Athltc Act - Prof Svrs CHECK 503186 TOTAL: 340.00 503187 01/17/2025 PRTD 100886 METROPOLITAN COUNCIL December 2024 SAC 01/02/2025 20250119 4,920.30 Invoice: December 2024 SAC 4,920.30 1000.GEN.PS.FIR.1210.00000.0000.0000.4307 Build Insp - SAC CHECK 503187 TOTAL: 4,920.30 503188 01/17/2025 PRTD 100886 METROPOLITAN COUNCIL 0001181364 01/03/2025 20250119 550,052.02 Invoice: 0001181364 Waste Water Services Def Rev 550,052.02 5900.ENT.UT.PWK.5910.59104.0000.0000.6302 Sew Treat - Sew Serv CHECK 503188 TOTAL: 550,052.02 503189 01/17/2025 PRTD 101161 MIDWEST CHEMICAL SUPPLY INC 56253 12/12/2024 20250119 484.58 Invoice: 56253 LINERS 484.58 6300.ISF.PW.ENG.6300.63000.0000.0000.6511 City Hall - SupCustod MIDWEST CHEMICAL SUPPLY INC 56264 12/13/2024 20250119 280.50 Invoice: 56264 liners & oven cleaner 280.50 6300.ISF.PW.ENG.6300.63000.0000.0000.6511 City Hall - SupCustod CHECK 503189 TOTAL: 765.08 503190 01/17/2025 PRTD 100252 MINNESOTA HIGHWAY SAFETY AND RESE 337900-11374 11/06/2024 20250119 610.00 Invoice: 337900-11374 EMS Hybrid- T. Gonsior and N. Hilliard 610.00 1000.GEN.PS.FIR.1200.12000.0000.0000.6104 Fire Gen - Conf&Schls CHECK 503190 TOTAL: 610.00 Page 46 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 33 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503191 01/17/2025 PRTD 101559 MINNESOTA STATE FIRE CHIEFS ASSN 8426 11/16/2024 20250119 495.00 Invoice: 8426 2025 Membership Renewal through December 31, 2025 495.00 1000.GEN.PS.FIR.1200.12000.0000.0000.6105 Fire Gen - Dues&Sub CHECK 503191 TOTAL: 495.00 503192 01/17/2025 PRTD 140955 MODIST BREWING LLC E-55978 12/27/2024 20250119 260.10 Invoice: E-55978 260.10 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer MODIST BREWING LLC E-55979 12/27/2024 20250119 92.26 Invoice: E-55979 92.26 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev MODIST BREWING LLC E-56020 12/31/2024 20250119 147.70 Invoice: E-56020 147.70 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer MODIST BREWING LLC E-56021 12/31/2024 20250119 1,463.86 Invoice: E-56021 1,463.86 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev MODIST BREWING LLC E-56082 01/02/2025 20250119 47.00 Invoice: E-56082 47.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer MODIST BREWING LLC E-56083 01/02/2025 20250119 92.26 Invoice: E-56083 92.26 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev CHECK 503192 TOTAL: 2,103.18 503193 01/17/2025 PRTD 100906 MTI DISTRIBUTING INC 1456269-00 12/20/2024 20250119 2,800.56 Invoice: 1456269-00 2,800.56 5200.ENT.GC.P&R.5200.52000.0000.0000.6103 Golf Gen - Prof Svrs CHECK 503193 TOTAL: 2,800.56 503194 01/17/2025 PRTD 101390 MUNICIPAL EMERGENCY SERVICES IN2171707 12/18/2024 20250119 644.00 Invoice: IN2171707 644.00 7200.CUS.PS.FIR.7200.00000.0000.0000.6406 MN TF 1 - SupOther CHECK 503194 TOTAL: 644.00 503195 01/17/2025 PRTD 104671 MUSCO CORPORATION 434070 12/19/2024 20250119 1,170.00 Invoice: 434070 PO# E1351JS 1,170.00 1000.GEN.PK.P&R.1700.17008.0000.0000.6530 Rink Maint - ReprParts Page 47 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 34 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503195 TOTAL: 1,170.00 503196 01/17/2025 PRTD 100076 NEW FRANCE WINE CO 234479 12/27/2024 20250119 299.00 Invoice: 234479 5.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 294.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq NEW FRANCE WINE CO 234480 12/27/2024 20250119 884.50 Invoice: 234480 12.50 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 872.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine NEW FRANCE WINE CO 234484 12/27/2024 20250119 299.00 Invoice: 234484 5.00 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 294.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq NEW FRANCE WINE CO 234481 12/27/2024 20250119 325.00 Invoice: 234481 5.00 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 320.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine NEW FRANCE WINE CO 234482 12/27/2024 20250119 299.00 Invoice: 234482 5.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.5512 50th Sell - CGS Liq 294.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq NEW FRANCE WINE CO 234483 12/27/2024 20250119 495.50 Invoice: 234483 7.50 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 488.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine CHECK 503196 TOTAL: 2,602.00 503197 01/17/2025 PRTD 143137 NORTHERN STAR COUNCIL, BOY SCOUTS 12172024 12/17/2024 20250119 1,310.00 Invoice: 12172024 2024-2025 Exploring Registration Fees 1,310.00 1000.GEN.PS.POL.1300.13003.0000.0000.6406 Res Prog - SupOther CHECK 503197 TOTAL: 1,310.00 503198 01/17/2025 PRTD 160385 ODP BUSINESS SOLUTIONS LLC 400501485001 12/12/2024 20250119 28.99 Invoice: 400501485001 28.99 5200.ENT.GC.P&R.5200.52000.0000.0000.6513 Golf Gen - SupOffice CHECK 503198 TOTAL: 28.99 Page 48 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 35 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503199 01/17/2025 PRTD 999995 CITYLINE HOMES INC ED193336-REFUND 12/30/2024 20250119 8,900.00 Invoice: ED193336-REFUND ED193336 6040 Kellogg Ave 8,900.00 1000.000.00.000.0000.00000.0000.0000.2064 GF Bal Sh - BldgEscrow CHECK 503199 TOTAL: 8,900.00 503200 01/17/2025 PRTD 999995 COMO HOMES LLC ED216189-REFUND 12/30/2024 20250119 2,500.00 Invoice: ED216189-REFUND ED216189 4311 Eton Pl 2,500.00 1000.000.00.000.0000.00000.0000.0000.2064 GF Bal Sh - BldgEscrow CHECK 503200 TOTAL: 2,500.00 503201 01/17/2025 PRTD 999995 Dream Homes Inc ED211064-REFUND 12/27/2024 20250119 9,700.00 Invoice: ED211064-REFUND ED211064 New Home Escrow 5917 Beard Ave S 9,700.00 1000.000.00.000.0000.00000.0000.0000.2064 GF Bal Sh - BldgEscrow CHECK 503201 TOTAL: 9,700.00 503202 01/17/2025 PRTD 999995 REFINED, LLC ED210790-REFUND 12/30/2024 20250119 10,000.00 Invoice: ED210790-REFUND ED210790 5305 Mirror Lakes Dr 10,000.00 1000.000.00.000.0000.00000.0000.0000.2064 GF Bal Sh - BldgEscrow CHECK 503202 TOTAL: 10,000.00 503203 01/17/2025 PRTD 999997 SCHERF, DAVID G 131365 01/14/2025 20250119 1,104.24 Invoice: 131365 UB 0304708001 5308 GLENGARRY 1,104.24 5900.ENT.00.PWK.5900.00000.0000.0000.1211 Wat BS - Accts Rec CHECK 503203 TOTAL: 1,104.24 503204 01/17/2025 PRTD 101659 ORKIN 272204968 12/19/2024 20250119 53.57 Invoice: 272204968 Pets Control 53.57 1000.GEN.PS.FIR.1200.12000.0000.0000.6103 Fire Gen - Prof Svrs CHECK 503204 TOTAL: 53.57 503205 01/17/2025 PRTD 100945 PEPSI-COLA COMPANY 11546001 01/03/2025 20250119 1,354.00 Invoice: 11546001 1,354.00 5500.ENT.BA.P&R.5500.55002.0000.0000.5510 Concession - CGS CHECK 503205 TOTAL: 1,354.00 Page 49 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 36 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503206 01/17/2025 PRTD 117087 PETERSON COMPANIES INC 57867 11/18/2024 20250119 19,134.01 Invoice: 57867 1 Irrigation repair at City Hall 11,618.81 1000.GEN.PW.ENG.1550.15500.0000.0000.6406 Faclt Gen - SupOther 7,515.20 1000.GEN.PW.ENG.1550.15500.0000.0000.6103 Faclt Gen - Prof Svrs CHECK 503206 TOTAL: 19,134.01 503207 01/17/2025 PRTD 160261 PETERSON, RACHAEL 1073987947 12/20/2024 20250119 420.00 Invoice: 1073987947 Edina Police Department December Invoice 420.00 1000.GEN.PS.POL.1300.13000.0000.0000.6175 Pol Ad Gen - EmpExams CHECK 503207 TOTAL: 420.00 503208 01/17/2025 PRTD 160501 PFM ASSET MANAGEMENT LLC 14560979 12/19/2024 20250119 3,363.43 Invoice: 14560979 11/01/2024-11/30/2024 3,363.43 1000.GEN.GG.FIN.1080.00000.0000.0000.6103 Finance - Prof Svrs CHECK 503208 TOTAL: 3,363.43 503209 01/17/2025 PRTD 102748 PIRTEK PLYMOUTH INC PL-T00022114 12/10/2024 20250119 149.52 Invoice: PL-T00022114 149.52 5200.ENT.GC.P&R.5200.52000.0000.0000.6530 Golf Gen - ReprParts CHECK 503209 TOTAL: 149.52 503210 01/17/2025 PRTD 119620 POMP'S TIRE SERVICE INC 210747563 12/23/2024 20250119 14,157.29 Invoice: 210747563 14,157.29 6100.ISF.PW.PWK.6100.61004.0000.0000.6583 PW Equip - Tire&Tube CHECK 503210 TOTAL: 14,157.29 503211 01/17/2025 PRTD 129706 PREMIUM WATERS INC 310538790 12/31/2024 20250119 15.00 Invoice: 310538790 Water @ EP, January 15.00 5400.ENT.CA.P&R.5400.54001.0000.0000.6406 Operations - SupOther CHECK 503211 TOTAL: 15.00 503212 01/17/2025 PRTD 143618 PRYES BREWING COMPANY LLC W-90127 01/02/2025 20250119 828.25 Invoice: W-90127 828.25 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer PRYES BREWING COMPANY LLC W-90081 01/02/2025 20250119 480.00 Invoice: W-90081 480.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer Page 50 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 37 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503212 TOTAL: 1,308.25 503213 01/17/2025 PRTD 160246 QUADIENT FINANCE USA INC 8365-11/24 12/01/2024 20250119 961.10 Invoice: 8365-11/24 Postage machine 961.10 1000.GEN.GG.ADM.1010.10100.0000.0000.6235 Admin Gen - Postage CHECK 503213 TOTAL: 961.10 503214 01/17/2025 PRTD 131685 QUADIENT LEASING US, INC. Q1638371 12/15/2024 20250119 1,098.60 Invoice: Q1638371 City Hall Mail Machine Lease 1,098.60 6200.ISF.GG.ITS.6200.62000.0000.0000.6230 I.T. Gen - SrvCntrcts CHECK 503214 TOTAL: 1,098.60 503215 01/17/2025 PRTD 100972 R & R SPECIALTIES INC 0084033-IN 12/17/2024 20250119 951.25 Invoice: 0084033-IN 951.25 5500.ENT.BA.P&R.5500.55003.0000.0000.6180 Ice Maint - Rep&Maint R & R SPECIALTIES INC 0084043-IN 12/17/2024 20250119 684.35 Invoice: 0084043-IN 684.35 5500.ENT.BA.P&R.5500.55003.0000.0000.6180 Ice Maint - Rep&Maint CHECK 503215 TOTAL: 1,635.60 503216 01/17/2025 PRTD 133627 REPUBLIC SERVICES #894 0894-006972689 12/31/2024 20250119 57,943.51 Invoice: 0894-006972689 Account 3-0894-7000078 57,943.51 5900.ENT.UT.FIR.5930.59301.0000.0000.6182 Rec Reg - Garb&Recyc CHECK 503216 TOTAL: 57,943.51 503217 01/17/2025 PRTD 100977 RICHFIELD PLUMBING COMPANY 90895 12/18/2024 20250119 770.00 Invoice: 90895 770.00 5500.ENT.BA.P&R.5500.55001.0000.0000.6180 Bldg/Grnds - Rep&Maint RICHFIELD PLUMBING COMPANY 90922 12/20/2024 20250119 705.00 Invoice: 90922 705.00 6300.ISF.PW.ENG.6300.63000.0000.0000.6180 City Hall - Rep&Maint CHECK 503217 TOTAL: 1,475.00 503218 01/17/2025 PRTD 129282 ROSENBAUER MINNESOTA LLC 0000074066 12/19/2024 20250119 428.71 Invoice: 0000074066 PO-SI000MB 428.71 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts Page 51 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 38 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503218 TOTAL: 428.71 503219 01/17/2025 PRTD 134173 SAFE-FAST INC INV301765 12/20/2024 20250119 196.70 Invoice: INV301765 196.70 6100.ISF.PW.PWK.6100.61004.0000.0000.6610 PW Equip - Saf Equip SAFE-FAST INC INV301764 12/20/2024 20250119 30.00 Invoice: INV301764 30.00 1000.GEN.PK.P&R.1700.17006.0000.0000.6610 Bldg Maint - Saf Equip CHECK 503219 TOTAL: 226.70 503220 01/17/2025 PRTD 144403 SENTEXT SOLUTIONS 376248 12/20/2024 20250119 318.50 Invoice: 376248 Sentext subscription for texting 318.50 1000.GEN.GG.COM.1040.10403.0000.0000.6127 . Website - OthrDigCom CHECK 503220 TOTAL: 318.50 503221 01/17/2025 PRTD 104098 SHI INTERNATIONAL CORP B19184687 12/20/2024 20250119 222.04 Invoice: B19184687 Headset for Tony Zappa 222.04 1000.GEN.PS.FIR.1210.00000.0000.0000.6406 Build Insp - SupOther CHECK 503221 TOTAL: 222.04 503222 01/17/2025 PRTD 120784 WALSH GRAPHICS INC 20005 12/19/2024 20250119 66.78 Invoice: 20005 20"x20" A-frame Panels 66.78 5200.ENT.GC.P&R.5200.52000.0000.0000.6406 Golf Gen - SupOther CHECK 503222 TOTAL: 66.78 503223 01/17/2025 PRTD 161309 SHED AND FENCE CO. 283 10/02/2024 20250119 9,540.00 Invoice: 283 DAVE BACIC 7121 SCHEY DRIVE 9,540.00 E PW22002 .CONSTRUCTN.CNTRCT PMT. 4000.CAP.PW.PWK.4070.00000.0000.0000.6710 PW CP - Cap Other CHECK 503223 TOTAL: 9,540.00 503224 01/17/2025 PRTD 132195 SMALL LOT COOP MN86070 12/27/2024 20250119 120.98 Invoice: MN86070 5.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.5515 50th Sell - CGS Other 115.98 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc SMALL LOT COOP MN86152 12/30/2024 20250119 715.62 Invoice: MN86152 7.50 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine Page 52 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 39 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 708.12 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine SMALL LOT COOP MN86192 12/31/2024 20250119 389.00 Invoice: MN86192 5.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 384.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine CHECK 503224 TOTAL: 1,225.60 503225 01/17/2025 PRTD 100430 SNAP-ON INDUSTRIAL ARV/63439254 12/19/2024 20250119 238.13 Invoice: ARV/63439254 Customer P.O. : S5500RP 238.13 6100.ISF.PW.PWK.6100.61004.0000.0000.6556 PW Equip - Tool&Acces SNAP-ON INDUSTRIAL ARV/63450605 12/20/2024 20250119 155.84 Invoice: ARV/63450605 155.84 6100.ISF.PW.PWK.6100.61004.0000.0000.6556 PW Equip - Tool&Acces SNAP-ON INDUSTRIAL ARV/63441516 12/19/2024 20250119 340.43 Invoice: ARV/63441516 Customer P.O. S5500RP 340.43 6100.ISF.PW.PWK.6100.61004.0000.0000.6556 PW Equip - Tool&Acces CHECK 503225 TOTAL: 734.40 503226 01/17/2025 PRTD 142753 SNOW KREILICH ARCHITECTS INC 2024.07-4610 12/17/2024 20250119 8,190.15 Invoice: 2024.07-4610 Project 2024.07 Edina Rosland Park Bridge 8,190.15 E ENG23106.CONST.PACS.CONSULTING. 2300.SPC.PW.ENG.2300.23001.0000.0000.6715 . Pedestrian - CapInfrast CHECK 503226 TOTAL: 8,190.15 503227 01/17/2025 PRTD 161282 SONETICS CORPORATION INV358981 12/12/2024 20250119 8,238.28 Invoice: INV358981 8,238.28 1000.GEN.GG.FIN.1080.10801.0000.0000.6103 . Fin Othr - Prof Svrs CHECK 503227 TOTAL: 8,238.28 503228 01/17/2025 PRTD 101000 RJM PRINTING INC 130447012 12/18/2024 20250119 189.90 Invoice: 130447012 47.48 1000.GEN.PW.ENG.1530.00000.0000.0000.6406 Eng Serv - SupOther 47.48 1000.GEN.PS.POL.1300.13000.0000.0000.6406 Pol Ad Gen - SupOther 47.47 5500.ENT.BA.P&R.5500.55000.0000.0000.6406 Admin - SupOther 47.47 1000.GEN.PS.FIR.1210.00000.0000.0000.6406 Build Insp - SupOther CHECK 503228 TOTAL: 189.90 Page 53 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 40 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503229 01/17/2025 PRTD 127878 SOUTHERN GLAZERS WINE & SPIRITS L 2571621 12/27/2024 20250119 1,844.58 Invoice: 2571621 7.07 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 1,837.51 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq SOUTHERN GLAZERS WINE & SPIRITS L 2571619 12/27/2024 20250119 .27 Invoice: 2571619 .27 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq SOUTHERN GLAZERS WINE & SPIRITS L 2571620 12/27/2024 20250119 1,037.60 Invoice: 2571620 5.60 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 1,032.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine SOUTHERN GLAZERS WINE & SPIRITS L 2571618 12/27/2024 20250119 635.50 Invoice: 2571618 2.40 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 633.10 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq SOUTHERN GLAZERS WINE & SPIRITS L 2571614 12/27/2024 20250119 884.75 Invoice: 2571614 4.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.5512 50th Sell - CGS Liq 880.75 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq SOUTHERN GLAZERS WINE & SPIRITS L 2571617 12/27/2024 20250119 211.80 Invoice: 2571617 8.80 5800.ENT.LQ.P&R.5800.58001.0000.0000.5515 50th Sell - CGS Other 203.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc SOUTHERN GLAZERS WINE & SPIRITS L 2571616 12/27/2024 20250119 513.60 Invoice: 2571616 1.60 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 512.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine SOUTHERN GLAZERS WINE & SPIRITS L 2572853 12/31/2024 20250119 450.75 Invoice: 2572853 .80 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 449.95 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq SOUTHERN GLAZERS WINE & SPIRITS L 2572852 12/31/2024 20250119 450.75 Invoice: 2572852 .80 5800.ENT.LQ.P&R.5810.58101.0000.0000.5512 Sthdl Sell - CGS Liq 449.95 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq CHECK 503229 TOTAL: 6,029.60 503230 01/17/2025 PRTD 145599 SSI MN TRANCHE 1 LLC 118912 12/17/2024 20250119 16,511.48 Invoice: 118912 11/1/2024-11/30/2024 1,567.05 5200.ENT.GC.P&R.5200.52005.0000.0000.6185 Clubhouse - Elec&Solar 11,805.61 5500.ENT.BA.P&R.5500.55001.0000.0000.6185 Bldg/Grnds - Elec&Solar Page 54 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 41 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 520.33 5700.ENT.CA.P&R.5700.57000.0000.0000.6185 General - Elec&Solar 956.77 5800.ENT.LQ.P&R.5800.58000.0000.0000.6185 50th AdGe - Elec&Solar 1,661.72 5800.ENT.LQ.P&R.5810.58100.0000.0000.6185 Sthdl AdGe - Elec&Solar CHECK 503230 TOTAL: 16,511.48 503231 01/17/2025 PRTD 145599 SSI MN TRANCHE 2 LLC 118913 12/17/2024 20250119 725.70 Invoice: 118913 11/1/2024-11/30/2024 725.70 5500.ENT.BA.P&R.5500.55001.0000.0000.6185 Bldg/Grnds - Elec&Solar CHECK 503231 TOTAL: 725.70 503232 01/17/2025 PRTD 160346 STANDARD INSURANCE COMPANY DEC 2024-1 12/20/2024 20250119 7,245.85 Invoice: DEC 2024-1 12-2024 Standard Life-actives 7,245.85 9000.000.00.000.0000.00000.0000.0000.2026 . Payroll BS - Life Ins STANDARD INSURANCE COMPANY DEC 2024-2 12/20/2024 20250119 153.75 Invoice: DEC 2024-2 12-2024 Standard Life-nonactives 153.75 6000.ISF.GG.HRM.6000.60004.0000.0000.6043 Other Insr - Cobra CHECK 503232 TOTAL: 7,399.60 503233 01/17/2025 PRTD 133068 STEEL TOE BREWING LLC 58528 01/02/2025 20250119 602.00 Invoice: 58528 602.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503233 TOTAL: 602.00 503234 01/17/2025 PRTD 101015 STREICHERS INC I1735829 12/20/2024 20250119 69.99 Invoice: I1735829 Uniform Pants - Chad Anderson 69.99 1000.GEN.PS.POL.1300.13000.0000.0000.6203 Pol Ad Gen - Uniforms CHECK 503234 TOTAL: 69.99 503235 01/17/2025 PRTD 135803 SUN LIFE ASSURANCE COMPANY OF CAN DEC 2024 LTD 12/20/2024 20250119 5,969.78 Invoice: DEC 2024 LTD 12-2024 LTD Sun Life Invoice 5,969.78 9000.000.00.000.0000.00000.0000.0000.2031 . Payroll BS - LT/ST Disability SUN LIFE ASSURANCE COMPANY OF CAN DEC 2024 STD 12/20/2024 20250119 2,863.21 Invoice: DEC 2024 STD 12-2024 STD Sun Life Invoice 2,863.21 9000.000.00.000.0000.00000.0000.0000.2031 . Payroll BS - LT/ST Disability CHECK 503235 TOTAL: 8,832.99 Page 55 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 42 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503236 01/17/2025 PRTD 137673 SWEETLAND ORCHARD LLC 5216 01/02/2025 20250119 120.00 Invoice: 5216 120.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503236 TOTAL: 120.00 503237 01/17/2025 PRTD 161298 TESSMAN, KATY 25EP0008 01/05/2025 20250119 200.00 Invoice: 25EP0008 PERFORMANCE, EDINBOROUGH PARK 200.00 5400.ENT.CA.P&R.5400.54000.0000.0000.6103 Admin - Prof Svrs CHECK 503237 TOTAL: 200.00 503238 01/17/2025 PRTD 123129 TIMESAVER OFF SITE SECRETARIAL IN M29719 12/12/2024 20250119 1,142.00 Invoice: M29719 167.00 1000.GEN.PK.P&R.1600.00000.0000.0000.6103 Park Admin - Prof Svrs 206.50 1000.GEN.GG.ADM.1020.10200.0000.0000.6103 Cty Ck Gen - Prof Svrs 483.00 1000.GEN.GG.ADM.1020.10200.0000.0000.6103 Cty Ck Gen - Prof Svrs 285.50 1000.GEN.GG.ADM.1020.10200.0000.0000.6103 Cty Ck Gen - Prof Svrs CHECK 503238 TOTAL: 1,142.00 503239 01/17/2025 PRTD 103277 TITAN MACHINERY INC PS0575346·1 12/17/2024 20250119 329.48 Invoice: PS0575346·1 Customer PO: S1000MB 329.48 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts TITAN MACHINERY INC PS0575346-1 12/17/2024 20250119 329.48 Invoice: PS0575346-1 Customer PO: S1000MB 329.48 6100.ISF.PW.PWK.6100.61004.0000.0000.6530 PW Equip - ReprParts CHECK 503239 TOTAL: 658.96 503240 01/17/2025 PRTD 138732 TRADITION WINE & SPIRITS LLC 41999 12/27/2024 20250119 898.00 Invoice: 41999 18.00 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 880.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine TRADITION WINE & SPIRITS LLC 42003 12/30/2024 20250119 735.00 Invoice: 42003 15.00 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 720.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine TRADITION WINE & SPIRITS LLC 42004 12/30/2024 20250119 444.00 Invoice: 42004 12.00 5800.ENT.LQ.P&R.5810.58101.0000.0000.5513 Sthdl Sell - CGS Wine 432.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine Page 56 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 43 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC CHECK 503240 TOTAL: 2,077.00 503241 01/17/2025 PRTD 160236 TRUE FABRICATIONS INC 229787CM 12/16/2024 20250119 -7.36 Invoice: 229787CM -7.36 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc TRUE FABRICATIONS INC 1507734 12/29/2024 20250119 244.72 Invoice: 1507734 Ordered 12/29/24 received on 1/7/25 244.72 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc CHECK 503241 TOTAL: 237.36 503242 01/17/2025 PRTD 100689 ULTIMATE SAFETY CONCEPTS INC 214754 12/12/2024 20250119 206.25 Invoice: 214754 CUSTOMER PO NUMBER TODD PORTHAN- CAL GAS 206.25 1000.GEN.PS.FIR.1200.12000.0000.0000.6406 Fire Gen - SupOther CHECK 503242 TOTAL: 206.25 503243 01/17/2025 PRTD 160648 UNIFIRST CORPORATION 1410110625 12/23/2024 20250119 44.01 Invoice: 1410110625 44.01 5900.ENT.UT.PWK.5900.59001.0000.0000.6201 Wat GB - Laundry UNIFIRST CORPORATION 1410110628 12/23/2024 20250119 46.53 Invoice: 1410110628 46.53 1000.GEN.PW.PWK.1400.14001.0000.0000.6201 Gen Mntce - Laundry UNIFIRST CORPORATION 1410110629 12/23/2024 20250119 51.65 Invoice: 1410110629 51.65 6100.ISF.PW.PWK.6100.61004.0000.0000.6201 PW Equip - Laundry UNIFIRST CORPORATION 1410110627 12/23/2024 20250119 59.31 Invoice: 1410110627 59.31 6300.ISF.PW.ENG.6300.63001.0000.0000.6201 . PW Fac - Laundry UNIFIRST CORPORATION 1410110626 12/23/2024 20250119 14.47 Invoice: 1410110626 14.47 1000.GEN.PK.P&R.1700.17006.0000.0000.6201 Bldg Maint - Laundry CHECK 503243 TOTAL: 215.97 503244 01/17/2025 PRTD 145567 UNMAPPED BREWING COMPANY LLC E-4457 01/02/2025 20250119 124.00 Invoice: E-4457 124.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503244 TOTAL: 124.00 Page 57 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 44 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503245 01/17/2025 PRTD 140954 URBAN GROWLER BREWING COMPANY E-38538 12/30/2024 20250119 101.00 Invoice: E-38538 101.00 5800.000.00.000.0000.00000.0000.0000.1354 Liquor BS - Inv Beer CHECK 503245 TOTAL: 101.00 503246 01/17/2025 PRTD 112118 US BANK 7583463 12/24/2024 20250119 400.00 Invoice: 7583463 2025 ADMIN FEES 12/01/2024 - 11/30/2025 400.00 3000.DBT.IN.DBT.3000.2017C.0000.0000.6103 Ref 2017C - Prof Svrs US BANK 7583913 12/24/2024 20250119 400.00 Invoice: 7583913 Series 2021C Agent Fees 400.00 5500.ENT.BA.P&R.5500.55000.0000.0000.6103 Admin - Prof Svrs US BANK 7583912 12/24/2024 20250119 400.00 Invoice: 7583912 Series 2021B Agent Fees 400.00 3000.DBT.IN.DBT.3000.2021B.0000.0000.6103 . Ref 2021B - Prof Svrs CHECK 503246 TOTAL: 1,200.00 503247 01/17/2025 PRTD 114236 USA BLUE BOOK INV00574374 12/20/2024 20250119 1,043.50 Invoice: INV00574374 1,043.50 5900.ENT.UT.PWK.5900.59003.0000.0000.6406 Wat Distr - SupOther CHECK 503247 TOTAL: 1,043.50 503248 01/17/2025 PRTD 144033 USS MINNESOTA ONE MT LLC 118911 12/17/2024 20250119 1,806.92 Invoice: 118911 11/1/2024 - 11/30/2024 1,806.92 5500.ENT.BA.P&R.5500.55001.0000.0000.6185 Bldg/Grnds - Elec&Solar CHECK 503248 TOTAL: 1,806.92 503249 01/17/2025 PRTD 101058 VAN PAPER COMPANY 093928 12/19/2024 20250119 240.30 Invoice: 093928 240.30 5800.ENT.LQ.P&R.5800.58001.0000.0000.6406 50th Sell - SupOther VAN PAPER COMPANY 093927 12/19/2024 20250119 40.23 Invoice: 093927 40.23 5800.ENT.LQ.P&R.5800.58000.0000.0000.6406 50th AdGe - SupOther VAN PAPER COMPANY 093930 12/19/2024 20250119 447.92 Invoice: 093930 447.92 5800.ENT.LQ.P&R.5820.58201.0000.0000.6406 Grnd Sell - SupOther VAN PAPER COMPANY 093929 12/19/2024 20250119 117.31 Invoice: 093929 117.31 5800.ENT.LQ.P&R.5820.58200.0000.0000.6406 Grnd AdGe - SupOther Page 58 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 45 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC VAN PAPER COMPANY 093926 12/20/2024 20250119 528.67 Invoice: 093926 528.67 5800.ENT.LQ.P&R.5810.58101.0000.0000.6406 Sthdl Sell - SupOther VAN PAPER COMPANY 093925 12/20/2024 20250119 17.28 Invoice: 093925 17.28 5800.ENT.LQ.P&R.5810.58100.0000.0000.6406 Sthdl AdGe - SupOther CHECK 503249 TOTAL: 1,391.71 503250 01/17/2025 PRTD 141589 TARGET SOLUTIONS LEARNING LLC INV108592 01/01/2025 20250119 6,352.13 Invoice: INV108592 guardian tracking annual (2025) 6,352.13 1000.GEN.PS.POL.1300.13000.0000.0000.6105 Pol Ad Gen - Dues&Sub CHECK 503250 TOTAL: 6,352.13 503251 01/17/2025 PRTD 144209 VENN BREWING COMPANY LLC 7854 12/30/2024 20250119 400.00 Invoice: 7854 400.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev VENN BREWING COMPANY LLC 7855 12/30/2024 20250119 460.00 Invoice: 7855 460.00 5800.000.00.000.0000.00000.0000.0000.1356 . Liquor BS - Inventory THC Bev CHECK 503251 TOTAL: 860.00 503252 01/17/2025 PRTD 101064 VESSCO INC 095813-NOV 11/11/2024 20250119 10,470.23 Invoice: 095813-NOV 10,470.23 E PWK22001.CONSTRUCTN. . 5900.ENT.00.PWK.5900.00000.0000.0000.1650 Wat BS - PurchWater CHECK 503252 TOTAL: 10,470.23 503253 01/17/2025 PRTD 151441 VESTIS 2500572351 12/17/2024 20250119 48.51 Invoice: 2500572351 48.51 5800.ENT.LQ.P&R.5820.58200.0000.0000.6162 Grnd AdGe - CustodSvs VESTIS 2500575536 12/23/2024 20250119 341.22 Invoice: 2500575536 341.22 5800.ENT.LQ.P&R.5810.58100.0000.0000.6162 Sthdl AdGe - CustodSvs CHECK 503253 TOTAL: 389.73 Page 59 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 46 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503254 01/17/2025 PRTD 148579 VIERKANT DISPOSAL LLC 11/1/24 - 11/30/24 11/01/2024 20250119 67,985.00 Invoice: 11/1/24 - 11/30/24 November 2024 Organics Contract Vierkant 67,985.00 5900.ENT.UT.FIR.5930.59302.0000.0000.6182 Rec Org - Garb&Recyc CHECK 503254 TOTAL: 67,985.00 503255 01/17/2025 PRTD 119454 VINOCOPIA INC 0365526-IN 12/27/2024 20250119 105.50 Invoice: 0365526-IN 1.50 5800.ENT.LQ.P&R.5820.58201.0000.0000.5515 Grnd Sell - CGS Other 104.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc VINOCOPIA INC 0365524-IN 12/27/2024 20250119 417.50 Invoice: 0365524-IN 2.50 5800.ENT.LQ.P&R.5820.58201.0000.0000.5512 Grnd Sell - CGS Liq 415.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq VINOCOPIA INC 0365525-IN 12/27/2024 20250119 145.25 Invoice: 0365525-IN 1.25 5800.ENT.LQ.P&R.5820.58201.0000.0000.5513 Grnd Sell - CGS Wine 144.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine VINOCOPIA INC 0365516-IN 12/27/2024 20250119 467.50 Invoice: 0365516-IN 7.50 5800.ENT.LQ.P&R.5800.58001.0000.0000.5512 50th Sell - CGS Liq 460.00 5800.000.00.000.0000.00000.0000.0000.1352 Liquor BS - Inv Liq VINOCOPIA INC 0365518-IN 12/27/2024 20250119 113.25 Invoice: 0365518-IN 1.25 5800.ENT.LQ.P&R.5800.58001.0000.0000.5515 50th Sell - CGS Other 112.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc VINOCOPIA INC 0365517-IN 12/27/2024 20250119 121.25 Invoice: 0365517-IN 1.25 5800.ENT.LQ.P&R.5800.58001.0000.0000.5513 50th Sell - CGS Wine 120.00 5800.000.00.000.0000.00000.0000.0000.1353 Liquor BS - Inv Wine VINOCOPIA INC 0365621-IN 12/28/2024 20250119 52.00 Invoice: 0365621-IN 52.00 5800.000.00.000.0000.00000.0000.0000.1355 Liquor BS - Inv Misc CHECK 503255 TOTAL: 1,422.25 503256 01/17/2025 PRTD 120627 VISTAR 74656133 12/20/2024 20250119 1,322.21 Invoice: 74656133 1,322.21 5500.ENT.BA.P&R.5500.55002.0000.0000.5510 Concession - CGS CHECK 503256 TOTAL: 1,322.21 Page 60 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 47 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503257 01/17/2025 PRTD 161085 WACONIA VETERINARY CLINIC PA 12182024 12/18/2024 20250119 363.50 Invoice: 12182024 12/18/2024 Exam - Wellness - Adult (Annual)1 363.50 1000.GEN.PS.POL.1320.13200.0000.0000.6406 Patrol Gen - SupOther CHECK 503257 TOTAL: 363.50 503258 01/17/2025 PRTD 103088 WASTE MANAGEMENT OF WI-MN 9168696-2282-6 11/05/2024 20250119 1,919.10 Invoice: 9168696-2282-6 Customer ID: 26-36420-53000 11/01/24-11/30/24 1,919.10 5400.ENT.CA.P&R.5400.54001.0000.0000.6103 Operations - Prof Svrs WASTE MANAGEMENT OF WI-MN 9197748-2282-0 01/06/2025 20250119 2,517.80 Invoice: 9197748-2282-0 Customer ID: 26-36420-53000 01/01/25-01/31/25 2,517.80 1000.GEN.PW.ENG.1550.15500.0000.0000.6102 . Faclt Gen - Contr Svrs WASTE MANAGEMENT OF WI-MN 0120492-2808-8 01/02/2025 20250119 7,097.04 Invoice: 0120492-2808-8 Customer ID: 13-26724-73008; 01/01/25-01/31/25 7,097.04 1000.GEN.PW.ENG.1550.15500.0000.0000.6102 . Faclt Gen - Contr Svrs CHECK 503258 TOTAL: 11,533.94 20241125 12/09/2024 MANL 112118 US BANK 20241125 12/09/2024 69,298.45 Invoice: 20241125 Pcards November 2024 69,298.45 9999.000.00.000.0000.00000.0000.0000.2011 Control BS - ACI Liab CHECK 20241125 TOTAL: 69,298.45 NUMBER OF CHECKS 197 *** CASH ACCOUNT TOTAL *** 2,851,928.32 COUNT AMOUNT TOTAL PRINTED CHECKS 196 2,782,629.87 TOTAL MANUAL CHECKS 1 69,298.45 *** GRAND TOTAL *** 2,851,928.32 Page 61 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 48 JOURNAL ENTRIES TO BE CREATED CLERK: STanGeil YEAR PER JNL SRC ACCOUNT ACCOUNT DESC T OB DEBIT CREDIT EFF DATE JNL DESC REF 1 REF 2 REF 3 LINE DESC 2025 1 430APP 5800-2010 Liquor BS - Accts Pay 98,410.14 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 9999-1012 Control BS - CashAP 2,851,928.32 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 4000-2010 Cap Prj BS - Accts Pay 1,340,513.60 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 1000-2010 GF Bal Sh - Accts Pay 322,967.39 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 52005200-2010 Course BS - Accts Pay 21,333.28 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 59005900-2010 Wat BS - Accts Pay 59,582.96 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 5300-2010 Aqu Ctr BS - Accts Pay 287.50 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 5500-2010 Arena BS - Accts Pay 25,638.30 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 2500-2010 CAS BalSh - Accts Pay 1,000.00 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 6100-2010 Equ Op BS - Accts Pay 35,575.44 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 5700-2010 Cent Lk BS - Accts Pay 1,765.52 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 4200-2010 EquRep BS - Accts Pay 88,533.39 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 5400-2010 EdinPrk BS - Accts Pay 14,038.90 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 21002100-2010 E911 BS - Accts Pay 56.99 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 59005910-2010 Sew BS - Accts Pay 550,900.52 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 59005920-2010 Stm BS - Accts Pay 6,617.11 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 26026002-2010 HRA HIA - Accts Pay 50.00 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 2300-2010 PACS BalSh - Accts Pay 8,290.15 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 9000-2010 Payroll BS - Accts Pay 19,926.72 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 6300-2010 FacMgmt BS - Accts Pay 1,563.07 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 7100-2010 PSTF BS - Accts Pay 517.81 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 7200-2010 MNTF1 BS - Accts Pay 57,080.22 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 6200-2010 I.T. BalSh - Accts Pay 1,098.60 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 59005930-2010 Rec BS - Accts Pay 125,928.51 Page 62 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 49 JOURNAL ENTRIES TO BE CREATED YEAR PER JNL SRC ACCOUNT ACCOUNT DESC T OB DEBIT CREDIT EFF DATE JNL DESC REF 1 REF 2 REF 3 LINE DESC 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 6000-2010 Rsk Mg BS - Accts Pay 153.75 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 3002017C-2010 Ref 2017C - Accts Pay 400.00 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 3002021B-2010 Ref 2021B - Accts Pay 400.00 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL APP 9999-2010 Control BS - Accts Pay 69,298.45 01/17/2025 20250116 SG AP CASH DISBURSEMENTS JOURNAL GENERAL LEDGER TOTAL 2,851,928.32 2,851,928.32 APP 9999-2099 Control BS - PoolCashL 2,782,629.87 01/17/2025 20250116 SG APP 5800-1010 Liquor BS - Cash 98,410.14 01/17/2025 20250116 SG APP 4000-1010 Cap Prj BS - Cash 1,340,513.60 01/17/2025 20250116 SG APP 1000-1010 GF Bal Sh - Cash 322,967.39 01/17/2025 20250116 SG APP 52005200-1010 Course BS - Cash 21,333.28 01/17/2025 20250116 SG APP 59005900-1010 Wat BS - Cash 59,582.96 01/17/2025 20250116 SG APP 5300-1010 Aqu Ctr BS - Cash 287.50 01/17/2025 20250116 SG APP 5500-1010 Arena BS - Cash 25,638.30 01/17/2025 20250116 SG APP 2500-1010 CAS BalSh - Cash 1,000.00 01/17/2025 20250116 SG APP 6100-1010 Equ Op BS - Cash 35,575.44 01/17/2025 20250116 SG APP 5700-1010 Cent Lk BS - Cash 1,765.52 01/17/2025 20250116 SG APP 4200-1010 EquRep BS - Cash 88,533.39 01/17/2025 20250116 SG APP 5400-1010 EdinPrk BS - Cash 14,038.90 01/17/2025 20250116 SG APP 21002100-1010 E911 BS - Cash 56.99 01/17/2025 20250116 SG APP 59005910-1010 Sew BS - Cash 550,900.52 01/17/2025 20250116 SG APP 59005920-1010 Stm BS - Cash 6,617.11 01/17/2025 20250116 SG APP 26026002-1010 HRA HIA - Cash 50.00 01/17/2025 20250116 SG APP 2300-1010 PACS BalSh - Cash 8,290.15 01/17/2025 20250116 SG Page 63 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 50 JOURNAL ENTRIES TO BE CREATED YEAR PER JNL SRC ACCOUNT ACCOUNT DESC T OB DEBIT CREDIT EFF DATE JNL DESC REF 1 REF 2 REF 3 LINE DESC APP 9000-1010 Payroll BS - Cash 19,926.72 01/17/2025 20250116 SG APP 6300-1010 FacMgmt BS - Cash 1,563.07 01/17/2025 20250116 SG APP 7100-1010 PSTF BS - Cash 517.81 01/17/2025 20250116 SG APP 7200-1010 MNTF1 BS - Cash 57,080.22 01/17/2025 20250116 SG APP 6200-1010 I.T. BalSh - Cash 1,098.60 01/17/2025 20250116 SG APP 59005930-1010 Rec BS - Cash 125,928.51 01/17/2025 20250116 SG APP 6000-1010 Rsk Mg BS - Cash 153.75 01/17/2025 20250116 SG APP 3002017C-1010 Ref 2017C - Cash 400.00 01/17/2025 20250116 SG APP 3002021B-1010 Ref 2021B - Cash 400.00 01/17/2025 20250116 SG SYSTEM GENERATED ENTRIES TOTAL 2,782,629.87 2,782,629.87 JOURNAL 2025/01/430 TOTAL 5,634,558.19 5,634,558.19 Page 64 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 51 JOURNAL ENTRIES TO BE CREATED FUND BALANCE SEG YEAR PER JNL EFF DATE DEBIT CREDIT ACCOUNT ACCOUNT DESCRIPTION 1000 General 2025 1 430 01/17/2025 1000-1010 GF Bal Sh - Cash 322,967.39 1000-2010 GF Bal Sh - Accts Pay 322,967.39 TOTAL 322,967.39 322,967.39 FUND TOTAL 322,967.39 322,967.39 2100 2100 Police SR /Emergency 2025 1 430 01/17/2025 21002100-1010 E911 BS - Cash 56.99 21002100-2010 E911 BS - Accts Pay 56.99 FUND TOTAL 56.99 56.99 2300 Pedestrian and Cyclist Safety 2025 1 430 01/17/2025 2300-1010 PACS BalSh - Cash 8,290.15 2300-2010 PACS BalSh - Accts Pay 8,290.15 FUND TOTAL 8,290.15 8,290.15 2500 Conservation & Sustainability 2025 1 430 01/17/2025 2500-1010 CAS BalSh - Cash 1,000.00 2500-2010 CAS BalSh - Accts Pay 1,000.00 TOTAL 1,000.00 1,000.00 FUND TOTAL 1,000.00 1,000.00 2600 26002 HRA /Housing Im 2025 1 430 01/17/2025 26026002-1010 HRA HIA - Cash 50.00 26026002-2010 HRA HIA - Accts Pay 50.00 26002 TOTAL 50.00 50.00 FUND TOTAL 50.00 50.00 3000 2017C Debt Ser /GO Refundi 2025 1 430 01/17/2025 3002017C-1010 Ref 2017C - Cash 400.00 3002017C-2010 Ref 2017C - Accts Pay 400.00 2017C TOTAL 400.00 400.00 3000 2021B Debt Ser /GO refundi 2025 1 430 01/17/2025 3002021B-1010 Ref 2021B - Cash 400.00 3002021B-2010 Ref 2021B - Accts Pay 400.00 Page 65 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 52 JOURNAL ENTRIES TO BE CREATED FUND BALANCE SEG YEAR PER JNL EFF DATE DEBIT CREDIT ACCOUNT ACCOUNT DESCRIPTION FUND TOTAL 800.00 800.00 4000 Capital Projects 2025 1 430 01/17/2025 4000-1010 Cap Prj BS - Cash 1,340,513.60 4000-2010 Cap Prj BS - Accts Pay 1,340,513.60 FUND TOTAL 1,340,513.60 1,340,513.60 4200 Equipment Replacement 2025 1 430 01/17/2025 4200-1010 EquRep BS - Cash 88,533.39 4200-2010 EquRep BS - Accts Pay 88,533.39 TOTAL 88,533.39 88,533.39 FUND TOTAL 88,533.39 88,533.39 5200 5200 Golf /Braemar Go 2025 1 430 01/17/2025 52005200-1010 Course BS - Cash 21,333.28 52005200-2010 Course BS - Accts Pay 21,333.28 FUND TOTAL 21,333.28 21,333.28 5300 Aquatic Center 2025 1 430 01/17/2025 5300-1010 Aqu Ctr BS - Cash 287.50 5300-2010 Aqu Ctr BS - Accts Pay 287.50 FUND TOTAL 287.50 287.50 5400 Edinborough Park 2025 1 430 01/17/2025 5400-1010 EdinPrk BS - Cash 14,038.90 5400-2010 EdinPrk BS - Accts Pay 14,038.90 FUND TOTAL 14,038.90 14,038.90 5500 Braemar Arena 2025 1 430 01/17/2025 5500-1010 Arena BS - Cash 25,638.30 5500-2010 Arena BS - Accts Pay 25,638.30 FUND TOTAL 25,638.30 25,638.30 5700 Centennial Lakes 2025 1 430 01/17/2025 5700-1010 Cent Lk BS - Cash 1,765.52 5700-2010 Cent Lk BS - Accts Pay 1,765.52 FUND TOTAL 1,765.52 1,765.52 5800 Liquor 2025 1 430 01/17/2025 Page 66 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 53 JOURNAL ENTRIES TO BE CREATED FUND BALANCE SEG YEAR PER JNL EFF DATE DEBIT CREDIT ACCOUNT ACCOUNT DESCRIPTION 5800-1010 Liquor BS - Cash 98,410.14 5800-2010 Liquor BS - Accts Pay 98,410.14 TOTAL 98,410.14 98,410.14 FUND TOTAL 98,410.14 98,410.14 5900 5900 Utl Fund /Water 2025 1 430 01/17/2025 59005900-1010 Wat BS - Cash 59,582.96 59005900-2010 Wat BS - Accts Pay 59,582.96 5900 TOTAL 59,582.96 59,582.96 5900 5910 Utl Fund /Sanitary S 2025 1 430 01/17/2025 59005910-1010 Sew BS - Cash 550,900.52 59005910-2010 Sew BS - Accts Pay 550,900.52 5910 TOTAL 550,900.52 550,900.52 5900 5920 Utl Fund /Storm Sewe 2025 1 430 01/17/2025 59005920-1010 Stm BS - Cash 6,617.11 59005920-2010 Stm BS - Accts Pay 6,617.11 5920 TOTAL 6,617.11 6,617.11 5900 5930 Utl Fund /Recycling 2025 1 430 01/17/2025 59005930-1010 Rec BS - Cash 125,928.51 59005930-2010 Rec BS - Accts Pay 125,928.51 FUND TOTAL 743,029.10 743,029.10 6000 Risk Management 2025 1 430 01/17/2025 6000-1010 Rsk Mg BS - Cash 153.75 6000-2010 Rsk Mg BS - Accts Pay 153.75 FUND TOTAL 153.75 153.75 6100 Equipment Operations 2025 1 430 01/17/2025 6100-1010 Equ Op BS - Cash 35,575.44 6100-2010 Equ Op BS - Accts Pay 35,575.44 FUND TOTAL 35,575.44 35,575.44 6200 Information Technology 2025 1 430 01/17/2025 6200-1010 I.T. BalSh - Cash 1,098.60 Page 67 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/16/2025 16:50User: STanGeilProgram ID: apcshdsb Page 54 JOURNAL ENTRIES TO BE CREATED FUND BALANCE SEG YEAR PER JNL EFF DATE DEBIT CREDIT ACCOUNT ACCOUNT DESCRIPTION 6200-2010 I.T. BalSh - Accts Pay 1,098.60 FUND TOTAL 1,098.60 1,098.60 6300 Facilities Management 2025 1 430 01/17/2025 6300-1010 FacMgmt BS - Cash 1,563.07 6300-2010 FacMgmt BS - Accts Pay 1,563.07 FUND TOTAL 1,563.07 1,563.07 7100 PS Training Facility 2025 1 430 01/17/2025 7100-1010 PSTF BS - Cash 517.81 7100-2010 PSTF BS - Accts Pay 517.81 FUND TOTAL 517.81 517.81 7200 MN Task Force 1 2025 1 430 01/17/2025 7200-1010 MNTF1 BS - Cash 57,080.22 7200-2010 MNTF1 BS - Accts Pay 57,080.22 FUND TOTAL 57,080.22 57,080.22 9000 Payroll 2025 1 430 01/17/2025 9000-1010 Payroll BS - Cash 19,926.72 9000-2010 Payroll BS - Accts Pay 19,926.72 FUND TOTAL 19,926.72 19,926.72 9999 Pooled Cash Fund 2025 1 430 01/17/2025 9999-1012 Control BS - CashAP 2,851,928.32 9999-2010 Control BS - Accts Pay 69,298.45 9999-2099 Control BS - PoolCashL 2,782,629.87 FUND TOTAL 2,851,928.32 2,851,928.32 Page 68 of 647 Page 69 of 647 Page 70 of 647 Page 71 of 647 Page 72 of 647 Page 73 of 647 Page 74 of 647 Page 75 of 647 Page 76 of 647 Page 77 of 647 Page 78 of 647 Page 79 of 647 Page 80 of 647 Page 81 of 647 Page 82 of 647 Page 83 of 647 Page 84 of 647 Page 85 of 647 Page 86 of 647 Page 87 of 647 Page 88 of 647 Page 89 of 647 Page 90 of 647 Page 91 of 647 Page 92 of 647 Page 93 of 647 Page 94 of 647 Page 95 of 647 Page 96 of 647 Page 97 of 647 Page 98 of 647 Page 99 of 647 Page 100 of 647 Page 101 of 647 Page 102 of 647 Page 103 of 647 Page 104 of 647 Page 105 of 647 Page 106 of 647 Page 107 of 647 Page 108 of 647 Page 109 of 647 Page 110 of 647 Page 111 of 647 Page 112 of 647 Page 113 of 647 Page 114 of 647 Page 115 of 647 Page 116 of 647 Page 117 of 647 Page 118 of 647 Page 119 of 647 Page 120 of 647 Page 121 of 647 Page 122 of 647 Page 123 of 647 Page 124 of 647 Page 125 of 647 Page 126 of 647 Page 127 of 647 Page 128 of 647 Page 129 of 647 Page 130 of 647 Page 131 of 647 Page 132 of 647 Page 133 of 647 Page 134 of 647 Page 135 of 647 Page 136 of 647 Page 137 of 647 Page 138 of 647 Page 139 of 647 Page 140 of 647 Page 141 of 647 Page 142 of 647 Page 143 of 647 Page 144 of 647 Page 145 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/24/2025 11:29User: STanGeilProgram ID: apcshdsb Page 4 JOURNAL ENTRIES TO BE CREATED FUND SUB FUND DUE TO DUE FR 4000 Capital Projects 191,463.009999 Pooled Cash Fund 191,463.00 TOTAL 191,463.00 191,463.00 ** END OF REPORT - Generated by Shirleng Tan Geil ** Page 146 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/24/2025 11:29User: STanGeilProgram ID: apcshdsb Page 1 CASH ACCOUNT: 9999 1012 Control BS - CashAP CHECK NO CHK DATE TYPE VENDOR NAME INVOICE INV DATE PO CHECK RUN NET INVOICE DTL DESC 503525 01/24/2025 PRTD 160991 EBERT INC 2310256-02 - 2 11/30/2024 20250123 48,488.00 Invoice: 2310256-02 - 2 Fire Station 2 Carpentry 48,488.00 E FIR21008.CONSTRUCTN. . 4000.CAP.PS.FIR.4050.00000.0000.0000.6713 Fire CP - CapBldStrc CHECK 503525 TOTAL: 48,488.00 503526 01/24/2025 PRTD 160994 LAKETOWN ELECTRIC CORPORATION 8 11/30/2024 20250123 142,975.00 Invoice: 8 Fire Station 2 Electrical 142,975.00 E FIR21008.CONSTRUCTN. . 4000.CAP.PS.FIR.4050.00000.0000.0000.6713 Fire CP - CapBldStrc CHECK 503526 TOTAL: 142,975.00 NUMBER OF CHECKS 2 *** CASH ACCOUNT TOTAL *** 191,463.00 COUNT AMOUNT TOTAL PRINTED CHECKS 2 191,463.00 *** GRAND TOTAL *** 191,463.00 Page 147 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/24/2025 11:29User: STanGeilProgram ID: apcshdsb Page 2 JOURNAL ENTRIES TO BE CREATED CLERK: STanGeil YEAR PER JNL SRC ACCOUNT ACCOUNT DESC T OB DEBIT CREDIT EFF DATE JNL DESC REF 1 REF 2 REF 3 LINE DESC 2025 1 965APP 4000-2010 Cap Prj BS - Accts Pay 191,463.00 01/24/2025 20250123 SG AP CASH DISBURSEMENTS JOURNAL APP 9999-1012 Control BS - CashAP 191,463.00 01/24/2025 20250123 SG AP CASH DISBURSEMENTS JOURNAL GENERAL LEDGER TOTAL 191,463.00 191,463.00 APP 9999-2099 Control BS - PoolCashL 191,463.00 01/24/2025 20250123 SG APP 4000-1010 Cap Prj BS - Cash 191,463.00 01/24/2025 20250123 SG SYSTEM GENERATED ENTRIES TOTAL 191,463.00 191,463.00 JOURNAL 2025/01/965 TOTAL 382,926.00 382,926.00 Page 148 of 647 City of Edina, MN A/P CASH DISBURSEMENTS JOURNAL Report generated: 01/24/2025 11:29User: STanGeilProgram ID: apcshdsb Page 3 JOURNAL ENTRIES TO BE CREATED FUND BALANCE SEG YEAR PER JNL EFF DATE DEBIT CREDIT ACCOUNT ACCOUNT DESCRIPTION 4000 Capital Projects 2025 1 965 01/24/2025 4000-1010 Cap Prj BS - Cash 191,463.00 4000-2010 Cap Prj BS - Accts Pay 191,463.00 FUND TOTAL 191,463.00 191,463.00 9999 Pooled Cash Fund 2025 1 965 01/24/2025 9999-1012 Control BS - CashAP 191,463.00 9999-2099 Control BS - PoolCashL 191,463.00 FUND TOTAL 191,463.00 191,463.00 Page 149 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.3 Prepared By: Pa Thao, Finance Director Item Type: Ordinance Department: Finance Item Title: Ordinance No. 2025-05: Setting Morningside Water Rates Action Requested: Approve Ordinance No. 2025-02 amending Code Section 2-724 Schedule A, setting Morningside water rates for 2025, and grant second reading. Information/Background: The City of Minneapolis provides the water used by much of the Morningside area of Edina. Edina pays Minneapolis for the water that comes into our City from Minneapolis based on a contracted rate. The contracted rate that Edina pays is proportional to the rates the Minneapolis City Council sets for their own residents. The Minneapolis rate for 2025 is $3.11 per 100 cubic feet of water, a 5.44% increase over the 2024 rate. The City of Edina also provides services to this area in the form of meter reading, billing, water distribution infrastructure, and other services except for water itself. To help offset the cost of these Edina-provided services, staff recommends increasing the Edina charge by 5% to 0.93/1,000 gallons in 2025. This rate adjustment is consistent with the rates recommended by the City's financial advisor, Ehlers & Associates, in the 2022 utility rate study. The recommended Morningside water rate for 2025 is $5.09 per 1,000 gallon of water. Below is the rate history and the recommended rate for 2025. The rates have been converted to 1,000 gallons, which is the unit of measurement used for billing by the City of Edina. (per 1,000 gal) 2021 2022 2023 2024 2025 Minneapolis charge 3.49 3.60 3.74 3.94 4.16 Edina charge 0.77 0.80 0.84 0.88 0.93 Total rate $4.26 $4.40 $4.58 $4.82 $5.09 For areas of Edina that do not receive Minneapolis water, the 2025 adopted rates are $2.67, $4.06, or $6.70 per 1,000 gallons, depending on type and quantity of usage. Another difference between Minneapolis and Edina water is Minneapolis delivers softened water, while Edina residents use home water softener systems. Resources/Financial Impacts: Relationship to City Policies: This is essential to our City policy and infrastructure. Supporting Documentation: 1. Ordinance No. 2025-02: Setting Morningside Water Rates Page 150 of 647 ORDINANCE NO. 2025-02 AN ORDINANCE AMENDING CHAPTER 2 OF THE EDINA CITY CODE THE CITY COUNCIL OF THE CITY OF EDINA ORDAINS: Section 1. The following described fees of Schedule A to Code Section 2-724 are amended to read as follows: Chapter and Section Purpose of Fee/Charge 2024 Fee Proposed 2025 Fee Chapter 28 28-43(b) Water Service: 1. Per 1,000 gallons for areas of city, except in the Morningside area $4.82 Per 1,000 gallons—Morningside area $5.09 Per 1,000 gallons—Morningside area Section 2. The effective date of Section 1 of this Ordinance shall be March 1, 2025. First Reading: January 21, 2025 Second Reading: February 4, 2025 Published: Attest: ____________________________ ______________________________ Sharon Allison, City Clerk James B. Hovland, Mayor PLEASE PUBLISH IN THE EDINA SUN CURRENT. SEND TWO AFFIDAVITS OF PUBLICATION BILL TO EDINA CITY CLERK Page 151 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.4 Prepared By: Scott Neal, City Manager Item Type: Resolution Department: Finance Item Title: Resolution No. 2025-14: Amending 2025 Budget Action Requested: Approve Resolution No. 2025-14 amending the 2025 City budget. Information/Background: At your December 17, 2024, meeting, the City Council approved an increase of the City’s 2025 property tax levy of 8.44%. The proposed levy increase for 2025 was 13.41%. In order to adjust the City’s spending limits down to the level where they could be funded by the 8.44% levy increase, it was necessary to reduce General Fund spending by 1%. Council gave me the direction to identify and implement the necessary spending reductions in 2025 to meet the approved levy target. At your January 21, 2025, meeting, I shared with the Council that, through the efforts of the management team, City staff have reached the necessary 2025 General Fund spending reduction of $545,000, which will enable City staff to meet the Council’s targeted levy cap. The spending reduction package was developed with the support and efforts of the Executive Leadership Team. The differences between the original and amended budget are due to adjustments made after finalizing the funding for the Capital Improvement Plan (CIP). This means the budget was updated to reflect the final project estimates and funding sources. I shared the spending reduction plan with City employees through an All Employee email on Friday, January 24. While I think it is fair to say that the spending reductions reduce our margin of error when it comes to City services and programs, the spending reductions identified in this Council action do not reduce service levels, employee head count, employee wages, or public safety. I am requesting that Council affirm these spending reductions by approving the proposed budget amendment so that our 2026- 2027 budget process can use the newly amended 2025 budget as our baseline for planning and communications. Resources/Financial Impacts: This is essential for the City's operational budget for 2025. Relationship to City Policies: This is essential for the City's operational budget for 2025. Supporting Documentation: 1. Resolution No. 2025-14 Amending 2025 Budget 2. 2025 1% Reduction 3. 2025 Budget Reports Page 152 of 647 RESOLUTION NO. 2025-14 A RESOLUTION AMENDING THE BUDGET FOR THE CITY OF EDINA FOR YEAR 2025 WHEREAS, the Budgets for all Governmental Funds as shown on Attachment A for the City of Edina for the calendar year 2025 is hereby amended and funds are hereby appropriated; and WHEREAS the Budgets for all Enterprise Funds as shown on Attachment B for the City of Edina for the calendar year 2025 is hereby amended and funds are hereby appropriated; and WHEREAS, there will be levied upon all taxable real and personal property in the City of Edina, a tax rate sufficient to produce the amount as follows: 2025 ORIGINAL 2025 AMENDED GENERAL FUND $47,313,215 $47,543,215 CONSTRUCTION FUND $6,060,000 $5,830,000 PAYMENT OF BONDS $5,377,639 $5,377,639 TOTAL TAX CAPACITY LEVY $58,750,854 $58,750,854 WHEREAS, the final 2025 budget for the City of Edina is as follows: 2025 ORIGINAL 2025 AMENDED TOTAL REVENUES – GOVERNMENTAL FUNDS $96,172,430 $95,958,430 TOTAL EXPENDITURES – GOVERNMENTAL FUNDS $127,325,595 $127,835,072 TOTAL REVENUES – ENTERPRISE FUNDS $62,185,054 $62,185,054 TOTAL EXPENDITURES – ENTERPRISE FUNDS $66,605,411 $74,544,216 TOTAL REVENUES – INTERNAL SERVICE FUNDS $10,749,823 $11,193,885 TOTAL EXPENDITURES – INTERNAL SERVICE FUNDS $9,385,781 $9,149,781 NOW, THEREFORE, BE IT RESOLVED, that the Edina City Council amends the budget for the year 2025. Approved this 4th day of February 2025. Attest: Sharon Allison, City Clerk James B. Hovland, Mayor STATE OF MINNESOTA ) COUNTY OF HENNEPIN ) SS CITY OF EDINA ) CERTIFICATE OF CITY CLERK I, the undersigned duly appointed and acting City Clerk for the City of Edina do hereby certify that the attached and foregoing Resolution was duly adopted by the Edina City Council at its Regular Meeting of February 4, 2025, and as recorded in the Minutes of said Regular Meeting. WITNESS my hand and seal of said City this ______ day of __________, 20___. _______________________________ Sharon, Allison, City Clerk Page 153 of 647 City of Edina • 4801 W. 50th St. • Edina, MN 55424 Listed below are line-item reductions to the 2025 Budget by approximately 1% as adopted by City Council in December 2024. Department Amount Item Impact PD $(192,000)Vacancy Savings Minimal, expected vacancies due to hiring challenge Fire $(230,000) Cardiac Monitor/Defibrillator Move to Public Safety Aid Funding IT $(22,000)Equipment Reduce ERP Budget PW $(42,500) Overlay Program reduced .5 mile Impact .5 mile of contracted mill & overlay Administration $(23,500) Elections – Salary Temp No impact, school district removed 2025 election resulting in savings. Community Development $(10,000)Contracted Services Eliminate/delay revision to the Southdale District Design Guidelines Engineering $(10,000) Transport - Prof Services Impact: less flexibility for misc. studies that arise Communications $(10,000)Chat Bot Website chatbot search discontinued Parks & Recreation $(5,000) Senior Center -Prof Services Non-critical contracts and purchase reduction $(545,000 ) Administration EdinaMN.gov Date:January 21, 2025 To:Mayor & Council cc:Pa Thao, Finance Director From:Scott Neal, City Manager Subject:2025 1% Reduction Scenario Page 154 of 647 Budget Budget 2024 2025 General Fund Levies General Operating Levy 43,744,165$ 47,543,215$ General Fund Subtotal 43,744,165 47,543,215 Increase From Prior Year (%)9.85%8.68% Debt Service Fund Levies Gymnasium Debt Service 392,000 398,000 Fire Station Debt Service 403,000 406,000 Public Works Facility Debt Service 1,508,000 1,512,000 Sports Dome 1,168,700 1,165,100 Fire Station 2 Debt Service*- 1,896,539 Debt Service Fund Subtotal 3,471,700 5,377,639 Increase From Prior Year (%)7.48%54.90% Construction Fund Levies Capital Improvement Plan Levy 2,000,000 1,000,000 Equipment Levy 2,470,000 2,668,000 Street Reconstruction Levy 1,481,000 1,762,000 Special Park Improvement Levy 1,000,000 400,000 Construction Fund Subtotal 6,951,000 5,830,000 Increase From Prior Year (%)5.95%-16.13% HRA Fund Levies HRA Operating Levy 251,700 259,300 HRA Fund Subtotal 251,700 259,300 Increase From Prior Year (%)2.99%3.02% Total Property Tax Levy 54,418,565$ 59,010,154$ Increase From Prior Year (%)9.15%8.44% PROPOSED TAX LEVIES 1 Page 155 of 647 2022 2023 2024 2025 Actual Actual Budget Budget REVENUES AND OTHER FINANCING SOURCES Property Tax Levy 45,096,245$ 49,156,932$ 54,418,565$ 10.70%59,010,154$ 8.44% Tax Increments 1,720,244 2,078,686 2,015,000 -3.06%2,415,000 19.85% Local Option Sales Tax - 5,450,871 5,436,000 -0.27%5,436,000 0.00% Franchise Fees & Other Taxes 3,661,134 3,694,430 3,995,900 8.16%3,995,900 0.00% Special Assessments 4,426,156 3,609,885 3,890,096 7.76%3,723,637 -4.28% Licenses & Permits 7,482,097 5,716,734 5,562,360 -2.70%5,819,338 4.62% Intergovernmental 6,673,178 8,117,356 3,181,828 -60.80%2,748,582 -13.62% Charges for Services 14,245,623 15,567,435 17,249,935 10.81%18,437,811 6.89% Fines and Forfeitures 359,680 488,872 350,000 -28.41%350,000 0.00% Investment Income (3,883,446) 7,467,598 1,776,000 -76.22%1,825,000 2.76% Other Revenue 8,550,501 3,977,165 3,911,850 -1.64%3,919,982 0.21% Transfers and Contributions 18,131,197 6,046,554 4,438,243 -26.60%4,672,391 5.28% Operating Revenue 56,166,200 53,842,160 53,970,248 0.24%55,967,574 3.70% Debt Issued 31,291,270 1,290,608 - -100.00%- N/A Other Financing Sources 145,686 362,697 2,000,000 451.43%1,016,000 -49.20% TOTAL REVENUES AND OTHER FINANCING SOURCES 194,065,763 166,867,982 162,196,026 -2.80%169,337,369 4.40% EXPENDITURES, EXPENSES AND OTHER FINANCING USES - BY TYPE Cost of Goods Sold 10,458,750 9,553,705 10,570,828 10.65%11,453,268 8.35% Personnel Service 49,620,892 54,196,885 60,155,231 10.99%64,456,712 7.15% Contractual Services 34,728,159 34,539,634 37,494,382 8.55%39,173,423 4.48% Commodities 6,183,923 5,596,220 6,639,838 18.65%6,710,039 1.06% Internal Services 7,978,288 8,190,952 9,507,757 16.08%9,404,606 -1.08% Capital Outlay 29,527,500 26,544,647 51,103,297 92.52%48,999,406 -4.12% Depreciation 8,864,924 8,958,385 - -100.00%- N/A Debt Service 12,802,481 9,336,381 9,921,353 6.27%26,809,224 170.22% Other Expenses 11,801 - - N/A - N/A Transfers and Contributions 14,685,915 6,046,554 4,438,243 -26.60%4,672,391 5.28% TOTAL EXPENDITURES, EXPENSES AND OTHER FINANCING USES 174,862,632 162,963,364 189,830,930 16.49%211,679,069 11.51% EXPENDITURES, EXPENSES AND OTHER FINANCING USES - BY DEPARTMENT Administration 2,481,936 2,322,986 3,560,065 53.25%3,232,608 -9.20% Human Resources 3,856,650 4,202,179 4,561,005 8.54%4,441,444 -2.62% Finance 5,106,801 5,186,646 3,620,179 -30.20%2,516,676 -30.48% Public Works 27,155,679 29,211,382 51,376,325 75.88%49,093,492 -4.44% Engineering 16,641,967 26,775,353 25,649,511 -4.20%29,779,168 16.10% Fire 29,207,398 17,234,249 17,092,318 -0.82%18,330,983 7.25% Parks and Recreation 36,067,820 38,043,870 42,309,354 11.21%41,744,117 -1.34% Police 15,662,369 16,316,230 19,418,967 19.02%19,443,069 0.12% Community Development 23,562,515 12,179,316 9,391,866 -22.89%13,021,625 38.65% Information Technology 2,317,269 2,309,810 3,265,043 41.36%3,278,168 0.40% Communications 1,508,948 1,735,656 1,706,115 -1.70%1,785,379 4.65% Debt Service 11,293,281 7,445,703 7,880,182 5.84%25,012,343 217.41% TOTAL EXPENDITURES, EXPENSES AND OTHER FINANCING USES 174,862,632 162,963,379 189,830,930 16.49%211,679,069 11.51% CHANGE IN FUND BALANCE OR NET POSITION 19,203,131 3,904,618 (27,634,904) (42,341,700) FUND BALANCE OR NET POSITION - JANUARY 1 227,495,702 246,724,287 250,628,904 222,994,000 FUND BALANCE OR NET POSITION - DECEMBER 31 246,698,833$ 250,628,904$ 222,994,000$ 180,652,300$ CONSOLIDATED BUDGET 2 Page 156 of 647 Governmental Enterprise Internal Service Funds Funds Funds Total REVENUES AND OTHER FINANCING SOURCES Property Tax Levy 59,010,154$ -$ -$ 59,010,154$ Tax Increments 2,415,000 - - 2,415,000 Local Option Sales Tax 5,436,000 - - 5,436,000 Franchise Fees & Other Taxes 3,410,000 585,900 - 3,995,900 Special Assessments 3,723,637 - - 3,723,637 Licenses & Permits 5,819,338 - - 5,819,338 Intergovernmental 2,658,582 90,000 - 2,748,582 Charges for Services 7,115,176 128,750 11,193,885 18,437,811 Fines and Forfeitures 350,000 - - 350,000 Investment Income 1,185,000 640,000 - 1,825,000 Other Revenue 468,682 3,206,300 - 3,674,982 Transfers and Contributions 3,105,861 1,566,530 - 4,672,391 Operating Revenue - 55,967,574 - 55,967,574 Other Financing Sources 1,261,000 - - 1,261,000 TOTAL REVENUES AND OTHER FINANCING SOURCES 95,958,430 62,185,054 11,193,885 169,337,369 EXPENDITURES, EXPENSES AND OTHER FINANCING USES - BY TYPE Cost of Goods Sold - 11,453,268 - 11,453,268 Personnel Services 47,043,108 14,382,131 3,031,473 64,456,712 Contractual Services 19,300,767 15,246,248 4,626,408 39,173,423 Commodities 2,569,194 2,648,945 1,491,900 6,710,039 Internal Services 6,099,719 3,304,887 - 9,404,606 Capital Outlay 24,661,080 24,338,326 - 48,999,406 Debt Service 25,012,343 1,796,881 - 26,809,224 Transfers and Contributions 3,298,861 1,373,530 - 4,672,391 TOTAL EXPENDITURES, EXPENSES AND OTHER FINANCING USES 127,985,072 74,544,216 9,149,781 211,679,069 EXPENDITURES, EXPENSES AND OTHER FINANCING USES - BY FUNCTION Administration 3,232,608 - - 3,232,608 Human Resources 1,883,661 - 2,557,783 4,441,444 Finance 1,716,557 800,119 - 2,516,676 Public Works 8,410,800 38,407,365 2,275,327 49,093,492 Engineering 27,396,751 903,914 1,478,503 29,779,168 Fire 16,524,403 1,806,580 - 18,330,983 Parks and Recreation 9,117,876 32,626,239 - 41,744,116 Police 19,443,069 - - 19,443,069 Community Development 13,021,625 - - 13,021,625 Information Technology 440,000 - 2,838,168 3,278,168 Communications 1,785,379 - - 1,785,379 Debt Service 25,012,343 - - 25,012,343 TOTAL EXPENDITURES, EXPENSES AND OTHER FINANCING USES 127,985,072 74,544,216 9,149,781 211,679,069 CHANGE IN FUND BALANCE OR NET POSITION (32,026,642) (12,359,162) 2,044,104 (42,341,700) FUND BALANCE OR NET POSITION - JANUARY 1 90,036,836 127,571,406 5,616,866 223,225,108 FUND BALANCE OR NET POSITION - DECEMBER 31 58,010,194$ 115,212,244$ 7,660,970$ 180,883,408$ 2025 Budget 3 Page 157 of 647 Opioid Public Braemar Arts &Debt General HRA PACS Response Safety Aid CAS CDBG Police SR Memorial Culture Service Construction Fund Fund Fund Fund Fund Fund Fund Fund Fund Fund Fund Fund Total REVENUES AND TRANSFERS IN Property Tax Levy 47,543,215$ 259,300$ -$ -$ -$ -$ -$ -$ -$ -$ 5,377,639$ 5,830,000$ 59,010,154$ Tax Increments - 2,415,000 - - - - - - - - - - 2,415,000 Local Option Sales Tax - - - - - - - - - - - 5,436,000 5,436,000 Franchise Fees & Other Taxes 1,120,000 - 1,230,000 - - 980,000 - - - - - 80,000 3,410,000 Special Assessments - - - - - - - - - - - 3,723,637 3,723,637 Licenses & Permits 5,819,338 - - - - - - - - - - - 5,819,338 Intergovernmental 2,453,960 - - 34,622 - - 170,000 - - - - - 2,658,582 Charges for Services 6,315,176 800,000 - - - - - - - - - - 7,115,176 Fines and Forfeitures 350,000 - - - - - - - - - - - 350,000 Investment Income 425,000 304,000 22,000 2,000 - 46,000 - 3,000 1,000 - - 382,000 1,185,000 Other Revenue 466,182 - - - - - - - 2,500 - - - 468,682 Transfers and Contributions 157,000 - - - - - - - - - 2,948,861 - 3,105,861 Other Financing Sources 1,016,000 - - - - 20,000 - 225,000 - - - - 1,261,000 TOTAL REVENUES AND TRANSFERS IN 65,665,871 3,778,300 1,252,000 36,622 - 1,046,000 170,000 228,000 3,500 - 8,326,500 15,451,637 95,958,430 EXPENSES AND TRANSFERS OUT - BY TYPE Personnel Services 46,264,059 182,088 156,234 - - 299,380 - - - - - 141,347 47,043,108 Contractual Services 10,438,260 8,069,640 80,440 34,622 70,865 298,440 170,000 137,500 1,000 - - - 19,300,767 Commodities 2,549,894 300 5,000 - - 4,000 - 10,000 - - - - 2,569,194 Internal Services 6,063,658 - 10,349 - - 22,646 - - - - - 3,066 6,099,719 Capital Outlay - 1,700,000 1,594,100 - 845,200 1,625,000 - - - - - 18,896,780 24,661,080 Debt Service - - - - - - - - - - 25,012,343 - 25,012,343 Transfers and Contributions 350,000 - - - - - - - - - - 2,948,861 3,298,861 TOTAL EXPENSES AND TRANSFERS OUT 65,665,871 9,952,028 1,846,123 34,622 916,065 2,249,466 170,000 147,500 1,000 - 25,012,343 21,990,054 127,985,072 EXPENSES AND TRANSFERS OUT - BY DEPARTMENT Administration 3,202,608 - - - - - - - - - - 30,000 3,232,608 Human Resources 1,883,661 - - - - - - - - - - - 1,883,661 Finance 1,716,557 - - - - - - - - - - - 1,716,557 Public Works 7,227,300 - - - 250,000 - - - - - - 933,500 8,410,800 Engineering 5,071,958 - 1,846,123 - - 2,249,466 - - - - - 18,229,204 27,396,751 Fire 15,211,531 - - 34,622 375,200 - - - - - - 903,050 16,524,403 Parks and Recreation 8,242,576 - - - - - - - 1,000 - - 874,300 9,117,876 Police 18,674,704 - - - 290,865 - - 147,500 - - - 330,000 19,443,069 Community Development 2,649,597 9,952,028 - - - - 170,000 - - - - 250,000 13,021,625 Information Technology - - - - - - - - - - - 440,000 440,000 Communications 1,785,379 - - - - - - - - - - - 1,785,379 Debt Service - - - - - - - - - - 25,012,343 - 25,012,343 TOTAL EXPENSES AND TRANSFERS OUT 65,665,871 9,952,028 1,846,123 34,622 916,065 2,249,466 170,000 147,500 1,000 - 25,012,343 21,990,054 127,985,072 CHANGE IN NET POSITION (0)$ (6,173,728)$ (594,123)$ 2,000$ (916,065)$ (1,203,466)$ -$ 80,500$ 2,500$ -$ (16,685,842)$ (6,538,417)$ (32,026,642)$ 2025 GOVERNMENTAL FUND BUDGETS 4 Page 158 of 647 Aquatic Golf Braemar Art Utilities Liquor Center Course Arena Field Center Edinborough Centennial Fund Fund Fund Fund Fund Fund Fund Fund Fund Total REVENUES AND TRANSFERS IN Operating Revenues 31,948,581$ 15,014,993$ 1,184,100$ 6,088,500$ 2,592,000$ 565,500$ 122,000$ 1,466,100$ 901,750$ 59,883,524$ Intergovernmental 90,000 - - - - - - - - 90,000 Investment Income 434,000 44,000 48,000 52,000 13,000 26,000 4,000 10,000 9,000 640,000 Other Revenues 5,000 - - - - - - - - 5,000 Transfers In - 5,180 17,000 61,050 400,000 1,300 300,000 18,000 764,000 1,566,530 TOTAL REVENUES AND TRANSFERS IN 32,477,581 15,064,173 1,249,100 6,201,550 3,005,000 592,800 426,000 1,494,100 1,674,750 62,185,054 EXPENSES AND TRANSFERS OUT - BY TYPE Cost of Goods Sold - 10,969,768 78,500 226,000 125,000 - - 39,000 15,000 11,453,268 Personnel Services 3,758,646 2,818,776 721,841 2,713,287 1,523,587 203,080 352,114 1,287,383 1,003,417 14,382,131 Contractual Services 11,162,105 638,731 267,586 923,852 1,165,907 201,818 86,599 386,903 412,747 15,246,248 Commodities 1,381,150 58,500 143,900 498,050 156,500 19,200 29,000 206,750 155,895 2,648,945 Internal Services 1,642,183 459,007 52,536 457,202 275,494 37,410 53,639 180,095 147,321 3,304,887 Capital Outlay 22,052,226 297,600 - 1,581,000 - 75,000 - 332,500 - 24,338,326 Interest and Fiscal Charges 1,548,138 - 9,600 189,044 50,100 - - - - 1,796,881 Transfers and Contributions 373,530 1,000,000 - - - - - - - 1,373,530 TOTAL EXPENSES AND TRANSFERS OUT 41,917,978 16,242,382 1,273,963 6,588,435 3,296,588 536,508 521,352 2,432,631 1,734,380 74,544,216 EXPENSES AND TRANSFERS OUT - BY DEPARTMENT Finance 800,119 - - - - - - - - 800,119 Public Works 38,407,365 - - - - - - - - 38,407,365 Engineering 903,914 - - - - - - - - 903,914 Fire 1,806,580 - - - - - - - - 1,806,580 Parks and Recreation - 16,242,382 1,273,963 6,588,435 3,371,588 461,508 521,352 2,432,631 1,734,380 32,626,239 TOTAL EXPENSES AND TRANSFERS OUT 41,917,978 16,242,382 1,273,963 6,588,435 3,371,588 461,508 521,352 2,432,631 1,734,380 74,544,216 CHANGE IN NET POSITION (9,440,397)$ (1,178,209)$ (24,863)$ (386,885)$ (291,588)$ 56,292$ (95,352)$ (938,531)$ (59,630)$ (12,359,162)$ 2025 ENTERPRISE FUND BUDGETS 5 Page 159 of 647 Risk Equipment Information Facilities Management Operations Technology Management Fund Fund Fund Fund Total REVENUES AND TRANSFERS IN Operational Revenues 4,264,313$ 2,331,113$ 3,070,384$ 1,528,075$ 11,193,885$ TOTAL REVENUES AND TRANSFERS IN 4,264,313 2,331,113 3,070,384 1,528,075 11,193,885 EXPENSES AND TRANSFERS OUT - BY TYPE Personal Services 236,510 902,827 1,431,448 460,688 3,031,473 Contractual Services 2,313,273 257,700 1,186,720 868,715 4,626,408 Commodities 8,000 1,114,800 220,000 149,100 1,491,900 TOTAL EXPENSES AND TRANSFERS OUT 2,557,783 2,275,327 2,838,168 1,478,503 9,149,781 EXPENSES AND TRANSFERS OUT - BY DEPARTMENT Human Resources 2,557,783 - - - 2,557,783 Public Works - 2,275,327 - - 2,275,327 Engineering - - - 1,478,503 1,478,503 Information Technology - - 2,838,168 - 2,838,168 TOTAL EXPENSES AND TRANSFERS OUT 2,557,783 2,275,327 2,838,168 1,478,503 9,149,781 CHANGE IN NET POSITION 1,706,530$ 55,786$ 232,216$ 49,572$ 2,044,104$ 2025 INTERNAL SERVICE FUND BUDGETS 6 Page 160 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.5 Prepared By: Pa Thao, Finance Director Item Type: Other Department: Finance Item Title: Adopt 2025-2030 Capital Improvement Plan Action Requested: Adoption of the 2025- 2030 Capital Improvement Plan Information/Background: The Capital Improvement Plan (CIP) is a six-year strategic framework designed to preserve and expand the City's infrastructure, facilities, equipment, and technology, all while advancing our long- term vision. As a policy document, the CIP identifies current and anticipated needs, with the understanding that projects will be reprioritized based on timing, evolving demands, and available financial resources. It serves as an essential first step in estimating project schedules, costs, and potential revenue sources to fund high-priority initiatives. The CIP outlines a macro-level plan that highlights priority projects and their intended funding approaches over the six-year period. By adopting the CIP, the Council establishes overall policy direction for the City's long-term community investment strategy. Funding for each improvement or purchase is determined based on the City’s established policies, historical practices, and legal or practical considerations. Final decisions regarding project selection and scheduling are made in accordance with the City's capacity to allocate and utilize various funding sources. Resources/Financial Impacts: Six- year plan, reviewed every year along with the City's operating budget. The City’s threshold for projects or equipment to be included in the CIP is $20,000. Projects or equipment expected to be under the threshold are instead included in the operating budget. Relationship to City Policies: The Capital Improvement Plan is part of a comprehensive approach to performance management supporting Vision Edina. Supporting Documentation: 1. 2025-2030 CIP Book Page 161 of 647 Page 162 of 647 City of Edina, Minnesota Capital Improvement Plan 2025-2030 (Adopted December 17th, 2024) Edina City Council Mayor James Hovland Council Member Kate Agnew Council Member Carolyn Jackson Council Member James Pierce Council Member Julie Risser City of Edina Staff City Manager Scott Neal Assistant City Manager Ari Lenz Finance Director Pa Thao Assistant Finance Director Nelly Chick-Brewer Contributing Staff Financial Analyst Mallory Jensvold City Management Fellow Zoe Johnson Page 163 of 647 Table of Contents Introduction 4-23 Overview 4 Organization 5 Vision Edina 6 Budget & Work Plan Process 7 Budget Goals 8 CIP Introduction 9 CIP Process 9-16 Funding Sources & Financing 17-23 Funded Project Data 24-298 Funded Projects by Funding Source 24-36 Funded Projects in Detail Sorted by Department 37-298 Appendices 299-351 Funding TBD Projects by Department 299-301 Funding TBD Projects in Detail Sorted by Department 302-351 3 Page 164 of 647 Introduction The City of Edina has over $550 million invested in capital assets that either need to be maintained or replaced. This number includes things such as land, buildings, roads, water and sewer lines, vehicles and equipment. The Capital Improvement Plan (CIP) is one of several ways that the City supports Vision Edina, the long-term strategic framework of the City. The 2025-2030 Capital Improvements Plan is a six-year, $547 million plan. This is an increase from the 2023-2028 funded $300 million plan. The increase is due to several large capital projects, including improvements to France Avenue Crossing Gallagher & 72nd ($16 million) and Citywide Roof Replacements ($12.5 million), construction of Fire Station 3 ($50 million), Braemar Golf Course Clubhouse ($27 million), Neighborhood Reconstruction projects ($63 million), Storm Water projects ($71 million), Water Utility projects ($68 million), and Sewer projects ($35 million). This plan includes 256 funded projects, a significant increase from 162 projects in the 2023-2028 CIP. This growth can be attributed to a structural change made in the 2023-2028 CIP where only projects with identified funding sources were included in the plan. This is contrasted by previous years’ CIPs where both funded and unfunded projects were included. While unfunded projects are tracked internally for future consideration, the rising number of funded initiatives underscores the growing need to address equipment maintenance, repairs, and expansion of community services. These efforts are critical to ensuring the City's infrastructure and amenities meet the evolving demands of residents. Approximately $280 million is planned for infrastructure projects, $28 million for parks projects, another $32 million is planned for vehicle and equipment replacement, over $188 million for building improvements, $12 million for land improvements, and $7 million for technology. Additionally, The American Rescue Plan Act (ARPA) funding project is nearing the final phase. These federal and state-distributed funds were allocated to provide economic relief in response to the COVID-19 pandemic. The City has primarily directed these resources toward enhancing public amenities and infrastructure at Centennial Lakes Park. Additionally, the Local Option Sales Tax (LOST), approved by voters in November 2022, generates revenue through a half-cent sales tax. This funding supports the implementation of the improvements detailed in the Fred Richards Park Master Plan and the Braemar Park Master Plan. Buildings 35% Equipment & Vehicles 6%Parks 5%Technology 1% Land 2% Infrastructure 51% 2025-2030 CIP Project Costs by Type 4 Page 165 of 647 Organization The City of Edina operates under the Council-Manager form of government. Policy-making and legislative authority are vested in a City Council (Council) consisting of the Mayor and four other members, all elected on a non-partisan basis. The Council is responsible for, among other things, adopting the budget, approving ordinances, appointing committees and hiring the City Manager. Council members serve four-year terms, with two Council members elected every two years. The Mayor also serves a four-year term. The Council and Mayor are elected at large. The City Manager is responsible for carrying out the policies and ordinances of the Council and overseeing the day-to-day operations of the city government. Edina has six “operating” departments which primarily serve the community and four “supporting” departments which primarily work within the City serving operating departments, in addition to the Administration Department which includes the City Manager and Assistant City Manager. RESIDENTS Operating Departments 5 Page 166 of 647 Vision Edina Vision Edina is a long-term strategic framework that aids in community understanding and guidance in important decision making that will impact Edina’s future. The Vision Edina work and publications have been developed through a broad based and inclusive community visioning process conducted in 2014. This framework lays out the City’s vision, and mission. Vision: Edina holds a well-earned reputation as a city of choice. It is the model of a successful, mature, and progressive urban community, that strives to lead in a modern and evolving world. We maintain our heritage and attractiveness, and afford our residents the highest quality of life, while actively embracing the future. The features that define our future community include: Inclusive and Connected Built-to-Scale Development Sustainable Environment Community of Learning Future-Oriented Mission: To provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. Eight key strategic focus areas have emerged through the Vision Edina process. This framework lays out the key issues identified by our community, which we need to focus our attention and resources on over the coming years. Residential Redevelopment Mix Transportation Options Commercial Development Mix Live and Work Educational Focus Population Mix Environmental Stewardship Regional Leadership 6 Page 167 of 647 Budget & Work Plan Process In the City of Edina, the Capital Improvement Plan is part of a comprehensive approach to performance management supporting Vision Edina. The City Council and staff develop a two-year Budget Work Plan that coincides with the operating budget. The operating budget and Capital Improvement Plan processes occur on alternating years. While both the operating budget and CIP will be reviewed every year, much of the planning, focus and effort will occur on a biennial basis. The process begins with identifying the goals, objectives, and actions that will put the City in the best position to achieve the outcomes identified in the City’s strategic plans. Vision Edina (Twenty-year) Comprehensive Plan (Ten-year) Capital Improvement Plan (Five-year) Strategic Policy Budget Work Plan (Two-year) Operating Budget (Two-year) Department Work Plans (Annual) Implementation 7 Page 168 of 647 The following Budget Pillars & Values were identified by the City’s Leadership Team and City Council for the 2024-2025 operating budget cycle: Pillars Budget pillars are two-year broad outcomes to be achieved by the budget. Strong Foundation City infrastructure, facilities, technology, and equipment meets community needs now and in the future. Reliable Service City services enhance the safety, wellbeing, and quality of life experienced in Edina. Livable City City planning fosters healthy, connected, sustainable development that enriches the lives of current and future residents. Better Together City government fosters an inclusive, informed, and engaged community. Values Budget values are beliefs that guide decision making. The values should be considered when making recommendations and asking for council action. Stewardship: We make wise investments that focus on the best long-term value for residents Health: We use Health-in-All Policies to promote and protect the physical, mental, and social wellbeing of all people who live, work, or visit Edina Equity: We provide equitable opportunities for people to participate in their city government and access City institutions, facilities, and services Sustainability: We ensure that our policies, decisions, and plans have a positive impact on people and the planet now and for future generations 8 Page 169 of 647 Capital Improvement Plan Introduction The CIP represents a framework for planning the preservation and expansion of infrastructure, facilities, equipment, and technology while at the same time advancing towards our long-term vision. The CIP serves as a form of policy document that outlines both needs and an expectation that projects will be reprioritized according to timing, changing needs and finances available. The CIP is the first step towards estimating schedules, costs, and sources of revenues to pay for higher priority projects. • The City’s threshold for projects or equipment to be included in the CIP is $20,000. Projects or equipment expected to be under the threshold are instead included in the operating budget. • In the CIP, the definition of a capital asset differs from GAAP financial accounting. The main difference being that the CIP can include maintenance expenditures that do not meet the GAAP definition of a capital asset. • The preparation of a long-range plan requires City staff to make material estimates of project scope, costs of labor and materials, anticipated interest rates, and other items. Many times, these estimates come from staff experience, outsourced published projections, vendor estimates, or a combination of resources. Generally, estimates for earlier years are more precise than later years. Actual results can differ significantly from such estimates. Process For both the CIP and the operating budget, it is the responsibility of City staff to gather information and develop a recommendation for the City Council to consider. City Council’s role is to guide City staff through the process and to formally adopt a CIP near the end of every even- numbered year. After adoption of the Capital Improvement Plan, staff will develop additional recommendations on how to proceed with specific projects. The process includes numerous instances of City Council oversight, including a kickoff meeting to review the process of developing the CIP, multiple reviews of draft CIPs and final approval of the 2025-2030 CIP. The calendar on page 16 provides a more detailed view of the full-year process. 