Loading...
HomeMy WebLinkAbout2026-06-18 ETC Packet Transportation Commission Meeting Agenda June 18, 2026, 6:00 PM Edina City Hall, Community Room, 4801 W. 50th St. Accessibility Support: The City of Edina wants all residents to be comfortable being part of the public process. If you need assistance in the way of hearing amplification, an interpreter, large-print documents or something else, please call 952-927-8861 at least 72 hours in advance of the meeting. 1. Call to Order 2. Roll Call 3. Approval of Meeting Agenda 4. Approval of Meeting Minutes 4.1. Minutes 5. Community Comment During "Community Comment," the Board/Commission will invite residents to share issues or concerns that are not scheduled for a future public hearing. Items that are on tonight's agenda may not be addressed during Community Comment. Individuals must limit their comments to three minutes. The Chair may limit the number of speakers on the same issue in the interest of time and topic. Individuals should not expect the Chair or Board/Commission Members to respond to their comments tonight. Instead, the Board/Commission might refer the matter to staff for consideration at a future meeting. 6. Reports/Recommendations 6.1. 2025 PACS Fund Annual Report 6.2. Traffic Safety Report of May 26, 2026 6.3. 2026/2027 Work Plan Updates 7. Staff Comments 7.1. Transportation Projects Update Page 1 of 54 7.2. 2026 Meeting Dates 8. Chair and Member Comments 9. Adjournment Page 2 of 54 Item Report June 18, 2026 Transportation Commission Item Number: 4.1 Department: Public Works Item Activity: Action Prepared By: Andrew Scipioni, Transportation Planner Item Title: Minutes Action Requested: Approve the draft minutes of the May 28, 2026 meeting. Information/Background: See attached draft minutes. Supporting Documentation: 1. Draft Minutes: May 28, 2026 Page 3 of 54 Draft Minutes☒ Approved Minutes☐ Approved Date: Minutes City Of Edina, Minnesota Transportation Commission City Hall Community Room May 28, 2026 1. Call to Order Chair Wright called the meeting to order at 6:05 p.m. 2. Roll Call Answering roll call: Commissioners Bildsten, Bruhschwein, Lewis, Lukens, Olson, Rosen, Wright Late: Commissioner Vandelist Absent: Commissioner Davidson, Bracken, Lassig Staff present: Transportation Planner Andrew Scipioni, Traffic Safety Coordinator Nick Bauler Commissioner Vandelist arrived at 6:09. 3. Approval of Meeting Agenda Motion was made by Commissioner Lewis and seconded by Commissioner Bildsten to approve the agenda. All voted aye. Motion carried. 4. Approval of Meeting Minutes Motion was made by Commissioner Lewis and seconded by Commissioner Bruhschwein to approve the April 16, 2026 meeting minutes. All voted aye. Motion carried. 5. Community Comment Sylvie Hyman from St. Louis Park attended to learn about how the Transportation Commission operates. Hyman is a transportation advocate interested in starting a similar commission in St. Louis Park. Will Maddry testified about their experience commuting to Edina from Minneapolis via bike and transit. Madry expressed disappointment that the France Ave pedestrian underpass project was discontinued and interest in seeing improvements to the city’s transportation system. Abby Malkerson, 6312 St. Johns Ave, testified about Item A2 on the Traffic Safety Report of April 28, 2026. Malkerson is supportive of changing the yield signs to stop signs and noted that the neighborhood also submitted a petition. Linda Sherman, 5209 Wooddale Ave, testified about the Wooddale Ave bike lane project. Sherman expressed concern that removing on-street parking on Wooddale Ave would create an unsafe situation as the side streets are narrower and do not have sidewalks. David Frenkel testified about ADA compliance related to the pedestrian bridges over Highway 100, the Grandview Pedestrian Bridge and other projects. Frenkel suggested that the City focus on fixing existing Page 4 of 54 Draft Minutes☒ Approved Minutes☐ Approved Date: infrastructure rather than building new assets. 6. Special Presentations 6.1. 2025 Traffic Safety Summary Report Traffic Safety Coordinator Nick Bauler presented the 2025 Traffic Safety Summary Report for review and comment. 