HomeMy WebLinkAbout2025-08-19 Work Session Meeting Packet
Meeting location:
Edina City Hall
Community Room
4801 W. 50th St.
Edina, MN
City Council Work Session Meeting Agenda
Tuesday, August 19, 2025
5:30 PM Accessibility Support:
The City of Edina wants all residents to be comfortable being part of the public process. If you need assistance in the way of hearing amplification,
an interpreter, large-print documents or something else, please call 952-927-8861 at least 72 hours in advance of the meeting.
1. Call to Order
2. Roll Call
3. Meeting Topics
3.1. 2026 - 2027 Budget and Preliminary Levy Discussion
4. Adjournment
Page 1 of 37
d
ITEM REPORT
Date: August 19, 2025 Item Activity: Discussion
Meeting: City Council
Agenda Number: 3.1
Prepared By: Scott Neal, City Manager
Item Type: Other Department: Finance
Item Title: 2026 - 2027 Budget and Preliminary Levy Discussion
Action Requested:
Discussion only
Information/Background:
The City Manager and staff will provide Council Members with preliminary budget projections for
2026 - 2027. This is a continuation of series of budget discussions with Council Members in advance
of the preliminary levy approval on September 16, 2025 and, ultimately, approval of the final levy
before the end of December 2025.
Resources/Financial Impacts:
Relationship to City Policies:
Supporting Documentation:
1. Staff Report
2. Staff Presentation
3. 2026-2027 Budget Work Plan Draft
4. 2026-2027 CIP
5. 2026-2027 CEP
Page 2 of 37
City of Edina • 4801 W. 50th St. • Edina, MN 55424
At the end of 2024, the City Council asked for a more elaborate budget review process. In February,
the City Council and the Executive Leadership Team met to present an overview of the services the
City offers and to discuss plans for the 2026-2027 budget. The Council directed me to work on
proposed changes to previous projections to reduce the projected budget for 2026-2027. In March, we
held a retreat and reviewed initial recommendations and Council Members discussed priorities for the
next two years. In May, we met twice to discuss further details related to the budget. Since then, staff
has worked to produce a draft budget. I believe that as an organization, we are more prepared and have
a stronger understanding of the Council’s priorities based on the work we did this year in preparation of
the budget.
Enclosed is my 2026-2027 biennial budget recommendation based on the Council’s priorities. The 2026-
2027 Biennial Budget reflects a balanced approach that considers both revenues and expenditures, as
well as capital prioritization and operational service choices. It also reflects the investments and
priorities the Council has communicated. While we have reduced projected growth significantly in 2026
and 2027, the proposed 2026-2027 City budget maintains essential services while investing in key
priorities like public safety, street maintenance, and facility improvements.
My proposed budget recommendation includes adopting a preliminary levy of 9.23% for 2026. As a
reminder, the preliminary levy must be set at the maximum levy amount and cannot be increased after it
has been set.
While we have managed to answer a lot of questions so far this year, whether we are awarded the
SAFER grant for Paramedic/Firefighters is yet to be seen. I have included and would recommend
adopting a preliminary levy that allows for either the 12 Paramedic/Firefighters with the grant or six
Paramedic/Firefighters if we are not able to obtain it. Following is a listing of other items included in the
proposed budget:
• Debt service additions for Fire Station 2 (realizing a reduction of more than $2 million in the
bond amount needed due to fiscal management and conservative budgeting).
• Debt Service to add a treatment room at the Aquatic Center to ensure ongoing operations
• Savings of approximately $500,000 in 2026 and $1 million in 2027 by transitioning Assessing
services to the County.
• Increases in franchise fee revenue to generate another $1 million to be used for street
reconstruction.
• Credit and debit card processing fees.
• 2050 Comprehensive Plan updates for all areas.
Date: August 19, 2025
To: Mayor & Council
From: Scott H. Neal, City Manager
Subject: 2026-2027 City Manager Budget Proposal
Page 3 of 37
City of Edina • 4801 W. 50th St. • Edina, MN 55424
• Continues contracting public safety partnership programs with Hennepin County, such as Joint
Community Police Partnership and our embedded social worker program, which were
previously funded with Public Safety Aid.
• Minimization of deferred maintenance by making strategic capital and equipment investments in
a variety of areas and using surplus capital reserves responsibly toward one-time expenditures
and investments.
The budget allows for investment into strategic priorities, like beginning funding for the new Art Center,
Fred Richards Park and other recreational facilities, and technology investments like process automation
and AI exploration. Most importantly, it upholds an on-going commitment to a strong, safe and
competitive workforce, which is vital for the success of the organization.