9 Page 170 of 647 Originally launched with the 2021-2026 CIP, the City implemented a formal departmental scoring process that standardizes priorities and functions across departments. The departmental scoring is high, medium, low, defined as: Additionally, a prioritization committee comprised of select staff from all departments provides another level of review and scoring with the criteria outlined below. The asset preservation project created to address immediate facility repair needs also receives semi-annual review and scoring using this criterion. Criteria I – Justification Project justification looks at three different asset categories, which most often coincide with project urgency. Projects are assigned one or multiple categories if applicable. • Health, Safety & Regulatory Compliance: Asset does not meet health and safety standards, has existing code violations, and/or displays safety hazards or structural defects. • Asset Functionality: Asset is no longer functioning properly or is expected to no longer function properly soon. • Expansion and/or Level of Service: Asset improvement or addition will directly impact level of access and/or service output. The projects summarized on the following page were identified as projects that have the most significant justification for funding. 10 Page 171 of 647 Aquatic Center Filter Room Health, Safety & Regulatory Compliance: Aspects of the pool filtration equipment no longer meet the Minnesota state Building Code. Expansion of surge tanks and upgrades to equipment are required. Pathways and maintenance spaces would also be designed for current pool, building, and health codes. Asset Functionality: An assessment was initiated in 2022 after an electrical failure closed the facility during peak season. Critical repairs were made to keep functionality and safety of the pool, but it was determined that additional repairs to existing equipment were not fiscally responsible due to existing conditions that have drastically accelerated wear and degradation of equipment. The pump room structure dates back to 1958 and while additions have been made since then, much of the equipment remains dependent on the original building and piping. It was determined that a new equipment room was needed to ensure sustainability of future investments and replacements. Expansion and/or Level of Service: The new structure allows for not only mechanical and electrical spaces but also the enhancement and increase of square footage above the structure on the pool deck apron. This will provide an opportunity to increase both services and seating areas. Public Works Building Emergency Services Radio Repeater Health, Safety & Regulatory Compliance: As of April of 2020, Minnesota State Statue 7511.7900 Appendix P requires all commercial buildings to have working emergency responder radio coverage within a building. The radio repeater in the Public Works building functions but has some “dead” spots throughout the building that pose reliability concerns. If an emergency was to occur within the space, the city would rely on a functioning unit to ensure public safety needs are met. Replacing the system will ensure that we are able to provide this critical function at a time of crisis. Edinborough Park Pool HVAC Unit Asset Functionality: Over the past 5 years the HVAC unit that supplies cooling to the pool and track area has broken down on four different occasions, most often during winter months. These repairs have cost tens of thousands of dollars and generally require emergency repairs and down-time of the pool and track which significantly and negatively impacts the services and amenities provided to users. 11 Page 172 of 647 Criteria II - Values Our budget values guide decision-making. Each project identifies how it meets our budget values, understanding these core values guide what projects received funding. The projects summarized below were identified as projects that best represent our values regardless of funding status. Stewardship We make wise investments that focus on the best long-term value for residents. Aquatic Center Filter Room The Edina Aquatic Center has operated in its current state since the early 2000’s and has been added onto a number of times. Its current configuration no longer meets today’s pool standards and requirements and as a result must be expanded to do so. The city has researched various options and scenarios that include both complete replacement and refurbishment and determined a hybrid of replacement and refurbished equipment was the most cost-effective approach to this project. Edinborough Park Pool Filter Replacement Replacement of filters that assist with keeping water chemistry levels in safe alignment helps to minimize the need for chemical treatment of pools and other aquatic facilities. These chemicals, while needed for the operation of the pools, can also wreak havoc on pool equipment and structures, therefore, it is crucial to maintain the filters. Regular maintenance and replacement will extend the life of the filters and cut down on the cost of chemical treatments which will intern extend the life of the surrounding and supporting equipment. Edinborough Park Replace Camus Boiler Planned replacement of boilers and mechanical equipment eliminates costly emergency repairs and replacements. When planned correctly, these replacements can be addressed during off-seasons, further reducing the cost and impact on amenity users. Health-In-All Policies We use Health-in-All Policies to promote and protect the physical, mental, and social wellbeing of all people who live, work, or visit Edina. Pedestrian And Bicycle Master Plan Update Walking and biking are important activities that can improve and maintain physical health. Well planned walking and biking routes can also encourage social interaction and improve access to healthy food and activities. An update of the pedestrian and bicycle master plan on a regular basis will evaluate the existing system and make future recommendations that adjust to new construction, land use, and changes in how and where people move. 12 Page 173 of 647 Rosland Park Master Plan Access to green space for physical activity, mental health, and social connection is an integral part of one’s well-being. Park planning will review the current state of Rosland Park and plan for necessary adjustments to improve access to park facilities, equipment, programming and green space. As demographics and density of the population changes, the Rosland Park Master Plan should assess immediate and future needs of park users. These needs may include easier ways to access the park, accessibility of park features and equipment, and updated programming. Edinborough Park Pool Filter Replacement Edinborough Park swimming pool provides access to swimming and aquatic activities for both physical fitness and entertainment. Safe water in the pool is a critically necessary part of operations, and requires daily testing, maintenance and adjustments. Pool filters lose efficacy over time and must be replaced to keep water safe for swimmers and to reduce the time spent by pool operations staff on manually changing the chemistry of the water to ensure safety. Replacement of the existing filters will provide a more consistent and safer experience for swimmers while reducing dedicated amount of staff time spent on water chemistry. Equity We provide equitable opportunities for people to participate in their city government and access City institutions, facilities, and services. Parks Accessibility Improvements Public accessibility improvements, including City of Edina facilities, aligns with the city's equity value by expanding accessibility of programs and services for all to use. All public facilities should be available for all users to access regardless of ability. This project aligns with the ADA Transition Plan and already has CIP funding allocated to address facility needs, grievances, and right of way. Examples of improvements to park accessibility include resurfacing trails, adaptive equipment and new programming to further meet the needs of a diverse and growing community. Rosland Park Master Plan The Rosland Park Master Plan is the first large study to identify overall park and facility needs. Rosland Park has notably aged since inception while daily users continue to increase. Attractions like the Edina Aquatic Center contribute to Rosland Park’s diverse population of daily visitors. As a new pedestrian bridge and aquatic center renovations are being planned, this study would allow for and encourage community engagement in a holistic analysis of the park for new programming, services, and/or facility needs that aim to maximize both recreational and natural resource potential. 13 Page 174 of 647 Centennial Lakes Park Public Wi-Fi The Centennial Lakes Public Wi-Fi project continues efforts to increase accessibility to Wi- Fi throughout the City of Edina. In the 2022 American Community Survey, 36.3% of those with a household income of less than $20,000 reported having no internet subscription, while 13.7% of those with household incomes ranging between $20,000-74,999 also reported no internet subscription. By comparison, 9.7% of Edina residents reported a household income of less than $25,000. In the 2023 Quality of Life Survey provided to Edina residents, 39% of residents rated fiber/home internet connectivity less than good or excellent, a number that increases above 50% for Hispanic and other race groups, and residents 18-54 years old. Reliable public Wi-Fi throughout the city helps Edina community members stay connected to public services, programming, and information, as needed. Sustainability We ensure that our policies, decisions, and plans have a positive impact on people and the planet now and for future generations. Public Works Fleet Bio Diesel Storage Tanks Biodiesel is a low carbon, cost-effective fuel option to reduce emissions from diesel-powered petroleum vehicles. To meet our Climate Action Plan goals to decarbonize municipal fleet vehicles, biodiesel is a cost-effective option for medium- and heavy-duty fleet. This project will allow the City to install a new dedicated biodiesel tank to deliver 100% biodiesel to its existing heavy-duty fleet. It’s anticipated that a 100% biodiesel powered vehicle reduces emissions by almost 75% compared to petroleum diesel. DC Fast Charger To meet the City’s carbon emission reduction goals, we are transitioning light- and medium- duty fleets to battery and plug-in hybrid battery electric vehicles. To fuel these electric vehicles, the City has installed Level 2 charging stations at different City buildings, including dedicated Level 2 chargers for fleet at its Public Works facility. A Level 2 charger often takes multiple hours to fully charge an electric vehicle, whereas a Level 3 charger can provide up to 40 miles of range in about 10 minutes. A dedicated Level 3 charger for fleet vehicles will reduce the downtime for electric fleet vehicles, including public safety vehicles that run 24- hour operations. Edinborough Park Replace Camus Boiler Aging mechanical equipment is inefficient and often costly to maintain and operate; and wasting energy results in higher greenhouse gas emissions which negatively impacts our ability to meet our climate goals. Edinborough Park is one of the City’s highest energy users and replacing its boiler with a more energy-efficient model will result in reduced energy costs and a more comfortable environment for residents and visitors who use the park. 14 Page 175 of 647 The 2025-2030 CIP is designed to be a financially viable plan for specific infrastructure projects, based on existing and proposed funding availability and policy guidance provided by the City Council. Implementation of this plan occurs when City Council takes action to initiate an individual project. By adopting the CIP, the City Council is providing overall policy guidance on a long-term community investment plan. Implementation of this plan occurs when individual project details are presented to City Council for formal approval and initiation. In addition to consideration of the overall project plan, the CIP serves as a mechanism to highlight policy issues that could significantly impact future capital project funding. These issues are presented as an opportunity for the City Council to provide additional guidance to staff if appropriate. 15 Page 176 of 647 20th Public hearing held for 2025-2030 CIP & 2025 Operating Budget CIP Prioritization Committee Final Review & Recommendations City Council adopts 2025-2030 CIP & 2025 Operating Budget 6th DECEMBER 2023 MAY 2024 CIP staff kickoff JULY 2024 APRIL 2024 JUNE 2024 CIP community engagement begins AUGUST 2024 SEPTEMBER 2024 DECEMBER 2024 19th 2024 – 2025 Budget & Work Plan approved by City Council 10th 17th 29th 20th 17th 3rd Departments submit CIP requests City leaders discuss CIP project prioritization City Council adopts preliminary 2025 levy Draft 2025-2030 CIP presented to City Council during Work Session CIP goal setting during City Council Retreat 17th 18th City Manager final CIP draft review 25th 21st MARCH 2024 31st CIP Prioritization Committee begins project review CIP Prioritization Committee & City Council Site Tours 2024-2025 Capital Improvement Plan Roadmap 16 Page 177 of 647 Funding Sources and Financing Planning for capital improvements requires sound and economic financing. The City of Edina has many options for funding sources and financing. The identified funding method for each improvement is based on the City’s general policies, past practices, and legal and practical considerations. The final selection and scheduling of proposed capital improvements is then based on the ability of the City to draw upon various funds. Many of the funding sources the City uses to pay for CIP projects are restricted to use. Each of these funding sources is examined in more detail in this section. For many of the above funding sources, the City and/or the HRA may decide to sell bonds to pay the upfront costs of a project when cash flows from the project funding sources are not immediately available. For other projects without a dedicated funding source (utility revenues, franchise fees, etc.), one of the few options available to pay for this type of project is a tax levy. Shown below is a strategy whereby an increase in the CIP levy is offset by expiring debt service levies (in green) for City Hall and the Gymnasium. Utility Funds 32% Other Funds 4% HRA Funds, 3% PACS Fund 3% Construction Fund 58% 2025-2030 CIP by Funding Source 17 Page 178 of 647 Debt Service Fund and Construction Fund Levies The strategy of increasing the CIP Levy as other levies expire allows the city to prioritize maintaining physical assets and infrastructure, as is emphasized in City Goal 1: Strong Foundation. In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for physical buildings, plumbing, HVAC and other mechanical systems, components, fixtures and equipment to optimize long-term financial resources and meet sustainability goals. Building improvement projects submitted for the 2023-2028 CIP include maintenance identified through new data collected. The City’s 2025 annual comprehensive budget is approximately $212 million. Much of that budget is spent on operating costs to provide community services. Part of the annual budget also pays for debt service on debt that has already been issued to pay for past projects. The final part of the budget is for capital improvements, which is the focus of this CIP plan. The graphic below is a conceptual diagram of the City’s budget, split between governmental activities and enterprise activities. The areas highlighted in yellow are those that typically have CIP needs. 18 Page 179 of 647 The following tables outline the 2025-2030 CIP expenses by funding source for all planned years. Construction Funds The construction fund contains several revenue streams including levies, special assessments, grants, franchise fees, and bonds, as well as several sub-funds. Edina Consolidated Budget $212M Governmental Funds $128M General Fund $66M Construction Fund $22M Debt Service Fund $25M Special Revenue Funds, including HRA $15M Enterprise Funds $75M Utility Fund $42M Liquor Fund $16M Park Enterprises $17M Internal Service Funds $9M Risk Management $3M Equip. Operations $2M IT $3M Facilities $1M 19 Page 180 of 647 • Bridge Maintenance: Funds from the Public Works budget set aside to be used for bridge maintenance and retaining wall repairs. • Capital Improvement Plan Bonds: In general, bonds are a written promise to pay a specified sum of money at a specified future date along with periodic interest paid at a specified percentage (interest rate). Bonds are typically used for long-term debt. These Capital Improvements Bonds, or general obligation (GO) bonds, are issued to pay for the construction of the Community Health and Safety Center, including Fire Station 2 and Public Health. • Capital Improvement Plan Levy: A plan developed to prioritize expenditures for significant projects and match financing to pay the project costs. The City of Edina prepares a five-year CIP every two years. • Equipment Levy: The Equipment Levy is designed to provide funding for replacing all equipment used for governmental purposes. This levy is projected to increase five percent each year to cover the escalating costs of replacing the general fund equipment, including police cars, snowplows and ambulances. • Grants & Donations: Funding received from a variety of sources, including state and federal, to be used for public infrastructure projects. • Local Option Sales Tax (LOST): A local tax levied on the sale of goods and services to be used for specific purposes by local government. This funding stream was approved by referendum in 2022 to pay for improvements in the Fred Richards Master Plan and the Braemar Arena Master Plan. Cash Reserves 0.2% Bridge Maintenance 0.3% PEG Comcast Fees 0.3% Special Park Improvement Levy 1% Grant/Donation 3%MSA 5% Equipment Replacement Levy 7% CIP Levy 7% Special Street Levy 7% Special Assessment 8% LOST 20% CIP Bonds 42% 2025-2030 Construction Funds by Funding Source 20 Page 181 of 647 • Municipal State Aid (MSA): A city designated street that becomes part of a broader state transportation system. This designation allows the city to receive resources to assist with the construction and maintenance of the street. • PEG Comcast Fees: Fees collected for public, educational & government access channels, used for communications and broadcasting technology. • Special Assessments: The City places a financial lien against a property to recoup the cost of certain improvements or services provided to a property, such as a street or utility improvement or unpaid utility services. • Special Park Improvement Levy: Established in 2023, this levy funds playground equipment replacement and park and recreation facility improvements. • Special Street Levy: Established in 2022, this levy is designed to offset some of the costs associated with street reconstruction, which were previously entirely assessed to property owners. This levy is expected to increase an average of five percent in each of the next 14 years. Utility Enterprise Funds Each utility enterprise fund collects revenue from customers of the specific service. The revenue can be spent on operational, capital and debt service costs of providing the service. Rates are studied and set to ensure revenue meets operating and capital costs into the future. In addition to the funds outlined above, a utility fund collects revenue from all three funds to finance capital infrastructure and equipment replacement for each utility. The total of this fund, for 2025-2030, is $2,735,000. 21 Page 182 of 647 Pedestrian And Cyclist Safety (PACS) Fund This special revenue fund was established in 2013 to account for funds received from gas and electric franchise fees, which the City Council intends to use for pedestrian and cyclist improvements (e.g. sidewalks, paths and trails) included in future street reconstruction projects. Housing And Redevelopment Authority Fund This fund accounts for the activities of the Housing and Redevelopment Authority. In tax increment finance (TIF) districts, property owners pay ad valorem taxes at the full rate levied by the units of local government within the taxing jurisdiction. The HRA is an entity legally separate from the City. However, for financial reporting purposes, the HRA is reported in a special revenue fund as if it were part of the City’s operations. This is done because the members of the City Council serve as HRA commissioners, and its activity is confined to the same geographic borders as the City of Edina. Other Funds These funds have over $21 million in projects in the 2025-2030 CIP, including $7M in the Golf Course Fund and $6.9M in the CAS Fund. 22 Page 183 of 647 • American Rescue Plan Act (ARPA) Fund: A fund set up to track state and local revenue received as a part of the economic stimulus package established to speed up the country’s recovery from the economic and health effects of the COVID-19 pandemic. • Braemar Field Fund: This fund was created in 2013 to account for the revenues and expenses for Braemar Field which was built in 2014. • Conservation and Sustainability (CAS) Fund: This special revenue fund was established in 2015 to account for funds received from gas and electric franchise fees beginning in 2016. The City will use these funds to provide a dedicated funding source for new conservation and sustainability functionality and programs. • E911 (Police Special Revenue) Fund: This special revenue fund was established to account for funds received for specific purposes within the Police Department, including E-911 and forfeiture funds. • Edinborough Park Fund: Edinborough Park’s finances were combined with Centennial Lakes Park in one fund through 2011. A separate fund for each facility was created in budget year 2012. • General Fund: This is the City’s primary operating fund. It records most of the City’s revenues and expenditures from core City operations like Administration, Police, Fire, Parks and Recreation, etc. Any activities that are not specifically reported in a different fund can be found in the General Fund. The General Fund is not used for debt service or capital projects. • Golf Course Fund: This fund was established to account for the City’s golf business when the 18-hole Braemar Golf Couse opened in 1964. Today, the City operates Braemar Golf Course (18-hole championship course), a 9-hole executive course and driving range, an indoor golf dome, and banquet room. • Liquor Fund: This fund accounts for the City’s off-sale liquor business, which Edina first started around 1948. Today, there are three municipally owned liquor stores in Edina. Profits are generally transferred into other City funds. • Public Safety Aid Fund: Fund created in 2023. The 2023 omnibus tax bill included $210 million in onetime public safety aid to cities across the state. This aid cannot be used for must be used to provide public safety. The City received $2,344,327 on December 26,2023. 23 Page 184 of 647 FUNDED PROJECTS BY FUNDING SOURCE 24 Page 185 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota PROJECTS BY FUNDING SOURCE 2025 2030thru Total20252026202720282029Source2030Project # Braemar Field Fund P&R25125Braemar Field Turf & Shell Replacement 2,300,0002,300,000 P&R25126Braemar Field Heater 200,000200,000 P&R25127Braemar Field Stormwater Design 75,00075,000 Braemar Field Fund Total 2,575,00075,000 200,000 2,300,000 Bridge Maintenance ENG210616520 Belmore Lane Multi-Tiered Retaining Wall 400,000400,000 ENG250186932 Valley View Road Multi-Tiered Retaining Wall 360,000360,000 ENG25020Dewey Hill Road CP Rail Crossing 35,00035,000 Bridge Maintenance Total 795,000395,000 400,000 CAS Fund: Utility Franchise Fees ENG21062Facility Efficiency Upgrades 3,000,000500,000 500,000 500,000 500,000 500,000 500,000 ENG25001DC Fast Charger 150,000150,000 ENG25079Electric Vehicle Infrastructure & Vehicle Upgrades 600,000100,000 100,000 100,000 100,000 100,000 100,000 FAC25126Photovoltaic & EV Charger Installation 2,225,000575,000 50,000 500,000 1,100,000 FAC25127Fire Station #1 Energy Management Study 500,000500,000 PWK25104Public Works Fleet - Bio Diesel Storage Tanks 375,000375,000 CAS Fund: Utility Franchise Fees Total 6,850,0001,625,000 1,175,000 600,000 650,000 1,100,000 1,700,000 CIP Bonds ENG23041TH Tight Diamond Interchange 4,000,0004,000,000 FAC25103City Wide Roof Replacement 12,500,000800,000 700,000 2,000,000 5,000,000 4,000,000 FAC2510550th & France Streetscapes Improvements 7,400,000400,000 3,000,000 3,000,000 1,000,000 FAC25113Public Works Cold Storage Building Replacement 2,300,0002,300,000 FAC25123Edinborough Park Pool HVAC Unit 350,000350,000 FIR21008Community Health & Safety Center 26,000,00026,000,000 FIR21009Fire Station #3 50,000,00050,000,000 P&R25117Aquatic Center Pool Paint, Equip & Signage Rplcmnt 558,100172,100 286,000 100,000 P&R25119Aquatic Center Filter Room 4,000,0004,000,000 P&R25157Edinborough Park Replace Camus Boiler 70,00070,000 P&R25163New Golf Course Clubhouse 27,000,00027,000,000 CIP Bonds Total 134,178,10035,792,100 6,286,000 55,000,000 6,100,000 31,000,000 25 Page 186 of 647 Total20252026202720282029Source2030Project # Construction Fund: Cable PEG COM25100Replacement of Council Chambers Cameras 40,00040,000 COM25101Cable TV Broadcast Server Replacement 70,00070,000 COM25102Video Production Studio Space 350,000350,000 COM25200Communications Equipment Replacement 70,00070,000 FAC25118Senior Center AV Equipment 55,00055,000 FAC25122City Hall Council Chambers Studio Lighting 300,000300,000 Construction Fund: Cable PEG Total 885,000355,000 140,000 350,000 40,000 Construction Fund: CIP Levy 15-048Normandale Park Shelter Building Replacement 1,040,00040,000 1,000,000 ENG21045City Wide ADA Facility Improvements Level 3&4 1,336,0001,336,000 ENG21051Pamela Park Facility Maintenance 210,000210,000 ENG25021Grandview Parking Ramp ADA Access Route 200,000200,000 ENG25022Grandview Parking Ramp ADA Access Route to Gus Yng 2,000,0002,000,000 FAC23109Arneson Acres Park Facility Improvements 700,000700,000 FAC25101City Wide Card Reader & Fire Alarm Updates 100,000100,000 FAC25114Public Works Space Reconfiguration 850,00075,000 775,000 FAC25115Public Works Access Gates 300,000300,000 FAC25117Public Works BAS & Lighting Upgrades 825,000125,000 700,000 FAC25125City Hall HVAC Equipment Replacement 500,000500,000 FAC25128City Wide ADA Facility Improvements Level 2 300,00050,000 100,000 50,000 100,000 FAC25129Fire Station #1 Living Quarters 500,000500,000 FAC25200Asset Preservation Funding 4,450,000800,000 700,000 700,000 700,000 750,000 800,000 ITS25100CLP Maintenance Fiber 30,00030,000 ITS25101Increase Fiber Capacity to SLP 60,00060,000 P&R21001General Park Asset Equipment Replacement 50,00050,000 P&R21006Athletic Field Improvements 1,050,000350,000 350,000 350,000 P&R21046Normandale Park Playground Equipment 200,000200,000 P&R21047Heights Park Playground Equipment 175,000175,000 P&R25102Highlands Park Shelter Replacement 1,250,0001,250,000 P&R25103Yorktown Park Master Plan 790,00040,000 750,000 P&R25104Chowen Park Playground Improvement 350,000350,000 P&R25105Countryside Playground Replacement 315,000315,000 P&R25106Park Pathways and Parking Project Improvements 525,00025,000 100,000 100,000 100,000 100,000 100,000 P&R25107Parks Accessibility Improvements 525,00025,000 100,000 100,000 100,000 100,000 100,000 P&R25108Utley Park Shelter Replacement 60,00060,000 P&R25110Arneson Park Shelter Replacement 75,00075,000 P&R25111Rosland Park Master Plan 100,000100,000 P&R25130Centennial Lakes Park Public Wi-Fi 40,00040,000 P&R25145Centennial Lakes Entrance Fountain Repair 150,000150,000 P&R25147Centennial Lakes Improvements 800,000800,000 26 Page 187 of 647 Total2026202720282029Source2030Project # 2025 PW22002Annual Deferred Retaining Wall Replacements 750,00050,000 100,000 200,000 200,000 200,000 Construction Fund: CIP Levy Total 20,606,0001,000,000 2,205,000 2,995,000 3,990,000 5,116,000 5,300,000 Construction Fund: Equipment Levy 17-028Braemar Arena Zamboni 400,000200,000 200,000 17-039Centennial Lakes Vehicle Replacement 40,00040,000 ADM25200Administration Equipment Replacement 325,00030,000 85,000 210,000 COM25200Communications Equipment Replacement 40,00040,000 DEV25200Development Equipment Replacement 97,00097,000 ENG25200Engineering Equipment Replacement 631,331150,000 102,631 191,500 64,700 92,500 30,000 FAC25110Facility Asset Maintenance Software 1,044,000300,000 135,000 142,000 150,000 155,000 162,000 FIR25200Fire Equipment Replacement 6,300,292515,300 1,044,845 1,258,995 1,403,395 1,112,350 965,407 ITS25200IT Equipment Replacement 2,340,000440,000 95,000 633,000 500,000 294,000 378,000 P&R21001General Park Asset Equipment Replacement 200,00050,000 50,000 50,000 50,000 P&R23120Park Maintenance Equip Replacement - Vehicles 1,693,750329,300 411,700 234,250 223,500 191,000 304,000 POL25101Patrol Squad Car Addition 60,00060,000 POL25200Police Equipment Replacement 3,052,300330,000 358,000 867,800 588,000 690,000 218,500 PWK23200Public Works Equipment Replacement 4,214,107583,500 830,000 23,000 767,684 1,089,000 920,923 Construction Fund: Equipment Levy Total 20,437,7802,678,100 3,102,176 3,810,545 3,847,279 3,873,850 3,125,830 Construction Fund: Grants/Donations 19-301Wooddale Ave Bridge Historic Rehab 1,500,0001,500,000 ENG23041TH Tight Diamond Interchange 700,000700,000 ENG25001DC Fast Charger 150,000150,000 ENG25026Rosland Park Pedestrian Bridge 6,000,0006,000,000 P&R25126Braemar Field Heater 200,000200,000 Construction Fund: Grants/Donations Total 8,550,000850,000 7,700,000 Construction Fund: MSA 17-01169th Street Roundabout 450,000450,000 19-301Wooddale Ave Bridge Historic Rehab 400,000400,000 ENG23004Benton Avenue A Reconstruction 1,475,2971,475,297 ENG23041TH Tight Diamond Interchange 5,007,4045,007,404 ENG23101Hilary Lane Reconstruction 3,387,9783,387,978 ENG25002Parklawn Avenue A Reconstruction 524,385524,385 ENG25003W 77th Street D Reconstruction 987,078987,078 ENG25023Valley View Rd Fence Replace Sdale Neighborhood 100,000100,000 ENG25028Traffic Signal at Halifax and 50th St 400,000400,000 ENG2502950th over Minnehaha Creek North Retaining Wall 275,000275,000 ENG25030Benton Avenue Over CP Rail Beam Painting 250,000250,000 ENG25031Valley View Road Bridge over CP Rail Beam Painting 250,000250,000 ENG25064West 76th Street A Reconstruction 968,276968,276 27 Page 188 of 647 Total20252026202720282029Source2030Project # Construction Fund: MSA Total 14,475,4185,007,404 400,000 500,000 3,662,978 2,929,739 1,975,297 Construction Fund: Reserves DEV25107City Zoning Ordinance Update 250,000250,000 FAC25113Public Works Cold Storage Building Replacement 300,000300,000 Construction Fund: Reserves Total 550,000550,000 Construction Fund: Special Assess 19-308Prospect Knolls C Reconstruction 1,091,2681,091,268 19-309Prospect Knolls D Reconstruction 332,125332,125 19-310Presidents B Reconstruction 1,129,5461,129,546 19-314Indian Trails A Reconstruction 671,785671,785 DEV25103France Avenue Branding/Lighting 2,000,0002,000,000 DEV25110HRA Grandview Maintenance District 545,000300,000 40,000 45,000 50,000 55,000 55,000 ENG23001Prospect Knolls A Reconstruction 1,632,1581,632,158 ENG23002Countryside E Reconstruction 782,328782,328 ENG23003Todd Park B Reconstruction 523,709523,709 ENG23004Benton Avenue A Reconstruction 108,997108,997 ENG23101Hilary Lane Reconstruction 302,453302,453 ENG25002Parklawn Avenue A Reconstruction 48,27048,270 ENG25003W 77th Street D Reconstruction 90,86190,861 ENG25005Chowen Park C Reconstruction 1,414,9911,414,991 ENG25006Chowen Park E Reconstruction 878,270878,270 ENG25009Minnehaha Woods B Reconstruction 618,632618,632 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 250,399250,399 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 191,481191,481 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 172,485172,485 ENG25013The Heights A Reconstruction 1,127,0301,127,030 ENG25014The Heights C Reconstruction 939,192939,192 ENG25064West 76th Street A Reconstruction 200,919200,919 ENG25074Parklawn (Parklawn Ct) Reconstruction 87,30187,301 ENG25075Rolling Green Reconstruction 2,505,0502,505,050 ENG25076Minnehaha Woods D Reconstruction 456,609456,609 ENG25077South Cornelia B Reconstruction 3,447,2973,447,297 ENG25078South Cornelia D Reconstruction 3,182,3943,182,394 ENG25100Presidents A Reconstruction 1,946,4511,946,451 Construction Fund: Special Assess Total 26,677,0015,375,997 3,182,852 6,669,132 3,169,423 1,912,171 6,367,426 E911 POL21005Dispatch E911 Call Handling System 550,000550,000 POL25200Police Equipment Replacement 1,053,000475,000 550,000 28,000 E911 Total 1,603,000475,000 550,000 578,000 Edinborough Fund 15-069Edinborough Park Track Air Conditioning 81,00081,000 28 Page 189 of 647 Total20252026202720282029Source2030Project # P&R21012Edinborough Park Fitness Equipment Replacement 26,00026,000 P&R25148Edinborough Park Track Surface Replacement 90,00090,000 P&R25149Edinborough Park Replace Exterior Landscaping 75,00075,000 P&R25150Edinborough Park Loading Dock 50,00050,000 P&R25151Edinborough Park Concession Replacement 24,00024,000 P&R25152Edinborough Park Amphitheater Upgrades 23,50023,500 P&R25153Edinborough Park SE Entry Concrete Replacement 27,00027,000 P&R25154Edinborough Park Locker Replacement 31,00031,000 P&R25155Edinborough Park Truck Replacement 50,00050,000 P&R25156Edinborough Park Pool Filter Replacement 70,00070,000 Edinborough Fund Total 547,500332,500 215,000 Federal ARPA P&R23100CLP & EP Interior and Exterior Public Furniture 40,00040,000 Federal ARPA Total 40,00040,000 General Fund DEV25107City Zoning Ordinance Update 250,000250,000 DEV251092050 Comprehensive Plan 600,000250,000 250,000 100,000 General Fund Total 850,000500,000 250,000 100,000 Golf Course Fund 17-031Braemar Golf Clubhouse Lower Level 100,000100,000 FAC25120Golf Course Audio Visual Replacement 250,000250,000 FAC25124Golf Course Restroom Front 9 400,000400,000 P&R21028Toro 300 Gal Sprayer 85,00085,000 P&R21036Dome Electrical Update 25,00025,000 P&R21043Cart Path Addition Hole #6 & #11 150,000150,000 P&R25160Golf Dome Netting Repairs 250,000100,000 150,000 P&R25162Golf Course Tractor & Mower Replacements 705,000100,000 295,000 160,000 50,000 100,000 P&R25164Golf Course Irrigation Upgrade 225,000225,000 P&R25166Club Car Utility Carts 78,00026,000 26,000 26,000 P&R25167Golf Maintenance Facility Lift Table 20,00020,000 P&R25168Golf Course Restroom Renovation 40,00040,000 P&R25169Golf Course Cold Storage Insulation 60,00060,000 P&R25170Update Well House #2 on Hole #13 75,00075,000 P&R25171Practice Green Enlargement / Academy 9 Pavilion 75,00075,000 P&R25172Driving Range Safety Netting 200,000200,000 P&R25175Golf Course Additional Native Areas 65,00065,000 P&R25176Golf Course New Nursery Green 100,000100,000 P&R25178Cart Path Addition Academy 9 150,000150,000 P&R25180Academy Training Facility 500,000500,000 P&R25182Golf Course Drainage Upgrade 40,00040,000 29 Page 190 of 647 Total2026202720282029Source2030Project # 2025 P&R25183Academy 9 Re-Grass & Irrigation 40,00040,000 P&R25184Green Renovation/Relocation Hole #8 500,000500,000 P&R25185Golf Dome Building Expansion 3,000,0003,000,000 Golf Course Fund Total 7,133,0001,581,000 571,000 1,151,000 3,630,000 100,000 100,000 HRA Fund: 72nd and France TIF DEV25102France Avenue Pedestrian/Bike Crossing 500,000500,000 HRA Fund: 72nd and France TIF Total 500,000500,000 HRA Fund: Centennial Lakes TIF 15-189Gateway Signs 150,00050,000 50,000 50,000 15-225HRA - Promenade Phase V 500,000500,000 17-01169th Street Roundabout 450,000450,000 17-018Valley View Rd Bicycle Facility Improvements 350,000350,000 DEV25100HRA Cahill Business District Branding 300,000300,000 DEV25101HRA City Entrance Markers 100,000100,000 ENG23041TH Tight Diamond Interchange 250,000250,000 ENG25025France Avenue Crossing Gallagher & 72nd 16,000,000500,000 1,500,000 7,000,000 7,000,000 HRA Fund: Centennial Lakes TIF Total 18,100,0001,200,000 2,050,000 7,050,000 7,000,000 450,000 350,000 Liquor Fund FAC23110Liquor Stores Facility Improvements 901,600297,600 324,000 280,000 Liquor Fund Total 901,600297,600 324,000 280,000 Local Option Sales Tax P&R25100Fred Richards Park 16,255,0005,500,000 9,250,000 805,000 700,000 P&R25101Braemar Park & Arena 47,140,00011,850,000 17,320,000 15,820,000 2,150,000 P&R25181Golf Course Parking Lot Upgrade 1,000,0001,000,000 Local Option Sales Tax Total 64,395,00017,350,000 26,570,000 17,625,000 2,850,000 PACS Fund: Utility Franchise Fees 17-072Hwy 169 Frontage Rd/Braemar Blvd Shared-Use Paths 658,420658,420 19-301Wooddale Ave Bridge Historic Rehab 200,000200,000 19-308Prospect Knolls C Reconstruction 319,200319,200 19-334Olinger Boulevard Sidewalk 883,500418,800 464,700 ENG21030McCauley Trail Shared-Use Path Phase 2 392,731392,731 ENG23004Benton Avenue A Reconstruction 109,800109,800 ENG23041TH Tight Diamond Interchange 400,000400,000 ENG23101Hilary Lane Reconstruction 190,400190,400 ENG25002Parklawn Avenue A Reconstruction 172,400172,400 ENG25003W 77th Street D Reconstruction 172,400172,400 ENG25005Chowen Park C Reconstruction 50,00050,000 ENG25006Chowen Park E Reconstruction 158,000158,000 ENG25013The Heights A Reconstruction 295,200295,200 ENG25014The Heights C Reconstruction 295,200295,200 30 Page 191 of 647 Total20252026202720282029Source2030Project # ENG25050Sidewalk Inspection Program 300,00050,000 50,000 50,000 50,000 50,000 50,000 ENG25051Drive 25 Improvements 120,00020,000 20,000 20,000 20,000 20,000 20,000 ENG25052Normandale Road/Viking Drive Bike Lanes 28,20028,200 ENG25053Pedestrian and Bicycle Master Plan Update 100,000100,000 ENG25054Wooddale Avenue Bike Lanes 111,10091,600 19,500 ENG25055McCauley Trail Shared-Use Path 503,000503,000 ENG2505669th Street Bike Lanes 24,40024,400 ENG25057West Shore Drive Bike Boulevard 35,10035,100 ENG25058W 44th St Bike Lanes 18,10018,100 ENG25059Metro Boulevard Bike Lanes 60,90060,900 ENG25060Minnehaha Creek Pedestrian Bridge 1,200,0001,200,000 ENG25061Edina Industrial Boulevard Sidewalk 297,500297,500 ENG25062W 66th Street Sidewalk 476,000476,000 ENG25063Valley View Road Bike Lane Design 50,00050,000 ENG25064West 76th Street A Reconstruction 41,15041,150 ENG25065France Avenue Shared-Use Paths 1,541,300762,900 778,400 ENG25066Lincoln Drive/7th Street/Malibu Drive Sidewalks 419,600419,600 ENG25067West 60th Street Sidewalk 710,500710,500 ENG25068West 77th Street Sidewalk 483,100483,100 ENG25069Benton Avenue Shared-Use Path 730,400730,400 ENG25070West 64th Street Shared-Use Path 422,654422,654 ENG25071Valley View Road Sidewalk 109,100109,100 ENG25072Amundson Avenue Sidewalk 156,100156,100 ENG25073Interlachen Boulevard Shared-Use Path 381,600381,600 ENG25074Parklawn (Parklawn Ct) Reconstruction 27,90027,900 ENG25076Minnehaha Woods D Reconstruction 288,600288,600 ENG25077South Cornelia B Reconstruction 444,150444,150 ENG25100Presidents A Reconstruction 233,000233,000 PACS Fund: Utility Franchise Fees Total 13,610,7051,594,100 2,404,831 3,220,650 2,085,700 1,537,550 2,767,874 Public Safety Aid FAC25121PW Building Emergency Services Radio Repeater 250,000250,000 FIR25200Fire Equipment Replacement 375,200375,200 POL25101Patrol Squad Car Addition 70,00070,000 POL25103Rifle-Rated Ballistic Shields 40,00040,000 POL25107PS Radio Bi-Directional Amplifier (BDA) Rplcmt 25,00025,000 POL25200Police Equipment Replacement 110,000110,000 Public Safety Aid Total 870,200845,200 25,000 Special Park Improvement Levy 17-143Creek Valley Irrigation 50,00050,000 19-763Tingdale Park Playground Replacement 155,000155,000 P&R21003Outdoor Athletic Field Lighting 900,000180,000 180,000 180,000 180,000 180,000 P&R21039Strachauer Park Master Plan Phase II 1,100,0001,100,000 P&R21048Sherwood Park Playground Equipment 150,000150,000 P&R21049Kojetin Park Playground Equipment 165,000165,000 31 Page 192 of 647 Total2026202720282029Source2030Project # 2025 P&R23212York Park Playground Replacement 175,000175,000 P&R25113Fox Meadow Shelter Replacement 55,00055,000 P&R25114Alden Park Playground Replacement 185,000185,000 P&R25118McGuire Park Playground Equipment Replacement. 250,000250,000 P&R25123Off Leash Dog Park Investments 10,00010,000 P&R25134Pamela Park Playground Equipment Replacement 300,000300,000 Special Park Improvement Levy Total 3,495,000405,000 305,000 1,940,000 485,000 180,000 180,000 Special Street Levy 19-308Prospect Knolls C Reconstruction 983,386983,386 19-309Prospect Knolls D Reconstruction 299,292299,292 19-310Presidents B Reconstruction 822,660822,660 19-314Indian Trails A Reconstruction 747,279747,279 ENG23001Prospect Knolls A Reconstruction 1,470,8041,470,804 ENG23002Countryside E Reconstruction 870,245870,245 ENG23003Todd Park B Reconstruction 720,847720,847 ENG23004Benton Avenue A Reconstruction 150,027150,027 ENG23101Hilary Lane Reconstruction 336,442336,442 ENG25002Parklawn Avenue A Reconstruction 82,82782,827 ENG25003W 77th Street D Reconstruction 155,909155,909 ENG25005Chowen Park C Reconstruction 1,947,6301,947,630 ENG25006Chowen Park E Reconstruction 1,208,8741,208,874 ENG25009Minnehaha Woods B Reconstruction 1,061,5191,061,519 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 429,663429,663 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 328,566328,566 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 374,045374,045 ENG25013The Heights A Reconstruction 2,444,0412,444,041 ENG25014The Heights C Reconstruction 2,036,7012,036,701 ENG25074Parklawn (Parklawn Ct) Reconstruction 78,67178,671 ENG25075Rolling Green Reconstruction 2,786,5642,786,564 ENG25076Minnehaha Woods D Reconstruction 783,502783,502 ENG25100Presidents A Reconstruction 1,417,6191,417,619 Special Street Levy Total 21,537,1132,240,279 2,832,153 3,533,843 4,213,793 2,841,986 5,875,059 Utility Fund PWK23201Utilities Equipment Replacement 2,735,000355,000 200,000 677,000 297,000 642,000 564,000 Utility Fund Total 2,735,000355,000 200,000 677,000 297,000 642,000 564,000 Utility Fund: Sewer 15-173Asset Management Software and Equipment 40,00010,000 10,000 10,000 10,000 19-308Prospect Knolls C Reconstruction 573,550573,550 19-309Prospect Knolls D Reconstruction 174,559174,559 19-310Presidents B Reconstruction 998,443998,443 19-314Indian Trails A Reconstruction 392,308392,308 19-335Sanitary Trunk Capacity Expansion York 3,800,0003,800,000 32 Page 193 of 647 Total2026202720282029Source2030Project # 2025 Segs 2-3 19-336Sanitary Trunk Capacity Exp York Seg 4 & Fairview 4,700,0004,700,000 19-340Sanitary Targeted Inflow Reduction Project 130,000130,000 ENG2105572nd Street Sewer Line Upsize 1,600,0001,600,000 ENG23001Prospect Knolls A Reconstruction 686,265686,265 ENG23002Countryside E Reconstruction 391,999391,999 ENG23003Todd Park B Reconstruction 299,187299,187 ENG23004Benton Avenue A Reconstruction 186,198186,198 ENG23009Hilary Lane Sanitary Sewer Lining 300,000300,000 ENG23033Sanitary Trunk Capacity Exp York Avenue Hazelton 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000 ENG23034Sanitary Trunk Capacity Exp York Avenue 69th St W 1,400,0001,400,000 ENG23041TH Tight Diamond Interchange 300,000300,000 ENG23101Hilary Lane Reconstruction 303,883303,883 ENG25002Parklawn Avenue A Reconstruction 103,924103,924 ENG25003W 77th Street D Reconstruction 195,622195,622 ENG25005Chowen Park C Reconstruction 929,616929,616 ENG25006Chowen Park E Reconstruction 577,003577,003 ENG25009Minnehaha Woods B Reconstruction 464,487464,487 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 188,007188,007 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 143,770143,770 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 34,33934,339 ENG25013The Heights A Reconstruction 858,472858,472 ENG25014The Heights C Reconstruction 715,394715,394 ENG25033Nine Mile Village Sanitary Sewer Lining 175,000175,000 ENG25034Olinger Road Sanitary Sewer Replacement 100,000100,000 ENG25064West 76th Street A Reconstruction 165,248165,248 ENG25074Parklawn (Parklawn Ct) Reconstruction 39,89939,899 ENG25075Rolling Green Reconstruction 281,326281,326 ENG25076Minnehaha Woods D Reconstruction 342,836342,836 ENG25077South Cornelia B Reconstruction 1,071,9041,071,904 ENG25078South Cornelia D Reconstruction 957,073957,073 ENG25100Presidents A Reconstruction 1,720,5301,720,530 PWK23010Nine Mile Village Sewer Lining 175,000175,000 PWK23011Olinger Road Dip Replacement: 130 LF + Road Repair 80,00080,000 PWK25105Lift Station Pump and VFD Renewal 180,00030,000 30,000 30,000 30,000 30,000 30,000 Utility Fund: Sewer Total 34,675,8427,708,973 3,694,273 8,585,538 7,149,689 4,233,894 3,303,475 Utility Fund: Storm 15-173Asset Management Software and Equipment 60,00015,000 15,000 15,000 15,000 17-01169th Street Roundabout 100,000100,000 19-301Wooddale Ave Bridge Historic Rehab 400,000400,000 19-308Prospect Knolls C Reconstruction 1,386,9361,386,936 19-309Prospect Knolls D Reconstruction 422,111422,111 33 Page 194 of 647 Total2026202720282029Source2030Project # 2025 19-310Presidents B Reconstruction 1,305,0781,305,078 19-314Indian Trails A Reconstruction 1,038,4751,038,475 19-346CWRMP Model Update 200,000200,000 ENG23001Prospect Knolls A Reconstruction 1,583,4181,583,418 ENG23002Countryside E Reconstruction 850,851850,851 ENG23003Todd Park B Reconstruction 826,220826,220 ENG23004Benton Avenue A Reconstruction 434,318434,318 ENG23010Concord Flood Infrastrucure Project #2 area 10,650,000200,000 950,000 9,500,000 ENG23011Arden & 50th Flood Infrastructure Project #3 Area 650,000200,000 450,000 ENG23012Lake Cornelia and Normandale Park Flood Infras 16,000,00016,000,000 ENG23013France Avenue Crossing (Minnehaha Creek)800,000200,000 600,000 ENG23014Adaptive Level Management Project Ph 2 Minnehaha 2,700,000200,000 2,500,000 ENG23015Adaptive Level Management Project Nine Mile Creek 2,500,0002,500,000 ENG23016Minor Pipe and Grading Project (Citywide)2,500,0002,500,000 ENG23017Chowen and 60th Flood Project 1,100,0001,100,000 ENG23041TH Tight Diamond Interchange 300,000300,000 ENG23101Hilary Lane Reconstruction 1,009,2451,009,245 ENG25002Parklawn Avenue A Reconstruction 226,673226,673 ENG25003W 77th Street D Reconstruction 426,678426,678 ENG25005Chowen Park C Reconstruction 2,460,7762,460,776 ENG25006Chowen Park E Reconstruction 1,527,3781,527,378 ENG25009Minnehaha Woods B Reconstruction 1,282,7071,282,707 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 454,631454,631 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 347,659347,659 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 332,148332,148 ENG25013The Heights A Reconstruction 2,370,7172,370,717 ENG25014The Heights C Reconstruction 1,729,9361,729,936 ENG2502750th St Concrete Curb and Gutter Replacement 55,00055,000 ENG25036CWS 1 - Lake & Pond Sediment Phosphorus Sequest 550,00050,000 100,000 100,000 100,000 100,000 100,000 ENG25037CWS 2 - Targeted Intensive Street Sweeping 100,00010,000 20,000 70,000 ENG25038CWS 3 - Assurance, Monitoring, Lakegrades 215,00040,000 35,000 35,000 35,000 35,000 35,000 ENG25039CWS 4 - Rough Fish Management 190,00030,000 40,000 40,000 40,000 40,000 ENG25040CWS 5 - New Clean Water Infrastructure 150,000150,000 ENG25064West 76th Street A Reconstruction 385,207385,207 ENG25074Parklawn (Parklawn Ct) Reconstruction 110,184110,184 ENG25075Rolling Green Reconstruction 4,009,2434,009,243 ENG25076Minnehaha Woods D Reconstruction 946,760946,760 ENG25077South Cornelia B Reconstruction 2,049,8752,049,875 ENG25078South Cornelia D Reconstruction 1,830,2771,830,277 ENG25100Presidents A Reconstruction 2,248,9282,248,928 Utility Fund: Storm Total 70,816,4296,669,006 6,982,649 11,212,593 16,563,619 20,565,315 8,823,247 34 Page 195 of 647 Total2026202720282029Source2030Project # 2025 Utility Fund: Water 15-162New Water Treatment Plant 5 - Southdale 18,000,00018,000,000 15-173Asset Management Software and Equipment 40,00010,000 10,000 10,000 10,000 19-308Prospect Knolls C Reconstruction 854,577854,577 19-309Prospect Knolls D Reconstruction 260,088260,088 19-310Presidents B Reconstruction 1,413,4941,413,494 19-314Indian Trails A Reconstruction 584,530584,530 19-351Water Main Condition Assessment 955,000150,000 160,000 160,000 165,000 160,000 160,000 19-913Well #7 Rehabilitation 300,000180,000 120,000 19-915Well #11 Rehabilitation and Facility Improvements 240,000120,000 120,000 19-918Well #20 Rehabilitation 180,000180,000 ENG21058Water Supply Grandview Area PH 3 2,500,0002,500,000 ENG21059Water Supply 50th and France 2,000,0002,000,000 ENG21060Water Supply Pentagon Park 1,000,0001,000,000 ENG23001Prospect Knolls A Reconstruction 1,278,1481,278,148 ENG23002Countryside E Reconstruction 584,093584,093 ENG23003Todd Park B Reconstruction 783,583783,583 ENG23004Benton Avenue A Reconstruction 369,875369,875 ENG23035Watermain Rehabilitation (Citywide)1,400,0001,400,000 ENG23036Grandview Area Watermain Improvements PH 2 240,000240,000 ENG23041TH Tight Diamond Interchange 300,000300,000 ENG23101Hilary Lane Reconstruction 786,652786,652 ENG25002Parklawn Avenue A Reconstruction 201,768201,768 ENG25003W 77th Street D Reconstruction 379,800379,800 ENG25005Chowen Park C Reconstruction 2,434,7052,434,705 ENG25006Chowen Park E Reconstruction 1,511,1961,511,196 ENG25009Minnehaha Woods B Reconstruction 692,075692,075 ENG25010Pamela Park B (Peacdale Avenue) Reconstruction 492,398492,398 ENG25011Pamela Park C (Halifax Avenue) Reconstruction 376,540376,540 ENG25012Braemar Hills E (Washington Avenue) Reconstruction 51,16451,164 ENG25013The Heights A Reconstruction 2,248,3762,248,376 ENG25014The Heights C Reconstruction 1,873,6471,873,647 ENG25043Chapel Drive Watermain Rehabilitation 300,000300,000 ENG25044Maloney Ave Watermain Rehabilitation 1,000,0001,000,000 ENG25045Watermain Replacement under NMC at 5901 Lincoln Dr 50,00050,000 ENG25046Watermain Replcmnt LB Tr/Shannon Dr/Coventry Way 225,000225,000 ENG25047Heights Neighborhood Watermain Rehabilitation 6,250,0006,250,000 ENG25064West 76th Street A Reconstruction 247,724247,724 ENG25074Parklawn (Parklawn Ct) Reconstruction 59,44959,449 ENG25075Rolling Green Reconstruction 1,676,6781,676,678 ENG25076Minnehaha Woods D Reconstruction 897,902897,902 ENG25077South Cornelia B Reconstruction 1,530,6691,530,669 ENG25078South Cornelia D Reconstruction 2,343,5492,343,549 ENG25100Presidents A Reconstruction 2,435,7532,435,753 35 Page 196 of 647 Total2026202720282029Source2030Project # 2025 FAC25109Fire Station #2 York Ave. Building Demo 500,000500,000 PW23002Well #15 Rehabilitation and Facility Improvements 140,000140,000 PW23004Well #10 Rehabilitation and Facility Improvements 120,000120,000 PW23005Well #12 Rehabilitation and Facility Improvements 180,000180,000 PW23006Well #13 Rehabilitation and Facility Improvements 180,000180,000 PW23007Well #2 Rehabilitation and Facility Improvements 170,000170,000 PW23008Well #6 Rehabilitation and Facility Improvements 180,000180,000 PWK25101Water Meter Radio Receivers 4,970,0001,300,000 880,000 900,000 930,000 960,000 PWK25102Filter Media Replacement 450,000450,000 PWK25103Fiber Installation, Van Valkenburg Tower 160,000160,000 Utility Fund: Water Total 68,398,4337,319,247 5,407,262 5,041,877 27,891,136 11,728,207 11,010,704 GRAND TOTAL 546,788,121102,141,506 77,347,196 131,042,178 90,503,617 63,310,712 82,442,912 36 Page 197 of 647 FUNDED PROJECTS IN DETAIL SORTED BY DEPARTMENT 37 Page 198 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Sharon Allison 2025 2030thru Department Administration Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as furniture and election equiment, among other items. 2025: Furniture - Voter Registration 2026: Furniture - Administration 2027: Furniture - Planning & Assessing Furniture - General Project #ADM23200 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of furniture and election equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Useful LifeProject Name Administration Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$325,000 Total2025 2026 2027 2028 2029Expenditures 2030 325,00030,000 85,000 210,000Vehicles and Equipment 30,000 85,000 210,000 325,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 325,00030,000 85,000 210,000Construction Fund: Equipment Levy 30,000 85,000 210,000 325,000Total 38 Page 199 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description The Edina Promenade, a dedicated route for pedestrians and bicyclists on public right-of-way currently terminates at 70th Street. It is intended to be extended incrementally when individual properties are redeveloped. Ultimately, the North Extension will create a non-motorized route from 70th Street to Highway 62. It may be necessary to acquire public easements on some private properties to complete this project. ENVIRONMENTAL CONSIDERATIONS: The purpose of the Promenade and the North Extension is to provide a safe and convenient route for bicyclists and pedestrians. The route can be used for both recreational and commuting purposes as a healthier and cleaner alternative than driving. Project #15-225 Justification The Edina Promenade pathway originated in the 2007 Promenade Urban Design Plan. The North Extension supports Objective #2 (Transportation Options) in Vision Edina. This project will provide new alternatives to better connect the residential neighborhoods and employment center located north of 66th Street and north of Highway 62 to commercial businesses in the Greater Southdale area. Useful LifeProject Name HRA - Promenade Phase V Category Land Type Expand or enhance Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000HRA Fund: Centennial Lakes TIF 500,000 500,000Total 39 Page 200 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Cary Teague 2025 2030thru Department Comm. Dev. and HRA Description Replacement of equipment according to the equipment replacement schedule. This includes essential departmental vehicles and other miscellanous equipment. 2030: 2010 Focus 2020 Chevrolet Bolt 2018 Toyota Prius II Project #DEV23100 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of department vehicles and other equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Development Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$97,000 Total2025 2026 2027 2028 2029Expenditures 2030 97,000Vehicles and Equipment 97,000 97,000Total97,000 Total2025 2026 2027 2028 2029Funding Sources 2030 97,000Construction Fund: Equipment Levy 97,000 97,000Total97,000 40 Page 201 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Develop a brand for the district. Borders of the district would be 70th on the north, Cahill Road on the west, the City border on the south and Highway 100 on the east. Project #DEV25100 Justification Asset Functionality Community Engagement: Would involve businesses within the district. Useful LifeProject Name HRA Cahill Business District Branding Category Land Type New Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000HRA Fund: Centennial Lakes TIF 300,000 300,000Total 41 Page 202 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Install entrance markers at key entrances to the City. Project #DEV25101 Justification Asset Functionality Useful LifeProject Name HRA City Entrance Markers Category Land Type Expand or enhance Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000HRA Fund: Centennial Lakes TIF 100,000 100,000Total 42 Page 203 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Provide a safe pedestrian crossing either under or above France Avenue in the 7200 Block of France. Project #DEV25102 Justification Health, Safety & Regulatory Compliance Stewardship, Race & Equity: Provides a safe crossing across France Avenue. Community Engagement: Better together Useful LifeProject Name France Avenue Pedestrian/Bike Crossing Category Infrastructure Type New Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000HRA Fund: 72nd and France TIF 500,000 500,000Total 43 Page 204 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Work with the business to develop branding along France Avenue. Project #DEV25103 Justification Justification - Asset Functionality Community Engagement - Work with businesses and property owners that will fund the project. Health in All Policies - Create a more walkable France Avenue. Stewardship - Creates a more walkable area in the future. Contributes to the economic viability in the area. Budget Impact/Other Useful LifeProject Name France Avenue Branding/Lighting Category Infrastructure Type New Total Project Cost:$2,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,000,0002,000,000Construction 2,000,000 2,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,000,0002,000,000Construction Fund: Special Assess 2,000,000 2,000,000Total 44 Page 205 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Cary Teague 2025 2030thru Department Comm. Dev. and HRA Description Update the City' Zoning Ordinance based on recommendations from the Zoning Audit, Planning Commission and City Council. Project #DEV25107 Justification Health, Safety & Regulatory Compliance Sustainability - Provides clarity of zoning regulations for residents, staff, land owners and developers. Zoning regulations influence the built environment. Community Engagement - Community Engagement would be important for this project. Public processes for land use regulation is housed in the zoning ordinance. Race and Equity - Review ordinance through the lens of race and equity. Budget Impact/Other Useful LifeProject Name City Zoning Ordinance Update Category Land Type New Total Project Cost:$500,000 Total20252026202720282029Expenditures2030 500,000250,000 250,000Planning and Design 250,000 250,000 500,000Total Total20252026202720282029Funding Sources 2030 250,000250,000General Fund 250,000250,000Construction Fund: Reserves 250,000 250,000 500,000Total 45 Page 206 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Addison Lewis 2025 2030thru Department Comm. Dev. and HRA Description Comprehensive Plan Update. Required every 10 years. Project #DEV25109 Justification "Health, Safety & Regulatory Compliance Sustainability - Sets a guide for the City for the next 10 years Community Engagement - Yes. Community Engagement is extensive with Comprehensive Plan updates. Including resident and business owner working group(s), numerous public meetings and ending with two public hearings. Entire process takes 2-3 years and every Edina Commission is involved. Health in all policies - Provides a guide for the built environment in Edina for the next 20 years. Race & Equity - Public process is to be determined. Staff, consultants and working group will seek inclusion from all of Edina. Including targeting of groups and areas in City that have no previously participated in comprehensive planning. Stewardship - The Comprehensive Plan should assist in future decision making for the next 10 years. This project includes all of the City's commissions." Useful LifeProject Name 2050 Comprehensive Plan Category Land Type New Total Project Cost:$600,000 Total2025 2026 2027 2028 2029Expenditures 2030 600,000250,000 250,000 100,000Planning and Design 250,000 250,000 100,000 600,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 600,000250,000 250,000 100,000General Fund 250,000 250,000 100,000 600,000Total 46 Page 207 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Improvements and ongoing maintenance of landscaping areas in the Grandview District. Cost assessed to property owners. Project #DEV25110 Justification Asset Functionality Budget Impact/Other Useful LifeProject Name HRA Grandview Maintenance District Category Buildings Type Expand or enhance Total Project Cost:$545,000 Total2025 2026 2027 2028 2029Expenditures 2030 545,000300,000 40,000 45,000 50,000 55,000Construction 55,000 300,000 40,000 45,000 50,000 55,000 545,000Total55,000 Total2025 2026 2027 2028 2029Funding Sources 2030 545,000300,000 40,000 45,000 50,000 55,000Construction Fund: Special Assess 55,000 300,000 40,000 45,000 50,000 55,000 545,000Total55,000 47 Page 208 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as cameras, broadcasting equipment, and graphics systems, among other items. 2026: Tightrope Server 2028: Council Chamber Cameras - Sony HD PTZ Replacement Chambers Cameras - 2 Sony HD PTZ Project #COM23100 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of communications technology, broadcasting equipment and other miscellaneous equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Communications Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$110,000 Total2025 2026 2027 2028 2029Expenditures 2030 110,00070,000 40,000Vehicles and Equipment 70,000 40,000 110,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Construction Fund: Equipment Levy 70,00070,000Construction Fund: Cable PEG 70,000 40,000 110,000Total 48 Page 209 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of robotic cameras in the Council Chambers due to end of useful life. Project #COM25100 Justification Asset Functionality Sustainability - This replacement equipment is not anticipated to increase energy and resource usage over what we currently use. Community Engagement - This equipment is used for a lot of community engagement-related projects. The videos produced with the equipment support community engagement and help to inform people in and around Edina. Health in all policies - This equipment will not have a negative impact on health-related items, and could certainly be used to help promote health and wellness initiatives in the future. Race & Equity - This equipment is used to promote and support race & equity initiatives of the City. Stewardship - This replacement equipment will help the City continue to provide useful, high-quality video content that benefits all who live and work in Edina. Useful LifeProject Name Replacement of Council Chambers Cameras Category Equipment and Vehicles Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Construction Fund: Cable PEG 40,000 40,000Total 49 Page 210 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Replacement of Tightrope Cablecast server. This server send the Edina TV video content to Comcast cable. Project #COM25101 Justification Asset Functionality Sustainability - It is not anticipated that this replacement server will negatively impact energy efficiency or usage. Community Engagement - This equipment is used to produce and deliver community engagement-related content. Health in all policies - This equipment could be used used to produce and deliver health-related content. Race & Equity - This equipment is used to produce and deliver race & equity-related content. Stewardship - This equipment benefits all who live and work in Edina by delivering valuable information via the Edina TV cable channel. Useful LifeProject Name Cable TV Broadcast Server Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$70,000 Total2025 2026 2027 2028 2029Expenditures 2030 70,00070,000Vehicles and Equipment 70,000 70,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 70,00070,000Construction Fund: Cable PEG 70,000 70,000Total 50 Page 211 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Scott Denfeld 2025 2030thru Department Communications Description Design and construction of a new video production studio space within a City facility. Project #COM25102 Justification Expansion and/or Level of Service Sustainable - This project would be designed and built in a way that promotes energy efficiency where possible. Community Engagement - This project would enhance community engagement efforts by providing a high-quality space to produce video content that will engage and educate community members about a variety of topics. Health in alll policies - This project could be used to create video content that promotes health-related initiatives. Race & Equity - This project could be used to create video content that promotes race & equity-related initiatives. Stewardship - This project would significantly streamline and improve the City's video production work, allowing for more content to be created, which would benefit those who live and work in Edina. Useful LifeProject Name Video Production Studio Space Category Equipment and Vehicles Type New Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 350,000350,000Vehicles and Equipment 350,000 350,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 350,000350,000Construction Fund: Cable PEG 350,000 350,000Total 51 Page 212 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project includes the design of Southdale Water Plant. This plant will filter water from wells 5, 18, and potentially future well 21. ENVIRONMENTAL CONSIDERATIONS: Consideration is made in the design for overall operating costs from energy and chemicals. Stormwater features will provide aesthetics, treatment and recharge. Project #15-162 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name New Water Treatment Plant 5 - Southdale Category Infrastructure Type Horizon Total Project Cost:$18,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 18,000,00018,000,000Construction 18,000,000 18,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 18,000,00018,000,000Utility Fund: Water 18,000,000 18,000,000Total 52 Page 213 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project continues to update and improve our current asset management system software and associated equipment to be more interactive with the public and mobile with City Staff. The current system contains map and condition assessment information on all infrastructure assets such as water, sanitary, storm, transportation, traffic and electrical systems. Software systems connect the EdinaToGo citizen request application with Cityworks asset management software and ESRI geographical information system software. Public works crews use tablets to assess and record infrastructure condition, create and fulfill service requests and work orders. ENVIRONMENTAL CONSIDERATIONS: Efficiency in management and operations allows more work with less trips and effort. Project #15-173 Justification Expansion and/or Level of Service The need is emphasized in the 2018 Edina Comprehensive Plan to "evaluate and employ technological advancements to provide city services" and to "provide a level of City services that sets Edina apart from other communities." Useful LifeProject Name Asset Management Software and Equipment Category Technology Type Replace or repair Total Project Cost:$140,000 Total2025 2026 2027 2028 2029Expenditures 2030 140,00035,000 35,000 35,000 35,000Software 35,000 35,000 35,000 35,000 140,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00015,000 15,000 15,000 15,000Utility Fund: Storm 40,00010,000 10,000 10,000 10,000Utility Fund: Water 40,00010,000 10,000 10,000 10,000Utility Fund: Sewer 35,000 35,000 35,000 35,000 140,000Total 53 Page 214 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Engineering Description A gateway sign is often the first impression people have of a city, development, business park or other public place. A well planned and executed gateway sign is important because it gives an immediate sense of a brand and denotes a sense of pride and caring, and makes visitors feel welcome. One entrance sign was installed at the 66th and York Intersection. This project would develop a plan on locations to continue installing gateway signs. The City’s Branding Committee and the Communications Department recommend the placement of "Welcome to Edina" gateway signs. ENVIRONMENTAL CONSIDERATIONS: Gateway signs need to be lighted to continue communicating the brand 24-hours a day. Solar lights could be considered to reduce electrical load. Project #15-189 Justification Expansion and/or Level of Service One of the City Leadership Priorities in the 2012 Work Plan was "Improve Communications Tools." One of the objectives toward meeting that goal is to implement branding standards. One of the City Leadership Priorities in the 2014 Work Plan is "Development and renewal of commercial and residential areas is essential to the on- going health of the city." Gateway signs that better reflect the City's brand will contribute to the renewal of those places. Useful LifeProject Name Gateway Signs Category Infrastructure Type New Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,00050,000 50,000 50,000Construction 50,000 50,000 50,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,00050,000 50,000 50,000HRA Fund: Centennial Lakes TIF 50,000 50,000 50,000 150,000Total 54 Page 215 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The scope of this project is to construct a roundabout on W 69th Street to allow vehicles to turn left into Southdale Center at its westerly entrance from 69th Street. Currently left turns at this location are prohibited. Other related intersection improvements, such as improved geometric design at the entrances to Southdale Center and The Galleria along with pedestrian and bicycle improvements, are also anticipated as part of this project. Project #17-011 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name 69th Street Roundabout Category Infrastructure Type Expand or enhance Total Project Cost:$1,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 450,000450,000Construction Fund: MSA 450,000450,000HRA Fund: Centennial Lakes TIF 100,000100,000Utility Fund: Storm 1,000,000 1,000,000Total 55 Page 216 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description The project involves the installation of buffered bike lanes on Valley View Road between West 64th Street and West 66th Street. This facility was proposed in the 2018 Pedestrian and Bicycle Master Plan and the work will be coordinated with MnDOT ENVIROMENTAL CONISDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #17-018 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Valley View Rd Bicycle Facility Improvements Category Infrastructure Type New Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 350,000Construction350,000 350,000Total350,000 Total2025 2026 2027 2028 2029Funding Sources 2030 350,000HRA Fund: Centennial Lakes TIF 350,000 350,000Total350,000 56 Page 217 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of shared-use paths on the East Frontage Road of Highway 169 between Valley View Road and West 78th Street and on Braemar Boulevard between the East Frontage Road and Hilary Lane. These new paths will connect to existing facilities on Valley View Road and West 78th Street, a proposed facility on Hilary Lane, and will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONISDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #17-072 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Hwy 169 Frontage Rd/Braemar Blvd Shared-Use Paths Category Infrastructure Type New Total Project Cost:$658,420 Total2025 2026 2027 2028 2029Expenditures 2030 658,420Construction658,420 658,420Total658,420 Total2025 2026 2027 2028 2029Funding Sources 2030 658,420PACS Fund: Utility Franchise Fees 658,420 658,420Total658,420 57 Page 218 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Wooddale Avenue Bridge over Minnehaha Creek is a Historic Bridge in need of rehabilitation. Specifically the wing walls and the bridge railings are deteriorating and need replacement. Because of the historic designation, the State Historic Preservation Office and HPC need to approve a plan of treatment. ENVIRONMENTAL CONSIDERATIONS: The plan of treatment will be reviewed with a sustainability lens. Project #19-301 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the structure, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Wooddale Ave Bridge Historic Rehab Category Infrastructure Type Replace or repair Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,100,000 400,000Construction 2,100,000 400,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Construction Fund: MSA 400,000400,000Utility Fund: Storm 1,500,0001,500,000Construction Fund: Grants/Donations 200,000200,000PACS Fund: Utility Franchise Fees 2,100,000 400,000 2,500,000Total 58 Page 219 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Lee Valley Circle, Fleetwood Drive, Lanham Lane, Kemrich Drive, Tara Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-308 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls C Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$5,208,917 Total2025 2026 2027 2028 2029Expenditures 2030 5,208,9175,208,917Construction 5,208,917 5,208,917Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,091,2681,091,268Construction Fund: Special Assess 1,386,9361,386,936Utility Fund: Storm 854,577854,577Utility Fund: Water 573,550573,550Utility Fund: Sewer 319,200319,200PACS Fund: Utility Franchise Fees 983,386983,386Special Street Levy 5,208,917 5,208,917Total 59 Page 220 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Weston Circle and Village Drive(public only?)) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-309 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls D Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$1,488,175 Total2025 2026 2027 2028 2029Expenditures 2030 1,488,1751,488,175Construction 1,488,175 1,488,175Total Total2025 2026 2027 2028 2029Funding Sources 2030 332,125332,125Construction Fund: Special Assess 422,111422,111Utility Fund: Storm 260,088260,088Utility Fund: Water 174,559174,559Utility Fund: Sewer 299,292299,292Special Street Levy 1,488,175 1,488,175Total 60 Page 221 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (2nd Street South, Belmore Lane, Van Buren Avenue, Harrison Avenue, Tyler Avenue, Tyler Court) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-310 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Presidents B Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$5,669,221 Total2025 2026 2027 2028 2029Expenditures 2030 5,669,2215,669,221Construction 5,669,221 5,669,221Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,129,5461,129,546Construction Fund: Special Assess 1,305,0781,305,078Utility Fund: Storm 1,413,4941,413,494Utility Fund: Water 998,443998,443Utility Fund: Sewer 822,660822,660Special Street Levy 5,669,221 5,669,221Total 61 Page 222 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West Trail, Samuel Road, Sioux Trail, Sally Lane and Iroquois Circle) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #19-314 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Indian Trails A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$3,434,377 Total2025 2026 2027 2028 2029Expenditures 2030 3,434,3773,434,377Construction 3,434,377 3,434,377Total Total2025 2026 2027 2028 2029Funding Sources 2030 671,785671,785Construction Fund: Special Assess 1,038,4751,038,475Utility Fund: Storm 584,530584,530Utility Fund: Water 392,308392,308Utility Fund: Sewer 747,279747,279Special Street Levy 3,434,377 3,434,377Total 62 Page 223 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of Olinger Boulevard between Vernon Avenue and Tracy Avenue. This sidewalk will connect to existing sidewalks on Vernon Avenue, Olinger Road, Sun Road, Colonial Way, and Tracy Avenue. This project was proposed in the 2014 Active Routes to School Plan and the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #19-334 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name Olinger Boulevard Sidewalk Category Infrastructure Type New Total Project Cost:$883,500 Total2025 2026 2027 2028 2029Expenditures 2030 883,500418,800 464,700Construction 418,800 464,700 883,500Total Total2025 2026 2027 2028 2029Funding Sources 2030 883,500418,800 464,700PACS Fund: Utility Franchise Fees 418,800 464,700 883,500Total 63 Page 224 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017). The project builds off CIP 15-147 that included two phases, one in 2017 and in 2020. The project area includes York Avenue north of the Promenade. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Project #19-335 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goal. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Sanitary Trunk Capacity Expansion York Segs 2-3 Category Infrastructure Type Expand or enhance Total Project Cost:$3,800,000 Total2025 2026 2027 2028 2029Expenditures 2030 3,800,0003,800,000Construction 3,800,000 3,800,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 3,800,0003,800,000Utility Fund: Sewer 3,800,000 3,800,000Total 64 Page 225 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) The project builds off of CIP 15-147 that included two phases, one in 2017 and another planned for 2019. The project area includes York Avenue north of 66th, and 69th Street between Barrie Rd and York. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. COST CONSIDERATIONS: This project qualifies for potential TIF/HRA funding. If Southdale TIF generates additional revenue, in its closing years, funding could be directed to this project. Project #19-336 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Seg 4 & Fairview Category Infrastructure Type Expand or enhance Total Project Cost:$4,700,000 Total2025 2026 2027 2028 2029Expenditures 2030 4,700,0004,700,000Construction 4,700,000 4,700,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 4,700,0004,700,000Utility Fund: Sewer 4,700,000 4,700,000Total 65 Page 226 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will use flow metering and groundwater data to target areas with high potential for groundwater infiltration and flood inflow for investigation and elimination of cross connections and leak points. Inflow of storm and ground water into the sanitary sewer system uses up system capacity, increases the risk of back flow, and wastes money and natural resources to convey and treat. A variety of methods such as in-home inspection, smoke testings, dye testing, and video will be used to identify and eliminate sources of inflow in the targeted area. Cost effective interventions will be designed and implemented in the following year. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. COST CONSIDERATIONS: Reduction of inflow and infiltration reduces metered flow which determines the City share of Met Council regional system expense. Project #19-340 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Sanitary Targeted Inflow Reduction Project Category Infrastructure Type Replace or repair Total Project Cost:$130,000 Total2025 2026 2027 2028 2029Expenditures 2030 130,000Construction130,000 130,000Total130,000 Total2025 2026 2027 2028 2029Funding Sources 2030 130,000Utility Fund: Sewer 130,000 130,000Total130,000 66 Page 227 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description A major update to the Comprehensive Water Resources Management Plan (CWRMP) is required to incorporate the Flood Risk Reduction Strategy (CIP item 19-341) and Clean Water Strategy (CIP item 19-342). The Flood Risk Reduction Strategy and corresponding major amendment are complete. This CIP item in 2024 would be for the Clean Water Strategy piece ENVIRONMENTAL CONSIDERATIONS: This would incorporate the aforementioned strategies into the existing CWRMP. Project #19-346 Justification The CWRMP lays out a framework for developing the Flood Risk Reduction Strategy and Clean Water Strategy. These would be considered major amendments to the plan. Useful LifeProject Name CWRMP Model Update Category Infrastructure Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Planning and Design 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Utility Fund: Storm 200,000 200,000Total 67 Page 228 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description Since September 2014, it has been standard practice to assess water main pipe conditions in project areas of future street reconstruction. The non- invasive water main testing provides us with more data about the condition of our water main system similar to closed circuit televising does for sanitary sewer trunk pipes. This data, plus water main break data proves to be a powerful tool in determining where to spend our water main funds to get the greatest value to our water main system. Assessments typically occur two years in advance of a neighborhood reconstruction project and include approximately 20,000 linear feet of watermain per year. ENVIRONMENTAL CONSIDERATIONS: The watermain condition data allows us to only replace the pipes that need it with this infrastructure replacement cycle. By getting the most life out of the existing watermain pipes, we are reducing the need for new resources where they are not needed. This lowers our potential carbon footprint and uses only the necessary resources to provide the level of service required. Project #19-351 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Water Main Condition Assessment Category Infrastructure Type Replace or repair Total Project Cost:$1,120,000 Total2025 2026 2027 2028 2029Expenditures 2030 955,000150,000 160,000 160,000 165,000 160,000Planning and Design 160,000 150,000 160,000 160,000 165,000 160,000 955,000Total160,000 Total2025 2026 2027 2028 2029Funding Sources 2030 955,000150,000 160,000 160,000 165,000 160,000Utility Fund: Water 160,000 150,000 160,000 160,000 165,000 160,000 955,000Total160,000 68 Page 229 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a shared-use path on the east side of McCauley Trail between Indian Hills Road and Gleason Road. This facility will connect to existing pedestrian and bicycle infrastructure on Gleason Road and will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21004 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name McCauley Trail Shared-Use Path Phase 2 Category Infrastructure Type New Total Project Cost:$392,731 Total2025 2026 2027 2028 2029Expenditures 2030 392,731392,731Construction 392,731 392,731Total Total2025 2026 2027 2028 2029Funding Sources 2030 392,731392,731PACS Fund: Utility Franchise Fees 392,731 392,731Total 69 Page 230 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will support Hennepin County's France Avenue at I-494 improvement project. This project includes the construction of new shared- use paths on both sides of France Avenue between Minnesota Drive and West 76th Street. These facilities will connect to existing sidewalks on France Avenue, Minnesota drive and West 76th Street. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21006 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name France Avenue Shared-Use Paths Category Infrastructure Type New Total Project Cost:$1,541,300 Total2025 2026 2027 2028 2029Expenditures 2030 1,541,300762,900 778,400Construction 762,900 778,400 1,541,300Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,541,300762,900 778,400PACS Fund: Utility Franchise Fees 762,900 778,400 1,541,300Total 70 Page 231 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of sidewalks on Lincoln Drive between Maloney Avenue and 7th Street, 7th Street between Lincoln Drive and Highway 169, and Malibu Drive between Lincoln Drive and Park Terrace. These sidewalks will connect to the existing sidewalk on Maloney Avenue and will provide residents in the Presidents and Parkwood Knolls neighborhoods with a safe walking connection to Van Valkenburg Park. These sidewalks were proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21007 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Lincoln Drive/7th Street/Malibu Drive Sidewalks Category Infrastructure Type New Total Project Cost:$419,600 Total2025 2026 2027 2028 2029Expenditures 2030 419,600419,600Construction 419,600 419,600Total Total2025 2026 2027 2028 2029Funding Sources 2030 419,600419,600PACS Fund: Utility Franchise Fees 419,600 419,600Total 71 Page 232 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on West 60th Street between France Avenue and Xerxes Avenue. This sidewalk will connect to existing sidewalks on France Avenue, Beard Avenue and Xerxes Avenue and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21013 Justification See Summary of Pedestrian/Bike Improvements. Useful Life 50Project Name West 60th Street Sidewalk Category Infrastructure Type New Total Project Cost:$710,500 Total2025 2026 2027 2028 2029Expenditures 2030 710,500Construction710,500 710,500Total710,500 Total2025 2026 2027 2028 2029Funding Sources 2030 710,500PACS Fund: Utility Franchise Fees 710,500 710,500Total710,500 72 Page 233 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on the north side of West 77th Street between Normandale Road and Parklawn Avenue. This sidewalk will connect to the existing sidewalk on Parklawn Avenue and will support transit riders along West 77th Street. This sidewalk was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21014 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name West 77th Street Sidewalk Category Infrastructure Type New Total Project Cost:$483,100 Total2025 2026 2027 2028 2029Expenditures 2030 483,100483,100Construction 483,100 483,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 483,100483,100PACS Fund: Utility Franchise Fees 483,100 483,100Total 73 Page 234 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves construction of a shared-use path on Benton Avenue between Hansen Road and Normandale Road. This path will connect to existing sidewalks on Normandale Road, Hansen Road and Benton Avenue, and will support transit riders along Benton Avenue. This path will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21015 Justification The City strives to improve mobility for residents, visitors and businesses through a multi-modal transportation system that accommodates pedestrians, bicyclists, transit users and motorists. This ideal is reflected in the Comprehensive Plan, the Living Streets Plan, the Active Routes to School Plan and the Pedestrian and Bicycle Master Plan. Walking and biking infrastructure promotes equity, safety and convenience and provides meaningful opportunities for active living and better health. Useful LifeProject Name Benton Avenue Shared-Use Path Category Infrastructure Type New Total Project Cost:$730,400 Total2025 2026 2027 2028 2029Expenditures 2030 730,400730,400Construction 730,400 730,400Total Total2025 2026 2027 2028 2029Funding Sources 2030 730,400730,400PACS Fund: Utility Franchise Fees 730,400 730,400Total 74 Page 235 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves construction of a shared-use path on the south side of West 64th Street between West Shore Drive and West 66th Street. This path will connect to existing sidewalks on West 66th Street, the Edina Aquatic Center, the Edina Art House, Rosland Park, and the pedestrian bridge over Highway 62. This path will form part of the Twin Loops pedestrian and bicycle network proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21016 Justification The City strives to improve mobility for residents, visitors and businesses through a multi-modal transportation system that accommodates pedestrians, bicyclists, transit users and motorists. This ideal is reflected in the Comprehensive Plan, the Living Streets Plan, the Active Routes to School Plan and the Pedestrian and Bicycle Master Plan. Walking and biking infrastructure promotes equity, safety and convenience and provides meaningful opportunities for active living and better health. Useful LifeProject Name West 64th Street Shared-Use Path Category Infrastructure Type New Total Project Cost:$422,654 Total2025 2026 2027 2028 2029Expenditures 2030 422,654Construction422,654 422,654Total422,654 Total2025 2026 2027 2028 2029Funding Sources 2030 422,654PACS Fund: Utility Franchise Fees 422,654 422,654Total422,654 75 Page 236 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on the south side of Valley View Road between Chapel Lane and Antrim Road. This sidewalk will connect to existing sidewalks on Valley View Road and Antrim Road, and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21017 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Valley View Road Sidewalk Category Infrastructure Type New Total Project Cost:$109,100 Total2025 2026 2027 2028 2029Expenditures 2030 109,100109,100Construction 109,100 109,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 109,100109,100PACS Fund: Utility Franchise Fees 109,100 109,100Total 76 Page 237 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a sidewalk on Amundson Avenue between Cahill Road and West 70th Street. This sidewalk will connect to existing sidewalks on the Cahill Road and West 70th Street, to the Nine Mile Creek Regional Trail and to the future Canadian Pacific Rail Regional Trail. This sidewalk was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21018 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Amundson Avenue Sidewalk Category Infrastructure Type New Total Project Cost:$156,100 Total2025 2026 2027 2028 2029Expenditures 2030 156,100Construction156,100 156,100Total156,100 Total2025 2026 2027 2028 2029Funding Sources 2030 156,100PACS Fund: Utility Franchise Fees 156,100 156,100Total156,100 77 Page 238 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project would construct a shared-use path on Interlachen Boulevard between Blake Road and Mirror Lakes Drive. This path will connect to existing pedestrian and bicycle infrastructure on Blake Road, Interlachen Boulevard and Mirror Lakes Drive, and was proposed in the 2018 Pedestrian and Bicycle Master Plan. ENVIROMENTAL CONSIDERATIONS: Sidewalks, bicycle facilities and trails support non-motorized transportation, which can replace trips taken by single- or low-occupancy motor vehicles. This can result in a lower carbon footprint, reduced greenhouse gas emissions and improved air quality. Project #ENG21019 Justification See Summary of Pedestrian/Bike Improvements. Useful LifeProject Name Interlachen Boulevard Shared-Use Path Category Infrastructure Type New Total Project Cost:$381,600 Total2025 2026 2027 2028 2029Expenditures 2030 381,600381,600Construction 381,600 381,600Total Total2025 2026 2027 2028 2029Funding Sources 2030 381,600381,600PACS Fund: Utility Franchise Fees 381,600 381,600Total 78 Page 239 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Washington Avenue South, Adams Avenue, Jefferson Ave South, Madison Avenue South, Monroe Avenue South, Jackson Avenue South, Van Buren Avenue South, Harrison Avenue South, Tyler Avenue South, Tyler Court, 2nd Street South, Belmore Lane, 3rd Street South) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21021 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Presidents A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$10,002,281 Total2025 2026 2027 2028 2029Expenditures 2030 10,002,28110,002,281Construction 10,002,281 10,002,281Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,946,4511,946,451Construction Fund: Special Assess 2,248,9282,248,928Utility Fund: Storm 2,435,7532,435,753Utility Fund: Water 1,720,5301,720,530Utility Fund: Sewer 233,000233,000PACS Fund: Utility Franchise Fees 1,417,6191,417,619Special Street Levy 10,002,281 10,002,281Total 79 Page 240 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Parklawn Court from Parklawn Avenue to the cul-de-sac. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21023 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Parklawn (Parklawn Ct) Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$403,404 Total2025 2026 2027 2028 2029Expenditures 2030 403,404403,404Construction 403,404 403,404Total Total2025 2026 2027 2028 2029Funding Sources 2030 87,30187,301Construction Fund: Special Assess 110,184110,184Utility Fund: Storm 59,44959,449Utility Fund: Water 39,89939,899Utility Fund: Sewer 27,90027,900PACS Fund: Utility Franchise Fees 78,67178,671Special Street Levy 403,404 403,404Total 80 Page 241 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Annaway Drive, Bywood West, Crescent Terrace, Mait Lane, Merilane, Paddock Road, Rolling Green Parkway) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21024 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Rolling Green Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$11,258,861 Total2025 2026 2027 2028 2029Expenditures 2030 11,258,86111,258,861Construction 11,258,861 11,258,861Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,505,0502,505,050Construction Fund: Special Assess 4,009,2434,009,243Utility Fund: Storm 1,676,6781,676,678Utility Fund: Water 281,326281,326Utility Fund: Sewer 2,786,5642,786,564Special Street Levy 11,258,861 11,258,861Total 81 Page 242 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Halifax Lane, Woodland Circle) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. Project #ENG21025 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Minnehaha Woods D Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$3,716,209 Total2025 2026 2027 2028 2029Expenditures 2030 3,716,2093,716,209Construction 3,716,209 3,716,209Total Total2025 2026 2027 2028 2029Funding Sources 2030 456,609456,609Construction Fund: Special Assess 946,760946,760Utility Fund: Storm 897,902897,902Utility Fund: Water 342,836342,836Utility Fund: Sewer 288,600288,600PACS Fund: Utility Franchise Fees 783,502783,502Special Street Levy 3,716,209 3,716,209Total 82 Page 243 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Andover Road, Claremore Drive, Dunham Drive, Ellsworth Drive, Fondell Drive, Gilford Drive, Kellogg Avenue, Oaklawn Avenue, West 72nd Street, West Shore Drive, Wooddale Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21026 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name South Cornelia B Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$8,543,895 Total2025 2026 2027 2028 2029Expenditures 2030 8,543,8958,543,895Construction 8,543,895 8,543,895Total Total2025 2026 2027 2028 2029Funding Sources 2030 3,447,2973,447,297Construction Fund: Special Assess 2,049,8752,049,875Utility Fund: Storm 1,530,6691,530,669Utility Fund: Water 1,071,9041,071,904Utility Fund: Sewer 444,150444,150PACS Fund: Utility Franchise Fees 8,543,895 8,543,895Total 83 Page 244 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Cornelia Drive, Glouchester Avenue, Heatherton Trail, Bristol Boulevard, Lynmar Lane, Mavelle Drive, Sandell Avenue, Hazelton Road, West 72nd Street) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21027 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name South Cornelia D Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$8,313,293 Total2025 2026 2027 2028 2029Expenditures 2030 8,313,293Construction8,313,293 8,313,293Total8,313,293 Total2025 2026 2027 2028 2029Funding Sources 2030 3,182,394Construction Fund: Special Assess 3,182,394 1,830,277Utility Fund: Storm 1,830,277 2,343,549Utility Fund: Water 2,343,549 957,073Utility Fund: Sewer 957,073 8,313,293Total8,313,293 84 Page 245 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Hilary Lane from Braemar Boulevard to Gleason Road. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG21028 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Hilary Lane Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$6,317,053 Total2025 2026 2027 2028 2029Expenditures 2030 6,317,053190,400 6,126,653Construction 190,400 6,126,653 6,317,053Total Total2025 2026 2027 2028 2029Funding Sources 2030 3,387,9783,387,978Construction Fund: MSA 302,453302,453Construction Fund: Special Assess 1,009,2451,009,245Utility Fund: Storm 786,652786,652Utility Fund: Water 303,883303,883Utility Fund: Sewer 190,400190,400PACS Fund: Utility Franchise Fees 336,442336,442Special Street Levy 190,400 6,126,653 6,317,053Total 85 Page 246 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated West 76th Street from Parklawn Avenue to France Avenue. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG21030 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name West 76th Street A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$2,008,524 Total2025 2026 2027 2028 2029Expenditures 2030 2,008,5242,008,524Construction 2,008,524 2,008,524Total Total2025 2026 2027 2028 2029Funding Sources 2030 968,276968,276Construction Fund: MSA 200,919200,919Construction Fund: Special Assess 385,207385,207Utility Fund: Storm 247,724247,724Utility Fund: Water 165,248165,248Utility Fund: Sewer 41,15041,150PACS Fund: Utility Franchise Fees 2,008,524 2,008,524Total 86 Page 247 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Engineering Description This project will continue to build electric vehicle charging infrastructure and provide support for fleet improvements to change to electric vehicles. Electrification of vehicles is happening as costs lower and mileage range continues to grow. Electric vehicles provide to lower GHG emissions and improve air quality with zero tailpipe emissions. One of the top hurdles to EV adoption is the lack of charging infrastructure to "fuel" up the vehicle. To support EV adoption, the City will need to make investments in EV infrastructure. ENVIRONMENTAL CONSIDERATIONS: Supporting electric vehicle infrastructure and fleet replacements provides an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21040 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2020-2021 Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained facilities provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goal. Useful Life 10Project Name Electric Vehicle Infrastructure & Vehicle Upgrades Category Equipment and Vehicles Type Replace or repair Total Project Cost:$600,000 Total2025 2026 2027 2028 2029Expenditures 2030 600,000100,000 100,000 100,000 100,000 100,000Vehicles and Equipment 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 600,000100,000 100,000 100,000 100,000 100,000CAS Fund: Utility Franchise Fees 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 87 Page 248 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Engineering Description In our continuing efforts to provide an accessible environment for residents, visitors and employees, the City completed an ADA inventory to understand areas of need. The inventory conducted an evaluation for compliance with applicable laws, codes and design guidelines pertaining to accessibility. ENVIRONMENTAL CONSIDERATIONS: Facility improvements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21045 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” This project is the implementation of the mission statement and the budget work plan goal. Useful LifeProject Name City Wide ADA Facility Improvements Level 3&4 Category Buildings Type Replace or repair Total Project Cost:$1,336,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,336,0001,336,000Construction 1,336,000 1,336,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,336,0001,336,000Construction Fund: CIP Levy 1,336,000 1,336,000Total 88 Page 249 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity needs near Lift Station #6 along 72nd Street. The pipe is undersized and requires more capacity. ENVIRONMENTAL CONSIDERATIONS: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG21055 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multimodal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. Useful LifeProject Name 72nd Street Sewer Line Upsize Category Infrastructure Type Replace or repair Total Project Cost:$1,600,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,600,0001,600,000Construction 1,600,000 1,600,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,600,0001,600,000Utility Fund: Sewer 1,600,000 1,600,000Total 89 Page 250 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description The project is included in the Water Supply Plan to better distribute water out from Water Treatment Plant #6. This project will install new watermain along Vernon Avenue connecting to 52nd Street. The project will start near the Grandview Parking Ramp. Project #ENG21058 Justification The City’s mission statement "is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Water Supply Grandview Area PH 3 Category Infrastructure Type Replace or repair Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,500,0002,500,000Utility Fund: Water 2,500,000 2,500,000Total 90 Page 251 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description The project is included in the Water Supply Plan to improve fire flows and circulation in the northeast area of the City Project #ENG21059 Justification Useful LifeProject Name Water Supply 50th and France Category Infrastructure Type Replace or repair Total Project Cost:$2,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,000,000Construction2,000,000 2,000,000Total2,000,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,000,000Utility Fund: Water 2,000,000 2,000,000Total2,000,000 91 Page 252 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description Project #ENG21060 Justification Useful LifeProject Name Water Supply Pentagon Park Category Infrastructure Type Replace or repair Total Project Cost:$1,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,000,000Construction1,000,000 1,000,000Total1,000,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,000,000Utility Fund: Water 1,000,000 1,000,000Total1,000,000 92 Page 253 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The multi-tiered retaining wall has a history of small area failures. Each failure requires a small contract with a vendor to patch together at the location of the failure. This project will remove and replace the entire wall with a large modular block wall system. ENVIRONMENTAL CONSIDERATIONS: The retaining wall is due for a complete replacement. A complete replacement with a more structurally sound retaining wall system will greatly reduce time and resources needed to complete small, frequent repairs to the existing wall. Project #ENG21061 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goal 1 is: Maintain Physical Assets & Infrastructure. Properly maintained streets, retaining walls, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. This project is the implementation of the mission statement and the budget work plan goals. Useful LifeProject Name 6520 Belmore Lane Multi-Tiered Retaining Wall Category Infrastructure Type Replace or repair Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Construction 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Bridge Maintenance 400,000 400,000Total 93 Page 254 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 70th Street, Antrim Court, Antrim Road, Antrim Terrace, Down Road, Dublin Circle, Dublin Road, Kerry Road, Lee Valley Road, Shannon Drive, Tralee Drive, Wexford Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23001 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Prospect Knolls A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$6,650,793 Total2025 2026 2027 2028 2029Expenditures 2030 6,650,7936,650,793Construction 6,650,793 6,650,793Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,632,1581,632,158Construction Fund: Special Assess 1,583,4181,583,418Utility Fund: Storm 1,278,1481,278,148Utility Fund: Water 686,265686,265Utility Fund: Sewer 1,470,8041,470,804Special Street Levy 6,650,793 6,650,793Total 94 Page 255 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Gate Park Road, Johnson Drive, Ridge Park Road, Warden Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23002 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Countryside E Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$3,479,516 Total2025 2026 2027 2028 2029Expenditures 2030 3,479,516Construction3,479,516 3,479,516Total3,479,516 Total2025 2026 2027 2028 2029Funding Sources 2030 782,328Construction Fund: Special Assess 782,328 850,851Utility Fund: Storm 850,851 584,093Utility Fund: Water 584,093 391,999Utility Fund: Sewer 391,999 870,245Special Street Levy 870,245 3,479,516Total3,479,516 95 Page 256 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 48th Street, West 49th Street, Edinbrook Lane, Millpond Place, Westbrook Lane) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG23003 Justification See Summary of Street Reconstruction Projects. Useful Life 50Project Name Todd Park B Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$3,153,546 Total2025 2026 2027 2028 2029Expenditures 2030 3,153,5463,153,546Construction 3,153,546 3,153,546Total Total2025 2026 2027 2028 2029Funding Sources 2030 523,709523,709Construction Fund: Special Assess 826,220826,220Utility Fund: Storm 783,583783,583Utility Fund: Water 299,187299,187Utility Fund: Sewer 720,847720,847Special Street Levy 3,153,546 3,153,546Total 96 Page 257 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Benton Avenue from Tracy Avenue to Hansen Road. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG23004 Justification See Summary of Street Reconstruction Projects. Useful LifeProject Name Benton Avenue A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$2,834,512 Total2025 2026 2027 2028 2029Expenditures 2030 2,834,512Construction2,834,512 2,834,512Total2,834,512 Total2025 2026 2027 2028 2029Funding Sources 2030 1,475,297Construction Fund: MSA 1,475,297 108,997Construction Fund: Special Assess 108,997 434,318Utility Fund: Storm 434,318 369,875Utility Fund: Water 369,875 186,198Utility Fund: Sewer 186,198 109,800PACS Fund: Utility Franchise Fees 109,800 150,027Special Street Levy 150,027 2,834,512Total2,834,512 97 Page 258 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project rehabilitates sanitary sewer adjacent to the Braemar Golf Course. This area of sanitary sewer has high levels in inflow and infiltration (I & I) or unnecessary clean water entering the system. Pipe and manholes will be lined where needed to reduce I & I. ENVIRONMENTAL CONSIDERATIONS: Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible. Project #ENG23009 Justification The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts. Useful LifeProject Name Hilary Lane Sanitary Sewer Lining Category Infrastructure Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Utility Fund: Sewer 300,000 300,000Total 98 Page 259 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Concord and Golf Terrace Neighborhoods, This project follows the 2022(Draft) Local Surface Water Management Plan. Project #ENG23010 Justification ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Useful LifeProject Name Concord Flood Infrastrucure Project #2 area Category Infrastructure Type New Total Project Cost:$10,650,000 Total2025 2026 2027 2028 2029Expenditures 2030 10,650,000200,000 950,000 9,500,000Construction 200,000 950,000 9,500,000 10,650,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 10,650,000200,000 950,000 9,500,000Utility Fund: Storm 200,000 950,000 9,500,000 10,650,000Total 99 Page 260 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Arden Park and Country Club Neighborhoods, This project need is discussed in the 2022(Draft) Local Surface Water Management Plan and informed by further staff evaluation of options to divert and add capacity for flood flow on 50th Street. Other opportunities for flood risk reduction will be evaluated. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23011 Justification This project is included in the 2022 Local water management plan in concept. 2027 and 2028 costs are placeholders for review and design work ahead of a 2029+ construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Arden & 50th Flood Infrastructure Project #3 Area Category Infrastructure Type New Total Project Cost:$5,150,000 Total2025 2026 2027 2028 2029Expenditures 2030 650,000200,000 450,000Construction 200,000 450,000 650,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 650,000200,000 450,000Utility Fund: Storm 200,000 450,000 650,000Total 100 Page 261 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Lake Cornelia and Normandale Park Neighborhoods, This project follows the 2022(Draft) Local Surface Water Management Plan and will require further evaluation of options to reduce flood risk. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23012 Justification Useful LifeProject Name Lake Cornelia and Normandale Park Flood Infras Category Infrastructure Type Horizon Total Project Cost:$16,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 16,000,00016,000,000Construction 16,000,000 16,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 16,000,00016,000,000Utility Fund: Storm 16,000,000 16,000,000Total 101 Page 262 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Minnehaha Woods and Pamela Park Neighborhoods, This project proposes the increase in flood carrying capacity of the France Avenue Minnehaha crossing that drives flood risk in very large storm events. ENVIRONMENTAL CONSIDERATIONS: Flood Infrastructure project take materials and natural resources to build. Project #ENG23013 Justification 2027 and 2028 costs are placeholders for review and design work ahead of a 2029+ construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name France Avenue Crossing (Minnehaha Creek)Category Infrastructure Type New Total Project Cost:$6,800,000 Total2025 2026 2027 2028 2029Expenditures 2030 800,000200,000 600,000Construction 200,000 600,000 800,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 800,000200,000 600,000Utility Fund: Storm 200,000 600,000 800,000Total 102 Page 263 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing flood control smart infrastructure into existing lift station and flow control features across a part of the City. ENVIRONMENTAL CONSIDERATIONS: Adaptive Level management retrofits take minimal materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23014 Justification This project is included in the 2022 Local water management plan in concept and follows the flood risk reduction strategy. 2025 costs are placeholders for review and design work ahead of a 2027 construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Adaptive Level Management Project Ph 2 Minnehaha Category Infrastructure Type New Total Project Cost:$2,700,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,700,000200,000 2,500,000Construction 200,000 2,500,000 2,700,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,700,000200,000 2,500,000Utility Fund: Storm 200,000 2,500,000 2,700,000Total 103 Page 264 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing flood control smart infrastructure into existing lift station and flow control features across a part of the City. ENVIRONMENTAL CONSIDERATIONS: Adaptive Level management retrofits take minimal materials and natural resources to build. Design also includes clean surface water consideration. Project #ENG23015 Justification This project is included in the 2022 Local water management plan in concept and follows the flood risk reduction strategy. 2023 cost is for review and design work ahead of a 2025 construction. Capital estimates will be further evaluated and included in the next CIP. Useful LifeProject Name Adaptive Level Management Project Nine Mile Creek Category Infrastructure Type New Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,500,0002,500,000Utility Fund: Storm 2,500,000 2,500,000Total 104 Page 265 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project proposes to retrofit existing pipe and graded overflows to better pass flow waters where there are minor downstream tradeoffs. Project #ENG23016 Justification This project bundles a variety of minor grading and pipe projects from the 2022 Local water management plan. The 2024 costs are for review and design work ahead of a 2026 construction. Capital estimates will be further evaluated and included in later CIPs. Useful LifeProject Name Minor Pipe and Grading Project (Citywide)Category Infrastructure Type New Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,500,000Construction 2,500,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,500,0002,500,000Utility Fund: Storm 2,500,000 2,500,000Total 105 Page 266 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will reduce flood risk in the Chowen Park and Strachauer Park Neighborhoods, This project need is discussed in the 2022 Local Surface Water Management Plan and informed by further staff evaluation of options to divert and add capacity for flood flow on 60th and France Avenue Project #ENG23017 Justification Useful LifeProject Name Chowen and 60th Flood Project Category Infrastructure Type Horizon Total Project Cost:$1,100,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,100,000Construction1,100,000 1,100,000Total1,100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,100,000Utility Fund: Storm 1,100,000 1,100,000Total1,100,000 106 Page 267 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) and the York Avenue Sanitary Sewer Extension (SEH Engineering 2019) Project #ENG23033 Justification ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Avenue Hazelton Category Infrastructure Type Expand or enhance Total Project Cost:$14,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000Construction 200,000 2,000,000 500,000 5,000,000 1,200,000 8,900,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 8,900,000200,000 2,000,000 500,000 5,000,000 1,200,000Utility Fund: Sewer 200,000 2,000,000 500,000 5,000,000 1,200,000 8,900,000Total 107 Page 268 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will meet increasing sewer capacity in southeast Edina by extending the York Avenue sanitary sewer trunk line. The project follows the Southeast Edina Sanitary Sewer Study (Barr Engineering 2017) and the York Avenue Sanitary Sewer Extension (SEH Engineering 2019) Project #ENG23034 Justification ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce infiltration and inflow of clean waters reduce future capital and infrastructure need both locally and in the regional treatment system. Useful Life 75Project Name Sanitary Trunk Capacity Exp York Avenue 69th St W Category Infrastructure Type Expand or enhance Total Project Cost:$1,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,400,0001,400,000Construction 1,400,000 1,400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,400,0001,400,000Utility Fund: Sewer 1,400,000 1,400,000Total 108 Page 269 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will replace, repair and rehabilitate watermain, gate valves,hydrants or service lines in areas that experience high reported breaks or component failure or are found to be near the end of their expected lifespan though maintenance records and nondestructive testing. One project area meeting this criteria for a standalone water main rehabilitation is the Heights Neighborhood. Project scope and limits to be determined based on scale of issue and current construction costs ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce water leaks reduce pumping costs and associated energy use, and reduce future capital and infrastructure need both locally and in the regional production system. Project #ENG23035 Justification The City’s mission statement "is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on the age and condition of the pavement surfaces, public utility systems, and pedestrian and traffic facilities. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Watermain Rehabilitation (Citywide)Category Infrastructure Type Replace or repair Total Project Cost:$1,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,400,0001,400,000Construction 1,400,000 1,400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,400,0001,400,000Utility Fund: Water 1,400,000 1,400,000Total 109 Page 270 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description As part of the 2012 Water Treatment Plant #6 design and construction and the 2018 Water Plan Update, the water distribution system in the Grandview Area is in need of improvements. The WTP #6 is unable to produce at full capacity because of a lack of pipe size in the distribution system. The project would install new watermain pipe from Arcadia Avenue to Grange Road along Vernon Avenue and 50th Street. ENVIRONMENTAL CONSIDERATIONS: Utility pipe rehabilitation through trenchless technologies reduces greenhouse gases associated with open cut installations. Efforts to reduce water leaks reduce pumping costs and associated energy use, and reduce future capital and infrastructure need both locally and in the regional production system. Project #ENG23036 Justification The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s 2018-2019 Budget Work Plan Goals 1 and 3 are; Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development, respectively. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi- modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. This project is the implementation of the mission statement and the budget work plan goals. The recommended schedule is based on need. It may also be coordinated with other city, county, and state projects in the area. Useful LifeProject Name Grandview Area Watermain Improvements PH 2 Category Infrastructure Type Replace or repair Total Project Cost:$240,000 Total2025 2026 2027 2028 2029Expenditures 2030 240,000240,000Construction 240,000 240,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 240,000240,000Utility Fund: Water 240,000 240,000Total 110 Page 271 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project involves the reconstruction of 50th Street from Grange Road to east of Dale Street. The project was discussed as part of the 4917 Eden Avenue redevelopment project. It will install traffic safety improvements. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, upgrading public utilities (watermain, sanitary sewer, and storm sewer) and pedestrian and traffic facility improvements. Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops Roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material, implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations, and hydro-seeding restoration versus traditional sod placement when feasible Project #ENG23041 Justification The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s 2020-2021 Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Budget Impact/Other Useful Life 50Project Name TH Tight Diamond Interchange Category Infrastructure Type Replace or repair Total Project Cost:$11,257,404 Total2025 2026 2027 2028 2029Expenditures 2030 11,257,40411,257,404Construction 11,257,404 11,257,404Total Total2025 2026 2027 2028 2029Funding Sources 2030 5,007,4045,007,404Construction Fund: MSA 250,000250,000HRA Fund: Centennial Lakes TIF 300,000300,000Utility Fund: Storm 700,000700,000Construction Fund: Grants/Donations 300,000300,000Utility Fund: Water 300,000300,000Utility Fund: Sewer 400,000400,000PACS Fund: Utility Franchise Fees 4,000,0004,000,000CIP Bonds 11,257,404 11,257,404Total 111 Page 272 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as vehicles, surveying and inspection tools, and technology, among other items. 2025: 2013 Nissan Leaf 2013 Ford F150 2012 GMC Sierra 2500 HD 2026: 2016 GMC Sierra Pickup 1500 4x4 2019 Mitsubishi Outlander 2027: Department Furniture 2017 GMC Sierra WT 2006 JLG PSESLIFT 2017 Ford Explorer 2028: 2016 Tennant M30 or S30 Power Sweeper 2029: 2017 Toyota Prius II 2017 GMC Sierra Pickup 2030: GS18i and CS20 GPS Unit and Controller Project #ENG23200 Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of department vehicles, surveying and inspection tools, and technology allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Useful LifeProject Name Engineering Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$631,331 Total2025 2026 2027 2028 2029Expenditures 2030 631,331150,000 102,631 191,500 64,700 92,500Vehicles and Equipment 30,000 150,000 102,631 191,500 64,700 92,500 631,331Total30,000 Total2025 2026 2027 2028 2029Funding Sources 2030 631,331150,000 102,631 191,500 64,700 92,500Construction Fund: Equipment Levy 30,000 150,000 102,631 191,500 64,700 92,500 631,331Total30,000 112 Page 273 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Engineering Description The project is the city’s first, city-owned fast charging station. The station will be located at Edina Public Works and Park Maintenance Facility, providing support for Edina’s growing electric fleet. Project #ENG25001 Justification Expansion and/or Level of Service Sustainability:Adding more electric vehicles to the City’s fleet is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emissions. Fast charging supports electric vehicle adoption by providing quick, convenient charging. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of electric vehicle charging infrastructure. Focusing on city fleet, this project does not contain an engagement component. Health in All Policies: Electric vehicles are zero-emission vehicles, meaning there are no harmful tailpipe emissions that negatively impact air quality. Race & Equity: Charging stations located across the community create equitable access to infrastructure. Stewardship: The cost to charge vehicles is decreasing and is already more cost-effective per mile to charge a vehicle when compared to gas- powered vehicles. Useful Life 10Project Name DC Fast Charger Category Equipment and Vehicles Type New Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Vehicles and Equipment 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Construction Fund: Grants/Donations 150,000150,000CAS Fund: Utility Franchise Fees 300,000 300,000Total 113 Page 274 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated Parklawn Avenue from West 76th Street to West 77th Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG25002 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Parklawn Avenue A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$1,360,247 Total2025 2026 2027 2028 2029Expenditures 2030 1,360,2471,360,247Construction 1,360,247 1,360,247Total Total2025 2026 2027 2028 2029Funding Sources 2030 524,385524,385Construction Fund: MSA 48,27048,270Construction Fund: Special Assess 226,673226,673Utility Fund: Storm 201,768201,768Utility Fund: Water 103,924103,924Utility Fund: Sewer 172,400172,400PACS Fund: Utility Franchise Fees 82,82782,827Special Street Levy 1,360,247 1,360,247Total 114 Page 275 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project involves the reconstruction of Municipal State Aid designated West 77th Street from Parklawn Avenue to France Avenue. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include streetlight upgrades, and pedestrian, bicycle and traffic facility improvements. The project will meet current State Aid requirements. Project #ENG25003 Justification Expansion and/or Level of Service Sustainability:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name W 77th Street D Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$2,408,348 Total2025 2026 2027 2028 2029Expenditures 2030 2,408,3482,408,348Construction 2,408,348 2,408,348Total Total2025 2026 2027 2028 2029Funding Sources 2030 987,078987,078Construction Fund: MSA 90,86190,861Construction Fund: Special Assess 426,678426,678Utility Fund: Storm 379,800379,800Utility Fund: Water 195,622195,622Utility Fund: Sewer 172,400172,400PACS Fund: Utility Franchise Fees 155,909155,909Special Street Levy 2,408,348 2,408,348Total 115 Page 276 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 55th Street, West 56th Street, West 57th Street, Abbott Avenue, York Avenue, Zenith Avenue) within the project area. This includes replacing the entire pavement surface, repair / replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25005 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Chowen Park C Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$9,237,718 Total2025 2026 2027 2028 2029Expenditures 2030 9,237,7189,237,718Construction 9,237,718 9,237,718Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,414,9911,414,991Construction Fund: Special Assess 2,460,7762,460,776Utility Fund: Storm 2,434,7052,434,705Utility Fund: Water 929,616929,616Utility Fund: Sewer 50,00050,000PACS Fund: Utility Franchise Fees 1,947,6301,947,630Special Street Levy 9,237,718 9,237,718Total 116 Page 277 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 57th Street, Beard Avenue, Chowen Avenue, Drew Avenue, Ewing Avenue) within the project area. This includes replacing the entire pavement surface, repair / replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25006 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Chowen Park E Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$5,860,721 Total2025 2026 2027 2028 2029Expenditures 2030 5,860,7215,860,721Construction 5,860,721 5,860,721Total Total2025 2026 2027 2028 2029Funding Sources 2030 878,270878,270Construction Fund: Special Assess 1,527,3781,527,378Utility Fund: Storm 1,511,1961,511,196Utility Fund: Water 577,003577,003Utility Fund: Sewer 158,000158,000PACS Fund: Utility Franchise Fees 1,208,8741,208,874Special Street Levy 5,860,721 5,860,721Total 117 Page 278 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (Brookview Avenue, Park Place, Woodcrest Drive, Woodland Road) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25009 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Minnehaha Woods B Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$4,119,420 Total2025 2026 2027 2028 2029Expenditures 2030 4,119,4204,119,420Construction 4,119,420 4,119,420Total Total2025 2026 2027 2028 2029Funding Sources 2030 618,632618,632Construction Fund: Special Assess 1,282,7071,282,707Utility Fund: Storm 692,075692,075Utility Fund: Water 464,487464,487Utility Fund: Sewer 1,061,5191,061,519Special Street Levy 4,119,420 4,119,420Total 118 Page 279 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description Pamela Park B (Peacedale Avenue)This project involves the reconstruction and rehabilitation of local street Peacedale Avenue from the Highway 62 frontage road to West 62nd Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25010 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Pamela Park B (Peacdale Avenue) Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$1,815,098 Total2025 2026 2027 2028 2029Expenditures 2030 1,815,0981,815,098Construction 1,815,098 1,815,098Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,399250,399Construction Fund: Special Assess 454,631454,631Utility Fund: Storm 492,398492,398Utility Fund: Water 188,007188,007Utility Fund: Sewer 429,663429,663Special Street Levy 1,815,098 1,815,098Total 119 Page 280 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Halifax Avenue from the Highway 62 frontage road to West 62nd Street. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25011 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Pamela Park C (Halifax Avenue) Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$1,388,016 Total2025 2026 2027 2028 2029Expenditures 2030 1,388,0161,388,016Construction 1,388,016 1,388,016Total Total2025 2026 2027 2028 2029Funding Sources 2030 191,481191,481Construction Fund: Special Assess 347,659347,659Utility Fund: Storm 376,540376,540Utility Fund: Water 143,770143,770Utility Fund: Sewer 328,566328,566Special Street Levy 1,388,016 1,388,016Total 120 Page 281 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local street Washington Avenue from Valley View Road to the City limits north of Valley View Road, which is a shared street with the City of Eden Prairie. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25012 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Braemar Hills E (Washington Avenue) Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$964,181 Total2025 2026 2027 2028 2029Expenditures 2030 964,181Construction964,181 964,181Total964,181 Total2025 2026 2027 2028 2029Funding Sources 2030 172,485Construction Fund: Special Assess 172,485 332,148Utility Fund: Storm 332,148 51,164Utility Fund: Water 51,164 34,339Utility Fund: Sewer 34,339 374,045Special Street Levy 374,045 964,181Total964,181 121 Page 282 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 66th Street, Cahill Lane, Cahill Road, Galway Drive, Hillside Lane, Limerick Lane) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25013 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name The Heights A Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$9,343,836 Total2025 2026 2027 2028 2029Expenditures 2030 9,343,836Construction9,343,836 9,343,836Total9,343,836 Total2025 2026 2027 2028 2029Funding Sources 2030 1,127,030Construction Fund: Special Assess 1,127,030 2,370,717Utility Fund: Storm 2,370,717 2,248,376Utility Fund: Water 2,248,376 858,472Utility Fund: Sewer 858,472 295,200PACS Fund: Utility Franchise Fees 295,200 2,444,041Special Street Levy 2,444,041 9,343,836Total9,343,836 122 Page 283 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description This project involves the reconstruction and rehabilitation of local streets (West 66th Street, West 68th Street, Grace Terrace, Hillside Circle, Hillside Court, Lois Lane, Susan Avenue, Tracy Avenue) within the project area. This includes replacing the entire pavement surface, repair/replacement of curb and gutter, and upgrading public utilities (watermain, sanitary sewer, and storm sewer). The project may also include installation of sump pump discharge pipes, streetlight upgrades, and pedestrian and traffic facility improvements. Project #ENG25014 Justification Expansion and/or Level of Service Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name The Heights C Reconstruction Category Infrastructure Type Replace or repair Total Project Cost:$7,590,070 Total2025 2026 2027 2028 2029Expenditures 2030 7,590,070Construction7,590,070 7,590,070Total7,590,070 Total2025 2026 2027 2028 2029Funding Sources 2030 939,192Construction Fund: Special Assess 939,192 1,729,936Utility Fund: Storm 1,729,936 1,873,647Utility Fund: Water 1,873,647 715,394Utility Fund: Sewer 715,394 295,200PACS Fund: Utility Franchise Fees 295,200 2,036,701Special Street Levy 2,036,701 7,590,070Total7,590,070 123 Page 284 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description The multi-tiered retaining wall has a history of small area failures. Each failure requires a small contract with a vendor to patch together at the location of the failure. This project will remove and replace the entire wall with a large modular block wall system. Project #ENG25018 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name 6932 Valley View Road Multi-Tiered Retaining Wall Category Infrastructure Type Replace or repair Total Project Cost:$360,000 Total2025 2026 2027 2028 2029Expenditures 2030 360,000360,000Construction 360,000 360,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 360,000360,000Bridge Maintenance 360,000 360,000Total 124 Page 285 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The material around the railroad tracks along Dewey Hill Road that provides a smooth transition from the street pavement over the railroad tracks is starting to fail. The city is responsible for providing the materials to CP Rail for their crews to install. Project #ENG25020 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Dewey Hill Road CP Rail Crossing Category Infrastructure Type Replace or repair Total Project Cost:$35,000 Total2025 2026 2027 2028 2029Expenditures 2030 35,00035,000Construction 35,000 35,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 35,00035,000Bridge Maintenance 35,000 35,000Total 125 Page 286 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create an ADA pedestrian access route from the new Grandview Pedestrian Bridge across the top level of the Grandview Parking Ramp. It will create a route for users to access Jerry’s Tower that has an elevator. The elevator would be accessible during normal business hours. Coordination with Jerry’s Enterprise is needed to discuss the impact of losing 16 parking stalls and maintenance and operations responsibilities. Project #ENG25021 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Grandview Parking Ramp ADA Access Route Category Infrastructure Type New Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Construction 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Construction Fund: CIP Levy 200,000 200,000Total 126 Page 287 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create an ADA pedestrian access route from the new Grandview Pedestrian Bridge across the top level of the Grandview Parking Ramp. It will create a route for users to access Jerry’s Tower that has an elevator. The elevator would be accessible during normal business hours. Coordination with Jerry’s Enterprise is needed to discuss the impact of losing 16 parking stalls and maintenance and operations responsibilities. Project #ENG25022 Justification Health, Safety & Regulatory Compliance Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Grandview Parking Ramp ADA Access Route to Gus Yng Category Infrastructure Type New Total Project Cost:$2,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,000,0002,000,000Construction 2,000,000 2,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,000,0002,000,000Construction Fund: CIP Levy 2,000,000 2,000,000Total 127 Page 288 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace 2,500 linear feet of 8-ft tall wood fence that is at the end of its useful life. The fence was installed in 1994. It has many trees, shrubs and other vegetation growing in and around it that increases the difficulty of replacement. Project #ENG25023 Justification Expansion and/or Level of Service Sustanability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects continue to provide a physical barrier between private property and the vehicle traveled way. This separation creates a safter environment for the individual property owners. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 25Project Name Valley View Rd Fence Replace Sdale Neighborhood Category Infrastructure Type Replace or repair Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Construction Fund: MSA 100,000 100,000Total 128 Page 289 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will create a pedestrian connection under France Avenue between Gallagher Drive and 72nd Street. It will extend into potential development projects on both the east and west sides of France Avenue. It will provide much safer pedestrian access on the east and west sides of France Avenue to Centennial Lakes Park and the Cornelia Neighborhood. Project #ENG25025 Justification Expansion and/or Level of Service Sustainability:Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name France Avenue Crossing Gallagher & 72nd Category Infrastructure Type New Total Project Cost:$16,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 16,000,000500,000 1,500,000 7,000,000 7,000,000Construction 500,000 1,500,000 7,000,000 7,000,000 16,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 16,000,000500,000 1,500,000 7,000,000 7,000,000HRA Fund: Centennial Lakes TIF 500,000 1,500,000 7,000,000 7,000,000 16,000,000Total 129 Page 290 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Project #ENG25026 Justification Health, Safety & Regulatory Compliance Sustainability: Carbon: The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Surface water: The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives: Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material and implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Rosland Park Pedestrian Bridge Category Infrastructure Type New Total Project Cost:$6,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 6,000,0006,000,000Construction 6,000,000 6,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 6,000,0006,000,000Construction Fund: Grants/Donations 6,000,000 6,000,000Total 130 Page 291 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace 1,300 linear feet of concrete curb and gutter in the 50th and France District along 50th Street between Halifax Avenue and France Avenue. The curb is at the end of its useful life. This work will be coordinated with a mill and overlay project. Project #ENG25027 Justification Expansion and/or Level of Service Sustainability:The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name 50th St Concrete Curb and Gutter Replacement Category Infrastructure Type Replace or repair Total Project Cost:$55,000 Total2025 2026 2027 2028 2029Expenditures 2030 55,00055,000Construction 55,000 55,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 55,00055,000Utility Fund: Storm 55,000 55,000Total 131 Page 292 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The traffic signal poles and bolt connections to the structural foundations are rusting and are nearing the end of their useful life. This project will install a new traffic control signal system. Project #ENG25028 Justification Health, Safety, and Regulatory Compliance Sustainability:The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, our roadway reconstruction projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses." The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Traffic Signal at Halifax and 50th St Category Infrastructure Type Replace or repair Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Construction 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Construction Fund: MSA 400,000 400,000Total 132 Page 293 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The retaining wall along the north side of the 50th Street Bridge over Minnehaha Creek is starting to separate from the structure. This project will remove and replace the retaining wall. Project #ENG25029 Justification Health, Safety and Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name 50th over Minnehaha Creek North Retaining Wall Category Infrastructure Type Replace or repair Total Project Cost:$275,000 Total2025 2026 2027 2028 2029Expenditures 2030 275,000275,000Construction 275,000 275,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 275,000275,000Construction Fund: MSA 275,000 275,000Total 133 Page 294 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Benton Ave Bridge over CP Rail has maintenance needs. The beams under the deck are due for painting to extend the life of the structure. Project #ENG25030 Justification Health, Safety & Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Benton Avenue Over CP Rail Beam Painting Category Infrastructure Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000Construction250,000 250,000Total250,000 Total2025 2026 2027 2028 2029Funding Sources 2030 250,000Construction Fund: MSA 250,000 250,000Total250,000 134 Page 295 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The Valley View Bridge over CP Rail has maintenance needs. The beams under the deck are due for painting to extend the life of the structure. Project #ENG25031 Justification Health, Safety & Regulatory Compliance Sustainability: The City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Compared to new construction projects, rehabilitation projects try to minimize disturbance and/or reuse as much of the existing facilities as possible to reduce the environmental impact. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 50Project Name Valley View Road Bridge over CP Rail Beam Painting Category Infrastructure Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000Construction250,000 250,000Total250,000 Total2025 2026 2027 2028 2029Funding Sources 2030 250,000Construction Fund: MSA 250,000 250,000Total250,000 135 Page 296 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will cure in place line 3,400 linear feet of clay sanitary sewer pipe. This type of trenchless rehabilitation technology only needs access to the manholes for installation. It does not require large scale open cutting operations. It builds a long-term structural pipe within the existing pipe. Project #ENG25033 Justification Expansion and/or Level of Service Sustainability: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Nine Mile Village Sanitary Sewer Lining Category Infrastructure Type Replace or repair Total Project Cost:$175,000 Total2025 2026 2027 2028 2029Expenditures 2030 175,000175,000Construction 175,000 175,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 175,000175,000Utility Fund: Sewer 175,000 175,000Total 136 Page 297 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace approximately 130 linear feet of sanitary sewer pipe that has settled and created a sag in the pipe. The sag slows flow and collects debris. The pipe will be replaced by open cut method and along with impacted street pavements Project #ENG25034 Justification Expansion and/or Level of Service Sustainability: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful Life 75Project Name Olinger Road Sanitary Sewer Replacement Category Infrastructure Type Replace or repair Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Utility Fund: Sewer 100,000 100,000Total 137 Page 298 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description "This project will use iron and aluminum chemical additions to sequester the sediment phosphorus that causes algae blooms and fuels lake and creek water quality impairments. The project will work citywide in priority watersheds. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible.Decades of urban development and runoff have lead to waterbodies with nutrient rich sediment. The sediment phosphorus fuels aerobic and anerobic decay of accumulated biomass and leads to low oxygen levels and phosphorus release into the water column that impairing waters. This project begins restore ecological processes by resetting the sequestering the sediment phosphorus. " Project #ENG25036 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 1 - Lake & Pond Sediment Phosphorus Sequest Category Infrastructure Type New Total Project Cost:$550,000 Total2025 2026 2027 2028 2029Expenditures 2030 550,00050,000 100,000 100,000 100,000 100,000Installation/Maintenance 100,000 50,000 100,000 100,000 100,000 100,000 550,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 550,00050,000 100,000 100,000 100,000 100,000Utility Fund: Storm 100,000 50,000 100,000 100,000 100,000 100,000 550,000Total100,000 138 Page 299 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description "This project will prevent pollution at and near their source on the roads draining to priority waters. Targeted intensive street sweeping is one of the most effective interventions cities can make to promote clean waters. Cleaner streets = cleaner water. The project will work citywide in priority watersheds. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. Urban development with curb and gutter speeds water and accumulated pollutants like sediment, phosphorus and nitrogen downstream to waters where it accumulates causing water quality impairments. Sweeping removes the pollutants at and near their source before they have a chance to break down and make their way into waters." Project #ENG25037 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 2 - Targeted Intensive Street Sweeping Category Infrastructure Type New Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,00010,000 20,000 70,000Installation/Maintenance 10,000 20,000 70,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,00010,000 20,000 70,000Utility Fund: Storm 10,000 20,000 70,000 100,000Total 139 Page 300 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description This project will coordinate with local watersheds and/or the Met Council to expand the network of monitoring for trends in waterbody health.The work is an implementation step of the Clean Water Strategy (CWS) the values and goals of which include;City actions align to do the most good towards measurable, desirable clean water outcomes leveraging creativity and innovation.•The city uses an iterative ‘build, test, learn’ model to make progress.•The city uses a systems approach in its implementation to consider cumulative benefits.•Clean water goals are pursued with consideration for multiple benefits and available resources.By tracking trends in close partnership with local water agencies, the City can better align and target its work for greater effect. Project #ENG25038 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 3 - Assurance, Monitoring, Lakegrades Category Infrastructure Type New Total Project Cost:$215,000 Total2025 2026 2027 2028 2029Expenditures 2030 215,00040,000 35,000 35,000 35,000 35,000Installation/Maintenance 35,000 40,000 35,000 35,000 35,000 35,000 215,000Total35,000 Total2025 2026 2027 2028 2029Funding Sources 2030 215,00040,000 35,000 35,000 35,000 35,000Utility Fund: Storm 35,000 40,000 35,000 35,000 35,000 35,000 215,000Total35,000 140 Page 301 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jessica Wilson 2025 2030thru Department Engineering Description This project will control rough fish like carp and hybrid goldfish to reduce their harmful effects on clean water. The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. Rough fish feed and stir up bottom sediments releasing accumulated pollutants into the water column causing algae blooms and water quality impairments. Project #ENG25039 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 4 - Rough Fish Management Category Infrastructure Type New Total Project Cost:$190,000 Total2025 2026 2027 2028 2029Expenditures 2030 190,00030,000 40,000 40,000 40,000Installation/Maintenance 40,000 30,000 40,000 40,000 40,000 190,000Total40,000 Total2025 2026 2027 2028 2029Funding Sources 2030 190,00030,000 40,000 40,000 40,000Utility Fund: Storm 40,000 30,000 40,000 40,000 40,000 190,000Total40,000 141 Page 302 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ross Bintner 2025 2030thru Department Engineering Description This project will mitigate pollution in the stormwater systems draining to priority waters. While not as cost competitive as some of the in- waterbody and pollution control work in CWS 1,2, and 4, Clean water infrastructure can work in combination with these practices to further reduce water pollutants.The work is an implementation step of the Clean Water Strategy (CWS), to promote a healthy ecosystem equilibrium where waters are clear, safe and accessible. The project will work citywide in priority watersheds. Urban development with curb and gutter speeds water and accumulated pollutants like sediment, phosphorus and nitrogen downstream to waters where it accumulates causing water quality impairments. Clean water infrastructure intercepts the water, and filters, settles, or adsorbs pollutants to sequester them so they can be removed by a maintenance action and properly disposes or reuses them. Project #ENG25040 Justification Expansion and/or Level of Service Useful LifeProject Name CWS 5 - New Clean Water Infrastructure Category Infrastructure Type New Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Utility Fund: Storm 150,000 150,000Total 142 Page 303 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will rehabilitate approximately 1,200 linear feet of watermain pipe along Chapel Drive between Chapel Lane and Antrim Road. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. Project #ENG25043 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Chapel Drive Watermain Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Utility Fund: Water 300,000 300,000Total 143 Page 304 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron Ditzler 2025 2030thru Department Engineering Description The project will rehabilitate approximately 4,000 linear feet of watermain pipe along Maloney Avenue between Washington Avenue and Blake Road. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. This work may be combined with the Presidents Neighborhood Street Reconstruction Project. Project #ENG25044 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Maloney Ave Watermain Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$1,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,000,0001,000,000Utility Fund: Water 1,000,000 1,000,000Total 144 Page 305 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description Project #ENG25045 Justification The project will replace approximately 175 linear feet of watermain pipe under Nine Mile Creek between residential properties on the north and commercial properties on the south. The pipe is failing and needs replacement. The adjacent properties will need to provide access for the project. Useful LifeProject Name Watermain Replacement under NMC at 5901 Lincoln Dr Category Infrastructure Type Replace or repair Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Construction 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Utility Fund: Water 50,000 50,000Total 145 Page 306 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will replace approximately 1150 linear feet of watermain pipe between Long Brake Trail, Shannon Drive and Coventry Way. The pipes are located behind residential properties in green space and storm water management areas. The pipes are failing and need replacement. The adjacent properties will need to provide access for the project. Project #ENG25046 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future.. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Watermain Replcmnt LB Tr/Shannon Dr/Coventry Way Category Infrastructure Type Replace or repair Total Project Cost:$225,000 Total2025 2026 2027 2028 2029Expenditures 2030 225,000225,000Construction 225,000 225,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 225,000225,000Utility Fund: Water 225,000 225,000Total 146 Page 307 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description The project will rehabilitate approximately 25,000 linear feet of watermain pipe within the Heights Neighborhood. The pipes are located under the streets. The pipes are breaking at high frequencies and need rehabilitation. It is anticipated that the project will use the cured-in-place pipe rehabilitation method. Project #ENG25047 Justification Expansion and/or Level of Service Sustainability: Alternative construction methods utilized within the City include implementation of utility pipe rehabilitation through trenchless technologies thus reducing greenhouse gases associated with open cut installations where applicable. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and utility systems. Health in All Policies: These projects provide the City's water customers with safe and reliable drinking and water for fire protection with a lens to protect the health, safety, and welfare of our citizens now and into the future. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. Useful LifeProject Name Heights Neighborhood Watermain Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$6,250,000 Total2025 2026 2027 2028 2029Expenditures 2030 6,250,0006,250,000Construction 6,250,000 6,250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 6,250,0006,250,000Utility Fund: Water 6,250,000 6,250,000Total 147 Page 308 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will include repair or replacement of public sidewalks and pedestrian curb ramps maintained by the City of Edina. This project supports the City’s ADA Transition Plan. Project #ENG25050 Justification Health, Safety & Regulatory Compliance Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Sidewalk Inspection Program Category Infrastructure Type Replace or repair Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,00050,000 50,000 50,000 50,000 50,000Installation/Maintenance 50,000 50,000 50,000 50,000 50,000 50,000 300,000Total50,000 Total2025 2026 2027 2028 2029Funding Sources 2030 300,00050,000 50,000 50,000 50,000 50,000PACS Fund: Utility Franchise Fees 50,000 50,000 50,000 50,000 50,000 50,000 300,000Total50,000 148 Page 309 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project will provide funding for roadway improvements that seek to reduce vehicle speeds and improve safety for pedestrians and cyclists. Such improvements may include curb extensions, medians, refuge islands, or dynamic display speed signs. Specific projects will be determined by staff based on observed data, traffic safety requests, and with input from the Traffic Safety Committee and the Transportation Commission. Project #ENG25051 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Drive 25 Improvements Category Infrastructure Type Replace or repair Total Project Cost:$120,000 Total2025 2026 2027 2028 2029Expenditures 2030 120,00020,000 20,000 20,000 20,000 20,000Construction 20,000 20,000 20,000 20,000 20,000 20,000 120,000Total20,000 Total2025 2026 2027 2028 2029Funding Sources 2030 120,00020,000 20,000 20,000 20,000 20,000PACS Fund: Utility Franchise Fees 20,000 20,000 20,000 20,000 20,000 20,000 120,000Total20,000 149 Page 310 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves implementing a road diet on Normandale Road between 77th Street and Viking Drive and on Viking Drive between Normandale Road and Computer Avenue. The reallocation of right-of-way will provide space to add on-street bicycle facilities. This work will be implemented as part of a scheduled pavement maintenance project. Project #ENG25052 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Normandale Road/Viking Drive Bike Lanes Category Infrastructure Type New Total Project Cost:$28,200 Total2025 2026 2027 2028 2029Expenditures 2030 28,20028,200Construction 28,200 28,200Total Total2025 2026 2027 2028 2029Funding Sources 2030 28,20028,200PACS Fund: Utility Franchise Fees 28,200 28,200Total 150 Page 311 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves updating the City’s Pedestrian and Bicycle Master Plan, which guides the development of the Edina’s multi-modal transportation network. This project will involve hiring a consultant to assist with community engagement, coordinating meetings with staff and officials, reviewing existing policies and best-practices, and developing recommendations. Project #ENG25053 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Pedestrian and Bicycle Master Plan Update Category Infrastructure Type Replace or repair Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000PACS Fund: Utility Franchise Fees 100,000 100,000Total 151 Page 312 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves upgrading the existing bike lanes on Wooddale Avenue between 50th Street and Valley View Road. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Valley View Road and Wooddale Avenue. Project #ENG25054 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Wooddale Avenue Bike Lanes Category Infrastructure Type New Total Project Cost:$111,100 Total2025 2026 2027 2028 2029Expenditures 2030 111,10091,600 19,500Construction 91,600 19,500 111,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 111,10091,600 19,500PACS Fund: Utility Franchise Fees 91,600 19,500 111,100Total 152 Page 313 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a shared-use path on McCauley Trail between Post Lane and Indian Hills Trail. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on McCauley Trail and proposed facilities on McCauley Trail and Indian Hills Trail. Project #ENG25055 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name McCauley Trail Shared-Use Path Category Infrastructure Type New Total Project Cost:$503,000 Total2025 2026 2027 2028 2029Expenditures 2030 503,000503,000Construction 503,000 503,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 503,000503,000PACS Fund: Utility Franchise Fees 503,000 503,000Total 153 Page 314 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves implementing a road diet on 69th Street between France Avenue and York Avenue. The reallocation of right-of-way will provide space to add on-street bicycle facilities. This work will be implemented as part of a scheduled pavement maintenance project. Project #ENG25056 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name 69th Street Bike Lanes Category Infrastructure Type New Total Project Cost:$24,400 Total2025 2026 2027 2028 2029Expenditures 2030 24,40024,400Construction 24,400 24,400Total Total2025 2026 2027 2028 2029Funding Sources 2030 24,40024,400PACS Fund: Utility Franchise Fees 24,400 24,400Total 154 Page 315 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a bike boulevard on West Shore Drive between 66th Street and 70th Street. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 70th Street and proposed facilities on 66th Street and West Shore Drive. Project #ENG25057 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name West Shore Drive Bike Boulevard Category Infrastructure Type New Total Project Cost:$35,100 Total2025 2026 2027 2028 2029Expenditures 2030 35,10035,100Construction 35,100 35,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 35,10035,100PACS Fund: Utility Franchise Fees 35,100 35,100Total 155 Page 316 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of bike lanes on 44th Street between France Avenue and Grimes Avenue. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 44th Street and Grimes Avenue. Project #ENG25058 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name W 44th St Bike Lanes Category Infrastructure Type New Total Project Cost:$18,100 Total2025 2026 2027 2028 2029Expenditures 2030 18,10018,100Construction 18,100 18,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 18,10018,100PACS Fund: Utility Franchise Fees 18,100 18,100Total 156 Page 317 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of bike lanes on Metro Boulevard between 70th Street and Edina Industrial Boulevard. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on 70th Street and 72nd Street. Project #ENG25059 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Metro Boulevard Bike Lanes Category Infrastructure Type New Total Project Cost:$60,900 Total2025 2026 2027 2028 2029Expenditures 2030 60,90060,900Construction 60,900 60,900Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,90060,900PACS Fund: Utility Franchise Fees 60,900 60,900Total 157 Page 318 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the replacement of an existing pedestrian bridge over Minnehaha Creek between Beard Avenue and Beard Court. This project will create a fully accessible pedestrian and bicycle bridge connecting the Creek Knoll and Chowen Park neighborhoods. Project #ENG25060 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Minnehaha Creek Pedestrian Bridge Category Infrastructure Type New Total Project Cost:$1,200,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,200,0001,200,000Construction 1,200,000 1,200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,200,0001,200,000PACS Fund: Utility Franchise Fees 1,200,000 1,200,000Total 158 Page 319 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of Edina Industrial Boulevard between Bush Lake Road and Metro Boulevard. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Metro Boulevard and Edina Industrial Boulevard. Project #ENG25061 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Edina Industrial Boulevard Sidewalk Category Infrastructure Type New Total Project Cost:$297,500 Total2025 2026 2027 2028 2029Expenditures 2030 297,500297,500Construction 297,500 297,500Total Total2025 2026 2027 2028 2029Funding Sources 2030 297,500297,500PACS Fund: Utility Franchise Fees 297,500 297,500Total 159 Page 320 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves the construction of a sidewalk on the north side of 66th Street between Ridgeview Drive and Josephine Avenue. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Ridgeview Drive, 66th Street and Normandale Road. Project #ENG25062 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternative - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name W 66th Street Sidewalk Category Infrastructure Type New Total Project Cost:$476,000 Total2025 2026 2027 2028 2029Expenditures 2030 476,000476,000Construction 476,000 476,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 476,000476,000PACS Fund: Utility Franchise Fees 476,000 476,000Total 160 Page 321 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Scipioni 2025 2030thru Department Engineering Description This project involves hiring a consultant to design bicycle facilities on Valley View Road between 64th Street and 66th Street underneath the Highway 62 overpass. This facility is recommended in the City’s Pedestrian and Bicycle Master Plan and will connect to existing facilities on Valley View Road and proposed facilities on 66th Street. Project #ENG25063 Justification Expansion and/or Level of Service Sustainability: Carbon - The Pavement Management Program implemented by the City seeks to utilize resources efficiently by performing infrastructure renewal that will provide the greatest lifespan increase for the lowest cost. Surface water - The Living Streets initiative reduces impervious surfaces and develops roads, bicycle and pedestrian facilities with low impact development techniques. Green Alternatives - Alternative construction methods utilized within the City include reclamation of existing bituminous surfaces to use as aggregate base material. Community Engagement: These projects encourage people to interact with staff to understand how important infrastructure is for safety and health of all. Engagement occurs over years, and it helps shape some of the project details. It also increases the awareness of having well maintained transportation and accessible systems. Health in All Policies: Connected and sustainable development includes an efficient multi-modal transportation system that balances improving personal mobility options with reducing the community’s carbon footprint all the while reducing negative impacts on human health and safety. Race & Equity: This project impacts infrastructure that may not be ADA compliant. Reconstruction is conducted to ADA standards, making the new infrastructure accessible to all users. Stewardship: The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses. The 2018 Comprehensive Plan notes to "maintain and enhance mobility for residents and businesses through creation and maintenance of a balanced system of transportation alternatives," and to "promote safe walking, bicycling, and driving." The approved Living Streets Policy and Plan strive to balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, and provide meaningful opportunities for active living and better health. Useful LifeProject Name Valley View Road Bike Lane Design Category Infrastructure Type New Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,000Construction50,000 50,000Total50,000 Total2025 2026 2027 2028 2029Funding Sources 2030 50,000PACS Fund: Utility Franchise Fees 50,000 50,000Total50,000 161 Page 322 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This proejct would provide for the lining of a neighborhood that experiences a significant amount of inflow and infiltration into the sanitary sewer system ENVIRONMENTAL CONSIDERATIONS: Infiltration and inflow required the Lift Station pumps to run much more often to lift the sewage and infiltration into the next gravity sewer main. Elimination of this inflow will use less energy. Project #PW23010 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protectthe health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Nine Mile Village Sewer Lining Category Infrastructure Type Replace or repair Total Project Cost:$175,000 Total2025 2026 2027 2028 2029Expenditures 2030 175,000175,000Construction 175,000 175,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 175,000175,000Utility Fund: Sewer 175,000 175,000Total 162 Page 323 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Chad Millner 2025 2030thru Department Engineering Description This project will replace 130 LF of sewer main on Olinger Boulevard. This dip in the sewer line collects debris and does not allow the sewer to flow properly which leads to potential blockages of the sewer. ENVIRONMENTAL CONSIDERATIONS: As mentioned in the description, there is a large dip in the sewer at this location. Since there is not free flowing sewage at this location, solids tend to settle out and create potential for blockages. This section of sewer needs to cleaned more frequently thereby creating addition trips and fuel usage. Project #PW23011 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protect the health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Olinger Road Dip Replacement: 130 LF + Road Repair Category Infrastructure Type Replace or repair Total Project Cost:$80,000 Total2025 2026 2027 2028 2029Expenditures 2030 80,00080,000Construction 80,000 80,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 80,00080,000Utility Fund: Sewer 80,000 80,000Total 163 Page 324 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description In our continuing efforts to provide an accessible environment for residents, visitors and employees, the City completed an ADA inventory to understand areas of need. The inventory conducted an evaluation for compliance with applicable laws, codes and design guidelines pertaining to accessibility. This project will begin to address the recommendations prioritized for completion in 3-8 years. ENVIRONMENTAL CONSIDERATIONS: Facility improvements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21044 Justification See Summary of Facilities Improvements. Useful LifeProject Name City Wide ADA Facility Improvements Level 2 Category Buildings Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,00050,000 100,000 50,000Construction 100,000 50,000 100,000 50,000 300,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 300,00050,000 100,000 50,000Construction Fund: CIP Levy 100,000 50,000 100,000 50,000 300,000Total100,000 164 Page 325 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals. Project #ENG21051 Justification See Summary of Facilities Improvements. Useful LifeProject Name Pamela Park Facility Maintenance Category Buildings Type Replace or repair Total Project Cost:$210,000 Total2025 2026 2027 2028 2029Expenditures 2030 210,000210,000Construction 210,000 210,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 210,000210,000Construction Fund: CIP Levy 210,000 210,000Total 165 Page 326 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Marisa Bayer 2025 2030thru Department Facilities Description This project will create funding to build new buildings more sustainable and replace failing mechanical systems with more energy efficient systems. These actions reduce energy use and greenhouse gas emissions. ENVIRONMENTAL CONSIDERATIONS: Major facility mechanical equipment replacements provide an excellent opportunity for the City to continue towards our sustainability goals. Each specific project will be reviewed from an environmental cost benefit analysis to determine the right balance between operations and sustainability. Project #ENG21062 Justification See Summary of Facilities Improvements Useful Life 50Project Name Facility Efficiency Upgrades Category Buildings Type Replace or repair Total Project Cost:$3,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 3,000,000500,000 500,000 500,000 500,000 500,000Construction 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000Total500,000 Total2025 2026 2027 2028 2029Funding Sources 2030 3,000,000500,000 500,000 500,000 500,000 500,000CAS Fund: Utility Franchise Fees 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000Total500,000 166 Page 327 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description Kitchen cabinets and remodel, exterior doors, gas furnace, swinging doors, painting, carpeting, new greenhouse, interior doors museum, museum carpet, mau maintence area, museum exterior windows and doors, museum stucco ceiling, museum roof, and basement wall paint, museum lights, maintenance roof, walls, casework and lights, painting, restroom accessories, ceramic tile, wood treatments, vct, concrete sealing, plaster, ceiling tile, exhst systems, electric controls, pa system, OH doors, partitions, water htrs, fire alarm system, security system, exit signs, batteries, restroom accessories, frp walls, 2025 - Museum Sprinkler, staining, 2026 - Museum restroom fixture, water distribution,cooler,maintenance bldg,custodial sinks, and restroom plumbing, electric feeder, exit signs, concrete sealing, water distribution Project #FAC23109 Justification See Summary of Facilities Improvements. Useful LifeProject Name Arneson Acres Park Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$700,000 Total2025 2026 2027 2028 2029Expenditures 2030 700,000700,000Installation/Maintenance 700,000 700,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 700,000700,000Construction Fund: CIP Levy 700,000 700,000Total 167 Page 328 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project will provide upgrades to fire alarm systems for planned centralized monitoring and location services to 911 dispatch.This project will expand card reader access devices to additional buildings and spaces." Project #FAC25101 Justification Expansion and/or Level of Service Useful LifeProject Name City Wide Card Reader & Fire Alarm Updates Category Buildings Type Expand or enhance Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Construction Fund: CIP Levy 100,000 100,000Total 168 Page 329 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description This project involves a scheduled replacement of roofs of city owned buildings. Many of the roofs are nearing the end of their useful life and if not addressed failure is likely causing damage to property and possible downtime for portions of city operations. Schedule replacement allows for planning of disruption to building and surroundings and can lessen the likelihood of critical system failures. In 2023 a consultant was retained to inspect and evaluate the roofing system on all buildings. The report detailed the conditions outlining the needs for repairs and total replacements indicating both remaining life expectancy and estimated costs. A roof photovoltaic (PV) feasibility study was conducted in 2023 researching possible solar arrays with planned replacements. If installed and planned together the probability of damage to the roofing during installation of PV systems is minimized. This also allows the city to time future replacement of both systems to happen simultaneously. The PV systems are submitted under a separate project. Roofs 2025 #1 Public Works Building Offices $800,000 2026 #2 Fire Station #1 $600,000 2027 #3 Edinborough Park $2,000,000 Roofs w/ PV 2026 #1 York Ave. Liquor $450,000 2026 #2 Pamela Park $100,000 2029 #3 SMPSTG $500,000 2030 #4 Public Works Building Shops $4,000,000 Project #FAC25103 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Wide Roof Replacement Category Buildings Type Replace or repair Total Project Cost:$12,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 12,500,000800,000 700,000 2,000,000 5,000,000Construction 4,000,000 800,000 700,000 2,000,000 5,000,000 12,500,000Total4,000,000 Total2025 2026 2027 2028 2029Funding Sources 2030 12,500,000800,000 700,000 2,000,000 5,000,000CIP Bonds 4,000,000 800,000 700,000 2,000,000 5,000,000 12,500,000Total4,000,000 169 Page 330 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jon Darsow 2025 2030thru Department Facilities Description "This project involves a multi-faceted approach to repairs and maintenance within the 50th and France Special Services District also referred to as “50th & France ” . The 50th & France District is a high-quality commercial and residential community asset that has seen numerous private developments and public improvements over the years giving it a unique and complex history. The majority of the district’s streetscape improvements were either reconstructed or newly installed in 1990. Kimley Horn & Associates have conducted a number of assessments over the past decade highlighting needed repairs and improvements in the district. The most recent of which in 2021 identified over $6M of items needing attention. This includes the street and pedestrian lighting, granite-cladding to raised planters, at grade foundation plantings, street trees planted in pits with tree grates, public fountain, benches, trash receptacles, and concrete paver sidewalks. These items are amplified by the new development in the area such as Nolan Mains and the Carillon Building. Investments in the city owned property are needed to ensure these items don’t fall into further dismay discouraging future development and investments in the area. 2025-$400,000 planning2026 --$3.0M--Phase 12027 --$3.0M--Phase 22029--$1.0M--Phase 3" Project #FAC25105 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name 50th & France Streetscapes Improvements Category Land Type Replace or repair Total Project Cost:$7,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 7,400,000400,000 3,000,000 3,000,000 1,000,000Installation/Maintenance 400,000 3,000,000 3,000,000 1,000,000 7,400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 7,400,000400,000 3,000,000 3,000,000 1,000,000CIP Bonds 400,000 3,000,000 3,000,000 1,000,000 7,400,000Total 170 Page 331 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description This project would renovate and update the living quarters in Fire Station 231. Project #FAC25108 Justification Asset Functionality Useful LifeProject Name Fire Station #1 Living Quarters Category Buildings Type Replace or repair Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000Installation/Maintenance 500,000 500,000Total500,000 Total2025 2026 2027 2028 2029Funding Sources 2030 500,000Construction Fund: CIP Levy 500,000 500,000Total500,000 171 Page 332 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Zuly Marquez 2025 2030thru Department Facilities Description This project involves the demolition of Fire Station #2, York Ave, and assumes the building is removed and site left as pad ready. No other modifications to building or site amenities are included. Project #FAC25109 Justification Asset Functionality Useful LifeProject Name Fire Station #2 York Ave. Building Demo Category Buildings Type Replace or repair Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Installation/Maintenance 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000Utility Fund: Water 500,000 500,000Total 172 Page 333 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project involves the replacement of software used to track the overall condition of city owned facilities. In addition to indexing the buildings this software would allow the city to process work orders for planned preventative maintenance, routine and emergency repairs to building components and other areas of the city like utility and infrastructure components, park playground structures, natural resource areas and enterprise sites. The software used to conduct the study in 2018 no longer meets the operational requirements of buildings as it does allow for tracking of resources spent on maintenance and repairs. Purchase of software is a lump sum price and will require an annual maintenance agreement." Project #FAC25110 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. Useful LifeProject Name Facility Asset Maintenance Software Category Technology Type Replace or repair Total Project Cost:$1,044,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,044,000300,000 135,000 142,000 150,000 155,000Installation/Maintenance 162,000 300,000 135,000 142,000 150,000 155,000 1,044,000Total162,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,044,000300,000 135,000 142,000 150,000 155,000Construction Fund: Equipment Levy 162,000 300,000 135,000 142,000 150,000 155,000 1,044,000Total162,000 173 Page 334 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "A structural engineering review in 2020 of the existing cold storage discovered damage to the building structure. Repairs were made to extend the useful life, but the extent was deemed temporary, the reviewing consultant recommended complete replacement in 2-5 years. $200,000 for planning $2,300,000 for new building " Project #FAC25113 Justification Asset Functionality Useful LifeProject Name Public Works Cold Storage Building Replacement Category Buildings Type Replace or repair Total Project Cost:$2,600,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Planning and Design 2,300,0002,300,000Installation/Maintenance 300,000 2,300,000 2,600,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,300,0002,300,000CIP Bonds 300,000300,000Construction Fund: Reserves 300,000 2,300,000 2,600,000Total 174 Page 335 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Reconfigure office spaces within Public Works to meet current and future staffing needs. As staffing increases to meet the needs of essential functions for the City, the office spaces for staff will require updates and reconfiguration as well. Many of these building are over-occupied with multiple staff using spaces that were once designed for storage or ancillary functions like copy rooms. Renovations allows the city to maximize within spaces while also providing flexible work spaces to attract prospective employees and align with current trends in work-flex and office policies. Expansion of Parking Lot also needed. " Project #FAC25114 Justification Expansion and/or Level of Service Useful LifeProject Name Public Works Space Reconfiguration Category Buildings Type Expand or enhance Total Project Cost:$850,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Planning and Design 775,000775,000Construction 75,000 775,000 850,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 850,00075,000 775,000Construction Fund: CIP Levy 75,000 775,000 850,000Total 175 Page 336 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace access gates in 2 locations at Public Works Building. Existing gates have reached the end of their useful life and require extensive maintenance and financial resources. These gates provide essential security and access control to the complex, when broken can affect the cities ability to provide essential services like utility repairs, snow management and ice-treatments and fueling services for public safety equipment of police and fire. " Project #FAC25115 Justification Asset Functionality Useful LifeProject Name Public Works Access Gates Category Buildings Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Installation/Maintenance 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Construction Fund: CIP Levy 300,000 300,000Total 176 Page 337 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description Existing Building Automation System (BAS) components has reached the end of its useful life. These systems provide control over the HVAC systems in the building and allow for building optimization during heat and cooling events. In addition the lighting systems in the building also need to be replaced as they are also nearing end of life. Project #FAC25117 Justification Asset Functionality Sustainability - Updated BAS & Lighting systems will reduce energy consumption and loss throughout the building. Thus lowering the carbon footprint of the building. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Public Works BAS & Lighting Upgrades Category Buildings Type Replace or repair Total Project Cost:$825,000 Total2025 2026 2027 2028 2029Expenditures 2030 125,000125,000Planning and Design 700,000700,000Installation/Maintenance 125,000 700,000 825,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 825,000125,000 700,000Construction Fund: CIP Levy 125,000 700,000 825,000Total 177 Page 338 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace existing AV equipment throughout space. Equipment is used for programming in space by city staff, residents and paid programming. Quote produced in 2023" Project #FAC25118 Justification Expansion and/or Level of Service Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Senior Center AV Equipment Category Technology Type Replace or repair Total Project Cost:$55,000 Total2025 2026 2027 2028 2029Expenditures 2030 55,00055,000Installation/Maintenance 55,000 55,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 55,00055,000Construction Fund: Cable PEG 55,000 55,000Total 178 Page 339 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description This project involves the design and replacement of the Audio Visual Systems at Braemar Golf Course. Includes both meeting rooms in basement and minor changes to banquet area. Project #FAC25120 Justification Asset Functionality Useful LifeProject Name Golf Course Audio Visual Replacement Category Equipment and Vehicles Type New Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000250,000Vehicles and Equipment 250,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000250,000Golf Course Fund 250,000 250,000Total 179 Page 340 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "This project involves the replacement of the emergency radio repeater/booster in the Public Works Building. The system provides signal boost to emergency services personal inside the building during an emergency and is vital to their ability to communicate.The existing system was damaged a number of years ago and is no longer functioning. " Project #FAC25121 Justification Health, Safety & Regulatory Compliance Useful LifeProject Name PW Building Emergency Services Radio Repeater Category Equipment and Vehicles Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000250,000Installation/Maintenance 250,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000250,000Public Safety Aid 250,000 250,000Total 180 Page 341 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Design Services to replace existing studio lighting in City Council Chambers. System is standalone from rest of building lighting and will remain so. Project includes design fees only to allow for a budget to be set in subsequent CIP. Facilities would lead project with support from Communications. " Project #FAC25122 Justification Asset Functionality Justification - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall Council Chambers Studio Lighting Category Equipment and Vehicles Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Installation/Maintenance 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Construction Fund: Cable PEG 300,000 300,000Total 181 Page 342 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Existing HVAC unit servicing Edinborough Park Pool area has reached the end of useful life. Mechanical failures in early 2024 resulted in a repair bill in excess of $15,000. This unit has a history of requiring major repairs similar to this over the past 3-5 years.$100K for design services, $250K for equipment and installation. " Project #FAC25123 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment Useful LifeProject Name Edinborough Park Pool HVAC Unit Category Equipment and Vehicles Type Replace or repair Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 350,000350,000Installation/Maintenance 350,000 350,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 350,000350,000CIP Bonds 350,000 350,000Total 182 Page 343 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jon Darsow 2025 2030thru Department Facilities Description "This project will install a new comfort station facility near hole 6. Facilities along with Braemar staff identified an area in the front 9 portion of the golf course where a much needed comfort station could be easily located. The amount included in the CIP is meant to be a match to funding from the Golf Course. " Project #FAC25124 Justification Expansion and/or Level of Service Sustainability - The new comfort station will possibly utilize solar power for all electrical and water heating needs. Useful LifeProject Name Golf Course Restroom Front 9 Category Parks Type Expand or enhance Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Construction 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Golf Course Fund 400,000 400,000Total 183 Page 344 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Replace 2 existing HVAC condensing units servicing city hall. These units provide necessary refrigeration to keep the building comfortable during cooling season. The existing units have reached the end of their useful life and need replacement. Preparations for the replacement will happen concurrently with the re-roofing of the building in 2024. " Project #FAC25125 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall HVAC Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Installation/Maintenance 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000Construction Fund: CIP Levy 500,000 500,000Total 184 Page 345 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description A roof photovoltaic (PV) feasibility study was conducted in 2023 researching possible solar arrays and Electric Vehicle (EV) charging stations for both private and public use. The study reviewed all city buildings, parking ramps, and large parking surface lots taking into consideration possible array size, energy generation, and required infrastructure upgrades and made recommendations on ideal sites. The installation of the PV & EV systems should align with the replacement of any roofing or parking lots to minimize disruption and avoid costly retrofitting of systems. PV 2026 #1 York Ave Liquor $225,000 2026 #2 Pamela Park $300,000 2028 #3 Senior Center $500,000 2029 #4 SMPSTF $500,000 EV 2030 #1 City Hall $600,000 Lvl. 3 Fast Charger 2030 #2 SMPSTF $500,000 Lvl 2 chargers Project #FAC25126 Justification Expansion and/or Level of Service Sustainability:This project supports Climate Action Plan Strategy BE 7: Achieve 25% municipal building thermal “fuel switching"" from on-site fossil fuel combustion to less carbon intensive, or carbon neutral sources by 2030. Adding more electric vehicles to the City’s fleet is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emissions. Fast charging supports electric vehicle adoption by providing quick, convenient charging. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of electric vehicle charging infrastructure. Focusing on city fleet, this project does not contain an engagement component. Health in All Policies: Electric vehicles are zero-emission vehicles, meaning there are no harmful tailpipe emissions that negatively impact air quality. Race & Equity: Charging stations located across the community create equitable access to infrastructure. Stewardship: The cost to charge vehicles is decreasing and is already more cost-effective per mile to charge a vehicle when compared to gas- powered vehicles Useful LifeProject Name Photovoltaic & EV Charger Installation Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$2,225,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,225,000575,000 50,000 500,000Vehicles and Equipment 1,100,000 575,000 50,000 500,000 2,225,000Total1,100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,225,000575,000 50,000 500,000CAS Fund: Utility Franchise Fees 1,100,000 575,000 50,000 500,000 2,225,000Total1,100,000 185 Page 346 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description The project will continue the process of making our buildings more efficient by conducting an evaluation of entire building systems across the cities portfolio. These studies review performance or MEP systems as well as those of that create the building envelope replacing inefficient system with newer technology. These types of projects are co-led by Facilities and Sustainability and work directly with building occupants and staff involved in the operations of the space. Project #FAC25127 Justification Asset Functionality Useful LifeProject Name Fire Station #1 Energy Management Study Category Buildings Type Replace or repair Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Planning and Design 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000CAS Fund: Utility Franchise Fees 500,000 500,000Total 186 Page 347 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description A portion of the current CIP levy will be held in reserve at the beginning of each year to address unforeseen or unplanned repairs that must be made. The intent is that the money will be used to lessen the impact on facilities and enterprise sites operating funds, better helping those responsible for the site to make sound decisions on proper repairs vs. band-aid solutions. The CIP committee will meet periodically each year to review the available funds against any items that may have come up, or when possible how those funds can be used to expand other programs or projects that didn’t make the initial funding list. Project #FAC25200 Justification See Summary of Facilities Improvements. Useful LifeProject Name Asset Preservation Funding Category Buildings Type Replace or repair Total Project Cost:$4,450,000 Total20252026202720282029Expenditures2030 4,450,000800,000 700,000 700,000 700,000 750,000Construction 800,000 800,000 700,000 700,000 700,000 750,000 4,450,000Total800,000 Total20252026202720282029Funding Sources 2030 4,450,000800,000 700,000 700,000 700,000 750,000Construction Fund: CIP Levy 800,000 800,000 700,000 700,000 700,000 750,000 4,450,000Total800,000 187 Page 348 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Zuly Marquez 2025 2030thru Department Fire Description For several years, the Edina Fire Department has been responding to an increasing number of emergency medical calls for service. The area of town with the greatest growth and concentration of medical calls is the southeast quadrant of the city, south of the Crosstown and east of Minnesota Highway 100. The Fire Department currently operates Fire Station 2 on York Avenue next to the Southdale YMCA. Staffed with two Firefighter/Paramedics, Fire Station 2 is not large enough to provide the level of services needed in the southeast quadrant in the future. The land is also too small to build the size of station needed to best serve the community. On May 4, 2022, City Council gave approval for the City to enter into a purchase agreement for the property at 4401 West 76th Street for the purposes of building a new fire station. City Council authorized financing for up to $39 million of general obligation bonds for the land acquisition and construction of the fire station project. Project #FIR21008 Justification Relocation and construction of Fire Station No. 2 near the southeast corner of the Southdale Center in Edina is imperative to the city’s attempt at addressing the major call density in that part of the city; as well as expands the capability of offering mutual aid assistance on a regional scale. As a provider of ambulance-based life support services in Hennepin County, Edina Fire Department must also meet Hennepin County Ordinance 9, Emergency Medical Services. This ordinance requires among other things that the department achieve a travel time of 10 minutes to 80% of the community for a city like Edina, with increase call for assistance within and outside of city limits these travel times will prove to become more challenging without the relocation of Fire Station 2. It should also be noted that more than 1/3 of the response zone for Station 2 is in Richfield; moving the station north and west of the current location will better center it and move it closer to growing areas of the community. Housing and the population of the Southdale area has increased significantly in recent years. The Greater Southdale District Plan, adopted by the city on December 18, 2018, reports that the population of this area grew 28% from 2000 to 2018, compared to an overall 9% population growth citywide over the same period. The Greater Southdale area, formerly used for primarily commercial purposes, has been transitioning in recent years to more multi-family housing with new commercial on first floor. The increased demand for fire and advanced life support ambulances also coincides with continued growth of the M-Health Fairview Southdale Hospital campus. Over the past 20 years, the hospital has nearly doubled in size from 395,000 sq ft in 2001 to 720,000 sq ft in 2021. Finally, the Greater Southdale District Plan also reports a larger percentage of older residents in this area than citywide. Aging demographics can be linked to an increase in the calls for emergency medical response in the Southdale area. Budget Impact/Other Useful LifeProject Name Community Health & Safety Center Category Buildings Type New Total Project Cost:$26,000,000 Total20252026202720282029Expenditures2030 26,000,00026,000,000Construction 26,000,000 26,000,000Total Total20252026202720282029Funding Sources 2030 26,000,00026,000,000CIP Bonds 26,000,000 26,000,000Total 188 Page 349 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Slama 2025 2030thru Department Fire Description Plan for the continued growth in the northeast quadrant of the city. It is anticipated that in 5-10 years there will be a need for a station in the general location of City Hall to support the need for improved ALS and fire response in the northern quadrants of the City. The Five Bugles Design report recommended the: - Acquisition of 2-4 acres of land for Proposed Station No. 3 near City Hall. - Construction of proposed Station No. 3 as needed (assumed to be required in next 5-10 years). Project #FIR21009 Justification In 2018, the Fire Department hired Five Bugles Design to conduct a response time and station location study. The final report was submitted to City Council in January 2019.The report recommended adding Fire Station 3 in the next 5 - 10 years. The new fire station would be approximately 13,400 sq. ft consisting of 3 bays, sleeping accommodations for 5 - 6 personnel. This 24-hour station would be capable of housing one ALS ambulance crew and one engine company and space for a utility/staff vehicle. Budget Impact/Other Useful LifeProject Name Fire Station #3 Category Buildings Type New Total Project Cost:$50,000,000 Total20252026202720282029Expenditures2030 50,000,00050,000,000Construction 50,000,000 50,000,000Total Total20252026202720282029Funding Sources 2030 50,000,00050,000,000CIP Bonds 50,000,000 50,000,000Total 189 Page 350 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Slama 2025 2030thru Department Fire Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as fire trucks, ambulances, safety equipment, emergency medical equipment and technology, among other items. 2025 Equipment Levy: 2016 Ford F350 Ambulance/Fire Truck Debt Payment 2019A GO Bond 2015 Toyota Prius C 2015 Toyota Prius C 2015 Toyota Prius C 2015 Toyota Prius C 2025 Public Safety Aid: Mobile Air Cart Response LUCAS 2 Chest Compression Device Respirator Fit Tester Machine Thermal Imager EOC IT Equipment Hub Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator Zoll X-series Monitor/Defibrillator 2026 Equipment Levy: Equip Cert Payment Ultrasound Devices Ambulance/Fire Truck Debt Payment 2019A GO Bond 2027 Equipment Levy: 2018 Chevrolet Tahoe 2018 Chevrolet Tahoe Equip Cert Payment Fire Protective Gear Dryer Ambulance/Fire Truck Debt Payment 2019A GO Bond Warning Siren #6 - Gleason/Dewey Hill Warning Siren #9 -7235 France Ave. Warning Siren #4 - 5300 Blake Rd Warning Siren #5 - 6250 Hansen Rd Warning System Siren (#2 - 4201 W.44th St.) 2028 Equipment Levy: 2018 Chevrolet Tahoe 2018 Chevrolet Tahoe Equip Cert Payment Station Alerting Ambulance/Fire Truck Debt Payment 2019A GO Bond 2016 Toyota Prius C 2016 Toyota Prius C 2018 Toyota Prius C 2018 Toyota Prius C 2029 Equipment Levy: Project #FIR25200 Useful LifeProject Name Fire Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$6,675,492 190 Page 351 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Andrew Slama 2025 2030thru Department Fire LUCAS 2 Chest Compression Device LUCAS 2 Chest Compression Device LUCAS 2 Chest Compression Device Equip Cert Payment Station 1 &2 Floor Scrubber Ambulance/Fire Truck Debt Payment 2019A GO Bond Warning Siren #3 - 7200 Metro Blvd 2030 Equipment Levy: Equip Cert Payment Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of fire safety equipment, emergency and medical equipment and vehicles allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenenace costs low. Budget Impact/Other Total2025 2026 2027 2028 2029Expenditures 2030 6,675,492890,500 1,044,845 1,258,995 1,403,395 1,112,350Vehicles and Equipment 965,407 890,500 1,044,845 1,258,995 1,403,395 1,112,350 6,675,492Total965,407 Total2025 2026 2027 2028 2029Funding Sources 2030 6,300,292515,300 1,044,845 1,258,995 1,403,395 1,112,350Construction Fund: Equipment Levy 965,407 375,200375,200Public Safety Aid 890,500 1,044,845 1,258,995 1,403,395 1,112,350 6,675,492Total965,407 191 Page 352 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project involves replacement of the Normandale Park shelter building with a more modern design similar to Countryside and Pamela Park. Normandale Park is a 10 acre neighborhood park. Staff would complete a master plan of Normandale Park is 2027 and recommends the replacement of the playground in 2028. ENVIRONMENTAL CONSIDERATIONS: Replacing this building will upgrade the lighting and heating systems with more energy efficient equipment. Project #15-048 Justification The Normandale Park shelter building was designed and build in the 1970ss and no longer meets resident's needs and expectations. A park building assessment was completed in conjunction with the Parks, Recreation & Trails Strategic Plan and the shelter building was assessed to be in poor condition. The building requires extensive maintenance, is poorly insulated, and visually intimidating with no windows, and was recommended for scheduled replacement. Useful LifeProject Name Normandale Park Shelter Building Replacement Category Buildings Type Replace or repair Total Project Cost:$1,040,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,040,00040,000 1,000,000Construction 40,000 1,000,000 1,040,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,040,00040,000 1,000,000Construction Fund: CIP Levy 40,000 1,000,000 1,040,000Total 192 Page 353 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Creek Valley park is an active park within our parks system, with two soccer fields that are utilized by private athletic leagues and the Edina Public School system. The current system is 35 years old, and is due for replacement. We are unable to secure parts for this system, uses an excess amount of water and is not efficient. It is important to note that the athletic fields are on school district property but we maintain them. Project #17-143 Justification This is a part of our City Work plan to maintain optimum field operations. Useful LifeProject Name Creek Valley Irrigation Category Parks Type Replace or repair Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Vehicles and Equipment 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Special Park Improvement Levy 50,000 50,000Total 193 Page 354 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Tingdale Park. Project #19-763 Justification See Summary of Playground Improvements Useful LifeProject Name Tingdale Park Playground Replacement Category Parks Type Replace or repair Total Project Cost:$155,000 Total2025 2026 2027 2028 2029Expenditures 2030 155,000155,000Vehicles and Equipment 155,000 155,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 155,000155,000Special Park Improvement Levy 155,000 155,000Total 194 Page 355 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project includes the repair and replacement of general park and recreation park assets and infrastructure. Final evaluation of the amenity will be made in order to continue replacement of park equipment prior to scheduled replacement to ensure improvements are made as needed. This includes items such as tennis, basketball and other hard court repair and replacement; fencing for tennis, softball and baseball; replacement of hockey rinks, basketball standards as well as other property in the open such as benches, tables, drinking fountains and trash receptacles. Regular repair and replacement of these amenities will extend the life of these facilities. ENVIRONMENTAL CONSIDERATIONS: Per city policy staff will incorporate the use of recycled materials in products as available to offset these replacements. Project #P&R21001 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. This is part of our City Work Plan to maintain optimum facility operations. Useful LifeProject Name General Park Asset Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$250,000 Total20252026202720282029Expenditures2030 250,00050,000 50,000 50,000 50,000Construction 50,000 50,000 50,000 50,000 50,000 250,000Total50,000 Total20252026202720282029Funding Sources 2030 200,00050,000 50,000 50,000Construction Fund: Equipment Levy 50,000 50,00050,000Construction Fund: CIP Levy 50,000 50,000 50,000 50,000 250,000Total50,000 195 Page 356 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project schedules the repair and replacement of existing outdoor athletic lighting for fields and rinks. This project does not expand lighting to areas that currently does not have lights. Project #P&R21003 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. This is part of our City Work Plan to maintain optimum facility operations. Useful LifeProject Name Outdoor Athletic Field Lighting Category Infrastructure Type Replace or repair Total Project Cost:$900,000 Total2025 2026 2027 2028 2029Expenditures 2030 900,000180,000 180,000 180,000 180,000Installation/Maintenance 180,000 180,000 180,000 180,000 180,000 900,000Total180,000 Total2025 2026 2027 2028 2029Funding Sources 2030 900,000180,000 180,000 180,000 180,000Special Park Improvement Levy 180,000 180,000 180,000 180,000 180,000 900,000Total180,000 196 Page 357 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project would improve the field condition and enhancements for programmed athletic fields in Edina Parks. Improvements would increase field drainage, field health, player safety, and sustainability. Improvement would increase field reliability for associations and users as well as improved participant experience. Project #P&R21006 Justification This field could support more youth athletics activities if the conditions are improved. Useful LifeProject Name Athletic Field Improvements Category Parks Type Replace or repair Total Project Cost:$1,400,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,050,000350,000 350,000Construction 350,000 350,000 350,000 1,050,000Total350,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,050,000350,000 350,000Construction Fund: CIP Levy 350,000 350,000 350,000 1,050,000Total350,000 197 Page 358 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description This project includes master planning for Strachauer Park, a 4.5 acre neighborhood park. This project is the second phase of implementation for the Strachauer Park Master Plan. This phase includes the removal and relocation of the park shelter. Design for this phase will incorporate park and programming requirements as well as community feedback. Project #P&R21039 Justification The shelter building was assessed to be in poor condition. The building requires extensive maintenance. Useful LifeProject Name Strachauer Park Master Plan Phase II Category Parks Type Expand or enhance Total Project Cost:$1,100,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,100,0001,100,000Construction 1,100,000 1,100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,100,0001,100,000Special Park Improvement Levy 1,100,000 1,100,000Total 198 Page 359 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Normandale Park. Project #P&R21046 Justification See Summary of Playground Improvements Useful LifeProject Name Normandale Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Vehicles and Equipment 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Construction Fund: CIP Levy 200,000 200,000Total 199 Page 360 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Heights Park. Project #P&R21047 Justification See Summary of Playground Improvements Useful LifeProject Name Heights Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$175,000 Total2025 2026 2027 2028 2029Expenditures 2030 175,000175,000Vehicles and Equipment 175,000 175,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 175,000175,000Construction Fund: CIP Levy 175,000 175,000Total 200 Page 361 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Sherwood Park. Project #P&R21048 Justification See Summary of Playground Improvements Useful LifeProject Name Sherwood Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Vehicles and Equipment 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Special Park Improvement Levy 150,000 150,000Total 201 Page 362 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Kojetin Park. Project #P&R21049 Justification See Summary of Playground Improvements Useful LifeProject Name Kojetin Park Playground Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$165,000 Total2025 2026 2027 2028 2029Expenditures 2030 165,000165,000Vehicles and Equipment 165,000 165,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 165,000165,000Special Park Improvement Levy 165,000 165,000Total 202 Page 363 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Replacement of and update to outdoor and indoor public facing furniture. Many of the amenities are outdated, mismatched and have no draw to users. Earlier this year, new outdoor furniture was installed at the Golf Course and at the Aquatic Center and was welcomed and positively received. $40,000 for furniture at Centennial Lakes Park and $25,000 for furniture at Edinborough Park. Project #P&R23100 Justification Replacement of and update to outdoor and indoor public facing furniture at these two locations will benefit users and visitors to each location. Useful LifeProject Name CLP & EP Interior and Exterior Public Furniture Category Equipment and Vehicles Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Federal ARPA 40,000 40,000Total 203 Page 364 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Replace equipment according to the equipment replacement schedule. The Parks Maintenance Department has almost $2 million of equipment covered under this program. Types of equipment include small machinery, mowers, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025: 2008 Ford Ranger 2013 GMC Sierra 60" turf Sweeper 2010 Terex Track Loader 2011 Ford XLT Ranger 4x4 2013 Chevrolet Silverado 2500HD 2026: 2013 Chevrolet Silverado 2500HD Toro Groundsmaster 5910 2015 John Deere 1570 Mower 2011 Ford Ranger 2013 F-450 2015 Ford F250 2010 Farm King Snowblower 2014 John Deere X540 Tractor 2015 Toro 2Master 2027: 2016 Toro SandPro 2040Z 2009 Silverado 1500 2017 Exmark Lazer Mower 2017 Bobcat 5600 2016 Toro GTX Workman 2006 Jacovsen Truck Cart 2028: GPS Line Marking System Toro Groundmaster 3500 Mower 2016 Chevrolet Colorado 2016 Polaris Ranger ATV 2004 John Deere Tractor 2029: 2015 Land Pride Mower 4216 2011 Freightliner M2106 2030: 2010 Vermeer Brush Chipper 2015 John Deere 5115M Tractor Groundsmaster 3280-D Mower Groundsmaster 3280-D Mower 2020 Ford F550 Project #P&R23120 Useful LifeProject Name Park Maintenance Equip Replacement - Vehicles Category Equipment and Vehicles Type Replace or repair Total Project Cost:$1,693,750 204 Page 365 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs low but most importantly allows us to keep maintaining our parks to high standards. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of the Park Maintenance division without a reliable fleet. Total2025 2026 2027 2028 2029Expenditures 2030 1,693,750329,300 411,700 234,250 223,500 191,000Vehicles and Equipment 304,000 329,300 411,700 234,250 223,500 191,000 1,693,750Total304,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,693,750329,300 411,700 234,250 223,500 191,000Construction Fund: Equipment Levy 304,000 329,300 411,700 234,250 223,500 191,000 1,693,750Total304,000 205 Page 366 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project replaces the existing playground structure and safety surface at Alden Park. Project #P&R23203 Justification See Summary of Playground Improvements. Useful LifeProject Name Alden Park Playground Replacement Category Parks Type Replace or repair Total Project Cost:$185,000 Total2025 2026 2027 2028 2029Expenditures 2030 185,000185,000Vehicles and Equipment 185,000 185,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 185,000185,000Special Park Improvement Levy 185,000 185,000Total 206 Page 367 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at McGuire Park. Project #P&R23206 Justification See Summary of Playground Improvements Useful LifeProject Name McGuire Park Playground Equipment Replacement.Category Parks Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000250,000Vehicles and Equipment 250,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000250,000Special Park Improvement Levy 250,000 250,000Total 207 Page 368 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project will provide for infrastructure enhancements at the Van Valenburg dog park. Project #P&R23207 Justification The dog park at Van Valkenburg is in need of repairs and for the provision of water for park users. Useful LifeProject Name Off Leash Dog Park Investments Category Parks Type Expand or enhance Total Project Cost:$10,000 Total2025 2026 2027 2028 2029Expenditures 2030 10,00010,000Construction 10,000 10,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 10,00010,000Special Park Improvement Levy 10,000 10,000Total 208 Page 369 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Pamela Park. Project #P&R23208 Justification See Summary of Playground Improvements Useful LifeProject Name Pamela Park Playground Equipment Replacement Category Parks Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Vehicles and Equipment 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Special Park Improvement Levy 300,000 300,000Total 209 Page 370 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at York Park. Project #P&R23212 Justification See summary of Playground Improvements. Useful LifeProject Name York Park Playground Replacement Category Parks Type Replace or repair Total Project Cost:$175,000 Total2025 2026 2027 2028 2029Expenditures 2030 175,000175,000Vehicles and Equipment 175,000 175,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 175,000175,000Special Park Improvement Levy 175,000 175,000Total 210 Page 371 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description "Fred Richards Park, 4400 Parklawn Ave., is being created from the former Fred Richards Executive Golf Course, which closed in 2014. It alsoincludes what was formerly known as Lake Edina Park. The 43-acre site, almost double the size of Centennial Lakes Park, will become a multi-use park for a variety of year-round activities.Fred Richards Park will subtly divide into sections, providing different experiences for people and nature:(1)Central Green with pickleball courts, basketball courts, lawn games area, stage/pavilion area, clubhouse renovation, landscaping, turf and walkways, parking and access via West 77th Street, lighting, signs and infrastructure.(2)The Nature Bank with native vegetation restoration and establishment, trees and shrubs, play nodes, wildlife habitat structures, boardwalk and trail, seating, signs and infrastructure.(3)Great Lawn and Loop with a pedestrian bridge restoration and new trail, great lawn area with high-quality drainage, picnic pavilion, traditionaland bike playgrounds, lighting, seating, signs and infrastructure." Project #P&R25100 Justification Expansion and/or Level of Service Useful LifeProject Name Fred Richards Park Category Parks Type Expand or enhance Total Project Cost:$16,255,000 Total2025 2026 2027 2028 2029Expenditures 2030 16,255,0005,500,000 9,250,000 805,000 700,000Construction 5,500,000 9,250,000 805,000 700,000 16,255,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 16,255,0005,500,000 9,250,000 805,000 700,000Local Option Sales Tax 5,500,000 9,250,000 805,000 700,000 16,255,000Total 211 Page 372 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description "At 500 acres, Braemar Park, 6364 John Harris Drive, is the largest recreational space in Edina. It is home to Braemar Golf Course, Braemar GolfDome, Braemar Arena, Braemar Field, Courtney Fields and the South Metro Public Safety Training Facility.While most of the land in Braemar Park already is in use, several opportunities for improvements were identified and explored starting in 2017 with the help of resident input at community meetings and through online surveys.The Braemar Park Master Plan balances the most-sought amenities with the park's environmental and natural resource needs. It includes an estimated $8.1 million in improvements, including: walking trails, mountain biking trails, cross-country skiing trails, pickleball and platform tennis courts, baseball complex improvements, wayfinding signs and trail connections, natural resource restoration, improved parking and access to Braemar Golf Course, Braemar Arena and Courtney Fields.Braemar Arena is home to Edina High School, the Edina Hockey Association, Breakaway Academy and the Braemar-City of Lakes Figure Skating Club. Braemar Arena is one of the busiest ice arenas in the entire state; approximately 500,000 annual visits are recorded there from residents of 158 Minnesota communities, 12 states and one other country. The project covers $13.5 million in capital rehabilitation improvements in Braemar Arena’s operating infrastructure, including: dasherboard and glass safety system replacements, flooring replacements, ice refrigeration system and delivery replacements, heat and boiler replacements for all rinks, electrical system replacements for all rinks, window and roofing replacements and repairs, hot water system replacements, domestic water distribution system replacements, sanitary system and fixture replacements, locker room rehabilitation, restroom rehabilitation, permafrost removal in East Rink, energy efficiency improvements and insulation, ADA route and walkwayimprovements, ADA door and access improvements, ADA restroom improvements, ADA viewing and seating improvements, waterproofing and moisture control, fire protection and security improvement." Project #P&R25101 Justification Expansion and/or Level of Service Useful LifeProject Name Braemar Park & Arena Category Buildings Type Expand or enhance Total Project Cost:$47,140,000 Total2025 2026 2027 2028 2029Expenditures 2030 47,140,00011,850,000 17,320,000 15,820,000 2,150,000Planning and Design 11,850,000 17,320,000 15,820,000 2,150,000 47,140,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 47,140,00011,850,000 17,320,000 15,820,000 2,150,000Local Option Sales Tax 11,850,000 17,320,000 15,820,000 2,150,000 47,140,000Total 212 Page 373 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description This project involves the replacement of Highland Park shelter building. Highlands Park was the city's first implemented park improvement project. Fields and landscaping were completed in 1960 and the shelter facility was built in the 1970s. This shelter is in poor condition and no longer meets resident's needs. This building is poorly insulated, and lacks windows, making it unwelcoming, therefore serving limited functions. Project #P&R25102 Justification Asset Functionality","Expansion and/or Level of Service Sustainability - New shelter would exceed sustainability goals and initiatives. Stewardship - Replacing the shelter reduces future costs of maintenance. Useful LifeProject Name Highlands Park Shelter Replacement Category Parks Type Replace or repair Total Project Cost:$1,250,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,250,000Installation/Maintenance 1,250,000 1,250,000Total1,250,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,250,000Construction Fund: CIP Levy 1,250,000 1,250,000Total1,250,000 213 Page 374 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Yorktown Park located in the Promenade neighborhood bordering Richfield is one of Edina's smallest parks. With the relocation of Fire Station 2, currently house on this parkland, this small area park requires a study to determine vision and future needs. This study would evaluate existing recreational features including skate park, community gardens, and regional trail link. This would require collaboration with Three Rivers and City of Richfield to incorporate trail needs and recreational linkages to Adams Hill Park. Project #P&R25103 Justification Expansion and/or Level of Service Sustainability - Master Plan process ensures sustainability and project longevity by reducing project waste. This process promotes smart and strategic growth. Community Engagement - This project would engage community on collaboration level to create park infrastructure and amenities that support community needs. Useful LifeProject Name Yorktown Park Master Plan Category Parks Type Expand or enhance Total Project Cost:$790,000 Total2025 2026 2027 2028 2029Expenditures 2030 790,00040,000Planning and Design 750,000 40,000 790,000Total750,000 Total2025 2026 2027 2028 2029Funding Sources 2030 790,00040,000Construction Fund: CIP Levy 750,000 40,000 790,000Total750,000 214 Page 375 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Chowen Park. Project #P&R25104 Justification Asset Functionality Stewardship - Replacing the playground equipment will reduce staff time spent on repairs and improve safety. Useful LifeProject Name Chowen Park Playground Improvement Category Parks Type Replace or repair Total Project Cost:$350,000 Total2025 2026 2027 2028 2029Expenditures 2030 350,000Installation/Maintenance 350,000 350,000Total350,000 Total2025 2026 2027 2028 2029Funding Sources 2030 350,000Construction Fund: CIP Levy 350,000 350,000Total350,000 215 Page 376 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This is a project to replace the existing playground structure and safety surface at Countryside Park. Project #P&R25105 Justification Expansion and/or Level of Service","Asset Functionality Stewardship - Replacing the playground equipment will reduce staff time spent on repairs and improve safety. Useful LifeProject Name Countryside Playground Replacement Category Parks Type Replace or repair Total Project Cost:$315,000 Total2025 2026 2027 2028 2029Expenditures 2030 315,000315,000Vehicles and Equipment 315,000 315,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 315,000315,000Construction Fund: CIP Levy 315,000 315,000Total 216 Page 377 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tom Swenson 2025 2030thru Department Park & Recreation Description Pathway and parking replacement and enhancements for park projects. These projects will evaluate capacity, site conditions, and accessibility needs for parks. Project #P&R25106 Justification Expansion and/or Level of Service","Asset Functionality Useful LifeProject Name Park Pathways and Parking Project Improvements Category Parks Type Replace or repair Total Project Cost:$525,000 Total2025 2026 2027 2028 2029Expenditures 2030 525,00025,000 100,000 100,000 100,000 100,000Construction 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 525,00025,000 100,000 100,000 100,000 100,000Construction Fund: CIP Levy 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 217 Page 378 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Continue to evaluate and identify accessibility barriers within parks and recreational programming. Improvements may include surfacing, pathways, signage, and other needs. Project #P&R25107 Justification Health, Safety & Regulatory Compliance Useful LifeProject Name Parks Accessibility Improvements Category Parks Type Expand or enhance Total Project Cost:$525,000 Total2025 2026 2027 2028 2029Expenditures 2030 525,00025,000 100,000 100,000 100,000 100,000Planning and Design 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 525,00025,000 100,000 100,000 100,000 100,000Construction Fund: CIP Levy 100,000 25,000 100,000 100,000 100,000 100,000 525,000Total100,000 218 Page 379 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Project includes replacement and enhancement of existing picnic shelter to accommodate user needs and accessibility. Project #P&R25108 Justification Asset Functionality Useful LifeProject Name Utley Park Shelter Replacement Category Parks Type Replace or repair Total Project Cost:$60,000 Total2025 2026 2027 2028 2029Expenditures 2030 60,00060,000Installation/Maintenance 60,000 60,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00060,000Construction Fund: CIP Levy 60,000 60,000Total 219 Page 380 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Replacement of existing Picnic Pavilion and garden gathering space. Maintenance and repairs have extended useful life of exiting shelter but a new structure would increase accessibility and useful functions. Design and accommodations will include integration of community, garden council, and historic society needs. Project #P&R25110 Justification Asset Functionality Useful LifeProject Name Arneson Park Shelter Replacement Category Parks Type Replace or repair Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Installation/Maintenance 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Construction Fund: CIP Levy 75,000 75,000Total 220 Page 381 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description Rosland Park located off crosstown in the heart of Edina embodies the profile of a special use park. Home of the Edina Aquatic Center and Edina Art Center it provides vital services to Edina and the community as a whole. With changes to the Art Center and identified upgrades for the Aquatic Center, this park requires evaluation and community input for its long term goals and vision. This park contains one of a kind Edina offering such as an inclusive playground, disc golf course, fishing pier, pickleball courts, and sand volleyball. A study would help determine how community and recreational trends can be incorporated into future project plans. Project #P&R25111 Justification Expansion and/or Level of Service Sustainability - The most recent park plan was done in 1958 and project and amenities have been added beyond these features. To ensure park sustainability and longevity it is important to assess existing needs and incorporate future needs. Planning helps eliminate waste in the form of both materials and time, reducing disturbances to residents and natural resources. Community Engagement - This project allow for a full community engagement and full collaboration on the future of Rosland Park. Engagement would include neighbors, residents, users, commissioners, and city council. Engagement will ensure features meet needs and are accessible. Health in all policies - A long term plan for Rosland Park will help to maximize its recreational potential as well as its health benefits. Features that maximize physical and mental health can be incorporated, as well as natural resource benefits. Race & Equity - This plan will review and evaluate all barriers to the current Rosland Park programming and also integrate opportunities in a new design. Stewardship - This projects plan will allow for long term growth and decision making within the park. It will accommodate phasing and smart growth. Useful LifeProject Name Rosland Park Master Plan Category Parks Type Expand or enhance Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Planning and Design 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Construction Fund: CIP Levy 100,000 100,000Total 221 Page 382 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Park & Recreation Description This project includes the replacement of the picnic shelter for Fox Meadow Park. The existing structure will need to be removed and a new structure installed that meet community and site needs. Project #P&R25113 Justification Asset Functionality Useful LifeProject Name Fox Meadow Shelter Replacement Category Parks Type Replace or repair Total Project Cost:$55,000 Total2025 2026 2027 2028 2029Expenditures 2030 55,00055,000Construction 55,000 55,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 55,00055,000Special Park Improvement Levy 55,000 55,000Total 222 Page 383 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Aquatic Center Description 2025 - Furniture Replacement, Electronic Signage Replacement Every year the Edina Aquatic Center has nearly 100,000 member and guest visits. For their comfort, we provide chaise lounge chairs on both sides of the 50 meter pool and surrounding the zero depth pool. Previously, there were 380 lounge chairs and in recent years we have had to discard 5-7 chairs per season because they were beyond repair, leaving us with about 350 lounge chairs. The capacity of the facility is 1,000 people and frequently, every chair we have is in use. The current chairs are made of a steel frame and thick vinyl straps and range from 15-20 years old. Given the high volume of patrons and as the chairs age, more and more straps are breaking and are not able to be repaired. We have systematically removed lounge chairs from the deck when two or more straps are broken to ensure the safety of our guests. In addition, many of our older guests have difficulty sitting down and getting up from the chairs because they are so low to the ground and have requested more upright chairs to be available for their use. Complete replacement would take place over a three year period. We are missing a valuable opportunity to promote our facility to the high volume of traffic in the 66th Street and Valley View area and an electronic sign would provide that. 2026 - Pool Painting & Concession Equipment Main pool and zero depth pool painting.The main pool and zero depth pool require painting every 3 years. Replace aging concession equipment to improve operational efficiency and reduce energy costs. 