6.2. Pedestrian and Bicycle Master Plan Progress Report Liaison Scipioni presented a progress report on the implementation of the Pedestrian and Bicycle Master Plan. 7. Reports/Recommendations 7.1. Traffic Safety Report of April 28, 2026 The Commission reviewed and commented on the recommendations of the Traffic Safety Committee. 7.2. 2026/2027 Work Plan Updates 1. Safe and Equitable Mobility Action Plan Participation – Adopted by City Council on May 5. 2. Traffic Safety Standards – No update. 3. Innovative Traffic Calming Solutions – Commissioners spoke to City Councilmembers about a potential project on France Avenue following the conclusion of the underpass project. 8. Staff Comments – Received. 8.1. Wooddale Ave Bike Lane Project Update Liaison Scipioni provided an update on the Wooddale Ave bike lane project. Motion was made by Commissioner Rosen and seconded by Commissioner Lewis to approve the advisory communication as drafted. All voted aye. Motion carried. 8.2. Safe Routes to School Application Discussion The Commission discussed assisting the City with a planning grant application through MnDOT's Safe Routes to School program 8.3. 2026 Meeting Dates The Commission’s next regular meeting is Thursday, June 18 at 6pm at Edina City Hall. 9. Chair and Member Comments – Received. 10. Adjournment Motion was made by Commissioner Lewis and seconded by Commissioner Bildsten to adjourn the May 28, 2026 regular meeting at 9:08p.m. All voted aye. Motion carried. Page 5 of 54 Draft Minutes☒ Approved Minutes☐ Approved Date: TRANSPORTATION COMMISSION ATTENDANCE J F M A M J J A S O N D # of Mtgs Attendance % Meetings 1 1 1 1 1 5 SEAT NAME 1 Wright, Grant 1 1 1 1 1 5 100% 2 Davidson, Scott 1* 1 2 67% 3 Bildsten, Roger 1 1* 1 1 1 5 100% 4 Lewis, Andy 1 1 1 1 4 80% 5 Rosen, Adam 1 1 1 1 1 5 100% 6 Lukens, Laura 1 1 1 3 100% 7 Olson, Bethany 1 1 1 1 1 5 100% 8 Bruhschwein, Taylor 1 1 1 3 100% 9 Vandelist, Jake 1 1 1* 3 100% 10 Lassig, Augie (s) 1 1* 2 40% 11 Bracken, Logan (s) 1 1 2 40% * Attended remotely Page 6 of 54 Item Report June 18, 2026 Transportation Commission Item Number: 6.1 Department: Public Works Item Activity: Information Prepared By: Andrew Scipioni, Transportation Planner Item Title: 2025 PACS Fund Annual Report Action Requested: Review and comment on the 2025 Annual PACS Fund Report. Information/Background: The PACS Funds available in 2025 were $1,828,443. This includes $106,439 in rollover funds from 2024. Approximately $555,397 will be deducted from the current (2026) PACS Fund budget. $2,383,840 (130%) of available funds were spent on PACS-related projects and items in 2025 (an increase of approximately $900,505 or 61% from 2024). About 1.5 miles of new pedestrian and bicycle facilities were installed in 2025 using the PACS Fund (the same as 2024). See attached staff report. Supporting Documentation: Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL) and are not included in the public packet. To request a board portal document, please submit a data request (URL). 1. 2025 PACS Fund Report 2. 2025 PACS Fund Summary Table (Board Portal) 3. 2025 PACS Fund Projects Map (Board Portal) 4. 2026-2027 PACS Fund Projects (Board Portal) 5. Staff Presentation (Board Portal) Page 7 of 54 Date: June 18, 2026 To: Transportation Commission From: Andrew Scipioni, Transportation Planner Subject: 2025 Pedestrian and Cyclist Safety Fund Report Information / Background: The PACS Funds available in 2025 were $1,828,443. This includes $106,439 in rollover funds from 2024. Approximately $555,397 will be deducted from the current (2026) PACS Fund budget. $2,383,840 (130%) of available funds were spent on PACS-related projects and items in 2025 (an increase of approximately $900,505 or 61% from 2024). About 1.5 miles of new pedestrian and bicycle facilities were installed in 2025 using the PACS Fund (the same as 2024). Table 1 shows a breakdown of all related expenditures in 2025. Detailed project costs and locations are shown in the attached summary table and project map. PACS Project Type Cost Percentage New Pedestrian & Bicycle Facilities $ 1,073,724 45.0% Maintain Existing Pedestrian & Bicycle Facilities $ 40,995 1.7% Final Payments for Previous Projects $ 296,187 12.4% Total Construction: $ 1,410,906 59.1% Professional Services $ 814,529 34.2% Promotional Activities $5,617 0.2% Other (maintenance, supplies, etc.) $ 10,449 