Long-term areas of opportunity and challenge remain. Council and Staff will need to continue strategic
prioritization to ensure continued ability to remain responsible stewards, especially with ever-changing
external pressures and aging infrastructure.
Page 4 of 37
EdinaMN.gov
2026 –2027 Levy and Budget
August 19, 2025
1 8/14/2025
Page 5 of 37
Agenda
•Looking Forward
•Local Economy
•Debt
•Other Comparisons
•Local Budget & Taxes
•Questions/Discussion
2 8/14/2025
Page 6 of 37
Tentative Timeline
Date Event Action
Dec 17th Council Approved 2025 Levy and Budget
February 4th & 6th Council Work Session Council Work Session (Services Overview by Dept.)
March 15th Discussion & Goal Setting Council Retreat
May 6th Council Work Session Council Work Session
May 20th Council Work Session Council Work Session
August 19th 26/27 Budget Presented Council Work Session
September 2nd 26/27 Budget Discussion Council Work Session
September 16th Preliminary Levy Adoption Council Meeting
September 30th Finance Deadline Preliminary levy due to County
Dec. 2 nd Council Work Session &
Council Meeting
Public hearing and adopt final 2026/27 Levy
Dec. 16th Council Meeting Adopt final 2026/27 Levy
Dec. 28 th Finance Deadline Final levy certification due to County
January 2025 Finance Deadline Publish detail budget book to website
3 8/14/2025
Page 7 of 37
Biennial Budget Process
2024 (Even Year)
First year of 2024-2025 Budget
Review/approve of
2025-2030 CIP
2025 (Odd Year)
Second year of 2024-2025 Budget
Approve 2026-2027 budget, including
CIP levy
4 8/14/2025
Page 8 of 37
2025 Consolidated Budget
Edina Consolidated Budget (in millions)
$211M
Governmental Funds
$127.9M
General Fund
$65.6M
Debt Service Fund
$25M
Construction Fund
$21.9M
Special Revenue Funds, including
HRA $15.4M
Enterprise Funds
$74.5M
Utility Fund
$41.9M
Liquor Fund
$16.2M
Park Enterprises
$16.4M
Internal Service Funds
$9M
Risk Management
$2.5M
Equip. Operations
$2.2M
IT
$2.9M
Facilities
$1.4M5 8/14/2025
Page 9 of 37
Public
Safety 52%
Public
Works 19%
General
Government
13%
Parks &
Recreation
13%
Community
Development
4%
Uses
General Fund –2025 Budget
Property Taxes
74%
Charges for
Services 10%
Licenses &
Permits
9%
Intergovernmental
Revenues 4%
Franchise Fees
2%Other 1%Interest on
Investments 1%Fines &
Forfeitures 1%
Sources
6 8/14/2025
Page 10 of 37
How is your 2025 property tax distributed?
Edina School District
38%
Hennepin County
29%
Watershed, Metro Districts, &
Other
6%
Debt Services
2%HRA
0.09%
Public Safety
12%
General Government
6%
Parks
3%
Public Works
2%
Construction Fund
2%
City of Edina
27%
7 8/14/2025
Page 11 of 37
Tax Capacity, Certified Levy and City Tax Rate
$157,910,360 $164,716,554 $169,928,228
$190,473,325
$205,645,781 $211,649,964
$39,659,543 $42,021,871 $45,367,336 $49,855,000 $54,418,565 $59,010,154
27.9%28.8%28.9%28.1%28.4%30.2%
-5.0%
5.0%
15.0%
25.0%
35.0%
45.0%
55.0%
65.0%
$-
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
2020 2021 2022 2023 2024 2025
Tax Capacity Certified Tax Levy City Tax Rate
8 8/14/2025
Page 12 of 37
Debt Service Levy Projection
$-
$1
$2
$3
$4
$5
$6
$7
$8
$9
$10
2023 2024 2025 2026 2027 2028 2029 2030Millions
Gymnasium Fire Station 1 Public Works Facility Sports Dome
Fire Station 2 Aquatic Center Highway 100 Interchange Citywide Roof
PW Cold Storage PD & Cityhall Fire Station 3 Public Works
9 8/14/2025
Page 13 of 37
How Does Edina Compare?