2029 - Pool Painting Project #P&R25117 Justification Expansion and/or Level of Service Sustainability - Current equipment is more than 18 years old and new equipment will use less energy. Community Engagement - Fast, efficient concession sales are critical to a positive patron experience and to achieving the budget of the Aquatic Center. Race and Equity - Everyone will benefit when the operation runs smoothly and the wait time is shorter. Useful LifeProject Name Aquatic Center Pool Paint, Equip & Signage Rplcmnt Category Equipment and Vehicles Type Replace or repair Total Project Cost:$558,100 Total2025 2026 2027 2028 2029Expenditures 2030 558,100172,100 286,000 100,000Vehicles and Equipment 172,100 286,000 100,000 558,100Total Total2025 2026 2027 2028 2029Funding Sources 2030 558,100172,100 286,000 100,000CIP Bonds 172,100 286,000 100,000 558,100Total 223 Page 384 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Parks: Aquatic Center Description Based off an existing conditions assessment, initiated after a critical electrical failure and shutdown, the pool pump house facility has extensive repairs needed. To accommodate code upgrades and energy efficiency upgrades a 15% larger facility is required. Project needs include pump apparatus, electrical supply and distribution, new surge tanks, water treatment system, and code compliance upgrades. Project #P&R25119 Justification Asset Functionality Sustainabilty - Upgrades to facility would include energy efficiencies. A solar study will also be initiated. Useful LifeProject Name Aquatic Center Filter Room Category Buildings Type Replace or repair Total Project Cost:$4,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 4,000,0004,000,000Installation/Maintenance 4,000,000 4,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 4,000,0004,000,000CIP Bonds 4,000,000 4,000,000Total 224 Page 385 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Arena Description New zambonis for Braemar Arena. The renovation and expansion will provide for one but the arena has multiple zambonis that are well beyond their useful life. ENVIRONMENTAL CONSIDERATIONS: The Zamboni is powered by a lithium ion battery. This is the most green technology in the ice resurfacing business. In addition, a self leveling system would be included that would reduce the amount of ice thus reducing the energy used to freeze the ice. Project #17-028 Justification Zamboni's are a necessity to ice arena operations. When a Zamboni ages you will start to see imperfections in the ice due to the machine not operating properly. During the winter months and the Backyard Rink is in operation we use all four Zamboni's, therefore it is very important that all machines are in proper working condition. Useful LifeProject Name Braemar Arena Zamboni Category Equipment and Vehicles Type Replace or repair Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000200,000 200,000Vehicles and Equipment 200,000 200,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000200,000 200,000Construction Fund: Equipment Levy 200,000 200,000 400,000Total 225 Page 386 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description Replace sports turf and dome fabric shell at Braemar Field. The existing turf is experiencing issues due to stormwater managemennt design and turf is having to be replaced in sections due to this. This will shorten the useful life of the turf. Project #P&R25125 Justification Asset Functionality Sustainability - New turf and fabric shell would provide energy efficiencies. Community Engagement - Field surface and structure will be safe for users. Health in all policies - Safe turf and building envelope will allow users of all ages, youth athletic associations, adults and others to continue to utilize the space for physical activity, community and socialization. Race and equity - Space would be inclusive for all users and continue to be a high-use facility for all of the community. Stewardship - A new turf field and shell allows for efficiencies in maintenance and provide another 15-20 years of use for the facility. Useful LifeProject Name Braemar Field Turf & Shell Replacement Category Land Type Replace or repair Total Project Cost:$2,300,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,300,0002,300,000Installation/Maintenance 2,300,000 2,300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,300,0002,300,000Braemar Field Fund 2,300,000 2,300,000Total 226 Page 387 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description Purchase and install a second coiled heater for Braemar Field. The existing insulation had to be discarded. In order to maintain a comfortable user temp and to provide a backup, a second coiled heater is recommended. The existing heater is not adequate for the space and is undersized for our dome size. Project #P&R25126 Justification Asset Functionality Sustainability: Adding a second coiled heater would provide a more comfortable environmennt for users and be more energy efficient. Community Engagement: During the winter months, the temp for users and guests would allow for a better overall experience Health in All Policies: A more comfortable temperature inside the dome would provide more opportunities and access for use. The community's older demographic would feel safer in a better temp controlled environment. Race & Equity: A warmer and safer space would allow for great accessiblity and use for walkers, renters, guests and program participants. Stewardship: A second heater would provide a backup if we had a failure with the existing heater and also provide for savings in service and maintenance. Useful LifeProject Name Braemar Field Heater Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Vehicles and Equipment 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Construction Fund: Grants/Donations 200,000200,000Braemar Field Fund 400,000 400,000Total 227 Page 388 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Braemar Field Description The Braemar Field Turf is experiencing numerous sink holes due to the design of the stormwater management system below the field surface. Turf is getting comprised and has been non-usable for weeks at a time due to these issues. A redesign of the system is needed to continue to have safe and playable surface at this site. Project #P&R25127 Justification Asset Functionality, Health, Safety & Regulatory Compliance Sustainability: Stormwater needs to be rerouted so as not to impede underlying system for drainage. Community Engagement: Turf needs to be level and safe for users to be able to utilize. A redesign of the sub surface stormwater system allows the city to continue to provide a year-round facility for play and physical activity. Health in All Policies: Turf surface is needed in order to be able to provide a year-round facility for exercise, play and programming. Race & Equity: Braemar Field provides a community location for all ages and abilities to exercise, play and socialize on a safe surface Stewardship: Providing a long-term solution to the stormwater issue will allow the city to keep a synthetic turf facility available to the public and users on a year-round basis for years to come. Useful LifeProject Name Braemar Field Stormwater Design Category Parks Type New Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Planning and Design 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Braemar Field Fund 75,000 75,000Total 228 Page 389 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description The 2005 Chevrolet pickup truck at Centennial Lakes was originally scheduled to be replaced in 2015 and again in 2018 but was removed due to funding constraints. Under the vehicle scoring criteria used by the Public Works mechanics, this vehicle is due for replacement. This vehicle is used for plowing the park pathways and ice skating rink in the winter months and for general hauling in the other months. ENVIRONMENTAL CONSIDERATIONS: A new vehicle would offer lower emissions which would help to achieve the City goal of a 25% reduction in emissions by 2025. We would consider both an electric vehicle as well as a hybrid vehicle for this replacement. Project #17-039 Justification As outlined in Vision Edina it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Useful LifeProject Name Centennial Lakes Vehicle Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Construction Fund: Equipment Levy 40,000 40,000Total 229 Page 390 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Add free public Wi-Fi in center portion of Centennial Lakes Park. Project #P&R25130 Justification Expansion and/or Level of Service Race and Equity - Provide free service to public in highly populated, diverse area of City Stewardship - Contributes to a better connected society. Useful LifeProject Name Centennial Lakes Park Public Wi-Fi Category Parks Type Expand or enhance Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Construction Fund: CIP Levy 40,000 40,000Total 230 Page 391 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Centennial Lakes Park Description Centennial Lakes Park has a large artistic fountain (seasonal) that greats visitors to the park. The fountain has suffered damaged to its internal components and needs repairs and cleaning to make it operational. Project #P&R25145 Justification Asset Functionality Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Centennial Lakes Entrance Fountain Repair Category Parks Type Replace or repair Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Construction Fund: CIP Levy 150,000 150,000Total 231 Page 392 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Parks: Centennial Lakes Park Description Centennial Lakes Park improvements as needed. Project #P&R25147 Justification The upkeep of City infrastructure is a key component of the Vision Edina document. Useful LifeProject Name Centennial Lakes Improvements Category Parks Type Expand or enhance Total Project Cost:$800,000 Total2025 2026 2027 2028 2029Expenditures 2030 800,000Construction800,000 800,000Total800,000 Total2025 2026 2027 2028 2029Funding Sources 2030 800,000Construction Fund: CIP Levy 800,000 800,000Total800,000 232 Page 393 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The track is an area with cardio and strength training equipment that is not air conditioned. It is surrounded by windows that can't be opened. Air conditioning is a basic expectation in this type of space and the lack of air conditioning presents a health and safety concern. Project #15-069 Justification When Edinborough Park was built more than 30 years ago, air conditioning was not installed in the track area. The track is surrounded by windows that cannot be opened. During the summer months temperatures can exceed 90 degrees. Air conditioning in an exercise area is a basic expectation of anyone working out indoors. As noted in Vision Edina one of the strategic actions is "to continue to prioritize amenities that meet the needs of residents of all ages." Exercising at these temperatures can become a safety and health issue for anyone, especially senior citizens using the area. The addition of air conditioning to the track will make the facility a more appealing alternative for the community to enjoy year round. Useful LifeProject Name Edinborough Park Track Air Conditioning Category Buildings Type New Total Project Cost:$81,000 Total2025 2026 2027 2028 2029Expenditures 2030 81,00081,000Vehicles and Equipment 81,000 81,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 81,00081,000Edinborough Fund 81,000 81,000Total 233 Page 394 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Edinborough Park has 15 pieces of fitness equipment that are in need of replacement. The treadmills, ellipticals, rowers and strength equipment is out of date. Parts and service for these old machines is becoming much more expensive and difficult to find. The track is used by our association partners (Corporate Center, Brookdale Senior Living, Marriott Residence Inn, and Edinborough Townhomes) as well as the Edina Swim Club, our annual members and guests who purchase a daily admission. To maximize the impact of this project, it should be coordinated with replacing the track flooring. Project #P&R21012 Justification Replacing the fitness equipment at Edinborough Park is needed because the equipment is beyond useful life and requires constant maintenance. Marketing Pool & Track memberships at this time is difficult due to the lack of equipment. The Marriott Residence Inn is one of our association partners that pays park maintenance fees and they do not have exercise equipment or a swimming pool. Our agreement with them includes pool and track privileges for their guests. Currently, the selection, condition and availability of the equipment does not meet our standards for quality. In addition, our other association partners also have privileges to use this equipment. With Brookdale Senior Living as another association partner, we could better serve their residents with updated equipment specifically geared towards older adults. Useful LifeProject Name Edinborough Park Fitness Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$26,000 Total2025 2026 2027 2028 2029Expenditures 2030 26,00026,000Vehicles and Equipment 26,000 26,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 26,00026,000Edinborough Fund 26,000 26,000Total 234 Page 395 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The project would replace the original track surface that is from 1986. The surface is worn down and has areas that are tripping hazards. Project #P&R25148 Justification Health, Safety & Regulatory Compliance, Asset Functionality Health in All Policies: The track provides a safe place for exercise and attracts many senior citizens. Keeping the integrity of the surface is important to reduce trips and falls. Useful LifeProject Name Edinborough Park Track Surface Replacement Category Parks Type Replace or repair Total Project Cost:$90,000 Total2025 2026 2027 2028 2029Expenditures 2030 90,00090,000Construction 90,000 90,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 90,00090,000Edinborough Fund 90,000 90,000Total 235 Page 396 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The project will replace exterior landscaping that is 38 years old and is esthetically unattractive. It does not represent the first impression that is expected of a City of Edina Facility Project #P&R25149 Justification Expansion and/or Level of Service Useful LifeProject Name Edinborough Park Replace Exterior Landscaping Category Parks Type Replace or repair Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Construction 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Edinborough Fund 75,000 75,000Total 236 Page 397 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace aging concession equipment to improve operational efficiency and reduce energy costs. Project #P&R25151 Justification Asset Functionality Useful LifeProject Name Edinborough Park Concession Replacement Category Parks Type Replace or repair Total Project Cost:$24,000 Total2025 2026 2027 2028 2029Expenditures 2030 24,00024,000Construction 24,000 24,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 24,00024,000Edinborough Fund 24,000 24,000Total 237 Page 398 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace sound and lighting systems for performances. Blue tooth connectivity is an expectation for most performers and we do not have that. The lighting gets extremely hot, making it uncomfortable for performers. Project #P&R25152 Justification Asset Functionality Sustainability: Replacing current lighting with LED would realize energy cost savings. Community Engagement: Performances are well attended and upgrading the sounds and lighting would improve the patron experience. Stewardship: The Amphitheater has a long history of community performances and keeping up with modern technology is expected at a City facility. Useful LifeProject Name Edinborough Park Amphitheater Upgrades Category Parks Type Replace or repair Total Project Cost:$23,500 Total2025 2026 2027 2028 2029Expenditures 2030 23,50023,500Construction 23,500 23,500Total Total2025 2026 2027 2028 2029Funding Sources 2030 23,50023,500Edinborough Fund 23,500 23,500Total 238 Page 399 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Temporary concrete was installed during the plaza reconstruction project and it needs to be replaced with permanent concrete. Project #P&R25153 Justification Health, Safety & Regulatory Compliance Community Engagement: Replacing the concrete ensures the integrity of the walkway and safety for everyone entering the facility. Health in All Policies: Replacing the concrete ensures the integrity of the walkway and safety for everyone entering the facility. Stewardship: This is the main entry to our facility and will ensure safety for everyone entering the facility. Useful LifeProject Name Edinborough Park SE Entry Concrete Replacement Category Parks Type Replace or repair Total Project Cost:$27,000 Total2025 2026 2027 2028 2029Expenditures 2030 27,00027,000Construction 27,000 27,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 27,00027,000Edinborough Fund 27,000 27,000Total 239 Page 400 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replace all lockers in locker room and in the playpark to ensure patrons can safely secure their personal belongings while they are using the facility. Existing lockers do not lock properly and are rusty on the inside leaving residue on patrons belongings. Project #P&R25154 Justification Asset Functionality Health in All Policies: Replacing the locker will provide patrons with a sense of security and safety for their belongings while they are using the facility. Stewardship: The lockers are so old, it's difficult to find replacement parts to make them operational. It tis frustrating to patrons that we have an asset doesn't work. Replacing the metal existing lockers with plastic lockers will increase their useful life. Useful LifeProject Name Edinborough Park Locker Replacement Category Parks Type Replace or repair Total Project Cost:$31,000 Total2025 2026 2027 2028 2029Expenditures 2030 31,00031,000Construction 31,000 31,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 31,00031,000Edinborough Fund 31,000 31,000Total 240 Page 401 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Replacing the 2008 Chevy Silverado (with Tommy Gate) vehicle allows staff to navigate the Edinborough Park campus, as well as hauling items for projects and trips for supplies. Project #P&R25155 Justification Asset Functionality Sustainability: New vehicle will be more fuel efficient than the 2008 model. Community Enagagement: The vehicle will represent the City in a positive and professional manner. Useful LifeProject Name Edinborough Park Truck Replacement Category Parks Type Replace or repair Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Vehicles and Equipment 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Edinborough Fund 50,000 50,000Total 241 Page 402 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description To continue to meet Health Code requirements, the pool filter needs to be replaced. The pool filter was installed in 2004 and has exceeded its useful life. Parts are no longer available for the model we have. Project #P&R25156 Justification Asset Functionality Sustainability: A new filter could use regenerative media, reducing the frequency of backwashing and saves water. Community Engagement: Replacing the filter ensures that the water will be clean and safe for community members to swim in. Health In All Policies: Replacing the filter ensures that the water will be clean and safe for community members to swim in. Race & Equity: Everyone will benefit from swimming in a clean, safe pool. Stewardship: The filter replacement ensures ongoing operations for our members, community members, swim clubs and other rental groups. Useful LifeProject Name Edinborough Park Pool Filter Replacement Category Parks Type Replace or repair Total Project Cost:$70,000 Total2025 2026 2027 2028 2029Expenditures 2030 70,00070,000Construction 70,000 70,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 70,00070,000Edinborough Fund 70,000 70,000Total 242 Page 403 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description The Camus boiler heats the entire facility and has exceeded its useful life. Project #P&R25157 Justification Asset Functionality Sustainability: The existing boiler is 20 years old and replacing it with a high efficiency model will reduce energy costs. Health In All Policies: The park will be comfortable for all patrons when the boiler is working consistently. Useful LifeProject Name Edinborough Park Replace Camus Boiler Category Parks Type Replace or repair Total Project Cost:$70,000 Total2025 2026 2027 2028 2029Expenditures 2030 70,00070,000Construction 70,000 70,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 70,00070,000CIP Bonds 70,000 70,000Total 243 Page 404 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The Braemar Clubhouse Lower Level is presently under-utilized because of its floor plan as well as its condition. Restrooms and shower facilities as well as the plumbing infrastructure need to be repaired and renovated. Project #17-031 Justification Renovation is needed to keep facility up to acceptable standards for a premier facility. National Golf Foundation (NGF) reports golf courses are "living and breathing" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system. Useful LifeProject Name Braemar Golf Clubhouse Lower Level Category Buildings Type Expand or enhance Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000Construction100,000 100,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 100,000Golf Course Fund 100,000 100,000Total100,000 244 Page 405 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description A second sprayer to help spray fairways and greens. Spraying fairways with the one sprayer we have can take one full week to complete. Ideally, when spraying you want to get it done in two days or less. Would like to be able to spray growth regulator on the fairways to help out with seedheads and slow the growth rate down to possibly mow once a week only. Not only to slow the vertical growth but it also helps horizontal growth to help fill in thinner areas. This smaller sprayer would be better on greens as well with less weight with the tire marks across the greens. ENVIRONMENTAL CONSIDERATIONS: Getting everything sprayed in one or two days rather than a week, the perception would be more ideal not seeing the sprayer out there all the time for a week straight. Project #P&R21028 Justification A visual by the customers not seeing the sprayer out there for a week straight and also better for the consistency of the way the golf course plays. Useful LifeProject Name Toro 300 Gal Sprayer Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$85,000 Total2025 2026 2027 2028 2029Expenditures 2030 85,00085,000Vehicles and Equipment 85,000 85,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 85,00085,000Golf Course Fund 85,000 85,000Total 245 Page 406 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Addition of cart paths on holes #6 and #11. This will complete the continuous loop of the 18-hole golf course. Project #P&R21043 Justification In strategic alignment with Edina’s mission statement to "offer premier public facilities". Useful LifeProject Name Cart Path Addition Hole #6 & #11 Category Infrastructure Type Expand or enhance Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Installation/Maintenance 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Golf Course Fund 150,000 150,000Total 246 Page 407 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The netting that protects the Golf Dome fabric is in disrepair due to the high volume of golf balls that are hit on a daily basis. We have made repairs to the netting each of the last three years. Cost of repairs have ranged between $5,000 and $8,500. A new net design is required to alleviate the constant repairs.Replacement needed to keep facility up to acceptable standards for a premier facility. In strategic alignment with Edina’s mission statement to ""offer premier public facilities"".The National Golf Foundation (NGF) report also confirms justification ""NGF has observed declining investment in in the golf courses as revenues declined. Golf courses are ""living and breathing"" assets that will deteriorate over time, and significant reductions in capital expenditures eventually will catch up to the system Project #P&R25160 Justification Asset Functionality Useful LifeProject Name Golf Dome Netting Repairs Category Parks Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000100,000 150,000Construction 100,000 150,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000100,000 150,000Golf Course Fund 100,000 150,000 250,000Total 247 Page 408 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replace existing gas mowers for tees and approaches with Hybrid model. Mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. Existing 4 Workman’s are reaching the end of their useful lifespan. Existing 4 Workman’s are reaching the end of their useful lifespan. Kubota or a John Deere tractor with a front end loader would be used year round by removing snow in the winter and other projects throughout the course and in the summer it could be used daily with loading topdressing sand or divot mix and other projects. These tractors are ideal for tractor mounted aerators and we have two of those for only one tractor at the present. With the construction of the new golf course there are many areas that are compacted and these machines could be running spring and fall yearly. Replace fairway mower. Fairway mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. Replace large rough mower. Rough mowers are critical to the overall golf operation and need to be replaced on regularly scheduled basis. As these machines age they require more maintenance and develop hydraulic oil leaks which is detrimental to the turf. 2025 - Toro 4500 Rough Mower 2026 - Kubota or John Deere Tractor, Toro 3555 Fairway Mowers (2), Toro 4500 Rough Mower 2027 - Toro 3320 Hybrid Triplex Mowers (2), Toro Workman 2028 - Toro Workman 2029 - Toro Workman Project #P&R25162 Justification Asset Functionality. By adding an additional tractor we will be able to save money in the long run. It will also add to the efficiency of golf course operations. Lots of acreage to mow with not much time to stay ahead of play. Adding this mower would help to dedicate one of our older mowers for the practice areas and Academy 9. Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the Useful LifeProject Name Golf Course Tractor & Mower Replacements Category Equipment and Vehicles Type Replace or repair Total Project Cost:$705,000 248 Page 409 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Total2025 2026 2027 2028 2029Expenditures 2030 705,000100,000 295,000 160,000 50,000 100,000Vehicles and Equipment 100,000 295,000 160,000 50,000 100,000 705,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 705,000100,000 295,000 160,000 50,000 100,000Golf Course Fund 100,000 295,000 160,000 50,000 100,000 705,000Total 249 Page 410 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Pre-construction costs to design new clubhouse at Braemar Golf Course. The existing clubhouse has exceeded its useful lifespan and is in need of replacement. Evaluation of programming and space needs will be included to determine required square footage. Design will be driven by city goals and values. $2,000,000 Construction costs to build new clubhouse at Braemar Golf Course. The existing clubhouse has exceeded its useful lifespan and is in need of replacement. Evaluation of programming and space needs will be included to determine required square footage. Design will be driven by city goals and values. $25,000,000 Project #P&R25163 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name New Golf Course Clubhouse Category Buildings Type New Total Project Cost:$27,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,000,000Planning and Design 2,000,000 25,000,000Construction25,000,000 27,000,000Total27,000,000 Total2025 2026 2027 2028 2029Funding Sources 2030 27,000,000CIP Bonds 27,000,000 27,000,000Total27,000,000 250 Page 411 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Add irrigation to areas of the course that were not irrigated in the Master Plan Project. These areas are heavily trafficked and require staff to manually pull around hoses and sprinkler bases which eliminates other tasks needed to be accomplished. Project #P&R25164 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Irrigation Upgrade Category Parks Type Expand or enhance Total Project Cost:$225,000 Total2025 2026 2027 2028 2029Expenditures 2030 225,000225,000Construction 225,000 225,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 225,000225,000Golf Course Fund 225,000 225,000Total 251 Page 412 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replacement of 6 utility carts. Existing carts are at the end of their useful lifespan. Project #P&R25166 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Club Car Utility Carts Category Equipment and Vehicles Type Replace or repair Total Project Cost:$78,000 Total2025 2026 2027 2028 2029Expenditures 2030 78,00026,000 26,000 26,000Vehicles and Equipment 26,000 26,000 26,000 78,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 78,00026,000 26,000 26,000Golf Course Fund 26,000 26,000 26,000 78,000Total 252 Page 413 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Replace existing lift table. The current one continues to leak hydraulic fluid even after the cylinders have been replaced a few years back. Used daily. Project #P&R25167 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Maintenance Facility Lift Table Category Equipment and Vehicles Type Replace or repair Total Project Cost:$20,000 Total2025 2026 2027 2028 2029Expenditures 2030 20,00020,000Vehicles and Equipment 20,000 20,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 20,00020,000Golf Course Fund 20,000 20,000Total 253 Page 414 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Comfort station located on hole #15 requires painting, siding replacement and roof repairs. Project #P&R25168 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Restroom Renovation Category Parks Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Construction 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 254 Page 415 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Insulate the cold storage building that is connected to the main shop to keep it warmer during the winter months so more work can be done out there and also help with longevity of equipment Project #P&R25169 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Cold Storage Insulation Category Buildings Type Expand or enhance Total Project Cost:$60,000 Total2025 2026 2027 2028 2029Expenditures 2030 60,00060,000Construction 60,000 60,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00060,000Golf Course Fund 60,000 60,000Total 255 Page 416 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Tear down and rebuild. The walls are rotting and have holes in them. Could be used for more storage as well for accessories during the winter months. Project #P&R25170 Justification Asset Functionality Useful LifeProject Name Update Well House #2 on Hole #13 Category Parks Type Replace or repair Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Construction 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Golf Course Fund 75,000 75,000Total 256 Page 417 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The existing practice green is too small for the number of Juniors and Academy 9 players. The plan is to rebuild and enlarge the green. Also, build a pavilion in the area for people waiting to pick up their children as well as a gathering point for the Academy 9. Project #P&R25171 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Practice Green Enlargement / Academy 9 Pavilion Category Parks Type Expand or enhance Total Project Cost:$75,000 Total2025 2026 2027 2028 2029Expenditures 2030 75,00075,000Construction 75,000 75,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 75,00075,000Golf Course Fund 75,000 75,000Total 257 Page 418 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Driving Range Safety Netting is needed to protect golfers on hole #9 of the Championship Golf Course and hole #1 of the Academy 9 Golf Course from errant shots coming from the driving range. Project #P&R25172 Justification Health, Safety & Regulatory Compliance Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Driving Range Safety Netting Category Parks Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Construction 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Golf Course Fund 200,000 200,000Total 258 Page 419 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description To be more sustainable and environmentally friendly, we are proposing to add native areas that would save water and enhance wildlife and the use of less emissions. Project #P&R25175 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Additional Native Areas Category Land Type Expand or enhance Total Project Cost:$65,000 Total2025 2026 2027 2028 2029Expenditures 2030 65,00065,000Construction 65,000 65,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 65,00065,000Golf Course Fund 65,000 65,000Total 259 Page 420 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Build a new nursery green that has the same USGA specs that the existing greens have. Project #P&R25176 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course New Nursery Green Category Land Type New Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000100,000Construction 100,000 100,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 100,000100,000Golf Course Fund 100,000 100,000Total 260 Page 421 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Fill in gaps in cart path to make a continuous loop. Project #P&R25178 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Cart Path Addition Academy 9 Category Parks Type Expand or enhance Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000150,000Construction 150,000 150,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 150,000150,000Golf Course Fund 150,000 150,000Total 261 Page 422 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Utilize the Braemar property just south of John Harris Drive (Old #21) to create an Academy Training Facility. Short Course, Teaching Bays, Practice Greens and Instruction area. Project #P&R25180 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Academy Training Facility Category Buildings Type New Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000Golf Course Fund 500,000 500,000Total 262 Page 423 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description As planned in the Braemar Park Master Plan, reconfigure and replace asphalt to make ADA accessible. Project #P&R25181 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Parking Lot Upgrade Category Parks Type Replace or repair Total Project Cost:$1,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 1,000,0001,000,000Construction 1,000,000 1,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,000,0001,000,000Local Option Sales Tax 1,000,000 1,000,000Total 263 Page 424 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Drainage upgrades on fairways #6, #11 and #16. Drainage lines to be installed to move water from low laying areas. Project #P&R25182 Justification Asset Functionality Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Drainage Upgrade Category Parks Type Expand or enhance Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Construction 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 264 Page 425 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Re-Grass and add irrigation system to the Academy 9 Clubhouse. Project #P&R25183 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Academy 9 Re-Grass & Irrigation Category Parks Type Expand or enhance Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Construction 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Golf Course Fund 40,000 40,000Total 265 Page 426 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description The drainage underneath the green on hole #8 sits lower than the pond so water has a really hard time exiting the green. Also, there is a large bird bath where water can’t exit the surface of the green. When you cut a cup, you can notice the difference in the greens mix compared to other greens. Propose to move the green on the other side of the pond to make it a true par 5. All this work can be completed without disrupting play. You could build the green then once you close in the fall, remove existing green and base and sod it with fairway grass and add fairway to the right of the pond leading up to green. Project #P&R25184 Justification Asset Functionality Useful LifeProject Name Green Renovation/Relocation Hole #8 Category Parks Type Expand or enhance Total Project Cost:$500,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 500,000 500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 500,000500,000Golf Course Fund 500,000 500,000Total 266 Page 427 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Dome Description Upgrade electrical capacity at Golf Dome. In future operations, this will facilitate offering an enhanced experience for the golf dome customers including the addition of television monitors to each bay. Project #P&R21036 Justification In strategic alignment with Edina’s mission statement to "offer premier public facilities". Useful LifeProject Name Dome Electrical Update Category Buildings Type Expand or enhance Total Project Cost:$25,000 Total2025 2026 2027 2028 2029Expenditures 2030 25,00025,000Installation/Maintenance 25,000 25,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 25,00025,000Golf Course Fund 25,000 25,000Total 267 Page 428 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Dome Description Expand the Golf Dome building to include enhanced Food & Beverage offerings. Project #P&R25185 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Dome Building Expansion Category Buildings Type Expand or enhance Total Project Cost:$3,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 3,000,0003,000,000Construction 3,000,000 3,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 3,000,0003,000,000Golf Course Fund 3,000,000 3,000,000Total 268 Page 429 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Liquor Stores Description Each building component was evaluated to determine needed maintenance and replacements to extend the buildings lifespan. The funding will be used for project design and planning, roof, electrical system repairs, exterior envelope repairs, interior finishes repairs, plumbing system repairs, and replacement of furniture, fixtures and equipment at the three liquor stores. Project #FAC23110 Justification This is a part of our City Work plan to maintain optimum facility operations. Useful LifeProject Name Liquor Stores Facility Improvements Category Buildings Type Replace or repair Total Project Cost:$901,600 Total2025 2026 2027 2028 2029Expenditures 2030 57,60029,600 28,000Planning and Design 71,00071,000Vehicles and Equipment 773,000197,000 296,000 280,000Installation/Maintenance 297,600 324,000 280,000 901,600Total Total2025 2026 2027 2028 2029Funding Sources 2030 901,600297,600 324,000 280,000Liquor Fund 297,600 324,000 280,000 901,600Total 269 Page 430 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replacement of E911 Call Handling System. Project #POL21005 Justification Between 2014-2016 Edina partnered with Hennepin County, Minneapolis, HCMC, and Allina to deploy a state of the art shared E911 call handling system. The system was forecast to have a service life of approximately 10 years. While it is hoped that ongoing upgrades will extend the service life of this system it is important we plan for potential replacement in 2026. A major system refresh is being completed in 2022 so this replacement has been deferred until 2027. This was previously funded split between both E911 and Equipment Replacement. Useful LifeProject Name Dispatch E911 Call Handling System Category Technology Type Replace or repair Total Project Cost:$550,000 Total2025 2026 2027 2028 2029Expenditures 2030 550,000550,000Software 550,000 550,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 550,000550,000E911 550,000 550,000Total 270 Page 431 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as squads, safety equipment and technology, among other items. 2025 Equipment Levy: 2018 Dodge Durango 2018 Dodge Durango 2018 Chevrolet Traverse 2018 Jeep Grand Cherokee 2018 Jeep Grand Cherokee Ford Interceptor AWD K8A S 26-215 2025 Public Safety Aid: Mobile Pro Defender Camera System License Plate Readers (ALPR/2017-2020) 2026 Equipment Levy: Speed Measurement Radar Equipment (Stalker Radar) SWAT Team Rifles 2019 Ford Interceptor Utility - Black/Ebony 2019 Toyota RAV4 2019 Toyota Highlander LE Hybrid - Model 6964 2021 Ford F-150 Hybrid 2021 Ford F-150 Hybrid 2026 E911: Dispatch Radio Consoles 2027 Equipment Levy: Computer Forensics Analysis Workstation StarChase Pursuit Intervention System 2020 Ford Explorer 2018 Dodge Grand Caravan 2022 Ford Interceptor Utility 2022 Ford Interceptor Utility 2022 Ford Lightning EV 2020 Ford Explorer (Unmarked) 2020 Toyota Rav4 Hybrid XLE (Unmarked) 2023 Ford Lightning 2023 Ford Lightning 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2023 Police Interceptor Utility Vehicle 2027 E911: E911 Call Handling System (CHS-1) 2028 Equipment Levy: License Plate Readers (ALPR/2021) StarChase Pursuit Intervention System 2017 Harley Davidson Motorcycle 2017 Harley Davidson Motorcycle Project #POL23200 Useful LifeProject Name Police Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$4,215,300 271 Page 432 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Ford Explorer Utility 2024 Chevy Blazer PPV EV 2024 Chevy Blazer PPV EV 2028 E911: 911 Logging System 2029 Equipment Levy: Patrol Rifles Tasers 2022 Ford Mach E - EV 2022 Toyota Rav4 Hybrid 2022 Toyota Highlander Hybrid 2022 Toyota Highlander Hybrid 2024 Ford Explorer Utility 2024 Dodge Durango Squad 2030 Equipment Levy: Tasers Replacement Program SWAT Vests 2023 Hyundai Santa Fe Hybrid Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of police safety equipment,technology and vehicles allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Total2025 2026 2027 2028 2029Expenditures 2030 4,215,300440,000 833,000 1,417,800 616,000 690,000Vehicles and Equipment 218,500 440,000 833,000 1,417,800 616,000 690,000 4,215,300Total218,500 Total2025 2026 2027 2028 2029Funding Sources 2030 3,052,300330,000 358,000 867,800 588,000 690,000Construction Fund: Equipment Levy 218,500 1,053,000475,000 550,000 28,000E911 110,000110,000Public Safety Aid 440,000 833,000 1,417,800 616,000 690,000 4,215,300Total218,500 272 Page 433 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description This will add a fully marked patrol squad to the police fleet. A total of (4) patrol officers are being added to the department between 2024-25. An additional squad car is required to accommodate this increased staffing. The cost includes the vehicle, emergency equipment, and upfitting costs. Costs are higher for the initial build of this squad car due to systems that are typically purchased for the entire fleet under other projects. This build includes a mobile radio, radar/LIDAR, first aid/AED equipment, mobile computer, squad mounted weapons, and the in squad video system. ***May be eligible for Public Safety Grant Funding*** Project #POL25101 Justification Expansion and/or Level of Service Sustainability: The Police Department continues to incorporate fully electric (EV) and hybrid vehicles into our fleet. Vehicle procurement for police squads has become very difficult in recent years and the final selection will be based on vehicle availability and balancing the fleet appropriately to assure maximum availability of emergency response vehicles. Community Engagement: Fully marked police vehicles are a highly visible and provide a sense of safety and security in the community. Health in All Policies: An adequate and reliable fleet of emergency response vehicles is essential for our police officers to carry out their job duties. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The police department continues to responsibly manage our fleet to maximize efficiency and minimize cost while prioritizing public safety and employee safety. Useful LifeProject Name Patrol Squad Car Addition Category Equipment and Vehicles Type New Total Project Cost:$130,000 Total2025 2026 2027 2028 2029Expenditures 2030 130,00070,000 60,000Vehicles and Equipment 70,000 60,000 130,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00060,000Construction Fund: Equipment Levy 70,00070,000Public Safety Aid 70,000 60,000 130,000Total 273 Page 434 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Purchase (4) rifle-rated ballistic shields for Police operations. Police Officers are facing an unprecedented number of threats involving firearms. This continues to evolve to include rifle fire including tragic incidents in 2024 in Burnsville and Minnetonka. Police body armor and existing ballistic shields are not rated to protect against rifle threats. This is essential equipment to protect Police Officers responding to active shooter situations and other firearm threats. Two shields will be placed in our SWAT vehicle and two shields will be deployed in our Patrol Sergeant squads to assure rapid availability in the field. ***May be eligible for Public Safety Grant Funding*** Project #POL25103 Justification Health, Safety & Regulatory Compliance, Expansion and/or Level of Service Sustainability: This project has no immediate sustainability impacts. Community Engagement: The community expects Police Officers to be equipped to immediately respond to violent acts including active shooters and other armed threats that have unfortunately become more common. This equipment assures our officers will be better equipped to intervene more quickly and safely when encountering rifle threats. Health in All Policies: We have an obligation to our employees to provide the equipment necessary to keep them safe. Technology, tactics, and threats rapidly evolve and this investment is critical to keep us properly equipped. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: This is a direct investment in officer safety and wellness as our staff faces increasing hazards in their work. Useful LifeProject Name Rifle-Rated Ballistic Shields Category Equipment and Vehicles Type New Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00040,000Vehicles and Equipment 40,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00040,000Public Safety Aid 40,000 40,000Total 274 Page 435 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace the bi-directional amplifier (BDA) system installed in City Hall. The BDA allows ARMER portable radios used by Police, Fire, and Public Works to function inside of City Hall / Police Department. These systems are critical for public safety and required by code. ARMER radios do not function in several areas of City Hall/Police without an operational BDA. The current BDA was installed in 2016 and is reaching the end of it's useful life. The original infrastructure used by this system including coaxial cables and antennas dates back to 2004. This project will replace the BDA device and replace any antenna/cable infrastructure that does not meet current standards. Project #POL25107 Justification Asset Functionality, Health, Safety & Regulatory Compliance Sustainability: Existing electronic equipment will be recycled properly. Community Engagement: This equipment allows public safety personnel to operate safely and efficiently. This includes protection of City staff and assets. Health in All Policies: This project replaces critical life safety equipment in City Hall/Police Department that is required by code. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: When the original ARMER BDA system (2004) failed in 2016 the department was able to repurpose infrastructure from an abandoned system for legacy cellular devices to significantly reduce the project cost by over $60,000. Proper maintenance has provided a longer than expected service life for the 2016 system. This investment maintains a critical system while continuing to minimize cost. Useful LifeProject Name PS Radio Bi-Directional Amplifier (BDA) Rplcmt Category Equipment and Vehicles Type Replace or repair Total Project Cost:$25,000 Total2025 2026 2027 2028 2029Expenditures 2030 25,00025,000Vehicles and Equipment 25,000 25,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 25,00025,000Public Safety Aid 25,000 25,000Total 275 Page 436 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well # 7 by repairing or replacing the well pump, motor, and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-913 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #7 Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000180,000 120,000Installation/Maintenance 180,000 120,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000180,000 120,000Utility Fund: Water 180,000 120,000 300,000Total 276 Page 437 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well # 11 by repairing or replacing the well pump, motor, and other worn equipment. It would also inlcude replacing: 2023 - Exterior doors and Interior doors, roof replacement, painting, gas unit heaters, controls, lighting fixtures, crackfilling/ sealing stucco walls, fire alarm system and sprinklers. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-915 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #11 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$240,000 Total2025 2026 2027 2028 2029Expenditures 2030 240,000120,000Construction 120,000 120,000 240,000Total120,000 Total2025 2026 2027 2028 2029Funding Sources 2030 240,000120,000Utility Fund: Water 120,000 120,000 240,000Total120,000 277 Page 438 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Dave Goergen 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #20 by repairing or replacing the well pump, motor, and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and pump assembly are premium efficient rated and controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. Project #19-918 Justification Our Vision Edina mission statement is to provide effective and valued public services and to maintain a sound public infrastructure. Specifically, the Comprehensive Plan identifies a goal to Provide the City’s water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons pumped. Useful LifeProject Name Well #20 Rehabilitation Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,000180,000Construction 180,000 180,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 278 Page 439 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Public Works Description A fiber connection is required to replace the existing wireless connection. This new fiber connection will improve the speed and reliability allowing improvements for computer use and security in the building. Project #ITS25100 Justification Expansion and/or Level of Service Sustainability: This connection will require less network hardware replacement and less power. Stewardship: This connection will cost less over its lifetime and provide better service than the existing wireless connection Useful LifeProject Name CLP Maintenance Fiber Category Technology Type New Total Project Cost:$30,000 Total2025 2026 2027 2028 2029Expenditures 2030 30,00030,000Construction 30,000 30,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 30,00030,000Construction Fund: CIP Levy 30,000 30,000Total 279 Page 440 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Public Works Description We are nearly out of fiber strands heading north from City Hall to St. Louis Park. Additional strands will be needed for fiber projects in the north end of town as well as projects that need to connect to LOGIS or Hennepin County. This would install a new fiber optic cable with plenty of strands to support operations well into the future. Project #ITS25101 Justification Expansion and/or Level of Service Sustainability: Fiber connections are often the network backbone that supports many types of projects. Stewardship: Fiber connections offer speed and security to all sorts of City projects. Fiber also offers a long service life. Useful LifeProject Name Increase Fiber Capacity to SLP Category Technology Type New Total Project Cost:$60,000 Total2025 2026 2027 2028 2029Expenditures 2030 60,00060,000Construction 60,000 60,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 60,00060,000Construction Fund: CIP Levy 60,000 60,000Total 280 Page 441 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replacing larger retaining walls citywide. We have a list of needed improvements. Project #PW22002 Justification Retaining wall failures for larger walls completely exhaust our budget and often need to be funded by our bridge maintenance budget causing significant deferred maintenance on our bridges Useful LifeProject Name Annual Deferred Retaining Wall Replacements Category Infrastructure Type Replace or repair Total Project Cost:$750,000 Total2025 2026 2027 2028 2029Expenditures 2030 750,00050,000 100,000 200,000 200,000Construction 200,000 50,000 100,000 200,000 200,000 750,000Total200,000 Total2025 2026 2027 2028 2029Funding Sources 2030 750,00050,000 100,000 200,000 200,000Construction Fund: CIP Levy 200,000 50,000 100,000 200,000 200,000 750,000Total200,000 281 Page 442 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #15 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23002 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #15 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$140,000 Total2025 2026 2027 2028 2029Expenditures 2030 140,000Construction140,000 140,000Total140,000 Total2025 2026 2027 2028 2029Funding Sources 2030 140,000Utility Fund: Water 140,000 140,000Total140,000 282 Page 443 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #10 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23004 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #10 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$120,000 Total2025 2026 2027 2028 2029Expenditures 2030 120,000Construction120,000 120,000Total120,000 Total2025 2026 2027 2028 2029Funding Sources 2030 120,000Utility Fund: Water 120,000 120,000Total120,000 283 Page 444 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #12 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23005 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #12 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,000180,000Construction 180,000 180,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 284 Page 445 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #20 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23006 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #13 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,000180,000Construction 180,000 180,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 285 Page 446 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #2 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23007 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #2 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$170,000 Total2025 2026 2027 2028 2029Expenditures 2030 170,000170,000Construction 170,000 170,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 170,000170,000Utility Fund: Water 170,000 170,000Total 286 Page 447 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the rehabilitation of Well #6 by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23008 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's water customers with safe, reliable, high quality potable water supply. In order to provide a reliable, sound infrastructure, the Public Works Department has implemented a well rehabilitation schedule based on one billion gallons water pumped. Useful LifeProject Name Well #6 Rehabilitation and Facility Improvements Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,000180,000Construction 180,000 180,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 180,000180,000Utility Fund: Water 180,000 180,000Total 287 Page 448 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description This project would include the annual rehabilitation of a Lift Station by repairing and replacing the well pump, motor and other worn equipment. ENVIRONMENTAL CONSIDERATIONS: Motor and Pump Assembly efficiency are controlled by Variable Frequency Drives (VFD) that optimize energy use and pump efficiency. The more efficent the pump the less energy used. Project #PW23009 Justification Our Vision Edina mission statement is to provide efficient and valued public services and to maintain sound public infrastructure. Specifically, our Comprehgensive Plan identifies a goal to provide the City's sewer customers with safe, reliable, and efficient removal of wastewater for residents and customers in the City of Edina, while eliminating risk of inflow, infiltration, and backflow to protectthe health, safety, and welfare of our citizens now and into the future. Useful LifeProject Name Lift Station Pump and VFD Renewal Category Infrastructure Type Replace or repair Total Project Cost:$180,000 Total2025 2026 2027 2028 2029Expenditures 2030 180,00030,000 30,000 30,000 30,000 30,000Construction 30,000 30,000 30,000 30,000 30,000 30,000 180,000Total30,000 Total2025 2026 2027 2028 2029Funding Sources 2030 180,00030,000 30,000 30,000 30,000 30,000Utility Fund: Sewer 30,000 30,000 30,000 30,000 30,000 30,000 180,000Total30,000 288 Page 449 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replace equipment according to the equipment replacement schedule. The Public Works Department has almost $10 million of equipment covered under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025 Equipment Levy: 2013 GMC Sierra 2013 GMC Sierra 2004 Clark C25C 51" SnoQuip XX Blower Patch King 6 Ton Patch Box 2015 Ford F350 7433S Case Loader 2026 Equipment Levy: Used 2010 TR MT6 Trackless Tractor L8500 Sterling MT6 Trackless 2027 Equipment Levy: Weiler TT500 Tack Trailer 2027 CIP Bonds - Equip Cert: MT6 Trackless MT1963 2012 International 7400 4x2 Truck Weiler P385 Paver 2015 Western Star 4700SB 2028 Equipment Levy: Equip Cert Payment CAT SW345B 3" Wheel Saw Crafco SS125 Diesel Melter 2002 Allu SM3-23 2018 Ford F550 2016 Ford F550 2017 Ford F350 2029 Equipment Levy: Equip Cert Payment Towmaster T14DT Trailer 2014 Caterpillar 272D Skid Steer MT6 Trackless Sidewalk Machine 2017 Western Star Tandem Axle Truck Hypac C747 Roller 2030 Equipment Levy: Equip Cert Payment Gilcrest Asphalt Tailgate Paver 2017 Caterpillar Skid Steer 2017 Ford F350 2020 Kenworth K370 Truck w/Velocity Patcher Asphalt Trailer Project #PWK23200 Useful LifeProject Name Public Works Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$4,214,107 289 Page 450 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs low but most importantly allows us to keep maintaining our snow removal in an efficient manner. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of a Public Works Department without a reliable fleet. Total2025 2026 2027 2028 2029Expenditures 2030 4,214,107583,500 830,000 23,000 767,684 1,089,000Vehicles and Equipment 920,923 583,500 830,000 23,000 767,684 1,089,000 4,214,107Total920,923 Total2025 2026 2027 2028 2029Funding Sources 2030 4,214,107583,500 830,000 23,000 767,684 1,089,000Construction Fund: Equipment Levy 920,923 583,500 830,000 23,000 767,684 1,089,000 4,214,107Total920,923 290 Page 451 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Description Replace equipment according to the equipment replacement schedule. The Public Works and Parks maintenance Department has almost $10 million of equipment covered under this program. Types of equipment include small machinery, passenger vehicles and heavy equipment. Most of this equipment has an estimated useful life of between 10-20 years. 2025: 2005 Kohler 300REOZVW 2015 Ford F250 2018 Volvo ECR88D 2026: 1996 Towmaster T12DD Trailer 2006 Thompson 6" water pump 2016 Ford F550 2027: 2007 Bluestar 175 Kw generator 2007 Multiquip Light Plant 2016 Westernstar 4700 Vaccon 2017 Ford F250 2028: 2017 Ford F350 2002 Speco easment machine 2013 Ford F550 2017 GMC Serri 2018 F150 2018 F150 2029: 2004 Katolight D300FJ4 2004 Cat 3456 2003 Cat 400Kw generator 2006 Bluestar BSJ300 300KW generator 2009 Cat 80Kw generator 2019 Ford F150 2019 Ford F150 2030: 2005 Kohler 300 kW generator 2020 Dulevo Sweeper 2020 F150 Project #PWK23201 Justification As outlined in Vision Edina, it is the mission of the City Council is to provide effective and valued public services and maintain a sound public infrastructure. Regular updates to equipment helps to keep maintenance costs lower but most importantly allows us to keep maintaining our snow removal in an efficient manner. Breakdowns delay performance. We are being fiscally responsible with our fleet as is outlined in our IQS and we cannot perform the functions of a Public Works Department without a reliable fleet. Useful LifeProject Name Utilities Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$2,735,000 291 Page 452 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Brian Olson 2025 2030thru Department Public Works Total2025 2026 2027 2028 2029Expenditures 2030 2,735,000355,000 200,000 677,000 297,000 642,000Vehicles and Equipment 564,000 355,000 200,000 677,000 297,000 642,000 2,735,000Total564,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,735,000355,000 200,000 677,000 297,000 642,000Utility Fund 564,000 355,000 200,000 677,000 297,000 642,000 2,735,000Total564,000 292 Page 453 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description This for water meter reading migration from AMR to AMI(drive by reading vs. push button real-time). We will be focusing on replacing commercial meters 1 1/2" and bigger in years 1 and 2, as these meters have the most potential for water lost. Years 2-5 will include replacement of residential meters. The replacement of these meters will allow us to fully utilize the AMI system. Project #PWK25101 Justification Expansion and/or Level of Service Sustainability: No fuel consumption for driving meter reading routes. Community Engagement: Expansion/upgrade of existing meter reading network allows for real-time monitoring and control of utility assets. Health in All Policies: Provide the City’s water customers with safe, reliable, high quality potable water supply Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Water Meter Radio Receivers Category Technology Type Expand or enhance Total Project Cost:$4,970,000 Total2025 2026 2027 2028 2029Expenditures 2030 4,970,0001,300,000 880,000 900,000 930,000 960,000Construction 1,300,000 880,000 900,000 930,000 960,000 4,970,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 4,970,0001,300,000 880,000 900,000 930,000 960,000Utility Fund: Water 1,300,000 880,000 900,000 930,000 960,000 4,970,000Total 293 Page 454 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description Inspect and evaluate existing filter media for possible replacement at Water Treatment Plants #2, #3 and #4. Project #PWK25102 Justification Asset Functionality Sustainability: Proper media depths and material are crucial for efficient water filtration. Health In All Policies: Provide the City’s water customers with safe, reliable, high quality potable water supply Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Filter Media Replacement Category Infrastructure Type Replace or repair Total Project Cost:$450,000 Total2025 2026 2027 2028 2029Expenditures 2030 450,000450,000Construction 450,000 450,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 450,000450,000Utility Fund: Water 450,000 450,000Total 294 Page 455 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Nathan Kaderlik 2025 2030thru Department Public Works Description Extend Fiber network to Van Valkenburg Water Tower(4949 Malibu Dr) Project #PWK25103 Justification Expansion and/or Level of Service Sustainability: Fiber expansion would eliminate the use of current radio communication, lessening electrical load. Community Engagement: Expansion of existing fiber network allows for real-time monitoring and control of utility assets. Health in All Policies: This project will help provide the City’s water customers with safe, reliable, high quality potable water supply. Stewardship: "The City’s mission statement “is to provide effective and valued public services, maintain a sound public infrastructure, offer premier public facilities, and guide the development and redevelopment of lands, all in a manner that sustains and improves the health and uncommonly high quality of life enjoyed by our residents and businesses.” The City’s Budget Work Plan Goals 1 and 3 are: Maintain Physical Assets & Infrastructure and Plan for Connected & Sustainable Development. Properly maintained streets, water main, sanitary sewer and storm sewer systems provide reliable and efficient operations that lessen the City’s carbon footprint and reduce energy costs. " Useful LifeProject Name Fiber Installation, Van Valkenburg Tower Category Infrastructure Type Expand or enhance Total Project Cost:$160,000 Total2025 2026 2027 2028 2029Expenditures 2030 160,000160,000Construction 160,000 160,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 160,000160,000Utility Fund: Water 160,000 160,000Total 295 Page 456 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Public Works Description This project will support Edina’s Climate Action Plan by introducing a dedicated 100 percent biodiesel fueling system to support the city’s heavy- duty fleet. The new fuel will require the acquisition of a containment vessel and distribution pumps that will be located at Public Works near existing fuel islands. Modifications to the site including concrete pad and bollards to support the system and electrical infrastructure upgrades. Project #PWK25104 Justification Expansion and/or Level of Service Sustainability: Converting heavy-duty fleet to biodiesel is a key strategy to achieving our Climate Action Plan (CAP) goals to reduce greenhouse gas emission for city operations. This project specifically supports CAP strategy TL-5. Community Engagement: These projects encourage people to interact with staff to understand the importance of biodiesel. Focusing on city fleet, this project does not contain an engagement component but provides the community an opportunity to see the city lead by example. Health in All Policies: Biodiesel vehicles are low-emission vehicles, meaning they have lower harmful tailpipe emissions that negatively impact air quality. This project will result in the consumption of B100 fuel, which has no tailpipe emissions. Race & Equity: Lowering or removing tailpipe emissions from our heavy-duty fleet improves tailpipe emissions which negatively impact low- income and under-served communities at a higher rate. Stewardship: The fueling tank and vehicle retrofit systems will be used by existing heavy-duty vehicles, removing the need to purchase new replacement vehicles, and prolonging the useful life of our existing heavy-duty fleet. Useful LifeProject Name Public Works Fleet - Bio Diesel Storage Tanks Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$375,000 Total2025 2026 2027 2028 2029Expenditures 2030 375,000375,000Vehicles and Equipment 375,000 375,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 375,000375,000CAS Fund: Utility Franchise Fees 375,000 375,000Total 296 Page 457 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Technology Description Replacement of equipment according to the equipment replacement schedule. This includes essential equipment such as copiers and printers, servers, camera systems and switch batches, among other items. 