0.5% Transportation Planner Salary and Benefits $ 142,339 6.0% Total Administrative: $ 972,934 40.9% Total 2024 PACS Expenditures: $ 2,383,840 100.0% Table 1: 2025 PACS Fund Expenditures While most of the costs shown are actual construction costs, some are estimated based on pending final payments to contractors. Attached: 2025 PACS Fund Summary Table 2025 PACS Fund Projects Map City of Edina • 4801 W. 50th St. • Edina, MN 55424 Page 8 of 54 Franchise Fees =1,566,383.88$ Intergovernmental (Grants) =-$ Other =155,619.74$ 2024 PACS Fund Rollover =106,439.51$ 1,828,443.13$ Category Project Location Map Key Approx. LF of New Facility Notes Cost % of Expenditures Vernon Avenue shared-use paths Interlachen Blvd to Grange Rd A 2,491 Vernon Avenue and Highway 100 Interchange 100,000.00$ Presidents sidewalk, shared-use paths B 4,331 Presidents A/B roadway reconstruction 347,350.87$ France Ave sidewalk W 60th St to W 62nd St C 1,260 625,566.10$ Edina Liquor Store bike racks 5013 Vernon Ave D 3 units 807.00$ Final payments on 2024 projects 296,186.63$ Sidewalk Inspection Program DeepWalk sidewalk inspection software 3,500.00$ Rectangular Rapid Flashing Beacons Eden Ave, W 62nd St, Braemar Blvd E Concrete bases, electrical equipment, signage 32,259.94$ Mobile dynamic display speed sign 5,235.40$ Safe & Equitable Mobility Action Plan development Alliant Engineering 100,456.08$ Bolton & Menk 133,270.50$ Barn Intertec 14,722.00$ Snow Kreilich Architects 17,453.00$ Bolton & Menk 485,446.00$ Braun Intertec 14,086.80$ France Ave sidewalk W 62nd St to Hwy 62 Bolton & Menk 40,482.00$ Wooddale Ave bridge Minnehaha Creek SEH 330.98$ Interlachen Blvd shared-use path Blake Rd to Mirror Lakes Dr SEH 1,919.69$ W 66th St sidewalk Ridgeview Dr to Josephine Ave Braun Intertec 820.50$ Final payments on 2024 projects Braun Intertec 5,541.00$ E-bike safety campaign Sidewalk stickers, social media ads, flyers 4,546.72$ Bike bells 455.00$ Bike lights 615.76$ Other Internal services (I.T., equipment maintenance)10,449.04$ 0.4% Staff One full-time employee (direct and indirect labor costs)Transportation Planner 142,339.25$ 6.0% Total =2,383,840.26$ 100.0% 8,082 Rollover to 2026 Budget =(555,397.13)$ Professional Services 34.2% Rosland Park pedestrian bridge Hwy 62 Promotion 0.2% Revenue2025 Pedestrian and Cyclist Safety Fund Expenditures 2025 PACS Budget = 57.5%Construction Maintenance 1.7% France Ave sidewalk W 60th St to W 62nd St Page 9 of 54 ¹» ¹» ¹» ¹» ñ ñ ñ ñ ñ ñ ñ ¹º¹º ¹º ¹º ¹º ¹º ¹º ¹º ¹ºTRACY AVEVERNON AVEWOODDALE AVEHANSEN RD70TH ST W FRANCE AVE SVALLEY VIEW RDMINNESOTA D RGLEASON RDEdinaCommunityCenter AvailAcademy GoldenYearsMontessori CityHall St Peter's LutheranChurch & School South ViewMiddle School NormandaleElementary ConcordSchool Cornelia School SouthdaleLibrary Fire Station Public Works &Park Maintenance Creek ValleySchool FireStation Valley ViewMiddle School EdinaHighSchool CountrysideSchool HighlandsSchool EdinaCommunityLibrary Our Lady ofGrace Church& School M in nehaha Cr eekNine Mile Cree kN ine Mile Creek Southdale Center Canadian Pacific RailroadCanadian Pacific RailroadBLAKE RDSCHAEFER RDVERNON A V E CAHILL RD66TH ST W YORK AVE SINTERLACHEN BLVD MALONEY AVE 44TH ST W 50TH ST W 54TH ST W 58TH ST W 70TH ST W 76TH ST W DEWEY HILL RD VALLEY VI E W R D VALLEY VIEW RD 78TH ST W I-494 HWY 100HWY 169HWY 169HWY 100HWY 62 HWY 62 June 2026 City of Edina 2025 PACS Fund Projects ± 0 1,000 Feet A B C D E E E Page 10 of 54 2026-2027 PACS Fund Projects 2026 Project Limits Category Notes Rosland Park Pedestrian Bridge Pedestrian/ Bicycle W 72nd St shared-use path Cornelia Dr to France Ave Pedestrian/ Bicycle Roadway reconstruction project Parklawn Ct sidewalk Parklawn Ave to cul-de-sac Pedestrian Roadway reconstruction project France Ave sidewalk W 62nd St to Hwy 62 Pedestrian Wooddale Ave bike lanes Wooddale Ln to Valley View Rd Bicycle Bituminous overlay project 50th & France bike racks Bicycle 2027 Olinger Blvd sidewalk Vernon Ave to Villa Way Pedestrian ARTS project Interlachen Blvd shared-use path Blake Rd to Mirror Lakes Dr Pedestrian/ Bicycle Roadway reconstruction project W 69th St bike lanes France Ave to York Ave Bicycle Bituminous overlay project Vernon Ave Multi-Modal Improvements Eden Ave to Interlachen Blvd Pedestrian/ Bicycle