Tax Comparison
2025
Tax Rate
City Taxes on $400,000
Homestead
City Taxes on $712,300
Homestead
Plymouth 25.8%$1,001 $1,967
Maple Grove 29.1%$1,113 $2,311
Edina 30.2%$1,178 $2,314
Eden Prairie 30.5%$1,188 $2,334
Lakeville 32.7%$1,274 $2,503
Eagan 36.1%$1,406 $2,763
Minnetonka 37.1%$1,445 $2,840
Apple Valley 41.8%$1,628 $3,199
Burnsville 45.8%$1,784 $3,505
St. Louis Park 48.8%$1,901 $3,735
Average 35.8%$1,392 $2,747
Difference Edina to Average -5.6%($214)($433)
Difference Edina to Highest -18.6%($723)($1,421)
Source: MN Department of Revenue Property Tax History Data
10 8/14/2025
Page 14 of 37
Tax Rate Comparison > 45,000 Population
48.8%
45.8%
41.8%
37.1%36.1%
32.7%30.5%30.2%29.1%
25.7%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
St. Louis Park Burnsville Apple Valley Minnetonka Eagan Lakeville Eden Prairie Edina Maple Grove Plymouth
2025 Tax Rate Average
Average Tax Rate: 35.8%
Credit: City of Plymouth 2025 Financial Overview
11 8/14/2025
Page 15 of 37
Tax Rate Comparison > 10,000 Population
66.7%63.0%62.0%61.5%58.1%57.1%56.4%54.6%52.6%48.8%44.7%40.6%38.6%37.1%
30.5%30.2%29.1%25.7%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
2025 Tax Rate Average
Average Tax Rate: 47.6%
Credit: City of Plymouth 2025 Financial Overview
12 8/14/2025
Page 16 of 37
2025 Assessment
Single Family Homes +2.3%Residential Condos +2.6%
Commercial -1.3%Townhouses +3.2%
Industrial -4.6%Double Bungalow -8.6%
Apartment -6.9%Residential Zero Lot Line +3.6%
City of Edina 2025 Assessment
Total market value:$17,218,964,600
New Construction $222,739,300
New percent increase for all property types +0.7%
Gross percent increase (EMV)2.0%
Source: Edina 2025 Assessment Report
13 8/14/2025
Page 17 of 37
Average Market Value by Property Type
$-
$2
$4
$6
$8
$10
$12
$14
$16
$18
$20
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026Billions
Residential Commercial Industrial Apartments
14 8/14/2025
Page 18 of 37
2026 – 2027 Preliminary Levy Proposal
2024 2025 2026 2027
Budget Budget Projected Projected
GENERAL FUND LEVY $ 43,744,165 $ 47,543,215 $ 53,374,152 $ 57,540,859
General Fund Total 43,744,165 47,543,215 53,374,152 57,540,859
EXISTING DEBT SERVICE LEVIES
Gymnasium Debt Service 2015 HRA 392,000 398,000 - -
Fire Station Debt Service 2016A 403,000 406,000 403,000 404,000
Public Works Facility Debt Service 2017C 1,029,200 1,030,000 1,029,000 1,025,000
Public Works Facility Debt Service 2021B (2013A) 478,800 482,000 478,800 480,000
Sports Dome 2014 HRA 1,168,700 1,165,100 1,166,100 1,166,400
Community Health & Safety Center Debt Service 2024A -1,133,449 1,070,600 1,070,600
Community Health & Safety Center Debt Service 2024B -763,090 1,071,100 1,071,100
Community Health & Safety Center Debt Service 2025A --700,900 701,800
Aquatic Center 2025B --321,583 643,166
Highway 100 Interchange 2025B --206,700 206,700
Debt Service Levies Total 3,471,700 5,377,639 6,447,783 6,768,766
CONSTRUCTION FUND LEVIES
Capital Improvement Plan Levy 2,000,000 1,000,000 1,300,000 2,010,000
Equipment Levy 2,470,000 2,668,000 1,613,450 2,209,278
Street Special Levy 1,481,000 1,762,000 1,053,000 1,355,400
Special Park Improvement Levy 1,000,000 400,000 400,000 400,000
Construction Levies Total 6,951,000 5,830,000 4,366,450 5,974,678
HRA Fund Levies
HRA Operating Levy 251,700 259,300 267,100 275,100
HRA Levies Total 251,700 259,300 267,100 275,100
TOTAL PROPERTY TAX LEVIED $ 54,418,565 $ 59,010,154 $ 64,455,485 $ 70,559,403
Increase from Prior Year 9.15%8.44%9.23%9.47%15 8/14/2025
Page 19 of 37
7.55%5.88%
2.08%
0.50%
0.95%0.79%
0.52%
0.27%
1.71%
0.31%
1.72%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
Base New Debt 6 Firefighters Budget Additions Budget Work Plans Strategic Prioritization
Budget Changes
9.23%9.47%
2026
-3.33%
2027
16 8/14/2025
Page 20 of 37
Proposed Budget Highlights:
•Debt Service addition for Fire Station 2
•Debt Service addition for Aquatic Center
•Debt Service addition for Highway 100 Interchange
•6 Paramedic Firefighters (with the possibility of 12 with SAFER Grant)
•Savings from transitioning Assessing Services to the County
•2050 Comprehensive Plan Updates
•Continues contracting public safety partnership programs with Hennepin
County, such as Joint Community Police Partnership and our embedded
social worker program (previously funded with Public Safety Aid)
•Strategic Capital and Equipment Investments
17 8/14/2025
Page 21 of 37
Budget Work Plan 2026-2027
Strong Foundation
•Fire Station 3 Design & Planning
•Park Improvements:
•Fred Richards
•Braemar Arena
•Braemar Park
•South Trunk Sanitary (Cahill Industrial Area)
•Police Department/City Hall Renovation Design & Planning
•Replace Pump Room at Edina Aquatic Center
18 8/14/2025
Page 22 of 37
Budget Work Plan 2026-2027
Reliable Service
•Enhancing Support for Staff Experience Social Disruption Events
•Mental- Health Service Advancements
•Assessing Transition
•Edinborough Park
•Process Automation & AI Exploration
•Staffing Study
19 8/14/2025
Page 23 of 37
Budget Work Plan 2026-2027
Livable City
•Affordable Housing Advancement and Growth
•Comprehensive Plan Update
•Zoning Code Update
•Safe & Equitable Mobility Action Plan
20 8/14/2025
Page 24 of 37
Budget Work Plan 2026-2027
Better Together
•Quality of Life Survey
•Community Engagement Online Platform Update
•Long-Term Art Center Plan
21 8/14/2025
Page 25 of 37
Next Steps
•Based on Council input, continue to refine 2026 – 2027 budget
•Budget work session Sept. 2nd
•Certify Preliminary Tax Levy on Sept. 16th
22 8/14/2025
Page 26 of 37
DRAFT 2026-27 Budget Work Plan 1
DRAFT: 2026-27 BUDGET WORK PLAN UPDATE
The attached is the Proposed Budget Work Plan which includes the projects funded and included in the 2026 and 2027 Biennial Budget. The final budget work
plan will be adopted in December along with the budget. Items on the plan below are on various levels of vetting and may be subject to change. These are our
best estimates at this time. Staff time is not reflected in the funding notes section, there is an assumption that all of these projects require significant staff
prioritization and time in order for them to be prioritized and completed.
Strong Foundation
City infrastructure, facilities, technology and equipment meets community needs now and in the future.
Infrastructure serves as the foundation for providing core City services such as transportation, clean drinking water, sanitary sewer services and flood protection. City facilities
house the people and equipment that provide public services, and the shared right-of-way, public places and parks are where people come together. Technology and equipment
support our ability to provide reliable service day to day or in emergencies.
Strong Foundation Objectives
• Capital assets and infrastructure systems are managed to minimize risk and sustain service levels.
• Infrastructure design reduces risk of flooded structures, improves water quality (drinking and surface), and increases filtered drinking water production.
• Facilities, infrastructure assets and equipment are maintained and replaced at the most cost-effective time to prevent emergency repair and avoid service disruptions.
• Integrated project scope and decision-making processes partner with customers, stakeholders and related City services to deliver best value projects that stand the test
of time.
• Technology systems are implemented effectively to easily maintain and locate data for the public and provide better data for informed decision-making by elected
officials and staff.
• Reliable technology systems are created and managed to protect against deliberate misuse and work when they are needed most, at times of emergency or natural
hazard.
Strategy Status Proposed Next Step Funding Notes
Fire Station 3 Design &
Planning Determine location,
finance method and plan for Fire
Station 3 in the northeast
quadrant of the city, utilizing
response models to provide
efficient emergency response to all
residents.
Location to be determined by the end of 2025. Fire Study proposed timeline is construction by 2029.
Design steps need to be taken to study the feasibility
of the City Hall adjacent site.
Site planning estimated at
1.5 million (would give
better idea of soil
conditions, traffic flow,
etc. and better cost
estimate and timeline of
projects).
Funding with FS2
Reimbursement funds for
design. Construction
Reserve. Will be
reimbursed with future
bond.
Page 27 of 37
DRAFT 2026-27 Budget Work Plan 2
Park Improvements: Fred
Richards and Braemar
Design and construct Fred
Richards Park improvements.
Design will be completed. Set final park design and set guaranteed maximum
price. Begin construction.
Projects are paid for by
Local Sales Tax
improvement
Braemar Ice Arena
Design and construct Braemar Ice
Arena improvements.
Design will be completed. Set final facility design and set guaranteed maximum
price. Begin construction.
Projects are paid for by
Local Sales Tax
improvement
Braemar Park
Design and construct Braemar
Park improvements.