2025: Citywide Switch Batch 2 IT Storage Replacement Server Replacements ESX 2026: Fire Control Systems at City Hall and PW Ricoh MFP - Building Cisco Access Points Batch 2 (25) 2027: PD & CH Surveillance Cameras City Hall UPS System - Full Replacement Citywide Switch Batch 3 Ricoh MFP - Admin Ricoh MFP - P&R Citywide Switch Batch 4 Squad Car Technology Upgrades City Hall UPS System (Batteries Only) Server Replacements ESX 2028: Cisco Phone System Cisco Access Point batch 3 (21) Citywide Switch Batch 5 Fire Apparatus Tech (TB, iPad & Install) PW UPS (Batteries Only) Cisco Access Point batch 3 (21) Citywide Switch Batch 5 2029: Fire Station 1 Security Fire Station 2 Security Fire Station Camera System Ricoh MFP - Police (1st Floor and 2nd Floor) Citywide Switch Batch 1 (Core and FW) Citywide Access Point Batch 1 (50) 2030: Ricoh MFP - PW Citywide Switch Batch 2 IT Storage Replacement Project #ITS23100 Useful LifeProject Name IT Equipment Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$2,340,000 297 Page 458 of 647 Capital Improvement Plan - FUNDED City of Edina, Minnesota Contact Ryan Browning 2025 2030thru Department Technology Justification As outlined in Vision Edina, it is the mission of the City Council to provide effective and valued public services and maintain a sound public infrastructure. Regular replacement of copiers and printers, servers, camera systems and other technology equipment allows the city to maintain a high level of quality service provided to the residents of the City of Edina. Timely replacement of equipment also ensures equipment reliability while keeping maintenance costs low. Total2025 2026 2027 2028 2029Expenditures 2030 2,340,000440,000 95,000 633,000 500,000 294,000Vehicles and Equipment 378,000 440,000 95,000 633,000 500,000 294,000 2,340,000Total378,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,340,000440,000 95,000 633,000 500,000 294,000Construction Fund: Equipment Levy 378,000 440,000 95,000 633,000 500,000 294,000 2,340,000Total378,000 298 Page 459 of 647 FUNDING TBD PROJECTS BY DEPARTMENT 299 Page 460 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota PROJECTS BY FUNDING SOURCE 2025 2030thru Total20252026202720282029Source2030Project #Priority Funding TBD 15-049Lewis Park Shelter Building Replacement 900,000900,000 19-946Walnut Ridge Park Facility Improvements 24,00024,000 DEV25104HRA Grandview Commons public space.2,500,0002,500,000 DEV25105HIA Funding 5,000,0002,500,000 2,500,000 DEV25106Cahill Area New District Plan 250,000200,000 50,000 DEV25108HRA Land Acquisition - Affordable Housing 8,000,0005,000,000 3,000,000 ENG21048Yancey Park 22,00022,000 FAC25100City Hall Space Needs Design 56,300,0001,800,000 2,000,000 2,500,000 50,000,000 FAC25102City Hall Deferred Maintenance 12,196,2915,109,023 1,304,651 88,663 5,693,954 FAC25104Golf Course Deferred Maintenance 4,155,7312,025,000 631,000 156,000 8,600 1,335,131 FAC25106Public Works Building Deferred Maintenance 43,918,7112,123,546 1,945,892 38,929,958 919,315 FAC25107Edinborough Park Asset Preservation 13,326,4389,597,163 3,152,615 576,660 FAC25112Fire Station #1 Deferred Maintenance 2,510,3311,251,082 14,525 1,181,490 63,234 FAC25116Edinborough Pool Mechanical and Filter Equipment 250,000125,000 125,000 P&R21052CLP Central Park Trellis 450,000150,000 150,000 150,000 P&R21053CLP Rebuild Retaining Walls 400,000200,000 200,000 P&R23106Aquatic Center Deferred Maintenance 1,261,304600,000 452,000 141,988 5,880 61,436 P&R23116Centennial Lakes Park Deferred Maintenance 1,960,393800,000 956,606 21,732 182,055 P&R25109Trailer Crash Attenuators 35,00035,000 P&R25115Aquatic Center User Feature 2,795,000500,000 470,000 75,000 150,000 100,000 1,500,000 P&R25116Edinborough Pool Resurfacing & Painting 125,000125,000 P&R25120Aquatic Center Changing House Expansion 6,000,0006,000,000 P&R25122Braemar Arena Pickup Truck 50,00050,000 P&R25124Edina Art Center Design, Fixtures, & Equipment 1,300,000250,000 1,050,000 P&R25128Centennial Lakes Park Paddleboat Replacement 40,00020,000 20,000 P&R25129CLP Golf Course Planting & Pond Replacement 210,000150,000 60,000 P&R25131Centennial Lakes Park Outdoor Sound System 150,000150,000 P&R25132Centennial Lakes Park Signage 200,000200,000 P&R25133CLP Amphitheater Maintenance & Bathroom Addition 1,280,00030,000 500,000 750,000 P&R25135Centennial Lakes Park Railings Replacement 200,000100,000 50,000 50,000 P&R25137Centennial Lakes Park Skating Mats 20,00020,000 P&R25138CLP Main Entrance Paver Replacement 100,000100,000 P&R25140Centennial Lakes Park Clubhouse Replacement 750,000750,000 300 Page 461 of 647 Total20252026202720282029Source2030Project #Priority P&R25141CLP Irrigation and Planting Bed Replacement 200,00050,000 50,000 50,000 50,000 P&R25142CLP Walking Path Repair 600,000100,000 100,000 100,000 100,000 100,000 100,000 P&R25143CLP Lawn Game Replacement/Seating Enhancement 50,00050,000 P&R25144Centennial Lakes Park Site Amenities Replacement 80,00040,000 40,000 P&R25146Centennial Lakes Site and Hardscapes Repairs 25,925,2007,000,000 13,500,000 5,425,200 P&R25150Edinborough Park Loading Dock 75,00075,000 P&R25158Edinborough Park Locker Room Upgrade 300,000300,000 P&R25159Edinborough Park Entrance & Visitor 1st Experience 600,000100,000 500,000 P&R25161Permanent Restroom Academy 9 400,000400,000 P&R25173Golf Chemical Fill Station Building/ Wash Pad 300,000300,000 P&R25179Golf Course Maintenance Building Additions/Upgrade 300,000300,000 POL25102Detective Vehicle Addition 55,00055,000 POL25104Special Operations Radio Headsets 20,00020,000 POL25105Special Operations Night Vision Equipment 80,00080,000 POL25106Preliminary Alcohol Breath Test Devices 20,00020,000 POL25108Special Operations Ballistic Helmet Replacement 21,00021,000 Funding TBD Total 195,706,39946,840,814 21,793,289 3,832,988 55,336,323 9,661,785 58,241,200 GRAND TOTAL 195,706,39946,840,814 21,793,289 3,832,988 55,336,323 9,661,785 58,241,200 301 Page 462 of 647 FUNDING TBD PROJECTS IN DETAIL SORTED BY DEPARTMENT 302 Page 463 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Bill Neuendorf 2025 2030thru Department Comm. Dev. and HRA Description Development of the public space at the old public works site. Project #DEV25104 Justification Justification - Expansion and/or Level of Service Sustainability - Adds a passive park in the area. Community engagement - Aligns with existing approved plans. Health in all policies - Outdoor walking...social recreation. Pedestrian connectivity. Race and Equity - Public space open for all. Useful LifeProject Name HRA Grandview Commons public space.Category Land Type New Total Project Cost:$2,500,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,500,0002,500,000Planning and Design 2,500,000 2,500,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,500,0002,500,000Funding TBD 2,500,000 2,500,000Total 303 Page 464 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Stephanie Hawkinson 2025 2030thru Department Comm. Dev. and HRA Description Funding source for homeowners association repairs in townhomes/condominium development. (Like the Edina West). These monies get paid back through assessments. Project #DEV25105 Justification Health, Safety & Regulatory Compliance Sustainability - Helps preserve existing buildngs Race & Equity - Helps preserve affordable housing Stewardship - Assists affordable housing with repairs. Useful LifeProject Name HIA Funding Category Land Type New Total Project Cost:$5,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 5,000,0002,500,000 2,500,000Land Acquisition 2,500,000 2,500,000 5,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 5,000,0002,500,000 2,500,000Funding TBD 2,500,000 2,500,000 5,000,000Total 304 Page 465 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Cary Teague 2025 2030thru Department Comm. Dev. and HRA Description New/revised study of the Cahill Area office/industrial park. Project #DEV25106 Justification Health, Safety & Regulatory Compliance Justification - Study to determine the future land use in the district. Included goals would be sustainability, built environment, pedestrian movement. Community Engagement - To be determined, but likely would be extensive. Health in all policies - Project will look at pedestrian and bike movement throughout the district to provide better connections. Race & Equity - Examination of appropriate land uses. Stewardship - Project will help shape development and land use in the area for the next 50 years Useful LifeProject Name Cahill Area New District Plan Category Land Type New Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000200,000 50,000Planning and Design 200,000 50,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000200,000 50,000Funding TBD 200,000 50,000 250,000Total 305 Page 466 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Stephanie Hawkinson 2025 2030thru Department Comm. Dev. and HRA Description Creation of affordable housing to assist the City in meeting its established affordable housing goals with the Metropolitan Council. Project #DEV25108 Justification Health, Safety & Regulatory Compliance Sustainability: Will incorporate per the sustainable buildings policy. Commnunity Enagagement: Alignment with housing chapter in the Comprehensive Plan & the Housing Strategy Task Force. Health in All Policies: Healthy homes criteria with access to transit and local amenities. Race & Equity: Increases the mix of housing options in the City to address diverse housing needs. Stewardship: Additional housing helps toward the issue of an overall lack of housing options in the Twin Cities, especially affordable housing. Useful LifeProject Name HRA Land Acquisition - Affordable Housing Category Land Type New Total Project Cost:$8,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 8,000,0005,000,000 3,000,000Land Acquisition 5,000,000 3,000,000 8,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 8,000,0005,000,000 3,000,000Funding TBD 5,000,000 3,000,000 8,000,000Total 306 Page 467 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Engineering Description Each building component was evaluated to determine needed maintenance and replacements to extend the buildings lifespan. Maintenance needs and costs increase as buildings age and are required to avoid unnecessary interruptions in operations due to breakdowns of critical components. The following components are recommended for service: 2030 - Interior doors, sealed concrete, water fountain, furnace Stain, restroom accessories, paint, ceramic tile, water htrs, exhaust systems, keyless entry, exit signs, batteries, casework Wooden wall panelsStain, partitions, toilets, exit signs and batteries Project #19-946 Justification See Summary of Facilities Improvements - Funding TBD. Useful LifeProject Name Walnut Ridge Park Facility Improvements Category Buildings Type Replace or repair Total Project Cost:$134,000 Total2025 2026 2027 2028 2029Expenditures 2030 24,000Construction24,000 24,000Total24,000 Total2025 2026 2027 2028 2029Funding Sources 2030 24,000Funding TBD 24,000 24,000Total24,000 307 Page 468 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Engineering Description Each building component was evaluated to determine needed maintenance and replacements to extend the buildings lifespan. Maintenance needs and costs increase as buildings age and are required to avoid unnecessary interruptions in operations due to breakdowns of critical components. The following components are recommended for service: 2030 - Ext wood panel, restroom accessories, ceramic tile carpet tile, paint, exhst system, keyless entry, stain, Janitor sink, plumbing fixtures, electrical feed, ext stain Project #ENG21048 Justification See Summary of Facilities Improvements - Funding TBD. Useful LifeProject Name Yancey Park Category Buildings Type Replace or repair Total Project Cost:$45,000 Total2025 2026 2027 2028 2029Expenditures 2030 22,000Construction22,000 22,000Total22,000 Total2025 2026 2027 2028 2029Funding Sources 2030 22,000Funding TBD 22,000 22,000Total22,000 308 Page 469 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description City Hall Phased Renovations This project continues the work outlined in the 2019 & 2023 City Hall Space Needs Study and includes projects to renovate and expand areas of the building that no longer meet the needs of city services. A phased approach for a project of this size and complexity is needed to minimize the impact on building occupants and public. 2024/5 –Design & Pre-Construction $300K—17-790 Meet with user groups ideas and needs outlined in 2023 space needs document. Work would include design services for phase 1 & 2 of projects outlined below. Phase 1 2025-26--Renovation $1.5M Project would renovate the 2nd floor Administration area, utilizing opportunities created by relocation of election equipment to new storage space in the building basement. This would allow departments currently scattered around in building to be consolidated to new grouping areas and provide much needed spaces of various sizes to conduct meetings, prayer and meditative spaces, and nursing areas. Phase 1a-2025/26 Pre-Construction $500K Perform investigative testing and site fit services for a new Civic Campus. Proposed project would encompass new Fire Station %233 and expansion of Police Department & Administrative services. Budget & schedule for proposed building could be set at this phase. Phase 2 2026/27—Renovation $2.5M Continuation of Phase 1 consolidation of departments would allow current office Parks and Rec. area to be converted into flexible meeting & conference rooms. These rooms would be available to both staff and public for use and a recommendation of the 2019 Space Needs Study. Police-renovation to both 1st & 2nd floor for better operational flow & staffing additions. Phase 3a 2029/30 Horizon TBD Minor expansion near current Mayors Conference room for additional meeting spaces. Phase 3b 2029/30-Horizon TBD Civic Campus Design Phase. Build upon information gathered in phase 1a. Project #FAC25100 Justification Expansion and/or Level of Service Sustainability: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Community Engagement: Additional conference room space would add options for community gathering not currently available in the space. Health in All Policies: Gender inclusive restrooms, lactation space are health policies. Race & Equity: Inclusion elements such as gender inclusive restrooms, prayer and lactation space for the public would be proposed in the project. Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall Space Needs Design Category Buildings Type Expand or enhance Total Project Cost:$56,300,000 Total2025 2026 2027 2028 2029Expenditures 2030 56,300,0001,800,000 2,000,000 2,500,000Planning and Design 50,000,000 1,800,000 2,000,000 2,500,000 56,300,000Total50,000,000 309 Page 470 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Total2025 2026 2027 2028 2029Funding Sources 2030 56,300,0001,800,000 2,000,000 2,500,000Funding TBD 50,000,000 1,800,000 2,000,000 2,500,000 56,300,000Total50,000,000 310 Page 471 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Values entered into 2025 include all outstanding deferred maintenance costs from 2017- 2025" Project #FAC25102 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Community Engagement - Additional conference room space would add options for community gathering not currently available in the space. Health in All Policies - Gender inclusive restrooms, lactation space are health policies. Race & Equity - Inclusion elements such as gender inclusive restrooms, prayer and lactation space for the public would be proposed in the project. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name City Hall Deferred Maintenance Category Buildings Type Replace or repair Total Project Cost:$12,196,291 Total2025 2026 2027 2028 2029Expenditures 2030 12,196,2915,109,023 1,304,651 88,663 5,693,954Installation/Maintenance 5,109,023 1,304,651 88,663 5,693,954 12,196,291Total Total2025 2026 2027 2028 2029Funding Sources 2030 12,196,2915,109,023 1,304,651 88,663 5,693,954Funding TBD 5,109,023 1,304,651 88,663 5,693,954 12,196,291Total 311 Page 472 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Values entered into 2025 include all outstanding deferred maintenance costs from 2017- 2025" Project #FAC25104 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Golf Course Deferred Maintenance Category Buildings Type Replace or repair Total Project Cost:$4,155,731 Total2025 2026 2027 2028 2029Expenditures 2030 4,155,7312,025,000 631,000 156,000 8,600 1,335,131Installation/Maintenance 2,025,000 631,000 156,000 8,600 1,335,131 4,155,731Total Total2025 2026 2027 2028 2029Funding Sources 2030 4,155,7312,025,000 631,000 156,000 8,600 1,335,131Funding TBD 2,025,000 631,000 156,000 8,600 1,335,131 4,155,731Total 312 Page 473 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. " Project #FAC25106 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Public Works Building Deferred Maintenance Category Buildings Type Replace or repair Total Project Cost:$43,918,711 Total2025 2026 2027 2028 2029Expenditures 2030 43,918,7112,123,546 1,945,892 38,929,958 919,315Installation/Maintenance 2,123,546 1,945,892 38,929,958 919,315 43,918,711Total Total2025 2026 2027 2028 2029Funding Sources 2030 43,918,7112,123,546 1,945,892 38,929,958 919,315Funding TBD 2,123,546 1,945,892 38,929,958 919,315 43,918,711Total 313 Page 474 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Values entered into 2025 include all outstanding deferred maintenance costs from 2017- 2025" Project #FAC25107 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Edinborough Park Asset Preservation Category Equipment and Vehicles Type Replace or repair Total Project Cost:$13,326,438 Total2025 2026 2027 2028 2029Expenditures 2030 13,326,4389,597,163 3,152,615 576,660Installation/Maintenance 9,597,163 3,152,615 576,660 13,326,438Total Total2025 2026 2027 2028 2029Funding Sources 2030 13,326,4389,597,163 3,152,615 576,660Funding TBD 9,597,163 3,152,615 576,660 13,326,438Total 314 Page 475 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Values entered into 2025 include all outstanding deferred maintenance costs from 2017- 2025" Project #FAC25112 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Fire Station #1 Deferred Maintenance Category Buildings Type Replace or repair Total Project Cost:$2,510,331 Total2025 2026 2027 2028 2029Expenditures 2030 2,510,3311,251,082 14,525 1,181,490 63,234Installation/Maintenance 1,251,082 14,525 1,181,490 63,234 2,510,331Total Total2025 2026 2027 2028 2029Funding Sources 2030 2,510,3311,251,082 14,525 1,181,490 63,234Funding TBD 1,251,082 14,525 1,181,490 63,234 2,510,331Total 315 Page 476 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Facilities Description "Assessment, preventative maintenance, and planned replacement to equipment critical to indoor pool operations,. Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Project #FAC25116 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Edinborough Pool Mechanical and Filter Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$250,000 Total2025 2026 2027 2028 2029Expenditures 2030 250,000125,000 125,000Installation/Maintenance 125,000 125,000 250,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 250,000125,000 125,000Funding TBD 125,000 125,000 250,000Total 316 Page 477 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Replacement of the Lewis Park shelter building based on space needs and community engagement. Evaluation of programming and space needs will be included to determine required square footage. Design will be driven by city goals and values. " Project #15-049 Justification The Lewis Park shelter building was designed and built in the 1970's and no longer meets residents' needs. The building requires extensive maintenance and is recommended for scheduled replacement. Useful LifeProject Name Lewis Park Shelter Building Replacement Category Buildings Type Replace or repair Total Project Cost:$900,000 Total20252026202720282029Expenditures2030 900,000900,000Construction 900,000 900,000Total Total20252026202720282029Funding Sources 2030 900,000900,000Funding TBD 900,000 900,000Total 317 Page 478 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Perry Vetter 2025 2030thru Department Park & Recreation Description Trailer crash attenuators can reduce the impact due to an accident that could occur while work vehicles are performing tasks on roadways. Trailer mounted attenuators can be towed by a variety of vehicles in Park Maintenance an Public Works. Project #P&R25109 Justification Health, Safety & Regulatory Compliance Useful LifeProject Name Trailer Crash Attenuators Category Equipment and Vehicles Type New Total Project Cost:$35,000 Total2025 2026 2027 2028 2029Expenditures 2030 35,00035,000Vehicles and Equipment 35,000 35,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 35,00035,000Funding TBD 35,000 35,000Total 318 Page 479 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Aquatic Center Description In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals. Project #P&R23106 Justification See Summary of Facilities Improvements. Useful LifeProject Name Aquatic Center Deferred Maintenance Category Infrastructure Type Replace or repair Total Project Cost:$1,261,304 Total2025 2026 2027 2028 2029Expenditures 2030 1,261,304600,000 452,000 141,988 5,880 61,436Installation/Maintenance 600,000 452,000 141,988 5,880 61,436 1,261,304Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,261,304600,000 452,000 141,988 5,880 61,436Funding TBD 600,000 452,000 141,988 5,880 61,436 1,261,304Total 319 Page 480 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Aquatic Center Description "Existing user feature require refurbishment and replacement. These features are unique to the Edina Aquatic Center and used to draw visitors to the park. Replace Shipwreck Zipline & Diving boards $500,000Site User Amenities $470,000Flow-rider Surf Simulator $100,000Slide Tower Stairs Painting $75,000Water Slide repainting--gel coating $150,000Site User Amenities $470,000Replace Zero Depth Play Structure $1,500,000" Project #P&R25115 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Aquatic Center User Feature Category Parks Type Replace or repair Total Project Cost:$2,795,000 Total2025 2026 2027 2028 2029Expenditures 2030 2,795,000500,000 470,000 75,000 150,000 100,000Installation/Maintenance 1,500,000 500,000 470,000 75,000 150,000 100,000 2,795,000Total1,500,000 Total2025 2026 2027 2028 2029Funding Sources 2030 2,795,000500,000 470,000 75,000 150,000 100,000Funding TBD 1,500,000 500,000 470,000 75,000 150,000 100,000 2,795,000Total1,500,000 320 Page 481 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Aquatic Center Description Re-surfacing and painting of indoor pool to maintain surface and integrity of pool. Project #P&R25116 Justification Asset Functionality Sustainability - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship - By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Edinborough Pool Resurfacing & Painting Category Parks Type Replace or repair Total Project Cost:$125,000 Total2025 2026 2027 2028 2029Expenditures 2030 125,000125,000Installation/Maintenance 125,000 125,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 125,000125,000Funding TBD 125,000 125,000Total 321 Page 482 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Rachel Finberg 2025 2030thru Department Parks: Aquatic Center Description This project request is for funding modern amenity upgrades for user experience and services. Facility upgrades would include a new admissions and entry, concessions area, ADA pathway upgrades, expanded pool deck and group area, gender neutral and family restroom upgrades. This project would increase safety, accessibility, and user experience. Project #P&R25120 Justification Expansion and/or Level of Service Sustainability - Upgrades to mechanical and plumbing systems would be included. This renovation would be subject to Edina Sustainable Building Policy. Solar feasibility would be included. Community Engagement - The Aquatic center sees 75,000 visitors a day. Project upgrades would allow for better wayfinding and experience. Upgrades would increase regional and youth exposure to water safety. Health in all polilcies - Improvements such as shade structures and healthier concession options would provide health benefits. Race and equity - Increased accessibility and wayfinding would promote use by public transit and pedestrian access. Useful LifeProject Name Aquatic Center Changing House Expansion Category Buildings Type Expand or enhance Total Project Cost:$6,000,000 Total2025 2026 2027 2028 2029Expenditures 2030 6,000,0006,000,000Construction 6,000,000 6,000,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 6,000,0006,000,000Funding TBD 6,000,000 6,000,000Total 322 Page 483 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Jesse Buchholz 2025 2030thru Department Parks: Arena Description Replace 2009 pickup truck Project #P&R25122 Justification Asset Functionality Sustainability: Current vehicle is not fuel efficient. Community Engagement: Vehicle allows staff to use throughout the arena, dome and parking areas as well as for hauling, projects and trips for supplies if needed. Health in All Policies: New vehicle allows staff to be more efficient in job functions and improve customer service for users and guests. Race & Equity: New vehicles allows for the city to maintain play spaces that are safe, accessible and welcoming for all. Stewardship: New vehicle reduces maintenance, fuel and staff time. Useful LifeProject Name Braemar Arena Pickup Truck Category Equipment and Vehicles Type Replace or repair Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Vehicles and Equipment 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Funding TBD 50,000 50,000Total 323 Page 484 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Remove dying trees and stumps and replacing with a pergola system and seating. Trees are currently a hazard. Project #P&R21052 Justification The upkeep of City infrastructure is a key component of the Vision Edina document. This trellis system would replace an area that is on the decline and turn it into an asset. Useful LifeProject Name CLP Central Park Trellis Category Equipment and Vehicles Type Expand or enhance Total Project Cost:$450,000 Total2025 2026 2027 2028 2029Expenditures 2030 450,000150,000 150,000Construction 150,000 150,000 150,000 450,000Total150,000 Total2025 2026 2027 2028 2029Funding Sources 2030 450,000150,000 150,000Funding TBD 150,000 150,000 150,000 450,000Total150,000 324 Page 485 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Centennial Lakes Park has over two dozen stone retaining walls of various lengths and heights, all of which are over 20 years old. Many of these walls are in need of restoration beyond the normal repairs we are able to do ourselves. There is about 1,200 square feet of wall throughout the park that needs to be restored. The project would involve demolition of existing wall sections, restoration of the wall using existing and new stone, and adding new landscape fabric and backfill for drainage. ENVIRONMENTAL CONSIDERATIONS: We will be reusing as much of our existing natural stone as possible as we rebuild the walls. Project #P&R21053 Justification The upkeep of City infrastructure is a key component of Vision Edina. The walls are showing signs of stress and will need to be repaired or will eventually collapse. Useful LifeProject Name CLP Rebuild Retaining Walls Category Parks Type Replace or repair Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000200,000 200,000Construction 200,000 200,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000200,000 200,000Funding TBD 200,000 200,000 400,000Total 325 Page 486 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Centennial Lakes Park Description In 2018, the City completed a three-year review process of 117 buildings to create a master replacement schedule for the components of each physical building. This extensive list includes repairs and replacements of Mechanical Electrical & Plumbing Systems (MEP), Furniture Fixtures and Equipment (FFE), and the building envelope components like roofing and glazing. Maintaining assets aligns with the following city goals. Project #P&R23116 Justification See Summary of Facilities Improvements. Useful LifeProject Name Centennial Lakes Park Deferred Maintenance Category Infrastructure Type Replace or repair Total Project Cost:$1,960,393 Total2025 2026 2027 2028 2029Expenditures 2030 1,960,393800,000 956,606 21,732 182,055Installation/Maintenance 800,000 956,606 21,732 182,055 1,960,393Total Total2025 2026 2027 2028 2029Funding Sources 2030 1,960,393800,000 956,606 21,732 182,055Funding TBD 800,000 956,606 21,732 182,055 1,960,393Total 326 Page 487 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace six paddleboats purchased in 2007-2015. Project #P&R25128 Justification Asset Functionality Health in all policies - Encourage exercise and socialization Useful LifeProject Name Centennial Lakes Park Paddleboat Replacement Category Parks Type Replace or repair Total Project Cost:$40,000 Total2025 2026 2027 2028 2029Expenditures 2030 40,00020,000 20,000Vehicles and Equipment 20,000 20,000 40,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 40,00020,000 20,000Funding TBD 20,000 20,000 40,000Total 327 Page 488 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description 2028 - Repair four ponds along the golf course that are leaking. 2029 - Replace Boulder Pond along south end of the Park. Project #P&R25129 Justification Asset Functionality Sustainability - Reduce water use. Replace current water feature with landscape elements to reduce water use. Community Engagement - Feature will be safe for enjoyment by all park visitors Race & Equity - Space would be inclusive for all users of the community. Health in all policies - Ponds are on putting course and encourage exercise and socialization. Provide space for socialization and gathering. Stewardship - Reduce maintenance costs to repair amenities. Useful LifeProject Name CLP Golf Course Planting & Pond Replacement Category Parks Type Replace or repair Total Project Cost:$210,000 Total2025 2026 2027 2028 2029Expenditures 2030 210,000150,000 60,000Installation/Maintenance 150,000 60,000 210,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 210,000150,000 60,000Funding TBD 150,000 60,000 210,000Total 328 Page 489 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace outdoor speakers throughout the Park. Project #P&R25131 Justification Asset Functionality Community Engagement: Entire system would function, providing music throughout park for people to enjoy Stewardship: Patrons often comment on the uniqueness of having music throughout the park. Specific to Centennial Lakes Park Useful LifeProject Name Centennial Lakes Park Outdoor Sound System Category Parks Type Replace or repair Total Project Cost:$150,000 Total2025 2026 2027 2028 2029Expenditures 2030 150,000Construction150,000 150,000Total150,000 Total2025 2026 2027 2028 2029Funding Sources 2030 150,000Funding TBD 150,000 150,000Total150,000 329 Page 490 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Finish replacement of outdoor signage throughout park. $150,000 of ARPA Funds were allocated in 2023-2024 and design was completed along with some replacement. Project #P&R25132 Justification Health, Safety & Regulatory Compliance Community Engagement - Finish updating wayfinding signage throughout park to provide better user experience. Race and Equity - Updated signage to serve entire population using the park. Useful LifeProject Name Centennial Lakes Park Signage Category Parks Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000200,000Vehicles and Equipment 200,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000200,000Funding TBD 200,000 200,000Total 330 Page 491 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description 2026 - Exterior Envelope Repairs and Replacements 2028 - Addition of bathrooms at the amphitheater 2030 - Replace, repair and paint amphitheater roof and structure. Replace A/V equipment Project #P&R25133 Justification Expansion and/or Level of Service, Asset Functionality Community Engagement: Provide restroom for park users utilizing the amphitheater. Feature will be safe for enjoyment by all park visitors Race & Equity: Provide enhancement of service at park with diverse audience. Useful LifeProject Name CLP Amphitheater Maintenance & Bathroom Addition Category Parks Type Replace or repair Total Project Cost:$1,280,000 Total2025 2026 2027 2028 2029Expenditures 2030 500,000500,000Construction 780,00030,000Installation/Maintenance 750,000 30,000 500,000 1,280,000Total750,000 Total2025 2026 2027 2028 2029Funding Sources 2030 1,280,00030,000 500,000Funding TBD 750,000 30,000 500,000 1,280,000Total750,000 331 Page 492 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace railings throughout park in poor condition Project #P&R25135 Justification Health, Safety & Regulatory Compliance","Asset Functionality Community Engagement - Replacement of broken and worn railings will provide safer walking experience for 500,000 visitors Stewardship - Reduce maintenance costs to repair worn railings. Useful LifeProject Name Centennial Lakes Park Railings Replacement Category Parks Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,000100,000 50,000 50,000Installation/Maintenance 100,000 50,000 50,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,000100,000 50,000 50,000Funding TBD 100,000 50,000 50,000 200,000Total 332 Page 493 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace rubber flooring used during skating season. Project #P&R25137 Justification Asset Functionality Useful LifeProject Name Centennial Lakes Park Skating Mats Category Parks Type Replace or repair Total Project Cost:$20,000 Total2025 2026 2027 2028 2029Expenditures 2030 20,000Vehicles and Equipment 20,000 20,000Total20,000 Total2025 2026 2027 2028 2029Funding Sources 2030 20,000Funding TBD 20,000 20,000Total20,000 333 Page 494 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace pavers in main park entry. Project #P&R25138 Justification Health, Safety & Regulatory Compliance, Asset Functionality Community Engagement: Replacement of worn pavers and concrete will provide safer walking experience for 500,000 visitors Health in All Policies: Replacement of worn pavers and concrete will provide safer walking experience for 500,000 visitors Useful LifeProject Name CLP Main Entrance Paver Replacement Category Parks Type Replace or repair Total Project Cost:$100,000 Total2025 2026 2027 2028 2029Expenditures 2030 100,000Construction100,000 100,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 100,000Funding TBD 100,000 100,000Total100,000 334 Page 495 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace and enhance the clubhouse at Centennial Lakes Park. Add restrooms and outdoor seating area to the structure. Project #P&R25140 Justification Asset Functionality","Health, Safety & Regulatory Compliance","Expansion and/or Level of Service Community Engagement - Replace building at popular attraction in park that has 500,000 visitors each year. Health in all policies - Provide covered seating space for socialization and restrooms for easier accessibility. Useful LifeProject Name Centennial Lakes Park Clubhouse Replacement Category Parks Type Replace or repair Total Project Cost:$750,000 Total2025 2026 2027 2028 2029Expenditures 2030 750,000750,000Installation/Maintenance 750,000 750,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 750,000750,000Funding TBD 750,000 750,000Total 335 Page 496 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace irrigation systems throughout park that are not functioning or require extensive maintenance. Replace landscape in area of irrigation replacement. Project #P&R25141 Justification Asset Functionality Sustainability - Replace broken irrigation systems with more efficient technology. Stewardship - Reduce maintenance costs to repair 30 year old irrigation systems. Useful LifeProject Name CLP Irrigation and Planting Bed Replacement Category Parks Type Replace or repair Total Project Cost:$200,000 Total2025 2026 2027 2028 2029Expenditures 2030 200,00050,000 50,000 50,000 50,000Installation/Maintenance 50,000 50,000 50,000 50,000 200,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 200,00050,000 50,000 50,000 50,000Funding TBD 50,000 50,000 50,000 50,000 200,000Total 336 Page 497 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Repair concrete walking paths throughout the 1.4 mile loop at Centennial Lakes Park and .75 miles on Edina Promenade. Remove paver inlays where appropriate. Project #P&R25142 Justification Health, Safety & Regulatory Compliance","Asset Functionality Community Engagement - Repair damaged concrete walking paths will provide safer walking experience for 500,000 visitors Health in all policies - Project will increase safety of walking paths, encouraging exercise and socialization Race and equity - Removal of paver inlays will improve walking and riding experience. Increase safety at popular, diverse park. Stewardship - 500,000 users utilize Centennial Lakes Park every year. The condition and safety of the walking paths is essential to a positive experience. This project will enhance the public pathways and encourage people to exercise. Useful LifeProject Name CLP Walking Path Repair Category Parks Type Replace or repair Total Project Cost:$600,000 Total2025 2026 2027 2028 2029Expenditures 2030 600,000100,000 100,000 100,000 100,000 100,000Installation/Maintenance 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 Total2025 2026 2027 2028 2029Funding Sources 2030 600,000100,000 100,000 100,000 100,000 100,000Funding TBD 100,000 100,000 100,000 100,000 100,000 100,000 600,000Total100,000 337 Page 498 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace Scottish Links with seating area for park users. Project #P&R25143 Justification Expansion and/or Level of Service Sustainability - "Remove bent grass that requires significant maintenance and replace with native plantings and seating areas. " Community Engagement - Remove paying amenity with free amenity. Health in all policies - Provide space for socialization and gathering. Race and equity - Remove paying amenity with free amenity that promotes community. Stewardship - Remove grass that requires a high level of resources and maintenance and replace with seating area for all park users to enjoy. Useful LifeProject Name CLP Lawn Game Replacement/Seating Enhancement Category Parks Type Expand or enhance Total Project Cost:$50,000 Total2025 2026 2027 2028 2029Expenditures 2030 50,00050,000Installation/Maintenance 50,000 50,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Funding TBD 50,000 50,000Total 338 Page 499 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description Replace worn swinging benches, trellis, drinking fountains, and garbage cans Project #P&R25144 Justification Health, Safety & Regulatory Compliance","Asset Functionality Race and Equity - Replace worn amenities at park with diverse audience. Stewardship - Reduce maintenance costs to repair amenities. Useful LifeProject Name Centennial Lakes Park Site Amenities Replacement Category Parks Type Replace or repair Total Project Cost:$80,000 Total2025 2026 2027 2028 2029Expenditures 2030 80,00040,000 40,000Installation/Maintenance 40,000 40,000 80,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 80,00040,000 40,000Funding TBD 40,000 40,000 80,000Total 339 Page 500 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Tiffany Bushland 2025 2030thru Department Parks: Centennial Lakes Park Description A site evaluation of Centennial Lakes Park was conducted in 2021 to review all exterior hardscapes and park infrastructure. Including sidewalks, benches and railings, irrigation systems, and site specific lighting. The report provided by Kimley-Horn & associates identified 3 priorities of repairs throughout the parkHigh--Items in critical or near critical need for replacement $7.0MMed--Items less critical with 5-10 years of life expectance $13.5MLow--Items deemed non-critical 10+ years of life expectance $5.5MAs these items were not previously tracked or reported in CIP plans they lacked major funding for replacement and should be included in this and future CIP projects as deferred maintenance. Project #P&R25146 Justification Asset Functionality Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Centennial Lakes Site and Hardscapes Repairs Category Parks Type Replace or repair Total Project Cost:$25,925,200 Total2025 2026 2027 2028 2029Expenditures 2030 25,925,2007,000,000 13,500,000Construction 5,425,200 7,000,000 13,500,000 25,925,200Total5,425,200 Total2025 2026 2027 2028 2029Funding Sources 2030 25,925,2007,000,000 13,500,000Funding TBD 5,425,200 7,000,000 13,500,000 25,925,200Total5,425,200 340 Page 501 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Edinborough Park Description Expand loading dock area for additional trash enclosure space. Includes repairs to loading dock surfaces. Repairs to exterior lighting at South entrance- $50,000 Project #P&R25150 Justification Asset Functionality Sustainability: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus eliminating items from the waste stream. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment Useful LifeProject Name Edinborough Park Loading Dock Category Parks Type Expand or enhance Total Project Cost:$125,000 Total2025 2026 2027 2028 2029Expenditures 2030 125,00050,000 75,000Construction 50,000 75,000 125,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 50,00050,000Edinborough Fund 75,00075,000Funding TBD 50,000 75,000 125,000Total 341 Page 502 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Patty McGrath 2025 2030thru Department Parks: Edinborough Park Description Upgrade the locker rooms to become ADA compliant. Project #P&R25158 Justification Health, Safety & Regulatory Compliance, Expansion and/or Level of Service Health in All Policies: The existing locker rooms (toilets, showers and sinks) do not meet ADA requirements and limits access for some patrons. Useful LifeProject Name Edinborough Park Locker Room Upgrade Category Parks Type Expand or enhance Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Funding TBD 300,000 300,000Total 342 Page 503 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Derik Otten 2025 2030thru Department Parks: Edinborough Park Description Enhance dated and damaged areas of East drive up entrance at Edinborough Park. Area will require new concrete sidewalks, pedestrian lighting and landscaping. Existing entrance was constructed in 1990's and components are failing.Strong Foundation: Maintain Physical Assets and InfrastructureReliable Service: Maintain service levels and best meet the community needs. to optimize long-term financial resources and meet sustainability goals. Continued reinvestment into the building portfolio ensures their use by current and future generations. Project #P&R25159 Justification Asset Functionality Stewardship: By providing preventative maintenance and scheduled repairs and replacement the city is able to extend the useful life of equipment and structures thus extending the useful life of the buildings ensuring their use by future generations. This includes minor maintenance like cleaning carpets and painting and major maintenance such as replacement of HVAC, plumbing, and electrical service equipment. Useful LifeProject Name Edinborough Park Entrance & Visitor 1st Experience Category Parks Type Replace or repair Total Project Cost:$600,000 Total2025 2026 2027 2028 2029Expenditures 2030 600,000100,000 500,000Construction 100,000 500,000 600,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 600,000100,000 500,000Funding TBD 100,000 500,000 600,000Total 343 Page 504 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Remove temporary/portable restroom on Academy 9 Golf Course and replace with permanent structure. Project #P&R25161 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Permanent Restroom Academy 9 Category Parks Type New Total Project Cost:$400,000 Total2025 2026 2027 2028 2029Expenditures 2030 400,000400,000Construction 400,000 400,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 400,000400,000Funding TBD 400,000 400,000Total 344 Page 505 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description This was included in the building study plan. At this time, we have a “closet” for chemical storage and how we fill our sprayer is not up to OSHA standards. A separate building for chemical storage and proper loading and mixing with proper containment is proposed. A recycled wash pad is also being proposed. Project #P&R25173 Justification Health, Safety & Regulatory Compliance Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Chemical Fill Station Building/ Wash Pad Category Parks Type Expand or enhance Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Funding TBD 300,000 300,000Total 345 Page 506 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Joe Abood 2025 2030thru Department Parks: Golf Course Description Additions/Upgrades to Breakroom, add an Office and expand Main Shop. Current space is inadequate for growth of facility. Project #P&R25179 Justification Expansion and/or Level of Service Sustainability: Braemar Golf Course is recognized for its Environmental Excellence as a “Certified Audubon Cooperative Sanctuary” through the Audubon Cooperative Sanctuary Program for Golf Courses, an Audubon International program. Braemar is one of 900 courses in the world to receive this honor for maintaining a high degree of environmental quality and natural resources in areas including wildlife and habitat management, chemical use reduction and safety, water quality management and environmental planning. Braemar was first certified in 2005 and has been able to retain the honor every three years during the recertification process. Braemar’s Championship 18 opened in May 2019 after being transformed into a 6,884-yard regulation18-hole golf course. The redesign included a significant environmental statement by restoring 4.37 acres of wetlands and enhancing a bit over a half-acre of additional wetlands, creating 32.11 acres of wetland buffer and introducing 33.85 acres of Oak Savanna throughout the course. Community Engagement: At the heart of Braemar Golf Course lies a sense of camaraderie and social interaction. Braemar brings people together, providing a platform for its patrons to connect, bond, and forge friendships. Braemar becomes a place where golfers of all skill levels, ages and abilities can come together, share experiences, and create a welcoming atmosphere that extends beyond the fairways. It's this sense of belonging that enhances the overall golfing experience and makes it truly special. Health in All Policies: Golf is a great way to enjoy regular exercise, develop social connections, and manage stress. Race & Equity: Braemar Golf Course is committed to being welcoming and inclusive to all who patronize the facility. To support and foster inclusivity, Braemar staff members are dedicated to acknowledging, seeking out and celebrating the diversity of its customers and proactively working together to eliminate systemic and institutional barriers to ensure all people have the opportunity to participate in golf at its facilities. Stewardship: Braemar Golf Course is committed to maintaining the golf course to the highest standard while preserving and enhancing the surrounding wildlife environment. Braemar demonstrates a high degree of environmental quality in a number of areas including environmental planning, wildlife & habitat management, outreach & education, integrated pest management, water conservation, and water quality management. Useful LifeProject Name Golf Course Maintenance Building Additions/Upgrade Category Buildings Type Expand or enhance Total Project Cost:$300,000 Total2025 2026 2027 2028 2029Expenditures 2030 300,000300,000Construction 300,000 300,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 300,000300,000Funding TBD 300,000 300,000Total 346 Page 507 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description This will add a unmarked detective car to the police fleet. A new Detective position was authorized in the 2024 budget with a total of six new positions in 2024-25. Detectives are assigned an unmarked police vehicle to carry out their job duties. Open positions in the department have allowed us to defer this addition until 2025. The cost includes the vehicle, emergency equipment, and upfitting costs. Costs are higher for the initial build of this police vehicle due to systems that are typically purchased for the entire fleet under other projects. This build includes a mobile radio, first aid/AED equipment, and a patrol rifle. ***May be eligible for Public Safety Grant Funding*** Project #POL25102 Justification Expansion and/or Level of Service Sustainability: The Police Department continues to incorporate fully electric (EV) and hybrid vehicles into our fleet. Typically we utilize hybrid vehicles for unmarked Detective cars. Vehicle procurement has become very difficult in recent years and the final selection will be based on vehicle availability. Community Engagement: Police vehicles are essential for officers to carry out their job duties. Health in All Policies: An adequate and reliable fleet of emergency response vehicles is essential for our police officers to carry out their job duties. Race & Equity: Promotes accessibility of police services to all members of the community Stewardship: The police department continues to responsibly manage our fleet to maximize efficiency and minimize cost while prioritizing public safety and employee safety. Useful LifeProject Name Detective Vehicle Addition Category Equipment and Vehicles Type New Total Project Cost:$55,000 Total2025 2026 2027 2028 2029Expenditures 2030 55,00055,000Vehicles and Equipment 55,000 55,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 55,00055,000Funding TBD 55,000 55,000Total 347 Page 508 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace (15) SWAT team radio headsets. Radio headsets allow SWAT team operators and paramedics to communicate effectively during special operations. Existing headsets are over 10 years old, are no longer serviceable, and require replacement. This is essential safety equipment required for SWAT operations. This items should be added to the Equipment Replacement Schedule. ***May be eligible for Public Safety Grant Funding*** Project #POL25104 Justification Health, Safety & Regulatory Compliance, Asset Functionality Sustainability: Existing equipment will be properly recycled. Community Engagement: Properly equipping our SWAT team assures effective and efficient police response to any situation in the community. Health in All Policies: We have an obligation to our employees to provide the equipment necessary to keep them safe. Technology, tactics, and threats rapidly evolve and this investment is critical to keep our SWAT team properly equipped. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The SWAT team has extended the life of existing equipment to over 10 years through proper maintenance and repair. Replacing the equipment now is essential for officer safety and effective SWAT operations. Useful LifeProject Name Special Operations Radio Headsets Category Equipment and Vehicles Type Replace or repair Total Project Cost:$20,000 Total2025 2026 2027 2028 2029Expenditures 2030 20,00020,000Vehicles and Equipment 20,000 20,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 20,00020,000Funding TBD 20,000 20,000Total 348 Page 509 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace (11) night vision units, IR aiming, and mounting hardware for SWAT team. Night vision equipment is used in SWAT Special Operations when operating in dark conditions indoors or out. The current SWAT night vision equipment is 20 years old and was acquired at the time through a donation. This equipment is long past its useful service life and requires replacement. This item should be added to the equipment replacement schedule. ***May be eligible for Public Safety Grant Funding*** Project #POL25105 Justification Health, Safety & Regulatory Compliance, Asset Functionality Sustainability: Existing equipment will be recycled properly. Community Engagement: Properly equipping our SWAT team assures effective and efficient police response to any situation in the community. Health in All Policies: We have an obligation to our employees to provide the equipment necessary to keep them safe. Technology, tactics, and threats rapidly evolve and this investment is critical to keep our SWAT team properly equipped. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The SWAT team has extended the life of existing equipment for 20 years through proper maintenance and repair. Replacing the equipment now is essential for officer safety and effective SWAT operations. Useful LifeProject Name Special Operations Night Vision Equipment Category Equipment and Vehicles Type Replace or repair Total Project Cost:$80,000 Total2025 2026 2027 2028 2029Expenditures 2030 80,00080,000Vehicles and Equipment 80,000 80,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 80,00080,000Funding TBD 80,000 80,000Total 349 Page 510 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace preliminary breath test (PBT) devices used in the field for a preliminary measurement of blood alcohol concentration. These devices are used in the enforcement of DWI and other alcohol related offenses. They are also used in medical situations to assess cases of extreme intoxication or unknown substance influence. PBT units are in all patrol squads and assigned to SROs in the schools. The existing units are more than 15 years old and have reached the end of their useful life. Project #POL25106 Justification Health, Safety & Regulatory Compliance, Asset Functionality Sustainability: Existing equipment will be recycled properly. Consideration will be given to products that minimize waste. Community Engagement: Equipment allows officers to efficiently carry out their duties in traffic enforcement and provide more effective medical care. Health in All Policies: This equipment is necessary to assist police in addressing alcohol related issues in the community including the threats to public safety from intoxicated drivers. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The department has long extended the life of existing equipment through proper maintenance and repair. Product selection will give consideration to reliability and serviceability to again minimize future replacement. Useful LifeProject Name Preliminary Alcohol Breath Test Devices Category Equipment and Vehicles Type Replace or repair Total Project Cost:$20,000 Total2025 2026 2027 2028 2029Expenditures 2030 20,00020,000Vehicles and Equipment 20,000 20,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 20,00020,000Funding TBD 20,000 20,000Total 350 Page 511 of 647 Capital Improvement Plan - UNFUNDED City of Edina, Minnesota Contact Aaron White 2025 2030thru Department Police Description Replace ballistic helmets for SWAT officers and paramedics. This is a required replacement of existing personal safety equipment. Costs have increased over the years bringing this to the level of CIP, it should be added to the equipment replacement schedule moving forward. Project #POL25108 Justification Health, Safety & Regulatory Compliance, Asset Functionality Sustainability: Existing equipment will be recycled properly. Consideration will be given to products that minimize waste. Community Engagement: Properly equipping our SWAT team assures effective and efficient police response to any situation in the community. Health in All Policies: This is essential personal safety equipment necessary to operate a SWAT team. Race & Equity: Promotes accessibility of police services to all members of the community. Stewardship: The SWAT team repairs and maintains all equipment to maximize effective service life. Replacing the equipment is essential for officer safety and effective SWAT operations. Useful LifeProject Name Special Operations Ballistic Helmet Replacement Category Equipment and Vehicles Type Replace or repair Total Project Cost:$21,000 Total2025 2026 2027 2028 2029Expenditures 2030 21,00021,000Vehicles and Equipment 21,000 21,000Total Total2025 2026 2027 2028 2029Funding Sources 2030 21,00021,000Funding TBD 21,000 21,000Total 351 Page 512 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.6 Prepared By: Nepa Bryant, Adminstrative Assistant Item Type: Request for Purchase Department: Fire Item Title: Request for Purchase: First Due Subscription Renewal Action Requested: Approve Request for Purchase of First Due Subscription Renewal for 2025 with Locality Media Inc. for $27,901.00. Information/Background: First Due is software for Fire and Emergency medical services agencies. It provides access to incident information to complete State and National records of incident reports, scheduling, and other asset management. The program is currently used at Edina Fire and this contract is a renewal of the subscription fees for 2025. Requisition Number: 12500016 Funding Source: Vendor: Locality Media Inc. Equipment Status: Cost: 27,901.00 Resources/Financial Impacts: Budgeted under the Fire Department 2025 budget. Relationship to City Policies: The Fire Department Work Plan Budget Pillar: Reliable Service- This product is used to complete Fire incident reports and other documentation for the Edina Fire Department. Values Impact: Stewardship The software provides accurate and timely information sharing and effective resource management. Page 513 of 647 Supporting Documentation: None Page 514 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.7 Prepared By: Nepa Bryant, Adminstrative Assistant Item Type: Resolution Department: Fire Item Title: Joint Powers Agreement with Bureau of Criminal Apprehension Action Requested: Approve the joint powers agreement with the Bureau of Criminal Apprehension. Information/Background: Edina Fire Department completes background checks for new employees as part of the hiring process. As part of the state statute about Firefighter background checks, the department must follow practices and policies identified by the State of Minnesota. The Bureau of Criminal Apprehension requires the joint powers agreement to complete the background checks for the Edina Fire Department. Resources/Financial Impacts: Relationship to City Policies: Strong Foundation- The JPA agreement is compliant with all Edina City policies. Supporting Documentation: 1. Joint Powers Agreement for Background Check Page 515 of 647 DPS/BCA NCJA Federal Background Check JPA (Aug. 2024) 1 Joint Powers Agreement State of Minnesota Federal Background Checks ORI – NCJMN0023 SWIFT Contract # 260646 This Agreement is between the State of Minnesota, acting through its commissioner of Public Safety on behalf of the Bureau of Criminal Apprehension ("BCA"), and the City of Edina on behalf of its Fire Department ("Governmental Unit”). Recitals 1 Under Minnesota Statutes § 471.59, the BCA and Governmental Unit are empowered to engage in such agreements as are necessary to exercise their powers. 2 The BCA is the State Identification Bureau for the State of Minnesota and is responsible for fingerprint identification services including submission of civil, fingerprint-based background checks to the Federal Bureau of Investigation (“FBI”) subsequent to conducting Minnesota records checks. 3 The Governmental Unit has a state statute, Minnesota Statutes, § 299F.035, that has been approved by the United States Attorney General as compliant with Public Law 92- 544. 4 The Governmental Unit wants to access federal data in support of its duties to conduct background checks as provided by law. 5 The purpose of this Joint Powers Agreement is to memorialize the requirements for Governmental Unit to obtain access and the limitations that apply to the information that Governmental Unit obtains. Agreement 1 Term of Agreement 1.1 Effective Date. This Agreement is effective on the date the BCA obtains all required signatures under Minnesota Statutes § 16C.05, subdivision 2. 1.2 Expiration Date. This Agreement expires five years from the date it is effective. 2 Agreement Between the Parties 2.1 Request Submission. Governmental Unit agrees that it will collect fingerprints from those individuals for whom a Minnesota and federal fingerprint-based background check will be conducted. Governmental Unit will forward the fingerprints and other documentation to the BCA. The fingerprints will be captured so they meet the requirements of National Institute of Standards and Technology Special Publication 500-290. The Governmental Unit will ensure that all fields required on the fingerprint card are completed. Fingerprints received by Governmental Unit will be forwarded to the BCA using a secure method. 2.2 Request Processing. On receipt of fingerprints that conform to the requirements of Clause 2.1, the BCA will conduct a check of the Minnesota criminal history repository Page 516 of 647 DPS/BCA NCJA Federal Background Check JPA (Aug. 2024) 2 for any records that match the fingerprints submitted. Any results of a fingerprint match in Minnesota will be returned to the Governmental Unit with the federal results. The BCA will also forward the fingerprints to the FBI for processing. The BCA will receive the response from the FBI, redact any data the Governmental Unit is not entitled to receive and forward the results to the Governmental Unit. 2.3 Policies. The FBI and BCA have laws and policies on access, use, audit, dissemination, screening (pre-employment), security, training, and use of the criminal history results. These FBI and BCA policies, as amended and updated from time to time, are incorporated into this Agreement by reference. The policies are available at https://bcanextest.x.state.mn.us//noncrim/launchpad/index.pl. Governmental Unit has created its own policies to ensure that Governmental Unit’s employees and contractors comply with all applicable requirements. Governmental Unit ensures this compliance through appropriate enforcement. 2.4 Limitations on Access. BCA agrees that it will comply with applicable state and federal laws when making information accessible. Governmental Unit agrees that it will comply with applicable state and federal laws when accessing, using, disseminating, and storing data. Each party is responsible for its own compliance with the most current applicable state and federal laws. 2.5 Requirement to Update Information. The parties agree that if there is a change to any of the information, whether required by law or this Agreement, the party will send the new information to the other party in writing within 30 days of the change. 2.6 Compliance with Personnel Security Requirements. Per Minnesota Statutes § 299C.46, employees of a Governmental Unit who review results of background checks will be required to take security awareness training and pass a federal, fingerprint-based background check. Any information technology staff who support the work of Governmental Unit and who have physical or logical access to criminal history information will also be required to take security awareness training and pass a federal, fingerprint-based background check and may need to sign a security addendum certification. All required training by Governmental Unit employees will be completed prior to reviewing or handling background checks. 3 Payment Governmental Unit will pay the BCA for all services performed under this Agreement. For each background check that is processed by BCA, Governmental Unit will pay the fee identified at https://dps.mn.gov/divisions/bca/Documents/Background-check-fees.pdf. There is an additional $10.00 fee if the fingerprints are taken at BCA. 4 Authorized Representatives BCA's Authorized Representative is the person below, or her successor: Name: Diane Bartell, Deputy Superintendent Address: Dept. of Public Safety; Bureau of Criminal Apprehension 1430 Maryland Avenue East Saint Paul, MN 55106 Telephone: 651.793.2590 Email Address:Diane.Bartell@state.mn.us Governmental Unit’s Authorized Representative is the person below, or his/her successor: Page 517 of 647 DPS/BCA NCJA Federal Background Check JPA (Aug. 2024) 3 Name: Andrew Slama, Fire Chief Address: 6250 Tracy Ave Edina, MN 55436 Telephone: 952.826.0330 Email Address:aslama@edinamn.gov 5 Assignment, Amendments, Waiver, and Agreement Complete 5.1 Assignment. Neither party may assign nor transfer any rights or obligations under this Agreement. 5.2 Amendments. Any amendment to this Agreement, except that described in Clause 2.5 above, must be in writing and will not be effective until it has been signed and approved by the same parties who signed and approved the original agreement, or their successors in office. 5.3 Waiver. If either party fails to enforce any provision of this Agreement, that failure does not waive the provision or the right to enforce it. 5.4 Agreement Complete. This Agreement contains all negotiations and agreements between the BCA and the Governmental Unit. No other understanding regarding this Agreement, whether written or oral, may be used to bind either party. 6 Liability The BCA and the Governmental Unit agree each party will be responsible for its own acts and behavior and the results thereof to the extent authorized by law and shall not be responsible or liable for the acts of any others and the results thereof. The BCA’s liability shall be governed by provisions of the Minnesota Torts Claims Act, Minnesota Statutes § 3.736, and other applicable law. The Governmental Unit’s liability shall be governed by the Minnesota Municipal Tort Claims Act, Minnesota Statutes Chapter 466, and other applicable law. 7 Audits 7.1 Under Minnesota Statutes § 16C.05, subdivision 5, the Governmental Unit’s books, records, documents, internal policies and accounting procedures and practices relevant to this Agreement are subject to examination by the BCA, State Auditor, or Legislative Auditor, as appropriate, for a minimum of six (6) years from the end of this Agreement. The examination shall be limited to the books, records, documents, and accounting procedures and practices that are relevant to this Agreement. 7.2 Under applicable state and federal law and policy, the Governmental Unit’s records are subject to examination by the BCA and the FBI to ensure compliance with laws, regulations and policies about access, use, and dissemination of data. 8 Government Data Practices 8.1 BCA and Governmental Unit. The BCA and Governmental Unit must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to all data accessible under this Agreement, and as it applies to all data created, collected, received, stored, used, maintained, or disseminated by the Governmental Unit under this Agreement. The remedies of Minnesota Statutes §§ 13.08 and 13.09 apply to the release of the data referred to in this clause by either the BCA or the Governmental Unit. 9 Investigation of Alleged Violations; Sanctions For purposes of this clause, “Individual User” means an employee or contractor of Page 518 of 647 DPS/BCA NCJA Federal Background Check JPA (Aug. 2024) 4 Governmental Unit. 9.1 Investigation. Governmental Unit and BCA agree to cooperate in the investigation and possible prosecution of suspected violations of federal law, state law, and policies and procedures referenced in this Agreement. When BCA becomes aware that a violation may have occurred, BCA will inform Governmental Unit of the suspected violation, subject to any restrictions in applicable law. When Governmental Unit becomes aware that a violation has occurred, Governmental Unit will inform BCA subject to any restrictions in applicable law. 9.2 Sanctions. 9.2.1 Under this Agreement, Governmental Unit must determine if and when an involved Individual User is disciplined due to inappropriate use of data. Governmental Unit may decide to suspend or terminate access and the decision must be made as soon as alleged violation is discovered, after notice of an alleged violation is received, or after an investigation has occurred. Governmental Unit must report the status of the Individual User’s access to BCA without delay. BCA reserves the right to temporarily suspend or eliminate an Individual User’s access to data and will notify Governmental Unit if an Individual User is affected. 9.2.2 If the BCA determines the Governmental Unit has jeopardized the integrity of the information, BCA may temporarily stop providing some or all the information under this Agreement until the failure is remedied to the BCA’s satisfaction. If Governmental Unit’s failure is continuing or repeated, Clause 11.1 does not apply and BCA may terminate this Agreement immediately. 10 Venue Venue for all legal proceedings involving this Agreement, or its breach, must be in the appropriate state or federal court with competent jurisdiction in Ramsey County, Minnesota. 11 Termination 11.1 Termination. The BCA or the Governmental Unit may terminate this Agreement at any time, with or without cause, upon 30 days’ written notice to the other party’s Authorized Representative. 11.2 Termination for Insufficient Funding. Either party may immediately terminate this Agreement if it does not obtain funding from the Minnesota Legislature, or other funding source; or if funding cannot be continued at a level sufficient to allow for the payment of the services covered here. Termination must be by written notice to the other party’s authorized representative. The Governmental Unit is not obligated to pay for any services that are provided after notice and effective date of termination. However, the BCA will be entitled to payment, determined on a pro rata basis, for services satisfactorily performed to the extent that funds are available. Neither party will be assessed any penalty if the agreement is terminated because of the decision of the Minnesota Legislature, or other funding source, not to appropriate funds. Notice of the lack of funding must be provided within 30 days of the affected party receiving that notice. 12 E-Verify Certification (In accordance with Minnesota Statutes § 16C.075) For services valued in excess of $50,000, Governmental Unit certifies that as of the date of services performed by the BCA, Governmental Unit and all its subcontractors will have implemented or be in the process of implementing the federal E-Verify Program for all newly hired employees in the United States who will perform work on behalf of the Page 519 of 647 DPS/BCA NCJA Federal Background Check JPA (Aug. 2024) 5 Governmental Unit. Governmental Unit is responsible for collecting all subcontractor certifications and may do so utilizing the E-Verify Subcontractor Certification Form available at http://www.mmd.admin.state.mn.us/doc/EverifySubCertForm.doc. All subcontractor certifications must be kept on file with Governmental Unit and made available to the BCA upon request. 