Hennepin County cost share grant Page 11 of 54 EdinaMN.gov 2025 Pedestrian and Cyclist Safety Fund Summary Report June 18, 2026 Page 12 of 54 Agenda •PACS Fund overview •2025 Expenditures •2025 Projects •2026-2027 Projects Page 13 of 54 PACS Fund Overview •Approved in 2012 •Revenue from utility franchise fees (~$1.5M annually) •Used exclusively for non-motorized transportation network improvements Page 14 of 54 2025 Expenditures •$1,828,443 available •$2,383,840 spent on PACS items (45% on new facilities) PACS Project Type Cost Total Percentage New Pedestrian & Bicycle Facilities $ 1,073,724 45.0% Maintain Existing Pedestrian & Bicycle Facilities $ 40,995 1.7% Final Payments for Previous Projects $ 296,187 12.4% Total Construction:$ 1,410,906 59.1% Professional Services $ 814,529 34.2% Promotional Activities $5,617 0.2% Other (maintenance, supplies, etc.)$ 9,069 0.4% Transportation Planner Salary & Benefits $ 126,497 6.0% Total Administrative:$ 972,934 40.9% Total 2025 PACS Expenditures: $ 2,383,840 100.0% Page 15 of 54 2025 Projects A.Vernon Avenue/Highway 100 interchange project -Interlachen Blvd to Grange Rd -Shared-use paths, curb ramps, APS pushbuttons B.Presidents A/B roadway reconstruction -Washington Ave,Belmore Ln shared-use paths -Monroe Ave sidewalk -Curb extensions C.France Ave sidewalk -W 60th St to W 62nd St Page 16 of 54 2025 Projects D.Edina Liquor Store bike racks -3 units E.RRFB equipment -Eden Ave/Grandview Sq -Braemar Blvd/mountain bike trail crossing -W 62nd St/Pamela Park Page 17 of 54 2026 Projects •Rosland Park pedestrian bridge replacement •W 72nd St shared-use path •Cornelia Dr to France Ave •Trunk sanitary sewer rehabilitation project •Parklawn Ct sidewalk •Parklawn Ave to cul-de-sac •Roadway reconstruction project •Wooddale Ave bike lanes •Wooddale Ln to Valley View Rd •Bituminous overlay project •France Ave sidewalk •W 62nd St to Hwy 62 •Sidewalk Inspection Program •50th & France bike racks •10 units to date Page 18 of 54 2027 Projects •Olinger Blvd sidewalk •Vernon Ave to Villa Way •Active Routes to School project •Interlachen Blvd shared-use path, bike lanes •Blake Rd to Mirror Lakes Dr •Roadway reconstruction project •W 69th St bike lanes •France Ave to York Ave •Bituminous overlay project •Vernon Ave multi-modal improvements •Eden Ave to Interlachen Blvd •Shared-use paths, road diet •Hennepin County cost-share project •Sidewalk Inspection Program Page 19 of 54 Item Report June 18, 2026 Transportation Commission Item Number: 6.2 Department: Public Works Item Activity: Discussion Prepared By: Nick Bauler, Traffic Safety Coordinator Item Title: Traffic Safety Report of May 26, 2026 Action Requested: Review and comment on the recommendations of the Traffic Safety Committee. Information/Background: The Traffic Safety Committee recommends action on three items and further study on one item. See attached staff report. Supporting Documentation: Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL) and are not included in the public packet. To request a board portal document, please submit a data request (URL). 1. Traffic Safety Report of May 26, 2026 Page 20 of 54 Staff Report Date: June 18, 2026 To: Transportation Commission From: Nick Bauler Subject: Traffic Safety Report of May 26, 2026 Information/Background: The Traffic Safety Committee (TSC) review of traffic safety matters occurred on May 26. The Traffic Safety Coordinator, Engineering/Public Works Director, Police Sargeant and Traffic Safety Specialist were in attendance for this meeting. On each of the items, persons involved have been contacted and the staff recommendation has been discussed with them. They were informed that if they disagree with the recommendation or have additional facts to present, they can submit correspondence to the Transportation Commission and/or to City Council prior to the July 21 meeting. Section A: Items on which the Traffic Safety Committee recommends action A1. Request for Share the Road sign on Valley View Rd Description Resident concerned with the gap between bike facilities between McCauley Trail, Valley View Road and Hwy 169 Frontage Road. AADT 3,043 (2023) Crashes One at each end of segment of concern. Previous Work McCauley was overlaid in 2025 Current Facilities Standard bike lanes on Valley View