Loading...
HomeMy WebLinkAbout(525) Saw & Seal Bituminous Roadway2-1/2" OR T/3• WHICHEVER IS GREATER CRACK SEALER (PER MnDOT 3723) BOND BREAKER TAPE 1/8" CURB & GUTTER -- SAW CUT = GATE VALVE • MANHOLE — CURB & GUTTER -- SAW CUT = GATE VALVE • MANHOLE TYPICAL JOINT SECTION •T/3 = 1/3 THE TOTAL BITUMINOUS THICKNESS (NEW CONSTRUCTION) OR 1/3 THE TOTAL BITUMINOUS OVERLAY THICKNESS. FIGURE 1. NO MANHOLES IN THE INTERSECTION FIGURE 2. TWO MANHOLES IN THE INTERSECTION NOTES: ALL SAW CUTS SHALL TERMINATE AT A MANHOLE CASTING, OR GATE VALVE UD OR CONCRETE CURB JOINT (IF PRESENT). SAW AND SEAL JOINTS SHALL BE SPACED NO MORE THAN 30' APART. IN INTERSECTIONS, SAWING SHOULD BE SIMILAR TO FIGURES 1 OR 2 DEPENDING ON WHETHER MANHOLES ARE PRESENT. CONTRACTOR SHALL SUBMIT SAW & SEAL PATTERNS FOR CUL—DE—SACS TO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. CITY OF EDINA pte wy, ENGINEERING etc3 & PUBLIC -2'1 WORKS 'floe' DEPTS. SAW & SEAL BITUMINOUS ROADWAY /21/11 APPROVED; CITY ENGINEER STANDARD PLATE 525 REVISED: 1-19