Construction of remaining components will be
finalized.
Finalize south trail segment and construct. Continue
with ongoing operations and maintenance of the new
and existing amenities.
Projects are paid for by
Local Sales Tax
improvement
South Trunk Sanitary (Cahill
Industrial Area)
Design and construct Cahill
Industrial area sanitary sewer
trunk capacity expansion project.
A contract was awarded to the selected firm at
the December 17, 2024, City Council meeting.
The consultant is starting design of the project
now.
Phase 1 construction planned for 2026 (72nd Street
from Cornelia Dr to France Ave, final phases
estimated for 2028 to 2030 or as budget allow.
This project is funded by
the sanitary sewer utility
fund.
Police Department/City Hall
Renovation Design and
Planning
Starting in 2019 a space needs study was
produced and some security improvements have
been made. The study was refreshed in 2023
based on updated service interaction levels. The
building for the Police Department and City Hall
was constructed in 2004 and is hitting an age
where reinvestment is needed based on changed
service operations, a need for a larger meeting
room and staffing changes.
Pushing project back to 2029 construction. Next step
would be to engage with an architecture firm on
design.
Design estimate 1.5
million. Fund with
construction fund
reserves, will be
reimbursed with future
bond.
Replace Pump Room at Edina
Aquatic Center
Design is underway. If funding is secured,
construction will take place in fall 2025 into spring
2026 with bonding period going into the budget in
2026.
Finalize design considerations and secure detailed cost
level estimates. Construction to begin in late 2025
Estimating $8.4 million to
be bonded, included in
debt service projections.
Page 28 of 37
DRAFT 2026-27 Budget Work Plan 3
Reliable Service
City services enhance the safety, wellbeing and quality of life experienced in Edina.
City services including police, fire, inspections, water/sewer and streets are critical to the safety of the community. Parks, recreational facilities and other City programs enhance
the overall quality of life for those who live, work and visit Edina. The City recognizes that a skilled and engaged workforce is critical for the delivery of high-quality services. The
City needs to recruit and retain a strong workforce with the necessary skills, tools, and resources to accomplish the work.
Reliable Service Objectives
• City facilities and property provide a safe and secure environment for employees and visitors.
• Appropriate and equitable response times effectively prioritize health and safety.
• Staffing, tools, equipment, resources and training are aligned to meet expectations for service delivery.
• An engaging and respectful work culture values employee quality of life, physical and mental wellbeing and work/life balance.
• Competitive employee compensation, benefits and practices attract and retain a skilled and high-performing workforce.
Strategy Status Proposed Next Step Funding Notes
Enhancing Support for Staff
Experiencing Social Disruption
Events
Support staff who experience social
disruption events and PTSD effects
through adequate staffing levels,
preventative measures and after-event
follow up.
Mental health check-up programs for
police officers, 911 dispatchers and
paramedic firefighters; de-escalation
training (ROAR and RESTORE); and
evaluating and implementing mental
health opportunities for police officers
and paramedic firefighters. Parks &
Recreation staff and the Risk & Safety
Manager are evaluating recommendations
to consider from the safety and security
assessments. In addition, they are
reviewing a draft safety and security
manual that encompasses standard
operations for preventing, preparing and
responding to hazards, threats, and
emergencies.
Continue this work.
Parks and Recreation will be
incorporating operational aspects into
onboarding, training and procedures for
operations. Physical improvements will
be included in proposals for capital
planning requests for during facility
renovations.
Expand vulnerability assessments to
facilities outside of Parks & Recreation.
Operational and physical infrastructure
upgrades would be reviewed with future
budget discussions and prioritization.
Certain physical upgrades would be
incorporated into current projects such
as Braemar Arena, Art Center and the
pump room upgrade phase of the Edina
Aquatic Center.
Vulnerability Assessment for other
buildings – $5,000.
$3,000 other program investments. Using
Risk Fund to pay for programming.
Mental-Health Service
Advancements
Increase resources, training and
interdepartmental coordination for
responding to mental health-related calls
for service.
Pilot will be completed. Review pilot results and determine next
steps. Analysis would need to include full
costs and a future funding plan.
Previous funded through Public Safety
one-time funding at $150,000/year (for
two years). Funding for 2026 and 2027
through Public Safety Aid.
Assessing Transition Council made the decision to transition
services to the County. Staff are working
to develop the transition plans.
Complete the transition of services to
the County in 2026.
Estimated savings of $500,000 in 2026
and $1,000,000 in 2027.
Page 29 of 37
DRAFT 2026-27 Budget Work Plan 4
Edinborough Park Edinborough Park has a detailed list of
unfunded and unscheduled capital
improvement projects identified. Prior to
developing a funding strategy staff will
complete an operational analysis of the
facility.