end at McCauley. Sidewalks end on both ends of segment. Proposed Facilities A shared-use path is proposed along McCauley. Safe & Equitable Mobility Action Plan This roadway is not on the Roadway Safety Priority Networks. Staff recommends a Share The Road signs along McCauley Trail and Hwy 169 frontage road. Valley View Rd at McCauley Tr Page 21 of 54 Memo A2. Request for Accessible parking near Rosland tennis/pickleball courts Description With high-use of courts off W 64th St, a request for an accessible parking spot is requested. ADT 238 (2012) 85% Speed 24.4 MPH (2012) Crashes One eastbound vehicle ran-off-road DUI. Miscellaneous Rosland Bridge to be replaced *soon* Safe & Equitable Mobility Action Plan This roadway is not on the Roadway Safety Priority Networks. Staff recommends adding one accessible parking space on W 64th St during the Rosland pedestrian bridge project. A3. Request to increase crosswalk treatment at Interlachen Blvd and Vandervork Ave Description Continued complaints and petition about lack of traffic stopping for pedestrians and added flashers can better inform drivers of users intending to cross. AADT 7,260 (2024) Crashes None reported in past ten years. Bike & Ped Crosses 61 Bike and Pedestrian crosses in one day Peak hour of 12 crosses (7:30-8:30 AM) Crossing Distance 35’ – two travel and two bike lanes. Past & Future Work Interlachen was overlaid in 2019. Interlachen is anticipated a 2021 reconstruction, Crosswalk Policy Policy recommends current treatment: in-street markings with road-side signs. Safe & Equitable Mobility Action Plan This intersection is identified as Very High Priority on the Roadway Safety Priority Networks. Staff recommends adding Rectangular Rapid Flashing Beacons in coordination with the anticipated 2027 Interlachen Blvd street reconstruction project. Staff have already added advanced crosswalk warning signs and an in-street crossing sign to increase crossing safety. Rosland Park Tennis and Pickleball Courts Crosswalk at Interlachen Blvd and Vandervork Ave Page 22 of 54 Memo Section C: Items on which the Traffic Safety Committee recommends further study C1. Review street parking on Sherwood Road Description Resident on Pinewood is requesting to remove 2-hour parking restrictions on Sherwood to allow clinic employees street parking, instead of parking on Pinewood Tr. Current Parking Parking restricted on west side (enacted in 1993), with 2- hour restrictions on east side. ADT 506 (2007) Crashes None reported in past ten years. Future Work Sherwood overlay in 2026. Street Width 29’, measured aerially (Living Streets allows two-sided parking). Miscellaneous Clinic policy restricts workers from parking in parking lot. Police respond frequently to six-hour restriction ordinance on Pinewood. Safe & Equitable Mobility Action Plan This roadway is identified as High Priority on the Roadway Safety Priority Networks. Staff needs further study of street parking history in the district and relevant safety countermeasures. Section D: Other traffic safety items handled D1. Many requests submitted for added traffic control on W 66th St at West Shore. All-way stops, signals and roundabouts were reviewed and not recommended. Staff will add W 66th to the list for the portable speed display sign to raise speed awareness. D2. A complaint submitted regarding a car parked in accessible parking space without proper identification. The requestor was notified to contact non-emergency police for enforcement. D3. Requests for crosswalk over Vernon Ave at Schaefer Rd. The request was sent to Hennepin County staff for review. D4. Complaints made of trash bins placed I the bike lane within the 5200 block of Blake Rd. The Health Division sent a notice to the home owner of proper trash placement. D5. A request for all-way stop controls on both sides of Gus Young Ln due to congestion from HWY 100 bridge project detours. Added stops are not warranted and may lead to further congestion or unsafe movements. D6. A driver request a Do Not Block Driveway sign in front of entrance to 6500 France Ave. The driver was encouraged to speak to the building management for such signage. D7. A staff member at a daycare center on W 42nd St requested a school sign to be replaced following a recent street reconstruction project