13 Continuing Obligations The following clauses survive the expiration or cancellation of this Agreement: 6. Liability; 7. Audits; 8. Government Data Practices; 9. Investigation of Alleged Violations; Sanctions; and 10. Venue. BCA and the Governmental Unit indicate their agreement and authority to execute this Agreement by signing below. GOVERNMENTAL UNIT Governmental Unit certifies that the appropriate person(s) has(have) executed this Agreement on behalf of the Governmental Unit and its jurisdictional government entity as required by applicable articles, laws, by-laws, resolutions, or ordinances. By and Title: _____________________________________________________ ______________ Governmental Unit Date By and Title: _____________________________________________________ ______________ Governmental Unit Date By and Title: _____________________________________________________ ______________ Governmental Unit Date By and Title: _____________________________________________________ ______________ Governmental Unit Date By and Title: _____________________________________________________ ______________ Governmental Unit Date DEPARTMENT OF PUBLIC SAFETY, BUREAU OF CRIMINAL APPREHENSION By and Title: _____________________________________________________ ______________ (with delegated authority) Date COMMISSIONER OF ADMINISTRATION As delegated to the Office of State Procurement By: _____________________________________________________________ ______________ Date Page 520 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.8 Prepared By: Ryan Schultz, Lieutenant Item Type: Request for Purchase Department: Police Item Title: Request for Purchase: Four Rifle Rated Ballistic Shields Action Requested: Approve request for purchase of four rifle rated ballistic shields from Alpha Training Tactical for $39, 996. Information/Background: This request is for the purchase of four ballistic shields that are rated to protect against both handgun and rifle ammunition. Currently, our ballistic shields are only rated to protect against handgun ammunition. Given recent local tragic events where suspects have used rifles against law enforcement officers, we are requesting this new equipment to enhance the safety of our officers and community. These shields will be carried in patrol vehicles and the SWAT Team to be used in critical situations. Requisition Number: 12500014 Funding Source: Public Safety Fund Vendor: Alpha Training and Tactical Equipment Status: New or Replacement Cost: $39,996.30 Resources/Financial Impacts: This purchase was approved as part of the 2025 Capital Improvement Plan and is funded with Public Safety Aid. This purchase will be made via the Minnesota State Contract #186645. Relationship to City Policies: This purchase improves officer and community safety. Budget Pillar: Strong Foundation Reliable Service Page 521 of 647 Livable City Values Impact: Stewardship This purchase should last 10 years before needing to be replaced. Health This purchase provides protection and safety improvements to our officers and community members. Supporting Documentation: None Page 522 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.9 Prepared By: Ryan Browning, IT Director Item Type: Request for Purchase Department: IT Item Title: Request for Purchase: Network Storage Support Renewal Action Requested: Approve Request for Purchase for the Network Storage Support Renewal from LOGIS (Insight) for $37,472.74. Information/Background: This is a request for purchase for the renewal of the support agreements covering the two network storage devices in use at the City. This agreement covers 24/7 support and assistance and next business day onsite service. Both labor and materials are covered. These systems house the critical servers, applications and data that keep the City's operations running. This renewal will run through August 31, 2026. Requisition Number: 12500020 Funding Source: I.T. Equip Replacement Vendor: LOGIS - Insight Equipment Status: Replacement Cost: $37,472.74 Resources/Financial Impacts: This purchase is within budget and will be paid out of the I.T. equipment replacement budget. This support renewal allows us to extend the useful life of these systems. Relationship to City Policies: The network storage devices are a part of the equipment replacement plan. Budget Pillar: Strong Foundation Reliable Service Values Impact: Page 523 of 647 Stewardship By purchasing this support agreement renewal, we are extending the useful life of these critical systems. Additionally, we are hopeful that this added time will result in additional replacement options. Supporting Documentation: None Page 524 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.10 Prepared By: Jessica Vanderwerff Wilson, Water Resources Coordinator Item Type: Request for Purchase Department: Engineering Item Title: Request for Purchase: ENG 25-3NB Bredesen Park Restoration Action Requested: Approve Request for Purchase for ENG 25-3NB Bredesen Park Restoration with Davey Resource Group for $172,011.42. Information/Background: A project to restore native oak savanna and wetlands at Bredesen Park began in 2024 with funding from a Conservation Partners Legacy Grant. This contract captures an additional 13 acres and leverages further grant funding. The contract includes two years of maintenance, final completion date is December 31, 2026. Five quotes were received. Davey Resource Group is the selected contractor. Requisition Number: 12500025 Funding Source: Stormwater Utility Fund and Conservation Partners Legacy Grant funding Vendor: Davey Resource Group Equipment Status: n/a Cost: $172,011.42 Resources/Financial Impacts: The improvement will be funded by the stormwater utility fund, conservation and sustainability fund, and Conservation Partners Legacy grant funds. Relationship to City Policies: 2015 Parks Strategic Plan, Climate Action Plan, and Clean Water Strategy Budget Pillar: Livable City Values Impact: Sustainability Invasive species removal and natural resources restoration. Page 525 of 647 Supporting Documentation: 1. ENG 25-3NB Contract Page 526 of 647 140400v01 Contract ENG 25-3NB RNK:08/06/2010 Engineering 1/2015 FORM OF AGREEMENT BETWEEN CITY OF EDINA AND CONTRACTOR FOR NON-BID CONTRACT ENG 25-3NB THIS AGREEMENT made this 4th day of February, 2025, by and between the CITY OF EDINA, a Minnesota municipal corporation (“Owner” or “City”) and Davey Resource Group Inc, 1196 7th Street East, Saint Paul, MN 55106, (“Contractor”). Owner and Contractor, in consideration of the mutual covenants set forth herein, agree as follows: 1. CONTRACT DOCUMENTS. The following documents shall be referred to as the “Contract Documents”, all of which shall be taken together as a whole as the contract between the parties as if they were set verbatim and in full herein: A. This Agreement B. City of Edina General Contract Conditions C. Specifications prepared by City of Edina D. Plans prepared by City of Edina E. Responsible Contractor Verification of Compliance F. Contractor’s Quote In the event of a conflict among the provisions of the Contract Documents, the order in which they are listed above shall control in resolving any such conflicts with Contract Document “A” having the first priority and Contract Document “F” having the last priority. 2. OBLIGATIONS OF THE CONTRACTOR. The Contractor shall provide the goods, services, and perform the work in accordance with the Contract Documents. 3. CONTRACT PRICE. Owner shall pay Contractor for completion of the Work, in accordance with the Contract $172,011.42 inclusive of taxes, if any. 4. PAYMENT PROCEDURES. A. Contractor shall submit Applications for Payment. Applications for Payment will be processed by the City Engineer. B. Progress Payments; Retainage. Owner shall make 95% progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment during performance of the Work. C. Payments to Subcontractors. (1) Prompt Payment to Subcontractors. Pursuant to Minn. Stat. § 471.25, Subd. 4a, the Contractor must pay any subcontractor within ten (10) days of the Contractor’s receipt of payment from Page 527 of 647 140400v01 Contract ENG 25-3NB RNK:08/06/2010 Engineering 1/2015 the City for undisputed services provided by the subcontractor. The Contractor must pay interest of 1 ½ percent per month or any part of a month to the subcontractor on any undisputed amount not paid on time to the subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100.00 or more is $10.00. For an unpaid balance of less than $100.00, the Contractor shall pay the actual penalty due to the subcontractor. (2) Form IC-134 required from general contractor. Minn. Stat. § 290.92 requires that the City of Edina obtain a Withholding Affidavit for Contractors, Form IC-134, before making final payments to Contractors. This form needs to be submitted by the Contractor to the Minnesota Department of Revenue for approval. The form is used to receive certification from the state that the vendor has complied with the requirement to withhold and remit state withholding taxes for employee salaries paid. D. Final Payment. Final payment will not be made until the Contractor has filed with the Owner a fully and duly executed Affidavit, General Waiver and Indemnity Agreement, in the form attached hereto as Exhibit B and hereby made a part hereof, together with such other and additional evidence as Owner may request, in form and substance satisfactory to the Owner, that all labor, materials and services expended or used in the Work have been paid for in full and that no liens or other claims for such labor, materials or services can be made or claimed against Contractor, Owner or any other person or any property. In case such evidence is not furnished, the Owner may retain out of any amount due said Contractor a sum sufficient, in the reasonable discretion of Owner, but in any event not less than one and one-half times the sum determined by Owner to be necessary, to pay for all labor, material, services or other claims which are then unpaid or which are then believed by Owner, in its reasonable discretion, to be unpaid. Upon final completion of the Work, Owner shall pay the remainder of the Contract Price as recommended by the City Engineer. 5. COMPLETION DATE. The Work must be completed by December 31, 2026. 6. CONTRACTOR’S REPRESENTATIONS. A. Contractor has examined and carefully studied the Contract Documents and other related data identified in the Contract Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. Page 528 of 647 140400v01 Contract ENG 25-3NB RNK:08/06/2010 Engineering 1/2015 C. Contractor is familiar with and is satisfied as to all federal, state, and local laws and regulations that may affect cost, progress, and performance of the Work. D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site. E. Contractor has obtained and carefully studied (or assumes responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto. F. Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. J. Responsible Contractor. This contract may be terminated by the City at any time upon discovery by the City that the prime contractor or subcontractor has submitted a false statement under oath verifying compliance with any of the minimum criteria set forth in Minn Stat. § 16C.285, subd. 3. Page 529 of 647 140400v01 Contract ENG 25-3NB RNK:08/06/2010 Engineering 1/2015 K. Subcontracts: (1) Unless otherwise specified in the Contract Documents, the Contractor shall, upon receipt of the executed Contract Documents, submit in writing to the Owner the names of the Subcontractors proposed for the work. Subcontractors may not be changed except at the request or with the consent of the Owner. (2) The Contractor is responsible to the Owner for the acts and omissions of the Contractor's subcontractors, and of their direct and indirect employees, to the same extent as the Contractor is responsible for the acts and omissions of the Contractor's employees. (3) The Contract Documents shall not be construed as creating any contractual relation between the Owner and any subcontractor. (4) The Contractor shall bind every subcontractor by the terms of the Contract Documents. 7. WORKER’S COMPENSATION. The Contractor shall obtain and maintain for the duration of this Contract, statutory Worker’s Compensation Insurance and Employer’s Liability Insurance as required under the laws of the State of Minnesota. 8. COMPREHENSIVE GENERAL LIABILITY. Contractor shall obtain the following insurance coverage and maintain it at all times throughout the life of the Contract, with the City included as an additional name insured on the general liability insurance on a primary and noncontributory basis. The Contractor shall furnish the City a certificate of insurance satisfactory to the City evidencing the required coverage: Bodily Injury: $1,000,000 each occurrence $1,000,000 aggregate products and completed operations Property Damage: $1,000,000 each occurrence $1,000,000 aggregate Contractual Liability (identifying the contract): Bodily Injury: $1,000,000 each occurrence Property Damage: $1,000,000 each occurrence $1,000,000 aggregate Comprehensive Automobile Liability (owned, non-owned, hired): Bodily Injury: $1,000,000 each occurrence $1,000,000 each accident Page 530 of 647 140400v01 Contract ENG 25-3NB RNK:08/06/2010 Engineering 1/2015 Property Damage: $1,000,000 each occurrence 9. WARRANTY. The Contractor guarantees that all new equipment warranties as specified within the quote shall be in full force and transferred to the City upon payment by the City. The Contractor shall be held responsible for any and all defects in workmanship, materials, and equipment which may develop in any part of the contracted service, and for a period of one (1) year following the completion of the Work and upon proper notification by the City shall immediately replace, without cost to the City, any such faulty part or parts and damage done by reason of the same in accordance with the bid specifications. 10. INDEMNITY. For a period of two (2) years following the completion of the Work, the Contractor agrees to indemnify and hold the City harmless from any claim made by third parties to the extent caused by the negligent services performed by it. In addition, the Contractor shall reimburse the City for any cost of reasonable attorney’s fees it may incur as a result of any such claims. Notwithstanding anything to the contrary in this Agreement, Contractor’s indemnity, defense, and hold harmless obligations will not extend to any claim or liability that is alleged to be caused by the negligence or willful misconduct of the indemnified party or other third party not controlled by Contractor; rather, such indemnification claims will be administered based upon a determination of the degree of comparative fault of each party. Contractor retains the right to select counsel reasonably acceptable to the indemnified party, and the indemnified party will provide reasonable cooperation and not unreasonably withhold consent to settle any claims for which Contractor is providing defense or indemnification. Notwithstanding anything to the contrary, in no event will Contractor be liable for any consequential, indirect, incidental, special, exemplary, punitive, or enhanced damages, and in no event will Contractor’s aggregate liability arising out of this Agreement, or the services performed exceed the amount of the applicable insurance limits set forth in this Agreement. 11. PERFORMANCE AND PAYMENT BONDS. Performance and payment bonds are not required for the doing of any public work if the contract price is $175,000 or less. On projects of more than $175,000 for the doing of public work a payment bond and a performance bond each in the amount of the contract price must be furnished to the City prior to commencement of work. The form of the bonds must satisfy statutory requirements for such bonds. 12. MISCELLANEOUS. A. Terms used in this Agreement have the meanings stated in the General Conditions. B. Owner and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. C. Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Page 531 of 647 140400v01 Contract ENG 25-3NB RNK:08/06/2010 Engineering 1/2015 Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provisions. D. Data Practices/Records. (1) All data created, collected, received, maintained or disseminated for any purpose in the course of this Contract is governed by the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, any other applicable state statute, or any state rules adopted to implement the act, as well as federal regulations on data privacy. (2) All books, records, documents and accounting procedures and practices to the Contractor and its subcontractors, if any, relative to this Contract are subject to examination by the City. E. Software License. If the equipment provided by the Contractor pursuant to this Contract contains software, including that which the manufacturer may have embedded into the hardware as an integral part of the equipment, the Contractor shall pay all software licensing fees. The Contractor shall also pay for all software updating fees for a period of one year following cutover. The Contractor shall have no obligation to pay for such fees thereafter. Nothing in the software license or licensing agreement shall obligate the City to pay any additional fees as a condition for continuing to use the software. F. Patented devices, materials and processes. If the Contract requires, or the Contractor desires, the use of any design, device, material or process covered by letters, patent or copyright, trademark or trade name, the Contractor shall provide for such use by suitable legal agreement with the patentee or owner and a copy of said agreement shall be filed with the Owner. If no such agreement is made or filed as noted, the Contractor shall in accordance and consistent with Section 10, indemnify and hold harmless the Owner from any and all claims for infringement by reason of the use of any such patented designed, device, material or process, or any trademark or trade name or copyright in connection with the Project agreed to be performed under the Contract, and shall indemnify and defend the Owner for any costs, liability, expenses and reasonable attorney's fees that result from any such infringement. G. Assignment. Neither party may assign, sublet, or transfer any interest or obligation in this Contract without the prior written consent of the other party, and then only upon such terms and conditions as both parties may agree to and set forth in writing. H. Waiver. In the particular event that either party shall at any time or times waive any breach of this Contract by the other, such waiver shall not Page 532 of 647 140400v01 Contract ENG 25-3NB RNK:08/06/2010 Engineering 1/2015 constitute a waiver of any other or any succeeding breach of this Contract by either party, whether of the same or any other covenant, condition or obligation. I. Governing Law/Venue. The laws of the State of Minnesota govern the interpretation of this Contract. In the event of litigation, the exclusive venue shall be in the District Court of the State of Minnesota for Hennepin County. J. Severability. If any provision, term or condition of this Contract is found to be or become unenforceable or invalid, it shall not effect the remaining provisions, terms and conditions of this Contract, unless such invalid or unenforceable provision, term or condition renders this Contract impossible to perform. Such remaining terms and conditions of the Contract shall continue in full force and effect and shall continue to operate as the parties’ entire contract. K. Entire Agreement. This Contract represents the entire agreement of the parties and is a final, complete and all inclusive statement of the terms thereof, and supersedes and terminates any prior agreement(s), understandings or written or verbal representations made between the parties with respect thereto. L. Permits and Licenses; Rights-of-Way and Easements. The Contractor shall give all notices necessary and incidental to the construction and completion of the Project. The City will obtain all necessary rights-of- way and easements. The Contractor shall not be entitled to any additional compensation for any construction delay resulting from the City’s not timely obtaining rights-of-way or easements. M. If the work is delayed or the sequencing of work is altered because of the action or inaction of the Owner or for other reasons outside Contractor’s control, the Contractor shall be allowed a time extension to complete the work but shall not be entitled to any other compensation. CITY OF EDINA CONTRACTOR BY: ____________________________ BY: ___________________________ Its Mayor Its AND ___________________________ AND ___________________________ Its City Manager Its Page 533 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.11 Prepared By: Noah Silver, Electrical Supervisor Item Type: Request for Purchase Department: Engineering Item Title: Request for Purchase: York Avenue Street Lighting Replacement Action Requested: Approve request for purchase for York Avenue Street Lighting Replacement with Xcel Energy for $50,116. Information/Background: The 25-year contract with Xcel Energy has expired, requiring street lighting replacements along York Avenue, south of Hazelton Road. This replacement is in conjunction with the York Avenue sanitary sewer trunk pipe expansion. It is beneficial to coordinate both projects to minimize disruption from construction. Xcel will replace 12 streetlights. Requisition Number: 12500015 Funding Source: Street Lighting Regular - operating budget Vendor: Xcel Energy Equipment Status: Replacement Cost: $50,116.00 Resources/Financial Impacts: This replacement is within budget and part of the City's street lighting replacement plan. Xcel Energy will maintain the new street lighting system. Relationship to City Policies: This aligns with the Comprehensive Plan and the City's street lighting replacement plan. Budget Pillar: Strong Foundation Values Impact: Stewardship Capital assets and infrastructure systems are managed to minimize risk and sustain service levels to be safe and reliable. Page 534 of 647 Supporting Documentation: 1. Contract: York Avenue Street Lighting Replacement Page 535 of 647 Northern States Power Company, a Minnesota corporation and wholly owned subsidiary of Xcel Energy Inc. Page 1 of 6 Outdoor Lighting 825 Rice Street St. Paul, MN 55117 Construction Agreement For Street Lighting Facilities The customer identified below ("Customer") and Northern States Power Company, a Minnesota Corporation and wholly owned subsidiary of Xcel Energy Inc. ("Xcel Energy" or "Company") agree to this Construction Agreement for Street Lighting Facilities, including the attached Terms and Conditions, for the following street light facilities: Customer: City of Edina Address: 4801 W 50th St City: Edina State: MN Zip Code: 55424 Project charges of: Fifty thousand one hundred sixteen dollars and 00/100 Dollars: $50116.00 In accordance with the following terms of payment: Payment due 30 days after construction is completed For Association or City of: City of Edina Streetlights/Facilities Location: York Ave S Rate Code: A30 standard service (14,000 Lumens, Labeled “D”). Current monthly rate is $27.87 per luminaire. Service consisting of: Standard Service rate includes ongoing electricity and maintenance. Installation of Company Owned streetlight facilities consisting of: Designation of Lamps: Install 12 LED cobra fixtures on 30' aluminum poles Install by directional bore approx. 3000' of #4 AL TX in 1½” conduit. Restoration is not included in this contract. Number of Luminaries: 12- 110-165W LED cobra fixtures Fixture Color –gray 12-30’ aluminum poles Pole Color – Dark Bronze Project charges valid for 60 days from signing of contract. Customer and Xcel Energy agree to the attached terms and conditions for the installation and moving of the facilities identified above. Customer and Xcel Energy agree that the operation of the facilities shall be subject to the General Street Lighting Contract for Operations & Maintenance Services between Customer and Xcel Energy, dated Dated this _________ day of _______ 20 ________ Dated this _________ day of _______ 20 _______ Customer: City of Edina Xcel Energy: By: By: Title: Title: Christie A. Black, Operations Manager – Minnesota as authorized agent for Northern States Power Co XCEL ENERGY USE ONLY Date: 01/13/25 Div: Edina Xcel Energy Outdoor Project Coordinator: Damon Erickson Xcel Energy Project Number: SAP Notification # 15054863 Customer Charges Paid: Page 536 of 647 Northern States Power Company, a Minnesota corporation and wholly owned subsidiary of Xcel Energy Inc. Page 2 of 6 Outdoor Lighting 825 Rice Street St. Paul, MN 55117 TERMS AND CONDITIONS Customer and Company agree to the following terms and conditions: 1. Acceptance. Execution of this Agreement constitutes Customer's acceptance of the express terms of Company’s proposal and the offer contained therein, which are included and incorporated into this Agreement. Any additional or different terms proposed by Customer, or any attempt by Customer to vary in any degree any of the terms in this Agreement in Customer’s acceptance, are hereby objected to and rejected, and (i) such additional or different terms shall not operate as a rejection of the incorporation of the Company's proposal in this Agreement unless such variances are with respect to terms involving the description, quantity, or delivery schedule of the Work to be performed by Company as described in Company’s proposal ("the Work” means the supplying of any labor, materials, or any other work of Company expressly described in Company’s proposal); (ii) such additional or different terms shall be deemed a material alteration hereof; and (iii) Company’s proposal shall be deemed accepted by Customer and incorporated into this Agreement without said additional or different terms. 2. Request for Installation; Rights. Customer requests that Company install outdoor lighting at the location(s) designated on page one and/or as shown on the attached exhibit. Customer grants Company any right, privilege and easement to install, operate and maintain its facilities, including underground facilities, on the property. 3. Installation Requirements. Customer agrees that, prior to Company starting work: (1) the route of Company’s service installation shall be accessible to Company’s equipment; (2) Customer will remove all obstructions from the route at no cost or expense to Company; (3) Customer will clearly mark all septic tanks, drain-fields, sprinkler systems, water wells, owner-installed electric or pipeline facilities, or other Customer-owned facilities in the installation route; and (4) the ground elevation along the route shall not be above or more than four inches below the final grade. Company will contact the appropriate agency to locate 3rd party utility facilities (phone, cable, etc.) on Customer property. Customer agrees Company is not responsible for damage to Customer-owned underground facilities not marked at the time of outdoor lighting service installation. 4. Installation Cost Contribution. Customer agrees to pay an installation cost contribution provided in Project Charges on page one. Customer is responsible for any additional installation costs incurred by Company because of (1) soil conditions that impair the installation of underground facilities, such as rock formations, etc., (2) extensive existing underground facilities, and (3) any existing conditions that exist but did not exist at the time the installation cost was determined, such as new sidewalks, curbing, black top, paving, sod or other landscaping and obstructions along the cable route. 5. Winter Construction Charges. When underground facilities are installed between October 1 and April 15, inclusive, because of failure of Customer to meet all requirements of the Company by September 30, or because the Customer's property, or the streets leading thereto, are not ready to receive the underground facilities by such date, such work will be subject to a Winter Construction Charge when winter conditions of six inches or more of frost exist, snow removal or plowing is required to install service, or burners must be set at the underground facilities in order to install service for the entire length of the underground service. Winter construction will not be undertaken by the Company where prohibited by law or where it is not practical to install underground facilities during the winter season. The charges apply to frost depths of 18” or less. At greater frost depths, the Company may individually determine the job cost. The Company also reserves the right to charge for any unusual winter construction expenses. All winter construction charges are non-refundable and are in addition to any normal construction charges. 6. Schedule; Delays. Quoted shipping and completion dates are approximate and are based on prompt receipt of all necessary information and approvals from Customer and access as required by Company and its contractors or subcontractors (if any) to the site and to the equipment which is the subject of this Agreement. If Company’s performance is delayed by Customer's suspension of work, in whole or in part, or by any act or omission of Customer, the time for performance will be extended by the period of time required by Company to return to the state of performance that existed before the delay. If the delay or suspension continues for sixty (60) days, Company has the right to cancel or renegotiate the Agreement. Customer will pay an equitable adjustment based on a claim submitted by Company for all reasonable costs, damages and expenses incurred by Company incident to the delay or suspension. Page 537 of 647 Northern States Power Company, a Minnesota corporation and wholly owned subsidiary of Xcel Energy Inc. Page 3 of 6 Outdoor Lighting 825 Rice Street St. Paul, MN 55117 7. Changes. The prices for any extras or changes to the scope of the Work or modifications to the payment or performance schedule will be agreed upon in writing before either party will be obligated to proceed with such changes. Performance of any change will not waive any claims for equitable adjustment in price or schedule. 8. Relocating Facilities. Customer agrees to pay the cost of relocating any portion of facilities, including underground facilities, to accommodate Customer or as required due to altering of grade, additions to structures, installation of patios, decks, gardens, sidewalks, curbing, paving, blacktop, sod, landscaping or any other condition which makes maintenance of the Company’s facilities impractical. Company shall notify Customer of such relocations prior to incurring relocation costs. 9. Environmental. Prior to the start of the Work, Customer will provide notice of any hazardous materials or hazardous situations that it is aware of with respect to the facilities where the Work is to be performed or that could affect the Work. In the event Company encounters the existence of asbestos, asbestos containing materials, formaldehyde, lead, or potentially toxic or otherwise hazardous material in the performance of the Work, the discovery thereof shall constitute a cause beyond Company’s reasonable control and Company shall have the right to cease or not commence the Work until the area has been made safe by Customer or Customer’s representative, at Customer’s expense. 10. Restoration. Company will restore any excavation of the boulevard on Customer’s property with existing soil so it is level and clean. Customer is responsible for the final compacting, loam, seeding, sod or watering of the boulevard at Customer’s expense unless otherwise noted on page one of this Agreement. 11. Additional Charges. In addition to the project charges on page one of this Agreement, Company shall be compensated for any added costs of performing the Work attributable to any one or more of the following: (i) any and all extras and change orders and any and all other additional work mutually agreed by Customer and Company; (ii) any and all costs and expenses related to asbestos or other environmental matters, any unforeseen conditions or any changes in the law; and (iii) any and all added costs and expenses of performing the Work attributable to any change by Customer in the criteria or information for the facility or to any delay or breach by Customer or its subcontractors. 12. Operations; Maintenance. Customer requests and authorizes Company to provide illumination and maintain the street lighting facilities under the Terms and Conditions as described in Customer’s General Street Lighting Contract for Operations & Maintenances Services with Company, which shall be effective upon the completion date of the street light installation. 13. Payments. Unless otherwise specified in Company’s proposal, Company may at its option invoice Customer upon completion of the Work or invoice Customer on a monthly basis for construction work performed under this Agreement. Customer shall pay Company all invoiced amounts within thirty (30) days of receipt of invoice. 14. Termination. Customer may terminate the Agreement only upon written notice to Company and payment to Company for all (i) services and Work rendered or performed to the effective date of such termination; (ii) materials, supplies and equipment purchased prior to the effective date of such termination; and (iii) costs incurred by Company as a result of such termination. To the extent that Company uses the materials, supplies, or equipment on other projects or for maintenance purposes, Customer will not be charged for them. 15. Warranties. Company shall perform the Work in a safe and professional manner in accordance with all applicable codes, standards, regulations and laws. Company shall repair, replace or correct to Customer’s satisfaction all faulty or substandard work or defects in materials which appear within ninety (90) days from the date of completion of the Work. Acceptance of the Work or payment by Customer shall not affect this obligation. THE WARRANTIES SET FORTH IN THIS AGREEMENT ARE EXCLUSIVE AND IN LIEU OF ALL STATUTORY OR IMPLIED WARRANTIES (INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR ANY IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE). 16. Limitation of Remedies. IN NO EVENT, WHETHER BASED ON CONTRACT, INDEMNITY, WARRANTY, TORT (INCLUDING NEGLIGENCE), STRICT LIABILITY OR OTHERWISE, SHALL COMPANY BE LIABLE TO CUSTOMER FOR SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES WHATSOEVER Page 538 of 647 Northern States Power Company, a Minnesota corporation and wholly owned subsidiary of Xcel Energy Inc. Page 4 of 6 Outdoor Lighting 825 Rice Street St. Paul, MN 55117 INCLUDING, WITHOUT LIMITATION, LOSS OF PROFITS OR REVENUE. In no event whatsoever shall Company ever be liable to Customer for any damages or other amounts (including, without limitation, direct or actual damages), whether arising in contract or tort (including, without limitation, negligence) or otherwise, under or in connection with this Agreement or the Work, in an amount, in the aggregate, in excess of the total price paid for the Work; any and all claims for damages in excess of such amount being hereby forever waived and released by Customer; provided, however, that nothing contained in this sentence shall waive or limit any direct damages which Customer may suffer on account of Company’s gross negligence or willful misconduct. 17. Force Majeure. Neither party will be liable to the other for any delay or failure to perform due to any cause beyond its reasonable control, including fire, flood, strike or other labor difficulty, act of God, or act of any governmental authority. The party experiencing the force majeure will notify the other party promptly, and appropriate adjustments will be negotiated. In the event of delay in performance due to force majeure, the date of delivery or time for completion will be extended by a period of time reasonably necessary to overcome the effect of such delay, provided that if such delay continues for 60 days the party not experiencing the force majeure may terminate this Agreement. 18. Document Approval. Company may request that Customer review documents developed by Company for conformity with Customer requirements or specifications. Unless Customer advises Company otherwise in writing within fifteen (15) days after Company’s submission, Company may consider the documents approved and proceed with work. Changes thereafter, made at the direction of Customer, will entitle Company to adjustment by change order. 19. Documentation and Proprietary Information. Customer will provide Company with accurate and complete information in order to permit Company to successfully undertake and complete the Work. Company shall not be prohibited from disclosure or use of proprietary or confidential information or documents necessary for Company to secure or maintain in effect any license or permit, or otherwise to complete the Work. Where Customer information is incomplete or incorrect, resulting in delay or extra work, Company will be entitled to adjustment by change order. 20. Work Product. All reports, drawings, plans, specifications, calculations, studies, software programs, tapes, models and memoranda, if any, assembled or prepared by Company or Company’s affiliates, independent professional associates, agents, consultants, contractors or subcontractors pursuant to this Agreement are instruments of service in respect of the Work, and Company shall retain all ownership and property interest therein, whether or not the Work is completed. Customer may make and retain copies for information and reference in connection with the Work; provided, however, that it is understood and agreed that such documents are not intended to be re-used by Customer or others on extensions of the project or on any other project or any other purpose other than as expressly set forth in this Agreement, and Customer shall not re-use or disclose to any third party all or any portion of such work product without the express prior written consent of Company. 21. Customer Facilities. Company does not assume any responsibility for the adequacy, safety or satisfactory performance of Customer's facilities. Customer shall, to the fullest extent permitted by law, indemnify, defend and hold harmless Company and its officers, directors, agents, employees, and representatives from and against any and all losses, claims, damages, expenses (including attorneys' fees and costs) arising, for any reason whatsoever, out of the failure, non-operation or faulty performance of Customer's facilities (except to the extent of Company’s gross negligence or willful misconduct). 22. Subcontracting. Company may subcontract any portion or all of the Work without the approval of Customer. 23. Independent Contractor. Nothing contained in this Agreement nor any acts of the parties shall be construed to create the relationship of principal and agent, or of limited or general partner, or of joint venture or of any association between or among the parties to this Agreement, except that of owner and independent contractor. 24. Title; Rights of Access. Customer warrants that it has fee simple title to the property. Customer hereby grants to Company the right to enter and improve the real property for the purposes stated herein. 25. Ownership. Customer shall acquire no right, title or interest in any portion of the Work or Company’s equipment or facilities placed in, on, over, through and/or under the real property by Company. The Work constructed and installed by Company on the real property of Customer shall be and mean the personal property of Company, Page 539 of 647 Northern States Power Company, a Minnesota corporation and wholly owned subsidiary of Xcel Energy Inc. Page 5 of 6 Outdoor Lighting 825 Rice Street St. Paul, MN 55117 shall not be considered a fixture of the property, shall not attach to the realty, and shall not be alienable or lienable by Customer or any other party. Further, Company may remove, repair and replace the Work and its component system and equipment at any time without notice in Company’s sole and absolute discretion. 26. Other. It is agreed that failure by Customer or by Company at any time or from time to time to enforce any of the provisions of this Agreement shall not be construed to be a waiver of such provision or of Customer's right or Company’s right, respectively, to thereafter enforce each and every provision hereof. This Agreement contains, with respect to the specific services to be performed by Company, the entire understanding of the parties, and shall supersede any other oral or written agreements and be binding upon and inure to the benefit of the parties' successors and assigns. This Agreement may not be modified in any way without the written consent of both parties. If any provision of this Agreement is determined by a court to be unenforceable, then such provision will be deemed null and void but the remaining provisions shall be enforceable according to their terms. This Agreement shall be construed and interpreted in accordance with the internal laws of the State of Minnesota (as opposed to conflicts of laws provisions) as though all acts and omissions contemplated hereby or related hereto occurred in Minnesota. No course of prior dealing, usage of trade and course of performance shall be used to modify, supplement or explain any terms of this Agreement. Neither Party will assign or otherwise transfer its rights or obligations hereunder, in whole or in part, without the advance written consent of the other. Notwithstanding the above, Company may assign its rights or obligations to any of its affiliates without the written consent of Customer. 27. Governing Law. The Terms and Conditions provided herein and the rights of all the parties hereunder shall be construed under and governed by the laws of the State of Minnesota. Page 540 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.12 Prepared By: Ross Bintner, Engineering Services Manager Item Type: Request for Purchase Department: Engineering Item Title: Request for Purchase: Change Order #1 for York Ave Pond Improvements Professional Services Action Requested: Approve Request for Purchase for Change Order #1 for York Ave Pond Improvements professional services with Barr Engineering for $37,500. Information/Background: In 2024, staff studied York Ave Pond to evaluate possible maintenance and improvement options to improve clean water performance and reduce flood risk. This scope of work will provide 30% design to support a grant application to MPCA's "Implementation Grants for Stormwater Resilience." Requisition Number: 12400083 Funding Source: Storm Water Utility Fund Vendor: Barr Engineering Equipment Status: Replacement Cost: $37,500 Resources/Financial Impacts: Original Budget $60,100 Change #1 $37,500 Updated Budget $97,600 This project is funded by the storm water utility. It will be implemented and operated by city staff. Relationship to City Policies: This project aligns with the Comprehensive Plan, Water Resources Management Plan and the Climate Action Plan. Budget Pillar: Strong Foundation Livable City Page 541 of 647 Values Impact: Stewardship Replacing infrastructure at the right time is a sound asset management practice. Sustainability Replacing infrastructure allows for the opportunity to increase resiliency and reduce risk. Supporting Documentation: 1. Letter Agreement for York Pond Project 30% design Page 542 of 647 barr.com Barr Engineering Co. 4300 MarketPointe Drive, Suite 200, Minneapolis, MN 55435 | 952.832.2600 January 15, 2025 Ross Bintner Engineering Services Manager City of Edina 7450 Metro Boulevard Edina, MN 55439 Re: York Avenue Pond Improvement Study, Amendment No. 1: 30% Design and Grant Support Dear Ross: As discussed at our January 2, 2025 project meeting and via subsequent email correspondence, Barr Engineering Co. (Barr) proposes to perform additional services for the York Avenue Pond project to (a) develop 30% design documents for one flood mitigation alternative selected by the City of Edina (City), and (b) support City grant-writing efforts related to application for the Minnesota Pollution Control Agency’s (MPCA) Implementation Grants for Stormwater Resilience. Barr proposes that the scope of work below be amended to the ongoing York Avenue Pond Improvement Study (Contract No. 300379). Background Barr delivered the York Avene Pond Improvement Study Technical Memorandum to the City on December 19, 2024 (Barr, 2024). Following review of this document, the City and Barr coordinated to discuss which alternative(s) the City wanted to move forward with and also discussed the applicability of flood mitigation and water quality improvement opportunities evaluated in this study to the MPCA’s Implementation Grants for Stormwater Resilience program. The application deadline for this grant opportunity is February 27, 2025, which informs the schedule outlined in this amendment. The following outlines our proposed scope of work based on those discussions with City staff. Task 6: Alternative Refinement, Updated Opinion of Probable Cost, and 30% Design Documents for Selected Alternative As discussed at our January 2, 2025 project meeting, the City has requested that Barr develop 30% design documents for the combined flood mitigation and water quality improvement opportunity, described below: • Selected alternative: alternative combining elements of P02 and A02 as outlined in Table F of the technical memorandum. Per discussion at the January 2nd meeting, the following provides additional detail regarding elements of the combined alternative: o Pumping Alternative P02: Barr will design a combined lift station at the correct SLS-11 location, capable of pumping to Xerxes Ave and to Barrie Rd. The combined lift station will retain all elements of the existing SLS-11 lift station, with no changes to pumping operation. SLS-11 will be expanded (or secondary structures will be constructed) to replace the function of SLS-5. Although it may be possible to retain or salvage elements of SLS-5 (e.g., retain existing forcemain), the design and cost will assume complete replacement, including demolition and removal, of existing SLS-5 infrastructure. o Sediment Management and ALCS Alternative A02: Barr will incorporate (a) sediment management (i.e., removal of accumulated sediment as identified during Barr’s soft Page 543 of 647 Ross Bintner January 15, 2025 Page 2 P:\Mpls\23 MN\27\23272052 York Ave Pond Improvement\WorkFiles\999_2025_GrantSupport\00_Amendment\YorkPond_Amendment01_30%Design_2025-01-15.docx sediment survey) and (b) adaptive level control systems (ALCS) into the design. Removing accumulated sediment from the pond will improve water quality performance of the pond and allow for ALCS to create greater abstraction volume through predictive drawdown of the pond ahead of forecasted rainfall events. Barr will evaluate the maximum drawdown depth allowable via ALCS based on (a) depth of pond expansion and (b) wetland regulations and permitting requirements. • Note regarding Pond Expansion and ALCS Alternative E03: The City has initiated contact with neighboring properties to discuss pond expansion (i.e., expansion of the pond footprint expanding into area owned by neighboring properties). As it is not anticipated that coordination with neighboring properties will be complete within the timeframe of this scope, any design modifications related to pond expansion will be completed through a separate project amendment. The scope of work for Task 6 includes the following major tasks: 1) Model refinement: update modeling of the selected alternative described above, including summary of flood mitigation benefit provided, water quality benefit, and downstream impacts. This task also includes (a) model refinement and alternatives analysis to evaluate impact of raising the overflow elevation from Xerxes Ave and (b) modeling of any/all design changes or modifications required based on coordination with permitting authorities (see Task 7). o Note: it is assumed that Xerxes Ave overflow raise will not be incorporated into the 30% design. The analysis will be updated and documented in the existing feasibility report to inform future coordination with Hennepin County. 2) Water Quality Modeling: evaluate the impact of pond excavation on water quality and incorporate into reporting to support the grant submittal. Note: we do not plan to attempt to quantify the impact of pre-event drawdown on water quality performance, as it is anticipated pre- event drawdown will occur infrequently. 3) Reporting Update / Addendum: update the feasibility study report to summarize the selected alternative discussed above. Barr will also update the report to use language and additional information that supports the grant application. This may be done through modification of the existing report or through an addendum to the report. 4) 30% construction plans: Barr will generate 30% construction plans for the selected alternative described above. It is anticipated that the 30% construction plans will include the following elements: o Title Sheet o Removals Plan o Storm Sewer Plan and Profiles o Lift Station Details o Grading Plan 5) Engineers Opinion of Probable Cost (OPC): Barr will update / refine the OPC for this alternative based on 30% design. Task 7: Permitting Coordination Barr understands that the City has initiated permitting coordination with Minnehaha Creek Watershed District (MCWD) and Nine Mile Creek Watershed District (NMCWD). It is our understanding that MCWD will be the permitting authority but will allow NMCWD to review and provide comments. Page 544 of 647 Ross Bintner January 15, 2025 Page 3 P:\Mpls\23 MN\27\23272052 York Ave Pond Improvement\WorkFiles\999_2025_GrantSupport\00_Amendment\YorkPond_Amendment01_30%Design_2025-01-15.docx The scope of work for this task assumes that Barr will participate in up the three (3) coordination meetings to discuss permitting. The scope of work includes up to 30 hours to respond to permitting comments, including alterations to the design and/or additional analysis to support the design. Task 8: Grant Application Support Barr understands that the City will lead the grant application process, including completing the application submission and organizing and submitting all required documents outlined in the MPCA’s Implementation Grants for Stormwater Resilience RFP document. The scope of work for this task provides hours for Barr to support the City throughout the grant application process, including organization of engineering-related documents required by the grant RFP, assistance with specific questions, and generation of any additional materials, quantities, etc. required through the grant application process. Schedule and Estimated Cost The schedule outlined below is informed by the grant application due date of February 27, 2025. To meet the application deadline, Barr will target February 14, 2025 for delivery of all draft materials for City review (see “Task 6”, above). Barr will coordinate with the City between February 14 and the submission deadline to incorporate City review comments into deliverables and support the City’s grant application process. The estimate cost for the work described above is shown in the table below. Task Schedule Task Cost ($) Task 6: Alt. Refinement, OPCs, 30% Design • Model Refinement: January 31 • Water Quality Modeling: January 31 o Updates in response to permitting discussion ongoing thru February 7 • Report Update / Addendum, 30% Construction Plans, and Engineer’s OPC: February 14 $24,200 Task 7: Permitting Coordination • Initial permitting coordination meeting(s): January 2025 • Follow up permitting meeting(s) and modeling / design updates through February 14 $7,500 Task 8: Grant Application Support • Support City grant application process: February 14 through submission deadline of February 27. $5,800 Total Amendment Cost: $37,500 1 Contract total as of the date of this amendment (January 15, 2025) is $60,100. The total amendment cost ($37,500) would increase the total budget of Contract No. 300379 to $97,600. We propose to complete all work on a time and expense basis. Barr will complete the proposed scope of work in accordance with the Master Agreement for Professional Engineering Services. We will not exceed $37,500 without prior approval from the City. Page 545 of 647 Ross Bintner January 15, 2025 Page 4 P:\Mpls\23 MN\27\23272052 York Ave Pond Improvement\WorkFiles\999_2025_GrantSupport\00_Amendment\YorkPond_Amendment01_30%Design_2025-01-15.docx We appreciate the opportunity to continue working with the City on the York Avenue Pond project. If the proposed scope of services is satisfactory, please sign a copy of this letter in the space provided and return to us. If you have any questions about this proposed scope of services, please contact Michael McKinney (Project Manager; mmckinney@barr.com; 952-842-3672) or Sarah Stratton (Principal-in- Charge; sstratton@barr.com, 952-832-2860). BARR ENGINEERING CO. Sarah Stratton Its Vice President Accepted this ____________ day of ___________________, 2024 City of Edina By Its Page 546 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.13 Prepared By: Jon Darsow, Facility Supervisor Item Type: Request for Purchase Department: Engineering Item Title: Request for Purchase: Change Order #1 for Braemar Golf Course Restroom Professional Services Action Requested: Approve Request for Purchase Change Order #1 for professional services for Braemar Golf Course restroom with SEH for $90,499. Information/Background: The original project and scope was to add a prefabricated restroom building to the golf course front nine championship course. We did some cost estimates on the original prefabricated building and compared the cost to do a custom-built stand alone building. The course chose to do custom built comfort stations, knowing they had future opportunity to add concessions. This cost change is for additional engineering services to produce a custom-built restroom with all site civil, mechanical, and architectural design. Requisition Number: 12400228 Funding Source: Golf Course Capital Vendor: Short Elliot Hendrickson Inc. (SEH) Equipment Status: N/A Cost: $90,499.00 Resources/Financial Impacts: The project is funded from the golf course operations budget. Original Contract Amount = $37,550.00 Change Order #1 = $90,499.00 Revised Contract Amount = $128,049.00 Relationship to City Policies: This project aligns with the Parks Strategic Plan. Budget Pillar: Strong Foundation Page 547 of 647 Reliable Service Values Impact: Engagement Provide two comfort stations and canopy shelter for inclement weather on Braemar Golf Course. Supporting Documentation: 1. Braemar Golf Course Change Order Agreement Page 548 of 647 Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 10650 Red Circle Drive, Suite 500, Minnetonka, MN 55343-9302 952.912.2600 | 800.734.6757 | 888.908.8166 fax | sehinc.com SEH is 100% employee-owned | Affirmative Action–Equal Opportunity Employer January 17, 2025 Rev. January 23, 2025 RE: City of Edina Braemar Golf Course Restroom Improvements SEH No. 181580 Mr. Jon Darsow Facilities Supervisor Engineering and Public Works Facility City of Edina 7450 Metro Boulevard Edina, MN 55439 Dear Jon: Short Elliott Hendrickson Inc. (SEH®) respectfully requests approval of this Supplemental letter Agreement in the amount of $90,499.00 for additional engineering services relative to the referenced project. In your e-mail on December 31, 2024, you notified us that the golf course had chosen to proceed with a custom-built restroom off the 6th hole at Braemar Golf Course in lieu of the previously proposed modular option. Our revised scope will include the following additional tasks: 1. Project Management o Architectural concepts meetings with City/golf course staff (3 assumed) 2. Civil/MEP/Architectural/Structural Design o Supplemental topographic survey (along path to and within compost site) o Sanitary lift station/force main design o Water/sanitary services for up to two toilets and two sinks o Electrical design for lift station, interior/exterior lighting, and outlets o Electrical design utility coordination o Architectural renderings and final design o Footing and structural final design o Develop 60%, 95%, and final MEP, structural, and architectural construction plans o Cost estimating (60%, 95%, final) o Preparation of MEP and architectural project specifications (draft and final) o MPCA Sanitary Extension permit o Department of Labor and Industry (DLI) submittal o Bid/quote package(s) for lift station/sanitary, electrical, and water service Assumptions: · All meetings will be held virtually · Exterior lighting will be placed on the building only · No heat or air conditioning will be provided (ventilation only) · Water service via existing 2” line will be sufficient Page 549 of 647 Jon Darsow January 17, 2025 Rev. January 23, 2025 Page 2 · Sanitary force main will be constructed via open-cut methods and connect into existing manhole in the City’s compost site · All work will be performed by City forces except for the items in the bid/quote packages listed above. Deliverables for work completed by City forces will consist of construction plans and specifications only The following is a summary of the fee required to complete the above scope of work. Tasks Estimated Fee Project Management $2,174 Architectural Design $45,160 MEP Design $33,049 Civil Design $10,116 Total Supplemental Agreement Amount: $90,499 We propose to complete the above scope of services on the following schedule: Milestone Date Submit 95% plans, specs, and cost estimate March 14, 2024 Submit bidding documents March 31, 2024 Authorization for bidding at City Council meeting April 1, 2025 Bid opening April 28, 2025 Award contract at City Council meeting May 6, 2025 Begin Construction May 2025 If this agreement is acceptable, our total contract amount will increase from $37,550.00 to $128,049.00. We will provide these services in accordance with our Agreement for Professional Engineering Services dated June 4, 2013. Please contact me at 952.912.2629 if you have any questions or need additional information. Sincerely, SHORT ELLIOTT HENDRICKSON INC. William Bauer, PE, ENV SP Toby Muse, PE Project Manager Client Service Manager (Lic. IA, MN, SD) (Lic. MN) Accepted on this ___day of________________, 2025 City of Edina, Minnesota By:_________________________________ Name ___________________________________ Title Approved by the City Council on __________________ Page 550 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.14 Prepared By: Andrew Scipioni, Transportation Planner Item Type: Request for Purchase Department: Engineering Item Title: Request for Purchase: I-494 Corridor Commission Annual Membership Dues for 2025 Action Requested: Approve Request for Purchase of I-494 Corridor Commission annual membershpip dues for 2025 for $31,598.40. Information/Background: The I-494 Corridor Commission works with businesses, residents, and agencies to reduce congestion along the I-494 corridor. The cities of Bloomington, Eden Prairie, Edina, Minnetonka and Richfield are part of the Commission. The Commission partners with the Minnesota Department of Transportation, Metropolitan Council, Metro Transit and SouthWest Transit to work on issues related to I-494. The Commission approved a 2025 budget of $855,692. A portion of this budget is funded by annual dues from each member city per our Joint Powers Agreement. The 2025 annual dues for the City of Edina are $31,598.40, or $0.58 per resident. Requisition Number: 12500026 Funding Source: General Fund Vendor: I-494 Corridor Commission Equipment Status: N/A Cost: $31,598.40 Resources/Financial Impacts: Annual dues are funded through the City's General Fund. Board meetings are held approximately every month; the City of Edina is represented by one City Councilmember and one staff member. Relationship to City Policies: The work of the Commission supports goals within the City's Comprehensive Plan, Living Streets Plan and Climate Action Plan. Budget Pillar: Better Together Page 551 of 647 Values Impact: Engagement Ensuring the City is a part of larger regional transportation matters. Supporting Documentation: 1. I-494 Corridor Commission 2025 Annual Dues Invoice Page 552 of 647 Page 553 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.15 Prepared By: Andrew Scipioni, Transportation Planner Item Type: Report & Recommendation Department: Engineering Item Title: Traffic Safety Report of December 18, 2024 Action Requested: Approve the staff recommendations in the Traffic Safety Report of December 18, 2024. Information/Background: The Traffic Safety Committee recommends action on two items, no action on three items and further study of one item. The Transportation Commission reviewed the report at their January 16 regular meeting and recommended further study of two items. See attached report. Resources/Financial Impacts: Traffic control signage and pavement markings within the public right-of-way are owned and maintained by the Public Works Department. Changes to additions to signage or markings will be funded through the Streets Division operating budget or the Pedestrian and Cyclist Safety (PACS) Fund. Relationship to City Policies: The recommendations in this report support the goal in the Transportation Chapter of the Comprehensive Plan to "manage, maintain and operate roadways to maximize wherever possible the safety and mobility of all users and all modes." The staff recommendations are guided by the Minnesota Manual on Uniform Traffic Control Devices and the City's local traffic policies. Supporting Documentation: 1. Traffic Safety Report of December 18, 2024 Page 554 of 647 Strong FoundationCITY GOALS:Better TogetherReliable Service Livable City Staff Report City of Edina • 4801 W. 50th St. • Edina, MN 55424 Date: To: From: Subject: February 4, 2025 Mayor and City Council Nick Bauler, Traffic Safety Coordinator Traffic Safety Report of December 18, 2024 Staff Recommendation: Approve the recommendations of the Traffic Safety Committee. Information / Background: The Traffic Safety Committee (TSC) review of traffic safety matters occurred on December 18. The Traffic Safety Coordinator, Transportation Planner, Engineering Director, Assistant City Planner, Public Works Director, Traffic Safety Specialists and Police Sargeant were in attendance for this meeting. On each of the items, persons involved have been contacted and the staff recommendation has been discussed with them. They were informed that if they disagree with the recommendation or have additional facts to present, they can submit correspondence to the Transportation Commission and/or to City Council prior to the February 4 regular meeting. Section A: Items on which the Traffic Safety Committee recommends action A1. Request updated lane striping on Willson Rd, south of Eden Ave Staff recommends restriping the center line and adding a parking bay on the west side of Willson Rd. Description With parking on the west side of Willson, southbound vehicles tend to cross the center line and new lane striping is requested ADT 3,916 (2017) 85% Speed 36.1 mph (2017) Crashes One in 2015 from driver exiting Executive Plaza driveway with obstructed view facing north (left) of southbound vehicle Unique Circumstances A posted restriction extends north from Executive plaza past fire hydrant to improve sight lines. Street Width 30’ face to face of curb – 15’ travel lanes Willson Rd facing South Page 555 of 647 STAFF REPORT Page 2 A2. Request for safety improvements at W 58th St and Wooddale Ave Staff recommends installing marked crosswalks on the northern and eastern leg of the intersection. Temporary markings will be installed in 2025 and permanent markings will be installed in 2026 following the scheduled overlay. Section B: Items on which the Traffic Safety Committee recommends no action B1. Request for crossing improvements at Countryside Elementary School – Benton Ave at Tracy Ave Description Concerns of students crossing both streets during morning and afternoon commute times and is requesting markings, flashers or other ways to improve crossing safety. AADT 5,190 – Wooddale (2023) 1,700 – W 58th (2013) 85% Speed 31.9 – Wooddale (2024) 33.5 – W 58th (2019) Pedestrian Crossings Wooddale – 162 in one day, eight hours exceed 10 crosses. W 58th – 136 in one day, six hours exceed ten crosses. Crashes Seven since 2016, four since 2021. All crashes were a 90-degree collision. All but one included an eastbound vehicle. Unique Circumstances Sidewalks on east side of Wooddale and north side of W 58th. Future Work Wooddale anticipated 2026 mill & overlay. Description School principal and parents are concerned with students crossing both streets during morning and afternoon commute times and is requesting flashers or other ways to improve crossing safety. AADT 2,500 – Benton (2023) 2,050 – Tracy (2020) 85% Speed N/A Crashes A crash reported of a southbound driver hit a child in the crosswalk. Child was ok. Four additional crashes since 2017 failure to yield. Unique Circumstances Offset intersection. School utilizes teachers to flag traffic for students crossing Tracy and Benton. Previous Work Tracy was reconstructed in 2012 and 2016, north and south of Benton respectively. Wooddale Ave at W 58th St Countryside Elementary School Page 556 of 647 STAFF REPORT Page 3 Staff recommends no action citing Countryside Elementary School’s use of morning and afternoon crossing flaggers. The Transportation Commission recommends that City Council direct staff to collect traffic volumes and pedestrian counts at the intersection, and to conduct a warrant analysis for the existing all-way stop. B2. Request to remove parking on France Ave between Market St and W 50th St Staff recommends no changes citing high demand for parking in the district. B3. Request to change time restrictions turning onto W 70th St from southbound HWY 100 exit ramp. Staff recommends no changes to restrictions. Description Resident believes the removal of parking will ease the comfort of drivers and pedestrians along France. AADT 9,945 (2023) 85% Speed N/A Crashes Three in ten years, all involved northbound vehicles – Minneapolis side of street. Unique Circumstances Metro Transit E-Line stations at southwest and northeast corner of 50th at France. Policy Guidance Any parking restrictions on France would also need review by Hennepin County Description Requestor wants to change the No Right Turn on Red 6 AM to 6 PM, to 7-9 AM and 3-6 PM. AADT 21,000 (1997) 16,100 (2016) 85% Speed N/A Crashes Ten since 2016. Most include drivers running red lights. Seven crashes took place between hours 10 AM and 3 PM. Unique Circumstances Designation 6 AM to 6 PM implanted in 1992. Also implemented to allow traffic gaps for vehicles entering W 70th St from Rabun Dr (Brookview Heights neighborhood). -Street parking allowed 50th & France W 70th St at HWY 100 Page 557 of 647 STAFF REPORT Page 4 Section C: Items on which the Traffic Safety Committee recommends further study C1. Request for parking restrictions on Creek Valley Rd Staff recommends further study based on feedback received from residents within the neighborhood. The Transportation Commission recommends further study by staff, including reviewing the recommendations of the 2018 Edina High School Neighborhood Parking Study and additional conversations with school staff. Section D: Other traffic safety items handled D1. A request for increased speed enforcement on W 66th St between Valley View Rd and HWY 100, France Ave and along Valley Ln, east of Tracy Ave. The Police Department was notified of these requests. D2. A concern of poor sight lines traveling east on W 60th St at Wooddale Ave was reported. Staff found the sight lines were adequate with vegetation on the southwest corner to be outside of City clear-view ordinances. D3. A stop sign was reported blocked due to overgrown vegetation at Hansen Rd and CP railroad intersection. CP rail removed the overgrowth. D4. A traffic signal was reportedly not working properly at W 70th St and Cornelia Dr. City staff fixed the issue. D5. A road work sign reported abandoned near Morningside Dr and Crocker Ave. The contractor responsible for the sign removed it. D6. A complaint of garbage bins in the roadway on the 5200 block of Blake Rd. The Police Department was notified of the encumbrance. D7. A request for increased crossing treatments over York Avenue at Parklawn Avenue. Hennepin County was notified and the request is under consideration. D8. A resident living near W 60th St at France Ave requested permanent traffic signals following the use of temporary signals during the Metro Transit E-line closures. This was sent to Hennepin County for consideration. Description Resident is concerned with high school traffic parking on both sides of street. ADT 916 (2011) 85% Speed 26.9 mph (2011) Crashes None in last 10 years. Previous Work Roadway reconstructed in 2012. Unique Circumstances No parking restrictions present. 30’ street width. Policy Guidance Street width and parking is consistent with Local street (Living Streets Plan). Creek Valley Rd area under consideration Page 558 of 647 STAFF REPORT Page 5 D9. A complaint made of an abandoned vehicle on Parklawn Ave during winter parking restrictions. The Police Department was notified of the concern. D10. Graffiti was reported on a road closed sign along the 4700 block of France Ave. The contractor managing the project was notified and removed the sign. D11. A tree was reported down in the street on Circle West. Public Works removed the tree. D12. Abandoned cones were reported along Ewing Cir. Appropriate staff removed the signs. D13. A request to add curb paint along the roundabout at Blake Rd and Interlachen Blvd to increase it’s visibility. Orange markings are already present on the pavement adjacent to the curb. D14. Three submissions made regarding a section of Vernon Ave was closed causing detoured vehicles onto Tamarac Ave and Walnut Dr. The contractor updated detour signage. D15. An electrical wire was reported low onto Cheyenne Tr. The wire was fixed by the electrical company. D16. A request made for police presence because of school-aged drivers traveling fast on Cheyenne Tr in the 8 o’clock hour. The Police Department was notified of the request. D17. A commuter notified staff a traffic cone was abandoned on HWY 100 near Vernon Ave. The cone was removed. D18. A visitor at 50th & France requested ways to increase crossing safety along Market Street. Edina Police was notified of drivers failing to yield and delivery trucks parking illegally for enforcement. D19. A request for all-way stop controls at Tracy Ave and Valley View Rd/westbound HWY 62 exit ramp. Traffic control changes at this intersection need review by MnDOT as such changes could impact traffic flow on HWY 62. Staff is working with MnDOT towards future improvement projects. D20. A resident had issues with non-local traffic in the Chowen Park neighborhood during the Metro Transit E-line project. A number of temporary measures were applied during the project to improve safety in the area. Page 559 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.16 Prepared By: Rachel DeVries Finberg, Park Planner Item Type: Request for Purchase Department: Parks & Recreation Item Title: Request for Purchase: Braemar Park Ecological Restoration 2025-2028 Action Requested: Approve Request for Purchase for Ecological Restoration at Braemar Park with RES Great Lakes for $324,902.30 Information/Background: Phase 1 natural resource restoration at Braemar Park was undertaken in 2024 and focused on invasive species removal and control. A subsequent ecological restoration package was created for additional areas around Braemar Park through 2028. The work will consist of woody and herbaceous invasive vegetation removal and control, native seeding and planting, and ecological management. RES will be furnishing labor, equipment, and materials and such additional, extra and incidental work as may be necessary to complete the work in accordance with the plans and specifications. Requisition Number: 12500018 Funding Source: Local Option Sales Tax Vendor: RES Great Lakes LLC Equipment Status: New Cost: $324,902.30 Resources/Financial Impacts: This contract will allow for long term maintenance of natural resources in Braemar Park and support trails and recreation. It is funded with Local Option Sales Tax funding. It is an implementation of the Braemar Park Master Plan laid out and approved in 2018. This contract maintains over 70 acres of Oak Savanna, Upland Prairie, and Lowland Forest. The success of this restoration impacts future long term natural resource management contracts. Relationship to City Policies: This project aligns with Braemar Park Master Plan, Parks and Trails Strategic Plan, Climate Action Plan Greenspace and Trees, and Water and Natural Resource goals. Budget Pillar: Strong Foundation Page 560 of 647 Livable City Values Impact:Use text snippets to include Values in the item report. Sustainability The restoration of these spaces reduces erosion, improves air and water quality, promotes tree canopy and heat reduction. The establishment of a successful restoration reduces future inputs for maintenance and invasive species control. Health Natural areas promote both physical and mental health. The restoration of these spaces promote the use of trail as well as contemplation and education of flora and fauna within ecosystems. Stewardship Restoration and management creates quality ecosystems that will be restorative and regenerative which will reduce long term maintenance cost. A base bid was selected due to challenges and costs of alternates including weighing probability to success and future costs. Equity Braemar Park promotes access to trails and natural resources. Its connection to the neighborhood and trail networks gives residents an opportunity to engage with nature and a variety of ecosystems. Engagement Natural Resource Restoration was identified during the Braemar Park Master Planning process which included resident and neighborhood engagement. Supporting Documentation: 1. Braemar Park Eco RES Contract Page 561 of 647 APRIL 2018 D-1 IB CONTRACT NO P&R 23208-7 Braemar Park Implementation Subsequent Ecological Restoration 2025-2028 THIS AGREEMENT made this _4th _ day of _ February _, 2025_, by and between the CITY OF EDINA, a Minnesota municipal corporation (“City”) and _ RES GREAT LAKES, LLC (“Contractor”). City and Contractor, in consideration of the mutual covenants set forth herein, agree as follows: 1. CONTRACT DOCUMENTS. The following documents shall be referred to as the “Contract Documents,” all of which shall be taken together as a whole as the contract between the parties as if they were set verbatim and in full herein: A. This Agreement. B. Instructions to Bidders. C. City of Edina General Contract Conditions. D. Addenda numbers _1 and 2__. E. Specifications prepared by SRF and RES dated 12/6/2024 F. Plan sheets numbered _L0.0-L2.3_. G. Performance Bond. H. Payment Bond. I. Responsible Contractor Verification of Compliance J. Contractor’s Proposal dated _January 17th, 2025_. The Contract Documents are to be read and interpreted as a whole. The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work and to require Contractor to provide the highest quality and greatest quantity consistent with the Contract Documents. If there are inconsistencies within or among part of the Contract Documents or between the Contract Documents and applicable standards, codes or ordinances, the Contractor shall provide the better quality or greater quantity of Work or comply with the more stringent requirements. 