Similar to the evaluation of Centennial
Lakes Park and Art Center operations,
staff will complete a study of
Edinborough Park in order to gauge the
level and strategy for reinvestment.
There is a concern in the context of
other projects regarding staff capacity.
Staff will need to evaluate this along with
other parks related project
improvements and determine if
additional resources are needed (for this
or other projects).
Estimated $150,000 in 2027 (needs to be
2027 or additional will be needed for
staffing).
In order to maintain financial viability
during this budget cycle, we have added a
general fund transfer of $400,000 to
Edinborough in 2026 and 2027.
Process Automation and AI
Exploration
Invest in exploring how AI could improve
systems and processes City-wide.
Complete some small pilot projects to
explore the cost benefits and
opportunities.
Estimated $50,000 budget and co-pilot
subscription for pilot team. Funded
through the IT Internal Service Fund.
Staffing Study Council requested at retreat that we
review current staffing studies and do
another staffing study including reviewing
process automation and AI impact.
Estimated cost $100,000 funded by the
General Fund
Page 30 of 37
DRAFT 2026-27 Budget Work Plan 5
Livable City
City planning fosters healthy, connected, sustainable development that enriches the lives of current and future residents.
Ensuring a vibrant city requires forward thinking and preparation. Affordable, walkable neighborhoods that foster mobility and interconnectedness improve the quality of life for
current and future residents. Reducing the community’s greenhouse gas emissions and responding to climate change through adaptive management of natural assets such as
trees, greenspace and water is critical to the health of future generations.
Livable City Objectives
• Neighborhoods, businesses and open spaces are connected with multi-modal transportation options.
• Installation of sidewalks and shared-use paths continues to connect neighborhoods per long-term strategies (e.g., Twin Loops implementation).
• There are a variety of housing options available for different incomes and life stages.
• Edina’s Climate Action Plan is implemented to meet climate mitigation and adaptation metrics.
• Residents and workers can easily access City resources to ensure clean, safe housing and workplaces.
• Residents can safely and enjoyably access a park or open green space within a short walk from home.
Strategy Status Proposed Next Step Funding Notes
Affordable Housing Advancement
and Growth
Advance affordable housing goals,
including increasing housing options and
developing a long-term growth strategy.
Staff is currently providing the City
Council with an overview at HRA
meetings to get direction on goals and
any modifications Council Members want
to make.
To be determined
Comprehensive Plan Update
Prepare for a Comprehensive Plan
update. Identify changes from previous
plan, hire a consulting firm to coordinate
updates and assemble a working group to
weigh in on needed updates. Focus areas
may include balancing mixed-use nodes,
activation and commercial zoning.
Preparation work will be completed. Keep on Budget Work Plan. Transition
from “prepare for Comprehensive Plan”
to “complete Comprehensive Plan
update.” Completion would take place in
2028.
There are several other processes that
get updated along with Comprehensive
plan.
Estimated $250,000 in 2027 and $250,000
in 2028 from General Fund.
$200k to update the Water Model –
Distribution System – flows and pressure,
Storage – current and future needs, and
Production – current and future needs.
$200k to update the Sanitary Sewer
Model – Pipe and Lift Station Capacities
for current and future needs.
$200k to update the Water Resources
Management Plan (Storm Water) –
Model flooding, pipe and lift station
capacities for current and future needs.
$200k to update the Transportation
Model (funded by PACS)
$200k Park System Plan (General Fund)
Page 31 of 37
DRAFT 2026-27 Budget Work Plan 6
Vision Edina will be reviewed and
updated within the scope of the
comprehensive plan update.
Zoning Code Update Currently working on RFP. Update will
take 18 months and go into 2026.
Project will help streamline and clean up
zoning code which has not had a
comprehensive update in 30 years.
RFQ came back and the project can be
done within the 2025 $250,000
allocation.
Safe & Equitable Mobility Action
Plan (SEMAP)
Developing a comprehensive plan to
reduce fatal and serious injury crashes for
all road users. The SEMAP will focus on
addressing roadway safety challenges,
such as distracted driving and speeding,
and the need for safer infrastructure for
people walking, biking, and using other
forms of active transportation. The plan
will identify projects and policies to
proactively address these challenges
based on best practices.
Started in 2025.
Plan complete Q2 2026. Implementation
thru 2027 and beyond.
Funded: PACS Fund
Page 32 of 37
DRAFT 2026-27 Budget Work Plan 7
Better Together
City government fosters an inclusive, informed and engaged community.