in the area. Upon review the sign was still in place. Sherwood Road in Grandview District Page 23 of 54 Memo D8. Requests for the speed display sign on Blake Rd near Mirror Lake and Valley View Rd near Edina High School. These locations were added to the display sign list. D9. A resident requested speed bumps on Sunnyside Alley between Grimes Ave and Wooddale Ave. City staff requested feedback of adjacent properties when the pavement was rehabilitated in 2024. The majority of properties were not in favor of the speed bumps and were not installed. Page 24 of 54 Item Report June 18, 2026 Transportation Commission Item Number: 6.3 Department: Public Works Item Activity: Information Prepared By: Andrew Scipioni, Transportation Planner Item Title: 2026/2027 Work Plan Updates Action Requested: None. Information/Background: Commissioners will provide updates on the status of current 2026/2027 work plan initiatives (unless an item is elsewhere on the current agenda). See attached work plan progress report. Supporting Documentation: Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL) and are not included in the public packet. To request a board portal document, please submit a data request (URL). 1. 2026/2027 Work Plan Progress Report Page 25 of 54 Page 3 Transportation Commission 2026-2027 Work Plan The Commission advises the City Council on matters relating to the operation of the Cityʼs local street system. The Commission also reviews and comments on plans to enhance non-motorized and mass transit opportunities in the city. In addition, the Commission evaluates methods for traffic calming and other speed and volume mitigation measures and recommends their implementation when appropriate. Owner: Andrew Scipioni %# Status Pending 33 1 On Track 33 1 Completed 33 1 Continued SEMAP Task Force Participation The Commission will continue to appoint Commissioners to represent the Transportation Commission's perspectives in the Safe and Equitable Mobility Action Plan (SEMAP) working group. This ongoing participation ensures that the Commission provides continuous input as SEMAP progresses, merging the Cityʼs current transportation-related plans (e.g., Safe Routes to School, Living Streets, Pedestrian and Bicycle Master Plan) into one streamlined action plan. Owner: Andrew Scipioni Initiative Type Project Target Completion Date Q4- 2027 Leads Bildsten, Wright, Davidson Update provided by Andrew Scipioni on May 28, 2026 05:00:01 City Council adopted final plan May 5. Commission Name 1.7 Progress 42% Initiative 1.7.1 Jan 01, 2026 - Dec 31, 2027 Completed Progress 100% Council Charge 2: Review & Comment Page 26 of 54 Page 4 Traffic Safety Standards/Warrants Review and Playbook for decision making and resident communication The Commission will conduct a critical review of existing design standards and decision-making processes (e.g. for traffic control devices like 2-way vs. 4-way stops) to ensure they effectively meet the lived experience needs of residents and contribute to a safer transportation network. Emphasis on local traffic management policies set by the city - pedestrian crossing, dynamic display speed signs, speed bumps, etc. Owner: Andrew Scipioni Initiative Type On-going / Annual Target Completion Date Q4 - 2026 Leads Rosen, Lewis, Lukens Initiative 1.7.2 Jan 01, 2026 - Dec 31, 2026 Status Pending Progress 0% Council Charge 4: Review & Decide Page 27 of 54 Page 5 Innovative Traffic Calming Solutions and "Toward Zero Deaths" Pilots Program (with Seasonal Adaptations) Expanding on previous research into quick-build solutions, the Commission will investigate a broader range of innovative and context-sensitive traffic calming measures and roadway design strategies from other municipalities, with a strong emphasis on solutions that align with the "Toward Zero Deaths" (TZD) initiative. Recognizing Edina's cold, snowy environment, the research will specifically explore seasonal adaptations for traffic calming, drawing inspiration from cities like Helsinki, Finland. This includes examining approaches such as temporary summer street transformations to prioritize active transportation, and winter-specific strategies like tailored snow removal practices that inherently encourage slower speeds or dedicated winter cycling infrastructure