1.1 Before ordering any materials or doing any Work, the Contractor shall verify measurements at the Project site and shall be responsible for the correctness of such measurements. No extra charges or compensation will be allowed on account of differences between actual dimensions and the dimensions indicated on the Drawings. Any difference that may be found shall be submitted to the City for resolution before proceeding with the Work. 1.2 If a minor change in the Work is necessary due to actual field conditions, the Contractor shall submit detailed drawings of such departure to the City for approval before making the change. The City shall not be required to make any adjustment to either the Contract Sum or Contract Time because of any failure by the Contractor to comply with the requirements of this paragraph. Actual or alleged conflicts or inconsistencies between the Plans and Specifications or other Contract Documents shall be brought to the City’s attention in writing, prior to performing the affected Work. The City’s directions shall be followed by the Contractor. 2. OBLIGATIONS OF THE CONTRACTOR. The Contractor shall provide the goods, services, and perform the work in accordance with the Contract Documents. Page 562 of 647 APRIL 2018 D-2 IB 3. OBLIGATIONS OF THE CITY. The City agrees to pay and the Contractor agrees to receive and accept payment in accordance with the Contractor’s bid $324,902.30_. 4. PAYMENT PROCEDURES. A. Contractor shall submit Applications for Payment. Applications for Payment will be processed by City as provided in the General Conditions. B. Progress Payments; Retainage. City shall make 95% progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment during performance of the Work. C. Payments to Subcontractor. (1) Prompt Payment to Subcontractors. Pursuant to Minn. Stat. § 471.25, Subd. 4a, the Contractor must pay any subcontractor within ten (10) days of the Contractor’s receipt of payment from the City for undisputed services provided by the subcontractor. The Contractor must pay interest of 1½ percent per month or any part of a month to the subcontractor on any undisputed amount not paid on time to the subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100.00 or more is $10.00. For an unpaid balance of less than $100.00, the Contractor shall pay the actual penalty due to the subcontractor. (2) Form IC-134 required from general contractor. Minn. Stat. § 290.92 requires that the City of Edina obtain a Withholding Affidavit for Contractors, Form IC-134, before making final payments to Contractors. This form needs to be submitted by the Contractor to the Minnesota Department of Revenue for approval. The form is used to receive certification from the state that the vendor has complied with the requirement to withhold and remit state withholding taxes for employee salaries paid. D. Final Payment. Upon final completion of the Work, City shall pay the remainder of the Contract Price as recommended by City. 5. COMPLETION DATE. The Work must be completed and ready for final payment by _December 31, 2028_. 6. CONTRACTOR’S REPRESENTATIONS. A. Contractor has examined and carefully studied the Contract Documents and other related data identified in the Contract Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the General Conditions; and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site. E. Contractor has obtained and carefully studied (or assumes responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, Page 563 of 647 APRIL 2018 D-3 IB sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto. F. Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by City and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. Contractor has given City written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by City is acceptable to Contractor. J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. K. Subcontracts: (1) Unless otherwise specified in the Contract Documents, the Contractor shall, upon receipt of the executed Contract Documents, submit in writing to the City the names of the subcontractors proposed for the work. Subcontractors may not be changed except at the request or with the consent of the City. (2) The Contractor is responsible to the City for the acts and omissions of the Contractor's subcontractors, and of their direct and indirect employees, to the same extent as the Contractor is responsible for the acts and omissions of the Contractor's employees. (3) The Contract Documents shall not be construed as creating any contractual relation between the City and any subcontractor. (4) The Contractor shall bind every subcontractor by the terms of the Contract Documents. 7. WARRANTY. The Contractor guarantees that all new equipment warranties as specified within the bid shall be in full force and transferred to the City upon payment by the City. The Contractor shall be held responsible for any and all defects in workmanship, materials, and equipment which may develop in any part of the contracted service, and upon proper notification by the City shall immediately replace, without cost to the City, any such faulty part or parts and damage done by reason of the same in accordance with the bid specifications. 8. INDEMNITY. The Contractor agrees to indemnify and hold the City harmless from any claim made by third parties as a result of the services performed by it. In addition, the Contractor shall reimburse the City for any cost of reasonable attorney’s fees it may incur as a result of any such claims. 9. MISCELLANEOUS. A. Terms used in this Agreement have the meanings stated in the General Conditions. B. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. C. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor, who agree that the Contract Documents shall be reformed to replace such Page 564 of 647 APRIL 2018 D-4 IB stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provisions. D. Data Practices/Records. (1) All data created, collected, received, maintained or disseminated for any purpose in the course of this Contract is governed by the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, any other applicable state statute, or any state rules adopted to implement the act, as well as federal regulations on data privacy. (2) All books, records, documents and accounting procedures and practices to the Contractor and its subcontractors, if any, relative to this Contract are subject to examination by the City. E. Copyright/Patent. Contractor shall defend actions or claims charging infringement of any copyright or patent by reason of the use or adoption of any designs, drawings or specifications supplied by it, and it shall hold harmless the City from loss or damage resulting there from. If the equipment provided by the Contractor pursuant to this Agreement contains software, including that which the manufacturer may have embedded into the hardware as an integral part of the equipment, the Contractor shall pay all software licensing fees. The Contractor shall also pay for all software updating fees for a period of one year following cutover. The Contractor shall have no obligation to pay for such fees thereafter. Nothing in the software license or licensing agreement shall obligate the City to pay any additional fees as a condition for continuing to use the software. F. Assignment. Neither party may assign, sublet, or transfer any interest or obligation in this Agreement without the prior written consent of the other party, and then only upon such terms and conditions as both parties may agree to and set forth in writing. G. Waiver. In the particular event that either party shall at any time or times waive any breach of this Agreement by the other, such waiver shall not constitute a waiver of any other or any succeeding breach of this Agreement by either party, whether of the same or any other covenant, condition or obligation. H. Governing Law/Venue. The laws of the State of Minnesota govern the interpretation of this Agreement. In the event of litigation, the exclusive venue shall be in the District Court of the State of Minnesota for Hennepin County. I. Severability. If any provision, term or condition of this Agreement is found to be or becomes unenforceable or invalid, it shall not affect the remaining provisions, terms and conditions of this Agreement, unless such invalid or unenforceable provision, term or condition renders this Agreement impossible to perform. Such remaining terms and conditions of the Agreement shall continue in full force and effect and shall continue to operate as the parties’ entire agreement. J. Entire Agreement. This Agreement represents the entire agreement of the parties and is a final, complete and all inclusive statement of the terms thereof, and supersedes and terminates any prior agreement(s), understandings or written or verbal representations made between the parties with respect thereto. K. Permits and Licenses; Rights-of-Way and Easements. The Contractor shall procure all permits and licenses, pay all charges and fees therefore, and give all notices necessary and incidental to the construction and completion of the Project. The City will obtain all necessary rights-of-way and easements. The Contractor shall not be entitled to any additional compensation for any construction delay resulting from the City’s not timely obtaining rights-of-way or easements. L. If the work is delayed or the sequencing of work is altered because of the action or inaction of the City, the Contractor shall be allowed a time extension to complete the work but shall not be entitled to any other compensation. Page 565 of 647 APRIL 2018 D-5 IB M. Responsible Contractor. This contract may be terminated by the City at any time upon discovery by the City that the prime contractor or subcontractor has submitted a false statement under oath verifying compliance with any of the minimum criteria set forth in Minn Stat. § 16C.285, subd. 3. CITY OF EDINA CONTRACTOR BY: ____________________________ BY: ____________________________ Its Mayor Its AND ___________________________ AND ___________________________ Its City Manager Its Page 566 of 647 d PURCHASE REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.17 Prepared By: Rachel DeVries Finberg, Park Planner Item Type: Request for Purchase Department: Parks & Recreation Item Title: Request for Purchase: Fred Richard Park and Braemar Arena Food Service Program and Business Plan, Phase 1 Action Requested: Approve Request for Purchase for Food Service Program and Business Plan at Fred Richards Park and Braemar Arena with JGL Consultants for $48,000. Information/Background: The City of Edina owns, supports, or operates concessions, or food and beverage services at numerous City owned Parks and Recreation Facilities. These operation range from vending and concessions, to leased food and beverage operations. The implementation of park master plans at Braemar Park and Fred Richards Park have presented an opportunity to look at services provided and demand for food and beverage at these locations. Phase 1 includes evaluation of demand drivers, national comparable operations, local market interest, and financial projections. JGL will report and recommend for both Braemar Ice Arena, and Fred Richards Park. This phase will be basis for design and future RFP. Requisition Number: 12500021 Funding Source: Local Option Sales Tax Vendor: JGL (Tracy Lawler Leahy) Equipment Status: New and Replacement Cost: $48,000 Resources/Financial Impacts: This consultant will be funded with Local Option Sales Tax funding and be paid out of approved project budgets for Braemar Arena Expansion and Fred Richards Park Master Plan Implementation. This phase will help the project teams to make informed decisions for design and square footage for facilities. It will weigh investments and long term management costs. Relationship to City Policies: This contract supports Braemar Park and Fred Richards Park Master Plans. It is part of Park and Recreation work plan items to implement these plans. Budget Pillar: Page 567 of 647 Strong Foundation Reliable Service Livable City Values Impact: Stewardship Planning and analysis allows staff to make informed and fiscally responsible decisions to service model and contract execution. Sustainability Informed decision making reduces materials and resources invested into facilities and waste created. Engagement Food and Beverage was identified during public engagement portion of Master planning process as a service and amenity desired. Supporting Documentation: 1. Food and Beverage JGL Contract Page 568 of 647 1 177119v1 PROFESSIONAL SERVICES AGREEMENT AGREEMENT made this 4th day of February, 2025, by and between the CITY OF EDINA, a Minnesota municipal corporation ("City") and JGL FOOD SERVICE CONSULTANTS, a food service and retail consultant ("Consultant"). IN CONSIDERATION OF THEIR MUTUAL COVENANTS, THE PARTIES AGREE AS FOLLOWS: 1. SCOPE OF SERVICES. The City retains Consultant to create a phase one program and business plan for Fred Richards Park and Braemar Arena created simultaneously. This includes engagement, a preliminary, and final report. 2. CONTRACT DOCUMENTS. The following documents shall be referred to as the "Contract Documents," all of which shall be taken together as a whole as the contract between the parties as if they were set verbatim and in full herein: A. This Professional Services Agreement B. Proposal dated January 8th, 2025 In the event of conflict among the provisions of the Contract Documents, the order in which they are listed above shall control in resolving any such conflicts with Contract Document "A” having the first priority and Contract Document "B" having the last priority. 3. COMPENSATION. The City shall pay the Consultant and the Consultant shall accept as payment $_48,000.00_ (the “fee”). Reimbursables and travel expenses are additional as laid out in JGL proposal. This fee shall not be adjusted if the estimated hour to perform a task, the number of required meetings, or any other estimate or assumption is exceeded. The City shall make payments on the basis of work performed upon receipt of an invoice from the Consultant. 4. OWNERSHIP. All reports, plans, models, software, diagrams, analyses, and information generated in connection with performance of this Agreement shall be the property of the City. The City may use the information for its purposes. The City shall be the copyright owner. 5. CHANGE ORDERS. All change orders, regardless of amount, must be approved in advance and in writing by the City. No payment will be due or made for work done in advance of such approval. 6. COMPLIANCE WITH LAWS AND REGULATIONS. In providing services hereunder, Consultant shall abide by all statutes, ordinances, rules and regulations pertaining to the provisions of services to be provided. Page 569 of 647 2 177119v1 7. STANDARD OF CARE. Consultant shall exercise the same degree of care, skill, and diligence in the performance of the services as is ordinarily possessed and exercised by a professional consultant under similar circumstances. No other warranty, expressed or implied, is included in this Agreement. City shall not be responsible for discovering deficiencies in the accuracy of Consultant’s services. 8. INDEMNIFICATION AND HOLD HARMLESS. The Consultant shall defend, indemnify and hold the City, its officers, employees and agents harmless from and against any and all liability, loss, expense (including reasonable attorneys’ fees and costs) or claims for injury or damage arising out of the performance of this Agreement, caused by or resulting from the negligent or intentional acts or omissions of The Consultant, its officers, directors, volunteers, agents or employees. 9. INSURANCE. Consultant shall secure and maintain such insurance as will protect Consultant from claims under the Worker’s Compensation Acts, and from claims for bodily injury, death, or property damage which may arise from the performance of services under this Agreement. Such insurance shall be written for amounts not less than: Commercial General Liability $1,000,000 each occurrence/aggregate Professional Liability $1,000,000 each claim The City shall be named as an additional insured on the general liability policy. Before commencing work the Consultant shall provide the City a certificate of insurance evidencing the required insurance coverage in a form acceptable to City. 10. INDEPENDENT CONTRACTOR. The City hereby retains Consultant as an independent contractor upon the terms and conditions set forth in this Agreement. Consultant is not an employee of the City and is free to contract with other entities as provided herein. Consultant shall be responsible for selecting the means and methods of performing the work. Consultant shall furnish any and all supplies, equipment, and incidentals necessary for Consultant’s performance under this Agreement. City and Consultant agree that Consultant shall not at any time or in any manner represent that Consultant or any of Consultant's agents or employees are in any manner agents or employees of the City. Consultant shall be exclusively responsible under this Agreement for Consultant’s own FICA payments, workers compensation payments, unemployment compensation payments, withholding amounts, and/or self-employment taxes if any such payments, amounts, or taxes are required to be paid by law or regulation. 11. SUBCONTRACTORS. Consultant shall not enter into subcontracts for services provided under this Agreement without the express written consent of the City. Consultant shall comply with Minnesota Statute § 471.425. Consultant must pay subcontractor for all undisputed services provided by subcontractor within ten days of Consultant’s receipt of payment from City. Consultant must pay interest of 1.5 percent per month or any part of a month to subcontractor on any undisputed amount not paid on time to subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. 12. CONTROLLING LAW/VENUE. This Agreement shall be governed by and construed in accordance with the laws of the State of Minnesota. In the event of litigation, the exclusive venue shall be in the District Court of the State of Minnesota for Hennepin County Page 570 of 647 3 177119v1 13. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Consultant must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created, collected, received, stored, used, maintained, or disseminated by Consultant pursuant to this Agreement. Consultant is subject to all the provisions of the Minnesota Government Data Practices Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it were a government entity. In the event Consultant receives a request to release data, Consultant must immediately notify City. City will give Consultant instructions concerning the release of the data to the requesting party before the data is released. Consultant agrees to defend, indemnify, and hold City, its officials, officers, agents, employees, and volunteers harmless from any claims resulting from Consultant’s officers’, agents’, city’s, partners’, employees’, volunteers’, assignees’ or subcontractors’ unlawful disclosure and/or use of protected data. The terms of this paragraph shall survive the cancellation or termination of this Agreement. 14. COPYRIGHT. Consultant shall defend actions or claims charging infringement of any copyright or software license by reason of the use or adoption of any software, designs, drawings or specifications supplied by it, and it shall hold harmless the City from loss or damage resulting therefrom. 15. PATENTED DEVICES, MATERIALS AND PROCESES. If the Contract requires, or the Consultant desires, the use of any design, devise, material or process covered by letters, patent or copyright, trademark or trade name, the Consultant shall provide for such use by suitable legal agreement with the patentee or owner and a copy of said agreement shall be filed with the City. If no such agreement is made or filed as noted, the Consultant shall indemnify and hold harmless the City from any and all claims for infringement by reason of the use of any such patented designed, device, material or process, or any trademark or trade name or copyright in connection with the services agreed to be performed under the Contract, and shall indemnify and defend the City for any costs, liability, expenses and attorney's fees that result from any such infringement. 16. ASSIGNMENT. Neither party shall assign this Agreement, nor any interest arising herein, without the written consent of the other party. 17. WAIVER. Any waiver by either party of a breach of any provisions of this Agreement shall not affect, in any respect, the validity of the remainder of this Agreement. 18. ENTIRE AGREEMENT. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. 19. TERMINATION. This Agreement may be terminated by the City for any reason or for convenience upon written notice to the Consultant. In the event of termination, the City shall pay the Consultant for completed work Page 571 of 647 4 177119v1 Dated: __________________, 20__. CITY OF EDINA BY: _______________________________ James Hovland, Mayor BY: ________________________________ Scott Neal, City Manager Dated: __________________, 20__. JGL FOOD SERVICE CONSULTANTS BY: _______________________________ Its ________________ Page 572 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.18 Prepared By: Scott Neal, City Manager Item Type: Other Department: Administration Item Title: Approve Out-of-State Travel for Mayor Hovland Action Requested: Approve out-of-state travel for Mayor Hovland for Feb, 20-23, 2025, to attend the U.S. Conference of Mayors Winter Leadership Meeting in Phoenix, Arizona. Information/Background: Mayor Hovland requests approval from the City Council, per the City’s Elected Official Out-of-State Travel Policy, to attend the U.S. Conference of Mayors Winter Leadership Meeting in Phoenix, Arizona, from Feb. 20-23. The estimated cost is $2,250. The City Manager has confirmed that sufficient funds for these expenses are included in the City's 2025 budget. Supporting Documentation: None Page 573 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.19 Prepared By: Sharon Allison, City Clerk Item Type: Resolution Department: Administration Item Title: Revised Resolution No. 2025-08: Approving Mayor's Appointment to the Housing & Redevelopment Authority Action Requested: Adopt revised Resolution No. 2025-08 approving the Mayor's appointment to the HRA. Information/Background: This resolution was revised to include the Mayor's appointment to the HRA which was inadvertently left out when it was approved on Jan. 7, 2025. Supporting Documentation: 1. Resolution No. 2025-08: Approving Mayor's Appointment to HRA Page 574 of 647 REVISED RESOLUTION NO. 2025-08 APPROVING MAYOR’S APPOINTMENT OF THE COMMISSIONERS OF THE HOUSING AND REDEVELOPMENT AUTHORITY IN AND FOR THE CITY OF EDINA, MINNESOTA BE IT RESOLVED by the City Council of the City of Edina, Minnesota (the “City”), as follows: 1. Pursuant to Minnesota Statutes, Section 469.003, Subdivision 5 and 6, the Mayor has submitted for the City Council’s consideration the appointment of the following members to the Authority: James Hovland, Carolyn Jackson and James Pierce. 2. In accordance with Minnesota Statutes, Section 469.003, Subdivision 6, the City Council hereby approves the appointment of two Commissioners of the Authority for terms of such office which coincide with their terms of office as members of the City Council, respectively. 3. In accordance with Minnesota Statutes, Section 469.003, Subdivision 7, the City Clerk (a) shall file the originals of such certificates of appointment in the office of the City Manager and (b) shall file in the office of the Commissioner of the Minnesota Department of Employment and Economic Development a certified copy of this Resolution and a certified copy of the above-mentioned certificates of appointment. Adopted by the Edina City Council this 4th day of February, 2025. Attest: Sharon Allison, City Clerk James B. Hovland, Mayor STATE OF MINNESOTA ) COUNTY OF HENNEPIN (SS CITY OF EDINA ) CERTIFICATE OF CITY CLERK I, the undersigned duly appointed and acting City Clerk for the City of Edina do hereby certify that the attached and foregoing Resolution was duly adopted by the Edina City Council at its Regular Meeting of February 4, 2025, and as recorded in the Minutes of said Regular Meeting. WITNESS my hand and seal of said City this day of , 2025. __________________________ Sharon Allison, City Clerk Page 575 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 6.20 Prepared By: Sharon Allison, City Clerk Item Type: Report & Recommendation Department: Administration Item Title: Approve Electronic Signature Policy Action Requested: Approve Electronic Signature Policy. Information/Background: Although the use of electronic signatures (e-signatures) has been in state law for many years, it became prominent in 2020 due to COVID. Traditionally, all documents were signed by a handwritten (wet) signature; however, we quickly learned that we could pivot to e-signature. This policy authorizes staff and City Council to use e-signatures for most documents whenever feasible, prudent and efficient, and that the e-signatures are legally binding and equivalent to handwritten signatures. An immediate efficiency is only printing documents that require wet signatures for City Council and HRA approval; all other documents will be signed using e-signatures. Supporting Documentation: 1. Electronic Signature Policy Page 576 of 647 ☒City Council Approved: Click here to enter a date. ☐City-Wide Revised: Click here to enter a date. ☐Department City of Edina Policy ELECTRONIC SIGNATURE POLICY PURPOSE The purpose of the Electronic Signature Policy is to establish when an electronic signature may replace a handwritten (or “wet”) signature in official City of Edina (the “City”) business. This policy has been adopted pursuant to the Uniform Electronic Transactions Act (Minn. Stat. 325L “UETA”), which authorizes municipalities to develop and implement policies regarding the use of electronic signatures. This policy applies to, and City staff and elected officials are authorized to use electronic signatures for such documents, including but not limited to the following: City resolutions, ordinances, minutes, building permits, business licenses, grant agreements, service agreements, purchase orders, inventory, receiving, accounting entries, payment records, timesheets, expense reports, credit card logs, time off requests, permit and license applications, and other customary and routine documents that are electronically generated. This policy does not apply to: 1. Certain documents and transactions governed by the Minnesota Uniform Commercial Code, Minnesota Statutes, Chapter 336, other than section 336.1-306, article 2, and article 2A; and 2. Certain documents and transactions governed by Minn. Stat. 507.24 relating to requirements for recording any conveyance, or other instrument affecting real estate. 3. e-Notarization in compliance with Minn. Stat. Chapters 358 and 359. 4. Facsimile Signatures in compliance with Minn. Stat. Chapter 47. POLICY To the fullest extent permitted by law, the City may utilize electronic digital signatures as legally binding and equivalent to handwritten signatures whenever feasible, prudent, and efficient. This policy adopts the definitions in UETA (Minn. Stat. 325L.02). A legible and acceptable electronic signature must comply with the following: 1. The electronic signature is capable of verification. 2. The electronic signature is under the sole control of the person using it. 3. The electronic signature is linked to the data in such a manner that it is readily ascertainable if the data is changed after the signature is applied. 4. The name of the signer can be applied in a manner to execute or validate the document. 5. The typed or printed name of the signer must appear below or adjacent to the signature. 6. The signer’s corporate, managerial, or partnership title must appear as part of or adjacent to the digital signature when the signer is signing on behalf of an organization or legal entity. 7. All documents submitted for electronic signature must be in PDF format or another acceptable electronic format authorized by the City Manager. 8. A font, size and color density that is clearly legible and reproducible when reviewed, copied, and scanned into a black and white format. Page 577 of 647 Page | 2 OTHER REQUIREMENTS 1. All legally binding electronic documents and agreements shall be executed in accordance with UETA, and the Minnesota Electronic Authentication Act (Minn. Stat. Chapter 325K, “MEAA”). In addition to state laws, City agencies must adhere to federal laws such as Electronic Signatures in Global and National Commerce (E-Sign) and the Health Insurance Portability and Accountability Act of 1996 (HIPAA). 2. City staff and elected officials may utilize third party certification methods to authenticate electronic or digital signatures with vendors, contractors, or other government departments and agencies whenever prudent or at the direction of the City Manager or City Attorney. 3. City staff are authorized to electronically sign documents provided by other entities so long as the document is accessed through a secure portal or email and if the system provides a date and time stamp for the electronic signature. 4. All electronic signatures on behalf of the City must be in accordance with this policy. 5. Electronic signatures must apply to individuals only, and not for roles, positions, or titles. 6. Where law or policy of the City requires that a record have the signature of a responsible person(s), that requirement is met when the electronic record has associated with it an electronic signature of the responsible person(s) using an approved electronic signature method. 7. Where a law requires a record to be in writing, an electronic record satisfies the law (Minn. Stat. 325L.07(c). Where law requires a signature, an electronic signature satisfies the law (Minn. Stat. 325L.07(d). 8. The City reserves the right to refuse to use or accept an electronic signature that does not comply with UETA, other Minnesota statutes, or other federal laws such as E-Sign and HIPAA. 9. The City shall retain a copy of all electronically signed documents and agreements in accordance with the City’s Record Retention Policy and Minn. Stat. 15.17 and 138.17. Page 578 of 647 BOARD & COMMISSION ITEM REPORT Date: February 4, 2025 Item Activity: Discussion Meeting: City Council Agenda Number: 7.1 Prepared By: Cary Teague, Community Development Director Item Type: Report & Recommendation Department: Community Development Item Title: Sketch Plan Review for 5516 Vernon Avenue Action Requested: No action requested. Provide the applicant non-binding feedback on a potential future development application. Information/Background: The City Council is asked to consider a sketch plan request to tear down the existing single- family home and build two double dwelling units. The development would gain access off Vernon Avenue on the east side of the property. See attached applicant narrative and plans. The subject property is zoned R-1, Single Dwelling unit District. The site is guided low density residential. The property is 38,064 square feet in size. The proposed density of this project is 5 units per acre. The following would be required if a formal application is made: • A Comprehensive Plan Amendment to re-guide the site from Low Density Residential to Low Density Attached Residential, to allow two double dwelling units/townhomes on the site. • A Rezoning from R-1, Single-Dwelling Unit District to PRD-2, Planned Residential District-2. • Site Plan Review. Supporting Documentation: 1. Planning Commission Sketch Plan Memo 2. Affordable Housing Manager Memo 3. Applicant Plans and Narrative 4. Development Team and Project Examples 5. Site Location, Zoning and Comprehensive Plan 6. Usable Lot Area 7. Staff Presentation at Planning Commission 8. Applicant Presentation at Planning Commission 9. League of Minnesota Cities - Guidance on Spot Zoning Page 579 of 647 City of Edina • 4801 W. 50th St. • Edina, MN 55424 City Hall • Phone 952-927-8861 Fax 952-826-0389 • www.CityofEdina.com Date: January 29, 2025 To: Planning Commission From: Cary Teague, Community Development Director Re: Sketch Plan Review – 5516 Vernon Avenue The Planning Commission is asked to consider a sketch plan request to tear down the existing single-family home and build two double dwelling units. The development would gain access off Vernon Avenue on the east side of the property. (See attached applicant narrative and plans.) The subject property is zoned R-1, Single Dwelling unit District. The site is guided low density residential. The property is 38,064 square feet in size. The proposed density of this project is 5 units per acre. The following would be required if a formal application is made:  A Comprehensive Plan Amendment to re-guide the site from Low Density Residential to Low Density Attached Residential, to allow two double dwelling units/townhomes on the site.  A Rezoning from R-1, Single-Dwelling Unit District to PRD-2, Planned Residential District- 2.  Site Plan Review. The compliance table on the following page demonstrates how the proposed new structures would comply with the PRD-2 zoning district standards. Page 580 of 647 City of Edina • 4801 W. 50th St. • Edina, MN 55424 Compliance Table Comp. Plan R-1 PRD-2 Proposed Front – Vernon Side – West Side – East Rear – North 110 feet 10 feet 10 feet 25 feet 30 feet 20 feet 20 feet 35 feet 35+ 20 feet 20 feet 35 feet Building Height 2.5 stories or 40 feet 2.5 stories or 40 feet 2.5 stories Building Coverage .25 .25 .19 Impervious Surface .50 .40 Minimum Lot Area Per Dwelling Unit -- 7,300 s.f. 9,516 s.f. Usable lot area -- 1,500 s.f. per dwelling unit 1,100*-2,100 Density Allowed in Low Density Attached Residential 4-8 units per acre** -- 6 units per acre 5 units per acre **Comprehensive Plan Amendment Required *Variance required – This is a rough estimate detail to be determined during formal Application (see attached Usable Lot Area Map) Highlights/Issues:  The properties on all sides are zoned R-1, Single-Dwelling Unit. However, the subject site and the site to the east are somewhat isolated from adjacent land uses. The site to the east could also be considered for a change in the land use map to low density attached residential. (See attached Site Location Maps.) These two sites are bordered by Highlands School to the north; Vernon Avenue to the south; a solid wood fence along the west lot line and a row of trees somewhat separates the single-family homes on Goya Lane; and the property to the east is a large wetland located on a 4.5-acre site owned by the City of Edina. (See next page and attached Zoning Map). Page 581 of 647 City of Edina • 4801 W. 50th St. • Edina, MN 55424  Comprehensive Plan. The proposed density would be 5 units per acre. A Comprehensive Plan Amendment would be required to Low Density Attached Residential to accommodate four units on the site. The designation would be similar to the Low Density Attached Designation to the west on Vernon for the Olde Vernon townhome development. As mentioned above, the property to the east could also be considered for a land use change. The applicant is going to approach the land owner with that possibility. Site Existing Land Use Plan Proposed Land Use Plan Site Page 582 of 647 City of Edina • 4801 W. 50th St. • Edina, MN 55424  Low Density Attached Land Use Description. The following is the description of this Land Use Category: “Applies to two-family and attached dwellings of low densities and moderate heights. This category recognizes the historical role of these housing types as transitional districts between single-family residential areas and major thoroughfares or commercial districts. May include single-family detached dwellings.” Below is language taken from the Comprehensive Plan, Community Design Guidelines regarding redevelopment: Page 3-39. “As a largely developed city, Edina’s future growth will be built on infill and redevelopment sites and will need to fit in, improving the character of surrounding areas. The small area plans provide more detailed guidance for specific redevelopment areas of the city. The following overall principles, focused primarily on aesthetic issues, provide general guidance when redevelopment occurs.” Site Similar Land use Similar Land use Page 583 of 647 City of Edina • 4801 W. 50th St. • Edina, MN 55424 Page 584 of 647 City of Edina • 4801 W. 50th St. • Edina, MN 55424 Page 3-46. Goal 4: Create and maintain housing options that serve a diverse range of ages, household types, and economic situations. 1. Building on current efforts, seek options that allow for residential redevelopment that is sensitive to the community character and context, while expanding options for residents. 2. Seek opportunities to increase the supply of affordable housing, as well as to preserve the affordability of existing affordable housing. 3. Facilitate the development of new housing that accommodates the needs of a people of diverse needs and from diverse backgrounds. 4. Investigate opportunities to accommodate Missing Middle housing within the city, defined as range of multi-unit or clustered housing types compatible in scale with single-family homes that help meet the growing demand for walkable urban living  Missing Middle. From page16 in the Housing Chapter in the Comprehensive Plan, and as stated in the attached memo from the City’s Affordable Housing Manager “Missing Middle housing encompasses housing between the scale of low and high densities, providing both an option to meet needs, and a built form type that can transition between adjacent districts of different levels of scale and intensity.” These may include co-housing, duplexes, triplexes, fourplexes, and other smaller scale multifamily types.” This type of housing is ideally suited along transit corridors, such as Vernon Avenue. Also, the Housing Strategy Task Force report encourages the development of duplexes and missing middle Housing. The report states “Support opportunities to accommodate missing middle housing within the city, defined as range of multi-unit or clustered housing types compatible in scale with single-family homes.” The Task Force also proposed a goal to consider zoning amendments that would expand housing options, such as considering zoning amendments in limited areas (such as transitional areas and activity nodes). From page 14 of the Housing Chapter in the Comprehensive Plan: “Maintaining community character. With the changing ways people are living, working, and using spaces, there will be changes in how land uses function – both in new and renovated spaces. Edina is frequently on the forefront of innovative practices, particularly related to sustainability and technology. However, this will require some flexibility in development Page 585 of 647 City of Edina • 4801 W. 50th St. • Edina, MN 55424 standards. One of the goals of innovating may be to find ways to accommodate missing housing types or to let housing be produced more affordably. Examples of housing types may include “missing middle” housing options – a range of multi-unit or clustered housing types compatible in scale with single-family homes that help meet the growing demand for walkable urban living. These housing options may include co-housing, duplexes, triplexes, fourplexes, and other smaller scale multifamily types. Ways to reduce housing costs could include modular building styles that take advantage of efficiencies in the construction process.” Page 586 of 647 TO: Cary Teague, Community Development Director FROM: Stephanie Hawkinson, Affordable Housing Development Manager DATE: January 29, 2025 RE: 5516 Vernon Avenue Abundance Properties submitted a sketch plan proposal to replace a single-family home with four townhomes on Vernon Avenue. This proposal aligns well with multiple City policies, plans and studies. Affordable Housing The Metropolitan Council establishes that a house is affordable to a household whose income is at 80% or below Area Median Income (AMI) if valued at no more than $304,700. Minnesota Housing and the Come Home 2 Edina down payment assistance programs (DPA) have purchase price limits set at $515,200. As the anticipated sale price of the proposed townhomes is in the $700-$800K range, they will not be considered affordable. However, as the median value home in Edina is greater than $700,000 and is expected to surpass $1MM by 2030, these townhomes are at a price point that is less than what is being brought to market with the new tear-down/re-build homes and therefore provides broader new housing options. Aligns with Support for Increasing Density According to the Federal Reserve Bank of Minneapolis, producing more homes is the single most effective way to ensure long-term housing affordability (based on economic supply/demand principles). To increase housing supply, yet not dramatically impact the character of a neighborhood, an option is to introduce more “Missing Middle: housing, such as duplexes, tri-plexes, up to townhomes and small-scale apartments. This scale of housing development has received preliminary support by some members of the City Council, and is encouraged in the following documents: •The Comprehensive Plan; •The Housing Strategy Task Force Implementation Plan; •Climate Action Plan; and •Transportation Plan. The Comprehensive Plan states that “’Missing Middle’ housing encompasses housing between the scale of low and high densities, providing both an option to meet needs, and a built form type that can transition between adjacent districts of different levels of scale and intensity.” This type of housing is ideally suited along transit corridors, such as Vernon Avenue. The Housing Strategy Task Force report encourages the development of duplexes and missing middle Housing. The report states “Support opportunities to accommodate missing middle housing within the city, defined as range of multi-unit or clustered housing types compatible in scale with single-family homes.” The Task Force also proposed a goal to consider zoning amendments that would expanding housing options, such as “consider[ing] zoning amendments in limited areas (such as transitional areas and activity nodes) and pursue zoning changes to encourage split lots to allow infill, to allow lot splits for infill, single-family ownership housing, detached or attached (zero lot line), on lots after splitting that are Page 587 of 647 50’ or wider (or 3,500 sf or larger).” This type of housing also has market benefits. According to the Edina Maxfield Housing Study: “With the overall aging of the population, more households are looking for greater convenience and less space in their housing and are selecting twin homes, detached townhomes, and condominiums.” Increasing housing density is also supported by the Climate Action Plan, which includes goals to increase the average population and to enhance affordable housing along transit corridors. To augment the plan, a density study was undertaken by students from the University of Minnesota and presented to the City Council. The study concluded that to reach Council approved emissions reduction goals by 2030, the City should allow “gentle density” (i.e missing middle) along Vernon Avenue, 66th Street, France Avenue, and in the Southdale area, among other roadways. This allows for an average citywide density increase of 18% that is required to meet the CAP emission goals. Increasing density is also reflected in the Transportation Plan, which includes the goal of increasing density along transit corridors. The Transportation Plan and housing intersect in the common vision of striving for a “,,,desirable and livable community…” Increasing housing density along transit corridors provides increased opportunities for people to use public transportation, either by choice to need, which also serves to reduce greenhouse gas emissions. One relevant goal is: “Reduce the overall dependence on and use of single-occupant vehicles by promoting land use patterns that allow for shorter vehicular trips and the use of alternative travel options.” Recommendation Based on these approved plans, and the location along a transit corridor, I recommend support of the proposal to develop four townhomes at 5516 Vernon. Page 588 of 647 Page 589 of 647 Development of 4 Townhomes at 5516 Vernon Avenue in Edina,MN The proposed redevelopment of an acre sized lot into 4 townhomes at 5516 Vernon Avenue aligns with Edina’s Comprehensive Plan by addressing key goals related to housing diversity, affordability,and sustainability,while also optimizing land use and leveraging existing infrastructure. Alignment with Edina’s Comprehensive Plan 1.Expanding Housing Options: ○The project adds single-family attached homes,catering to a range of residents, including young professionals,small families,and seniors looking to downsize. This aligns with Edina’s goal to diversify its housing stock and provide options that suit different lifestyles and income levels. 2.Efficient Land Use in a Developed Area: ○Replacing a single-family home with 4 townhomes optimizes the use of Edina’s limited land resources.This type of redevelopment exemplifies the city’s focus on strategic,higher-density housing in appropriate locations. 3.Affordable Housing Alternatives: ○Townhomes are a more accessible option compared to traditional single-family homes in Edina,where high land values can make homeownership challenging. This development supports affordability goals by creating housing at a variety of price points. 4.Sustainability and Transit Accessibility: ○Located near major transit corridors,this project promotes sustainable living by reducing reliance on cars and encouraging walkable,connected communities. The compact design further minimizes environmental impact while contributing to Edina’s sustainability objectives. 5.Neighborhood Revitalization: ○Redeveloping an aging property with modern townhomes enhances the aesthetic and functional value of the neighborhood,aligning with Edina’s goal to modernize while maintaining the character of established areas. Page 590 of 647 Addressing Housing,Affordability,and Sustainability Challenges 1.Housing Shortages: ○The project increases housing availability in a high-demand area,addressing Edina’s need for additional housing units to meet current and future demand. 2.Affordability Barriers: ○Townhomes offer a cost-effective entry point for families,young professionals, and seniors who may otherwise be excluded from Edina’s housing market.This supports Edina’s goals for inclusivity and economic diversity. 3.Efficient Use of Resources: ○The redevelopment uses existing roads,utilities,and public services more effectively,minimizing the need for additional infrastructure investments and aligning with fiscal sustainability goals. 4.Environmental Benefits: ○Compact,energy-efficient townhomes reduce the per-unit environmental footprint compared to single-family homes.Proximity to transit options further supports Edina’s climate action goals by encouraging reduced vehicle usage. Conclusion The proposed 4-townhome development at 5516 Vernon Avenue is a model of thoughtful, sustainable,and inclusive redevelopment that aligns with Edina’s Comprehensive Plan.It addresses critical needs for diverse,affordable housing while optimizing land use and supporting environmental goals.This project is a step forward in realizing Edina’s vision of a modern,adaptable,and vibrant community. Thank you for your consideration Abundance Properties Jordan Crockett 952.649.9174 Page 591 of 647 WHO ARE WE ?ABUNDANCE PROPERTIES LETS BUILD TOGETHER! Commercial Construction Development Community Development At Abundance Properties, we are a collective of Black developers based in Minneapolis, driven by a mission to foster equity, empowerment, and excellence in all we do. Our core values are at the heart of our approach, guiding us as we serve diverse communities, build meaningful relationships, and create lasting, positive change. We are committed to making a tangible impact by prioritizing inclusivity and providing opportunities for growth and success in every project we undertake. Page 592 of 647 THE DREAM TEAM Page 593 of 647 Empowerment Through Real Estate Through out the year we hold walkthroughs of our diernt projects. We do this to show aspiring developers behind the scenes of construction and development. When it comes to Empowering emerging developers. We use the 3 E’s Exposure Education Experience Page 594 of 647 Media The RE-SEED Project! We partnered with Project for Pride in Living (PPL) to do a 1.6 million $ redevelopment on 9 properties (60 units). These properties have been updated by our company Abundance properties so that they can be sold to investors in the community. Abundance Properties Featured in the Star Tribune Page 595 of 647 Eagan Townhome Development Address: 4153 Old Sibley Memorial Hwy Type: Rezoning and New Construction Multifamily, Built in 2022 Scope: Execution: Our team responded to Eagan's increasing need for modern, family-friendly housing by delivering well-designed townhomes that not only enhances the neighborhood’s appeal but also aligns with the city’s goals for expanding multi-family residential options. The units sold in a timiley manager and it was a Win Win for everyone. Rezoning: We worked closely with the City of Eagan to rezone the property from limited business use to high-density multi-family. This involved extensive coordination with city ocials, planning committees, and the local community to align with the city's vision for housing development. Building and Construction Total Square Feet Living: 2189 Above Grade Finished Area: 2189 Foundation Area: 931.00 Roof: Composition Levels Or Stories: 2 Total Above Grade Sqft Area: 2189.00 Total Area Main: 2189.00 4 beds, 3 baths, 2 car Garage Page 596 of 647 Page 597 of 647 Maple wood townhomes Maplewood Townhomes Type: Rezoning and New Construction Multifamily Scope: Challenges Addressed: Goal: This collaborative eort with the City of Maplewood ensures the project aligns with community needs while overcoming the challenges of rezoning and phased construction. Rezoning: We worked closely with the City of Maplewood to rezone the property from limited business use to high-density multi-family. This involved extensive coordination with city ocials, planning committees, and the local community to align with the city's vision for housing development. Construction:Developing 16 slab-on-grade townhomes, split into two phases: Phase 1: Eight townhomes currently under construction, with framing underway. Expected completion is spring 2025. Phase 2: Eight townhomes scheduled to begin in summer 2025. Design Details: Second Level: Includes the living area, kitchen, and a powder bath for convenience. Third Level: Features 3 bedrooms, 2 bathrooms, and a laundry room, designed to accommodate families. Successfully navigated a complex rezoning process to transition the property from business to high-density residential use. This included addressing zoning requirements, community feedback, and environmental considerations to gain approval. To meet the growing demand for modern, family-friendly housing in Maplewood by providing thoughtfully designed townhomes that enhance the neighborhood and support the city’s vision for multi-family development. Page 598 of 647 Page 599 of 647 U Of M Edina City Study Summary What would this study say about approving townhome development? The Study would say Edina should approve the proposed townhome development at 5516 Vernon Ave, transitioning from a single-family structure, for the following reasons derived from the report: In summary, transitioning 5516 Vernon Ave from a single-family home to townhomes would help address Edina’s housing shortage, reduce commuter trac, promote sustainable transit, and contribute to the city’s climate and density goals. Jordan Crockett Abundance Properties 1. Jobs-to-Housing Imbalance: Edina has a disproportionate ratio of jobs to residents (2.35 jobs per household vs. a healthy ratio of 1.4) (pg 8.), meaning many employees commute into Edina daily. Increasing housing density, especially near job centers, would allow more employees to live locally, reducing vehicle miles traveled (VMT) and enhancing sustainability. 2. VMT Reduction: The city aims to reduce greenhouse gas emissions, and the transportation sector accounts for 41% of Edina's emissions. Increasing residential density near transit and job hubs is strongly linked to lowering VMT, as residents will rely less on cars and more on public transportation, biking, or walking. 3. Transit and Sustainability Goals: The city’s Climate Action Plan targets doubling public transit ridership by 2030. Increased housing density near existing or planned transit routes will support this shift, making public transportation more accessible and eective. 4. Alignment with City Planning: Edina’s zoning and climate strategies encourage densification in targeted areas, including transit corridors and neighborhoods with mixed-use potential. Developing townhomes aligns with these strategies, creating walkable communities and supporting sustainable growth. Page 600 of 647 St.Paul Twin homes Address: 321 Irvine Avenue South Type: New Construction Twin Home Scope: Permits and City Collaboration: Goal: This project highlights a successful collaboration with the City of St. Paul to deliver a property that respects the area's historic standards while meeting the demand for spacious and modern housing. Construction:Built a new, thoughtfully designed twin home, oering: 5 bedrooms per unit to accommodate larger households or families. 4 bathrooms per unit for added convenience and modern living. Partnered closely with the City of St. Paul to ensure compliance with local regulations and standards, including: Historic Preservation Community Approval: Secured approval for the design to align with the neighborhood’s historic aesthetic and character. Zoning and Site Plan Review: Worked with city planners to ensure the project met zoning requirements and harmonized with the surrounding environment. Building Department Approvals and Permits: Coordinated with the city’s building department to obtain all necessary permits for construction, ensuring a seamless and compliant building process. The twin home is scheduled for sale in spring 2025. It is designed to balance modern functionality with a nod to the neighborhood’s historic charm, enhancing property value while meeting the community's expectations for high-quality housing. Page 601 of 647 Page 602 of 647 EdinaMN.gov Sketch Plan Review 5516 Vernon Avenue Page 603 of 647 Site Page 604 of 647 Site Page 605 of 647 Page 606 of 647 Site Page 607 of 647 Page 608 of 647 Usable Lot Area does not include required setback area and driveways USABLE LOT AREA Page 609 of 647 EdinaMN.gov Sketch Plan Review 5516 Vernon Avenue Page 610 of 647 Sit e Page 611 of 647 Site Page 612 of 647 Site Page 613 of 647 Site Page 614 of 647 127 ’ 18’ 15’ 15’ 140 ’ SETBACKS Page 615 of 647 Page 616 of 647 Page 617 of 647 Formal Application Would Require   A Comprehensive Plan Amendment to re-guide the site from Low Density Residential to Low Density Attached Residential, to allow two double dwelling units/townhomes on the site. A Rezoning from R-1, Single-Dwelling Unit District to PRD-2, Planned Residential District-2.    Site Plan Review.   Page 618 of 647 Issues/Considerations Page 619 of 647 Usable Lot Area does not include required setback area and driveways USABLE LOT AREA Page 620 of 647 Issues/Considerations The properties on all sides are zoned R-1, Single-Dwelling Unit. However, the subject site and the site to the east are somewhat isolated from adjacent land uses. The site to the east could also be considered for a change in the land use map to low density attached residential. These two sites are bordered by Highlands School to the north; Vernon Avenue to the south; a solid wood fence along the west lot line and a row of trees somewhat separates the single-family homes on Goya Lane; and the property to the east is a large wetland located on a 4.5-acre site owned by the City of Edina.     Page 621 of 647 Issues/Considerations Page 622 of 647   Low Density Attached Land Use Description. The following is the description of this Land Use Category: “Applies to two-family and attached dwellings of low densities and moderate heights.  This category recognizes the historical role of these housing types as transitional districts between single-family residential areas and major thoroughfares or commercial districts. May include single-family detached dwellings.” Page 623 of 647   Missing Middle. From page16 in the Housing Chapter in the Comprehensive Plan, and as stated in the attached memo from the City’s Affordable Housing Manager “Missing Middle housing encompasses housing between the scale of low and high densities, providing both an option to meet needs, and a built form type that can transition between adjacent districts of different levels of scale and intensity.”  These may include co-housing, duplexes, triplexes, fourplexes, and other smaller scale multifamily types.” This type of housing is ideally suited along transit corridors, such  as Vernon Avenue.  Also, the Housing Strategy Task Force report encourages the development of duplexes and missing middle Housing. The report states “Support opportunities to accommodate missing middle housing within the city, defined as range of multi-unit or clustered housing types compatible in scale with single-family homes.” The Task Force also proposed a goal to consider zoning amendments that would expand housing options, such as considering zoning amendments in limited areas (such as transitional areas and activity nodes). Issues/Considerations Page 624 of 647 Discussion/Feedback Page 625 of 647 ABUNDANCE PROPERTIES 5516 VERNON PROPOSAL JORDAN CROCKETT, DARION FLETCHER, RASHAD KENNEDY Page 626 of 647 AGENDA About us The Proposal The Plan Questions 2Page 627 of 647 Page 628 of 647 Page 629 of 647 5516 VERNON AVE PROPOSAL Page 630 of 647 WHY DOES IT WORK? •Edina Supports Increased Density •Location •U of M Study: More Density = Less Green house gases/ VMT •Land Use Efficiency •Clear Record of Successful Development Page 631 of 647 THE PLAN •Rezone to PRD1 •4 Town Homes •3000 Sqft •4 Beds 3 Baths •Owner Occupied, End Buyers Page 632 of 647 SUMMARY Edina’s Comprehensive Plan and Climate Action Plan highlight the need for increased density in targeted areas Location and size of the land is perfect for slightly higher density rezone Abundance Properties has the experience and capability to overdeliver for your city Page 633 of 647 QUESTIONS Page 634 of 647 Page 635 of 647 Page 636 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Action Meeting: City Council Agenda Number: 7.2 Prepared By: Scott Neal, City Manager Item Type: Ordinance Department: Administration Item Title: Ordinance No. 2025-01: Amending Chapter 8 Concerning the Sale of Inhumanely Bred Animals Action Requested: Approve Ordinance No. 2025-01 amending Chapter 8 concerning the Sale of Inhumanely Bred Animals and grant second reading. Information/Background: The proposed ordinance was prepared at the request of Council Member Agnew. Council Member Agnew presented the ordinance at the January 21, 2025, meeting for first reading, and will present it for second reading and approval. Supporting Documentation: 1. Ordinance No. 2025-01: Concerning the Sale of Inhumanely Bred Animals Page 637 of 647 234298v1 ORDINANCE NO. 2025-01 AN ORDINANCE AMENDING CHAPTER 8, ARTICLE III OF THE EDINA CITY CODE CONCERNING THE SALE OF INHUMANELY BRED ANIMALS The City Council of Edina Ordains: Section I.Chapter 8, Article III of the Edina City Code is amended to add the following Section 8-118: Sec. 8-118. – Sale or showcase of inhumanely bred animals prohibited. (a)Purpose and Findings. The City Council finds that current federal, state, and local regulation of commercial kennels and breeding facilities do not adequately address the health and well-being of animals through the point of sale. The City Council also finds that many commercial kennels showcase adoptable animals or collaborate with local animals shelters and rescue organizations to support adoption and care efforts for abandoned, abused, or stray animals. The City council seeks to discourage the inhumane breeding of animals by eliminating their profitability through sale to commercial kennels without limiting commercial kennels from engaging in collaborative efforts to care for and sell animals sourced through a reputable breeder, impound, shelter, or rescue organization. The City Council therefore adopts the following regulations pursuant to its power to regulate the keeping of animals under Minn. Stat. § 412.221, subd. 21. (b) No person holding a license to maintain a commercial kennel under this chapter may purchase, acquire, or otherwise obtain any animal for sale or showcase from a breeder that is not USDA licensed or does not otherwise follow state and federal minimum breeding standards at the time of the transfer of the animal to the commercial kennel. (c) Nothing in this section shall prevent a commercial kennel licensee from purchasing, acquiring, or otherwise obtaining any animal for sale or showcase from a person, shelter, or organization that cares for or houses animals not bred by that person, shelter, or organization without a USDA license or in violation of state and federal minimum breeding standards, or animals considered abandoned, abused, stray, or lawfully impounded. (d) A commercial kennel shall display a notice in a conspicuous place on or within three feet of each animal’s kennel, cage, or enclosure that identifies the name of the source from which the animal was obtained and the source’s contact information. This information must also be provided to each animal’s adopter upon sale and maintained by the commercial kennel for review upon request of the animal control officer or other persons designated by the City to enforce this Chapter. (e) Any person operating a commercial kennel in violation of any of the above provisions shall be subject to the penalties provided in section 8-3 for each violation. Page 638 of 647 234298v1 Section 2.This ordinance is effective immediately. First Reading: January 21, 2025 Second Reading: February 4, 2025 Published: ATTEST: _________________________ _________________________ Sharon Allison, City Clerk James B. Hovland, Mayor Please publish in the Edina Sun Current on: Send one affidavit of publication. Bill to Edina City Clerk Page 639 of 647 BOARD & COMMISSION ITEM REPORT Date: February 4, 2025 Item Activity: Information Meeting: City Council Agenda Number: 8.1 Prepared By: Perry Vetter, Parks & Recreation Director Item Type: Minutes Department: Parks & Recreation Item Title: Minutes: Parks & Recreation Commission Nov. 13, 2024 Action Requested: None. Information/Background: Receive minutes from the Nov. 13, 2024 Parks & Recreation Commission meeting. Supporting Documentation: 1. Minutes: Parks & Recreation Commission Nov. 13, 2024 Page 640 of 647 Draft Minutes☐ Approved Minutes☒ Approved Date:01/14/2025 Minutes City of Edina, Minnesota Edina Parks & Recreation Commission Braemar Golf Course November 13, 2024 7 p.m. 1. Call to Order Vice-Chair Pfuhl called the meeting to order at 7:04 p.m. 2. Roll Call Answering roll call were Commissioners Garazatua, Kane, Luangrath, Pettit, Pfuhl, Spanhake, Welsh and Student Commissioners Ellertson and Syed. Garazatua joined remotely in accordance with state statute. Commissioners Absent: Weaver Staff Present: Staff Liaison Perry Vetter, Assistant Director Recreation & Facilities Tracy Petersen, General Manager Braemar Golf Course Joe Abood, Park Planner Rachel Finberg and Administrative Coordinator Janet Canton 3. Approval of Meeting Agenda Motion made by Welsh to approve the meeting agenda. Motion seconded by Spanhake. Roll call vote. Motion carried. 4. Approval of Meeting Minutes Motion made by Pettit to approve the Oct. 8, 2024, minutes. Motion seconded by Kane. Roll call vote. Motion carried. 5. Special Recognitions and Presentations 5.1 Welcome New Student Commissioners Staff Liaison Vetter introduced new Student Commissioner Emma Ellertson. The Commissioners introduced themselves. 6. Community Comment None 7. Reports/Recommendations 7.1 Braemar Golf Operations Update Staff Liaison Vetter reminded the Parks & Recreation Commission that Commissioner Garazatua is currently serving Active Duty in the United States Navy, and he is allowed by Minnesota State Statute to serve remotely as long as certain protocols are in place. Staff Liaison Vetter introduced General Manager of Braemar Golf Course Joe Abood. Page 641 of 647 Draft Minutes☐ Approved Minutes☒ Approved Date:01/14/2025 General Manager Abood gave a general history of Braemar Golf Course. In 2013 the golf dome reopened after reconstruction due to the original dome having been burned down. In 2014, the golf course was losing approximately $400,000 per year and a decision was made to go from a 27-hole to an 18-hole golf course. General Manager Abood stated that the food and beverage portion of the business was outsourced in 2015 and 13.5% of the gross revenue goes back to the golf course. The City has contracted with the current catering company for five years with the potential for two additional five-year extensions. General Manager Abood stated that in June of 2016, the golf course was shut down for renovations and remained closed until May of 2019. In November of 2019, Top Tracer Range Technology was added to the golf dome, and it was a huge success. In addition, the golf dome yearly revenue went from $300,000 to the current revenue of $1.7 million. The next logical step is to begin a study for a clubhouse, which was approved in August of 2023 by the City Council. General Manager Abood stated that 77,513 rounds of golf were recorded this season. In greens fees, there is $2.1 million in revenue. General Manager Abood stated that the driving range was closed for a short period of time in 2015, it was re-opened in 2016, and this year there was $654,000 in revenue. The golf shop is one of the largest in the area and the year-to-date revenue is $399,000. Because the weather was so nice this year, the golf dome took a downward turn in revenue. General Manager Abood stated that the PGA Section Championship was held at Braemar Golf Course and approximately 140 of the top golfers from around the State played in it. The PGA Junior Golf Mini Tour as well as one of the largest Pro-Am’s from the State used Braemar Golf Course, in addition to many other events. General Manager Abood gave the results of a survey and noted that getting a tee time was one of the greater complaints as well as golf leagues. General Manager Abood stated that next year there will be a newly constructed restroom on hole number six, which will cost approximately $250,000. The conversation shifted to online tee times and pre-payments. Page 642 of 647 Draft Minutes☐ Approved Minutes☒ Approved Date:01/14/2025 Safety concerns were raised regarding parking at the Golf Dome in the winter. General Manager Abood stated that additional parking is being considered. General Manager Abood stated that the golf course has been running in the black for the past four or five years. 7.2 Proposed Parks & Recreation Fees for 2025 Assistant Director Petersen gave the background on how the fees are created. An attempt is always made to cover the costs; however, some areas are more difficult than others. She noted staffing continues to be the greatest challenge. Assistant Director Petersen stated that no fee increase is recommended for the Aquatic Center; however, the plan is to offer the punch passes again for the upcoming season. Assistant Director Petersen stated that the online payment options for the golf course are going to be eliminated. The plan is to offer some different prepaid package options. In addition, there will be some slight increases to the 9-hole and 18-hole greens fees as well as an increase for league fees. Assistant Director Petersen stated that at the Ice Arena and Braemar Field, there will be increases. There is an additional $1 per participant fee for the hockey players and noted that these fees have not been raised in five years. Assistant Director Petersen stated that the rates for the Edina Senior Center have not increased since 2021 and therefore there are some adjusted incremental rates for 2025. Motion made by Spanhake to recommend the proposed 2025 Parks & Recreation Fees to City Council. Motion seconded by Garazatua. Roll call vote. Motion carried. 7.3 Discuss Special Project Request Process Staff Liaison Vetter stated that Special Project guidelines were established in 2020, and they were not used at all for the first three years. The purpose was to provide a community member a pathway to bring forward a request without a lot of red tape while providing solid ideas as opposed to wish list items. Park Planner Finberg explained that her position was created for the purpose of implementing some of the larger capital projects, but she also has an opportunity to speak with the residents about their ideas and goals for the Edina Parks System. Park Planner Finberg is present for the purpose of discussing ways to get more community feedback and community-driven projects. Additional discussion ensued. Page 643 of 647 Draft Minutes☐ Approved Minutes☒ Approved Date:01/14/2025 7.4 Mid-year Officer Election Staff Liaison Vetter explained that Commissioner Doscotch has resigned due to personal and professional demands. His position will not be filled until March of 2024 when appointments are made for all Commissions. Therefore, it is now necessary to have an election for Vice Chair. Chair Pfuhl opened the floor for nominations for Vice Chair of the Parks & Recreation Commission. Spanhake moved to nominate Commissioner Kane as Vice Chair of the Parks & Recreation Commission. Motion seconded by Luangrath. Roll call vote. Motion carried. 8. Chair and Member Comments No comments were made. 9. Staff Comments 9.1. Upcoming 2024 and 2025 Meetings and Events Staff Liaison Vetter gave the following updates:  There will be no December meeting.  There will be no July meeting in 2025.  Wednesday, Nov. 12, 2025, is a deviation from the regular schedule due to Veteran’s Day. 10. Adjournment Motion made by Kane to adjourn the Nov. 13, 2024, meeting at 8:52 p.m. Motion seconded by Spanhake. Roll Call vote. Meeting adjourned. Page 644 of 647 d ITEM REPORT Date: February 4, 2025 Item Activity: Information Meeting: City Council Agenda Number: 8.2 Prepared By: Andrew Scipioni, Transportation Planner Item Type: Minutes Department: Engineering Item Title: Minutes: Transportation Commission, Dec. 19, 2024 Action Requested: None. Information/Background: Receive the minutes of the Transportation Commission's December 19, 2024 regular meeting. Supporting Documentation: 1. Minutes: Dec. 19, 2024 Page 645 of 647 Draft Minutes☐ Approved Minutes☒ Approved Date: January 16, 2025 Minutes City Of Edina, Minnesota Transportation Commission City Hall Community Room December 19, 2024 1. Call to Order Chair Lewis called the meeting to order at 6:13 p.m. 2. Roll Call Answering roll call: Commissioners Bildsten, Brown, McCarthy, Olson, Plumb-Smith, Rubenstein, Wright, Lewis Absent: Commissioners Rosen, Lassig Staff present: Transportation Planner Andrew Scipioni 3. Approval of Meeting Agenda Motion was made by Commissioner McCarthy and seconded by Commissioner Plumb-Smith to amend the agenda to move Section 8: Staff Comments before Section 7: Chair and Member Comments. All voted aye. Motion carried. Motion was made by Commissioner Brown and seconded by Commissioner Bildsten to approve the amended agenda. All voted aye. Motion carried. 4. Approval of Meeting Minutes Motion was made by Commissioner Rubenstein and seconded by Commissioner Plumb-Smith to approve the November 21, 2024 meeting minutes. All voted aye. Motion carried. 5. Community Comment None. 6. Reports/Recommendations 6.1. Pedestrian and Bicycle Master Plan Review Draft Report The Commissioner reviewed and commented on the draft report. Motion was made by Commissioner Bildsten and seconded by Commissioner Brown to approve the report. All voted aye. Motion carried. 6.2. Advisory Communication: Parking The Commission reviewed and commented on the Planning Commission’s advisory communication. Comments from Commissioners included:  The report contains a lot of ideas, but City Council needs to provide further direction.  Many of the recommendations are planning-related and beyond the ETC’s ability to control or change. Page 646 of 647 Draft Minutes☐ Approved Minutes☒ Approved Date: January 16, 2025 6.3. 2024 Work Plan Updates 1. Traffic Safety Infrastructure Research and Recommendations – Completed 2. Pedestrian and Bicycle Master Plan – Commission approved the final report. 3. Parking – Commission reviewed and commented on the advisory communication. 4. 20th Anniversary Proclamation – Completed. 7. Staff Comments – Received. 7.1. Presidents A/B Roadway Reconstruction Project Update Staff provided an update on the status of the Presidents A/B roadway reconstruction project. 8. Chair and Member Comments – Received. 9. Adjournment Motion was made by Commissioner Plumb-Smith and seconded by Commissioner Rubenstein to adjourn the December 19, 2024 regular meeting at 6:51 p.m. All voted aye. Motion carried. TRANSPORTATION COMMISSION ATTENDANCE J F M A M J J A S O N D # of Mtgs Attendance % Meetings 1 1 1 1 1 1 1 1 1 1 1 1 12 SEAT NAME 1 Wright, Grant 1 1 1 1 1 1 1 1 1 1 1 11 92% 2 Rubenstein, Tricia 1 1 1 1 1 1 1 1 1 1 10 83% 3 Bildsten, Roger 1 1 1 1 1 1 1 1 1 1 1 11 92% 4 Lewis, Andy 1 1 1 1 1 1 1 1 1 1 1 11 92% 5 Rosen, Adam 1 1 1 1 1 1 6 60% 6 Brown, Chris 1 1 1 1 1 1 1 1 1 9 75% 7 Olson, Bethany 1 1 1 1 1 1 1 1 1 1 10 83% 8 McCarthy, Bruce 1 1 1 1 1 1 1 1 1 9 75% 9 Plumb-Smith, Jill 1 1 1 1 1 1 1 1 1 1 10 83% 10 Lassig, Augie (s) 1 1 2 50% Page 647 of 647