The City wants to ensure that it works for all of the community. An inclusive and engaged community is one where everyone feels welcome, has equitable access to
government, and has a voice in decisions that affect them. City government works best when residents are informed and have meaningful opportunities for engagement that
include a variety of diverse perspectives. The City will continue to learn and adapt to the multiple needs of all in the community, while consistently applying an equity lens in all
decisions and interactions.
Better Together Objectives
• City Council, City staff and members of the community treat each other with professionalism and respect.
• Residents can easily find and access information that affects them.
• Inclusive engagement methods provide a variety of ways for the public to participate in the decision-making process and ensure all voices are heard and,
• The decision to be made and decision-making process is clearly defined.
• Individuals understand how and when they can participate.
• The City communicates what feedback is used and why.
• Residents are satisfied with the process, even if they disagree with the outcome.
• City government representatives, volunteers and staff reflect the diversity of the people it serves.
• There is ongoing evaluation of City policies and practices to ensure they are equitable regardless of an individual’s race, color, national origin, creed, religion, age, sex,
sexual orientation, gender expression, economic status or other protected classes.
Strategy Status Proposed Next Step Funding Notes
2025 Quality of Life Survey
Administer the 2025 Quality of Life
Survey.
2025 will be completed Update for 2027 Quality of Life Survey. The survey has typically been paid for out
of the General Fund as part of the
Communications Department budget.
The department's Professional Services
budget is increased in odd-numbered
years to cover the cost of the survey. The
Council would take action on the
contract for the 2027 survey in late 2026.
Approximately $50,000 from General
Fund.
Community Engagement Platform
Update
City will issue RFP at the end of
2025/ January of 2026 to replace
system no longer being
supported.
Update online community engagement platform.
The platform used for BetterTogetherEdina.org
needs to be replaced, as there have been ongoing
issues with support and lack of new development.
On-going funds would be in place of the
existing project but first year installation
would likely be higher.
Estimated $16,000 from General Fund.
Long-Term Art Center Plan Project is moving out of the
develop plan stage and into the
actual construction phase with a
planned opening in 2027.
Construction completion planned for Q3/Q4 2027
opening. Staff will develop a management plan for
staffing and operational programming for the
facility.
Budget includes $300,000 transfer from
General Fund in 2026 and $350,000
transfer in 2027.
Page 33 of 37
DRAFT 2026-27 Budget Work Plan 8
Awaiting lease agreements with Hennepin
County/Hennepin County Library for next steps of
approval.
Page 34 of 37
Project CIP Project Cost Project CIP Project Cost
City Hall HVAC Equipment Replacement FAC25125 500,000$ Lewis Park Shelter Building Replacement 15-049 900,000$ Pay with Surplus
Asset Preservation Funding FAC25200 600,000 Normandale Park Playground Equipment P&R21046 200,000 Special Park Levy
Annual Deferred Retaining Wall PW22002 100,000 Yorktown Park Master Plan P&R25103 40,000 Pay with Construction Reserves
Life Safety System FAC25101 50,000 Increase Fiber Capacity to SLP ITS25101 60,000 Fund from IT Internal Service Reserve
Parks Acccessibility & Pathways P&R25106 50,000 CLP Maintenance Fiber ITS25100 30,000 Fund from IT Internal Service Reserve
1,300,000$ 1,230,000$
Project CIP Project Cost Project CIP Project Cost
Public Works Access Gates FAC25115 300,000$ Heights Park Playground Equipment P&R21047 175,000$ Special Park Levy