maintenance. The goal is to identify measures that effectively improve safety for all road users (pedestrians, bicyclists, motorists), reduce cut- through traffic in residential areas, and contribute to Edina's "Living Streets" principles and greenhouse gas reduction goals. The Commission will then propose potential pilot projects for specific areas within Edina, focusing on high-risk locations or areas with documented safety concerns, considering both warm and cold weather applications. Owner: Andrew Scipioni Initiative Type On-going / Annual Target Completion Date Q4- 2027 Leads Olson, Bildsten, Vandelist, Bruhschwein, Lassig Update provided by Andrew Scipioni on May 28, 2026 05:00:01 Commissioners spoke to City Councilmembers about a potential project on France Avenue following the conclusion of the underpass project. Initiative 1.7.3 Jan 01, 2026 - Dec 31, 2027 On Track Progress 25% Council Charge 3: Review & Recommend Page 28 of 54 Item Report June 18, 2026 Transportation Commission Item Number: 7.1 Department: Public Works Item Activity: Information Prepared By: Andrew Scipioni, Transportation Planner Item Title: Transportation Projects Update Action Requested: None. Information/Background: Staff will provide an update on transportation-related projects in and around Edina. Supporting Documentation: Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL) and are not included in the public packet. To request a board portal document, please submit a data request (URL). 1. Staff Presentation Page 29 of 54 City Projects Vernon Ave/Hwy100 Interchange (2025-2026) •Ribbon cutting ceremony Thurs, Jun 25, 2pm •Expected to open to traffic Fri, Jun 26 •More info at https://www.bettertogetheredina.org/ vernon-hwy100 Page 30 of 54 City Projects Prospect Knolls A/C/D Reconstruction (2026) •Construction started in May •Project divided into 3 phases •More info at https://www.bettertogetheredina.org/ prospect-knolls Page 31 of 54 City Projects Parklawn Ct Reconstruction (2026) •New sidewalks on both sides •Contract awarded, no start date yet •More info at https://www.bettertogetheredina.org/ parklawn-court Page 32 of 54 City Projects W 72nd St Improvements (2026) •First segment of South Trunk Sanitary Sewer project •Cornelia Dr to France Ave •New shared-use path on south side •Contract awarded, no start date yet •More info at https://www.bettertogetheredina.org/ 72nd-street-improvements Page 33 of 54 City Projects France Ave sidewalk (2026) •W 62nd St to Hwy 62 •Contract awarded, no start date yet Page 34 of 54 City Projects Rosland Park Pedestrian Bridge (2026-2027) •Wed, Jun 24 •WB on-ramp at Valley View Rd closed for 120 days •W 64th St near pickleball court closed until further notice •10 pm Fri, Jun 26 through 5am Mon, Jun 29, Hwy 62 closed in both direction to remove existing bridge •Detour: Hwy 100, I-494, I-35W Page 35 of 54 City Projects Rosland Park Pedestrian Bridge (2026-2027) •MnDOT providing funding to install portion of noise wall in 2026 •Remainder of noise wall and TH62 auxiliary lane will be built in 2028 •New bridge placed late Oct-early Nov •More info at https://www.bettertogether edina.org/rosland-park-bridge Page 36 of 54 City Projects Wooddale Ave Bike Lane Project(2026) •Wooddale Ln to Valley View Rd •Staff report available online •5 options under consideration •One-way bike lanes •Two -way bike lanes •Existing configuration •Council decision July 21 •More info at https://www.bettertogetheredina.org/wooddale-avenue-bike-lanes Page 37 of 54 City Projects Railroad Crossing Safety Study (2026) •Presented to Council 6/16 •Five public crossings,none meet minimum requirements for quiet zone establishment •Some crossings are spaced to allow establishment of separate quiet zones •Improvement costs range from $1.4M -$3.5M per zone •No funding sources identified Page 38 of 54 City Projects Vernon Ave Multi-Modal Improvements (2027) •Eden Ave to Interlachen Blvd •Reduce to two lanes, install 10’ shared-use paths on both sides •Received $500,000 cost-share grant from Hennepin County •Seeking Met Council Regional Solicitation funding for additional project scope Page 39 of 54 City Projects Interlachen Blvd Reconstruction (2027) •Blake Rd to Mirror Lakes Dr •Proposed shared-use path (Twin Loops segment) •More info at https://www.bettertogetheredina. org/interlachen-blvd Page 40 of 54 City Projects Rolling Green Reconstruction (2027) •No proposed pedestrian/bicycle facilities •More info at https://www.bettertogetheredina.org/ rolling-green Page 41 of 54 City Projects Wooddale Ave Bridge (2029) •Replace bridge, expand cross section to provide sidewalks and bike lanes •Seeking Met Council Regional Solicitation and MnDOT Local Bridge Replacement funding •More info at https://www.bettertogetheredina.org /wooddale-avenue-bridge- project?tool=news_feed#tool_tab Page 42 of 54 City Projects Bike Rack Program (ongoing) •Pedestrian and Cyclist Safety Fund •10 units added at W 50th St and Halifax Ave •Working with 50th &France Business Association to add more this year Page 43 of 54 Other Agency Projects MnDOT I-494 Project I (2023-2026) •W 78th St closed between Computer Ave and Johnson Ave through Jun •EB closed between I-35W and Hwy 77 overnight Tue, Jun 23 –Wed, Jun 24 •WB closed between I-35W and Hwy 77 overnight Wed,Jun 24 –Thu Jun 25 •More info at https://www.dot.state.mn.us/metro/projects/i494edina- richfield/index.html Page 44 of 54 Other Agency Projects Hennepin County Repaving (2026) •York Ave, W 69th to W 76th St •SB right turn lane removed at Parklawn Ave •Curb extensions added at Parklawn Ave •Ped crossing at Parklawn Ave upgraded to HAWK beacon •France Ave, W 44th to W 51st St •https://www.hennepin.us/en/residents/transp ortation/road-maintenance Page 45 of 54 Other Agency Projects MnDOT I-494 Project 2 (2027-2030) •E-ZPass lanes between Hwy 169 and Hwy 100 •E-ZPass lanes between I-35W and Hwy 77 •More info: https://www.dot.state.mn.us/metro/projects/i494edina- richfield/index.html#project2 Page 46 of 54 Other Agency Projects MnDOT TH62 Auxiliary Lane (2028) •Widen WB shoulder to create dedicated lane to NB Hwy 100 •Noise walls constructed on •North side from W 62nd St to Valley View Rd •South side along EB on-ramp •More info at https://www.dot.state.mn.us/metro/pr ojects/hwy62edina/index.html Page 47 of 54 Other Agency Projects MnDOT TH62 Noise Wall (2031) •North side, France Ave to Xerxes Ave •More info at https://www.dot.state.mn.us/metro/pr ojects/hwy62edina/nbi.html Page 48 of 54 Private Redevelopment 4200 W 76th St •Proposed Salvation Army retail store and warehouse •Zoning ordinance amendment, rezoning and site plan review approved by Council 6/16 •More info at https://www.bettertogetheredina.org/sketch- plan/news_feed/4200-w-76th-street-salvation-army Page 49 of 54 Private Redevelopment 6016 Vernon Ave •Proposed electric vehicle charging stations •Comp Plan amendment, variance, site plan denied by Council 6/2 •More info at https://www.bettertogetheredina.org/ sketch-plan/news_feed/6016-vernon- ave-s-ionna-electric-vehicle-charging- station Page 50 of 54 Private Redevelopment 5780 Lincoln Dr •Proposed Kwik Trip gas station •Requires Comp Plan amendment, rezoning, multiple variances •Council sketch plan review 11/18 •Applicant withdrew proposal Page 51 of 54 Private Redevelopment 7600 Parklawn Ave •Proposed two 1125-150-unit senior apartments •Requires multiple variances, site plan review •Council sketch plan review 4/21 •More info at https://www.bettertogetheredina.org/sket ch-plan/news_feed/7600-parklawn-avenue- senior-apartments Page 52 of 54 Private Redevelopment 5201 Grandview Ln •Proposed 4-unit townhome •Requires Comp Plan amendment, rezoning, multiple variances •Council sketch plan review 5/5 •More info at https://www.bettertogetheredina.org/ sketch-plan/news_feed/5201- grandview-lane-townhomes Page 53 of 54 Item Report June 18, 2026 Transportation Commission Item Number: 7.2 Department: Public Works Item Activity: Information Prepared By: Andrew Scipioni, Transportation Planner Item Title: 2026 Meeting Dates Action Requested: None. Information/Background: The Commission's next regular meeting is Thursday, July 16 at 6pm at Edina City Hall. The regular meeting dates for the remainder of the year are: • August 20 • September 17 • October 22 • November 19 • December 17 Supporting Documentation: Documents marked with "Board Portal" do not meet ADA Web Content Accessibility Guidelines (URL) and are not included in the public packet. To request a board portal document, please submit a data request (URL). None Page 54 of 54