City Wide ADA Facility Improvements Level 2 FAC25128 100,000 Utley Park Shelter Replacement P&R25108 60,000 Special Park Levy
Asset Preservation Funding FAC25200 650,000 Arneson Park Shelter Replacement P&R25110 75,000 Special Park Levy
Park Pathways and Parking Project Improvements P&R25106 150,000
Parks Accessibility Improvements P&R25106 150,000
Annual Deferred Retaining Wall PW22002 100,000
Life Safety System FAC25101 50,000
Public Works Space Reconfiguration FAC25114 75,000
Public Works BAS & Lighting Upgrades FAC25117 125,000
City Hall Facility Improvements 100,000
Pamela Park Facility Maintenance ENG21051 210,000
2,010,000$ 310,000$
DEFER TO FUTURE YEAR
Centennial Lakes Entrance Fountain P&R25145 150,000
Arneson Acres Park Facility Improvement FAC23109 700,000
2026 Budget
CIP LEVY FUND ALTERNATIVELY
2027 Budget
CIP LEVY FUND ALTERNATIVELY
Page 35 of 37
2026 Capital Equipment Project Listing (CEP)
Description Date Purchased Useful Life Adjusted Useful Life Replacement Cost Replacement Year Department
2016 Ford F350 2015 10 11 45,000.00$ 2026 FIR
Ultrasound Devices 2019 7 7 7,000.00$ 2026 FIR
Debt Payment 395,000.00$ 2026 FIR
Used 2010 TR MT6 Trackless Tractor 2018 7 8 250,000.00$ 2026 PWK
Speed Measurement Radar Equipment (Stalker Radar)2018 6 8 48,000.00$ 2026 POL
SWAT Team Rifles 2016 10 10 45,000.00$ 2026 POL
2019 Toyota RAV4 2019 3 7 55,000.00$ 2026 POL
2019 Toyota Highlander LE Hybrid - Model 6964 2019 3 7 60,000.00$ 2026 POL
2021 Ford F-150 Hybrid 2021 5 5 50,000.00$ 2026 POL
2021 Ford F-150 Hybrid 2021 5 5 50,000.00$ 2026 POL
FURNITURE - City Hall 2004 20 22 100,000.00$ 2026 ADM
2006 JLG PSESLIFT 2010 6 16 12,500.00$ 2026 ENG
2013 Chevrolet Silverado 2500HD 2013 10 13 60,000.00$ 2026 P&R
2015 John Deere 1570 Mower 2015 7 11 30,200.00$ 2026 P&R
2011 Ford Ranger 2012 10 14 30,000.00$ 2026 P&R
2013 F-450 2013 10 13 83,000.00$ 2026 P&R
2015 Ford F250 2014 7 12 61,500.00$ 2026 P&R
2014 John Deere X540 Tractor 2014 10 12 9,000.00$ 2026 P&R
2015 Toro 2Master 2015 10 11 14,000.00$ 2026 P&R
2009 Silverado 1500 2009 10 17 51,750.00$ 2026 P&R
2006 Jacovsen Truck Cart 2006 10 20 37,750.00$ 2026 P&R
Fire Control Systems at City Hall and PW 2015 10 11 45,000.00$ 2026 ITS
Facility Asset Maint Software NEW 20 20 33,750.00$ 2026 ENG
CLP Vehicle Replacement 2005 10 21 40,000.00$ 2026 CLP
1,613,450.00$
Page 36 of 37
2027 Capital Equipment Project Listing (CEP)
Description Date Purchased Useful Life Adjusted Useful Life Replacement Cost Replacement Year Department
Equip Cert Payment (Proposed)65,100.00$ 2027 FIR
Equip Cert Payment (Proposed)70,350.00$ 2027 FIR
Debt Payment 393,750.00$ 2027 FIR
Warning Siren Replacement Combined Various Various 30,000.00$ 2027 FIR
Weiler TT500 Tack Trailer 2017 10 10 23,000.00$ 2027 PWK
Dispatch Radio Consoles 2016 10 11 237,500.00$ 2027 POL
2020 Ford Explorer 2020 3 7 60,000.00$ 2027 POL
2022 Ford Interceptor Utility 2022 4 5 60,000.00$ 2027 POL
2022 Ford Interceptor Utility 2022 4 5 60,000.00$ 2027 POL
2019 Ford Interceptor Utility - Black/Ebony 2019 3 8 50,000.00$ 2027 POL
2022 Ford Lightning EV 2022 4 5 70,000.00$ 2027 POL
2020 Ford Explorer (Unmarked)2020 3 7 60,000.00$ 2027 POL
2020 Toyota Rav4 Hybrid XLE (Unmarked)2020 3 7 50,000.00$ 2027 POL
2023 Ford Lightning 2023 3 5 75,000.00$ 2027 POL
2023 Police Interceptor Utility Vehicle 2023 3 4 60,000.00$ 2027 POL
2023 Police Interceptor Utility Vehicle 2023 3 4 60,000.00$ 2027 POL
2023 Police Interceptor Utility Vehicle 2023 3 4 60,000.00$ 2027 POL
2023 Police Interceptor Utility Vehicle 2023 3 4 60,000.00$ 2027 POL
2013 Nissan Leaf 2013 10 14 31,578.00$ 2027 ENG
Department Furniture 2004 10 10 91,000.00$ 2027 ENG
2017 Exmark Lazer Mower 2016 7 11 20,000.00$ 2027 P&R
Squad Car Technology Upgrades 2022 5 5 120,000.00$ 2027 ITS
FURNITURE - CITY HALL 2004 20 23 110,000$ 2027 ADM
Facility Asset Maint Software New 20 20 42,000.00$ 2027 ENG
General Park Asset Equip Rep Various Various 50,000.00$ 2027 P&R
Braemar Arena Zamboni New 15 15 200,000.00$ 2027 Arena
2,209,278.00$
Page 37 of 37