HomeMy WebLinkAboutPublicWorksPipeline_Late2026_Web_1 (1)PUBLIC WORKS Pipeline LATE 2026
Your Drinking Water
Is Certified Safe
Monitoring done on Edina’s and
Minneapolis’ drinking water last year
shows that it is safe. The City’s goal
is to provide residents with water
that surpasses both state and federal
requirements for safety and quality.
This year’s report shows Edina water
surpasses regulatory standards on all
counts. Morningside Neighborhood
residents who receive their water
from the City of Minneapolis will find
information detailing the quality of
Minneapolis’ water in the report, too.
Read the detailed report at EdinaMN.gov/WaterReport.
2
Citywide Water Meter Replacement Program Continues
The City is replacing water meters in phases over several years. Each year, a different group of meters is scheduled for replacement.
Installations began earlier this year and are expected to continue through 2029. There is no separate charge for the new meter. The
cost is covered by the City’s Utility Fund, so it will not appear on your bill. Meters that have been replaced in the last five years are not
included in the replacement plan.
This year, about 5,000 properties are included. If your property is part of this year’s group, you will receive a letter from the City with
instructions to schedule your appointment. Notifications will be mailed on a rolling basis throughout the year.
Learn more at EdinaMN.gov/MeterReplacement. If you’re unsure whether a letter, phone call or visit is legitimate, contact the Edina Public Works Department’s Utilities Division at 952-826-0375 to verify.
— Compiled by Brittany Bader
Why Meters Are Being Replaced
• Water meters in Edina were last replaced
between 2012 and 2014 and are now approaching
the end of their useful life.
• Replacing meters now helps prevent billing
inaccuracies caused by failing batteries.
• Replacing meters now allows the City to collect
water use data more efficiently and identify
potential water leaks sooner.
What to Expect
Watch Your Mail
You will receive a letter from the City when it’s your property’s turn for meter replacement.
Schedule Your Appointment
Use the instructions in the letter to schedule your appointment. Verified scheduling and contact information is posted at EdinaMN.gov/MeterReplacement. Please do not attempt to schedule unless you have received a letter asking you to do so.
Prepare for Installation
Confirm that your water shutoff valves on your incoming water service are working properly and can be fully shut off. The technician will need access to the water meter inside your home or business, so please make sure the area around the meter is clear and accessible.
3. 4. 1. 2.
Get the Meter Replaced
During the appointment, a technician will replace your water meter and install an externally mounted antenna as part of this upgrade. An adult 18 years or older must be present for the entire appointment. Most installations take about one hour, and your water will be shut off briefly during that time.
Who Is Doing the Work
The City has contracted with Ferguson Waterworks and RMR Services.
Technicians performing installations will:
Wear uniforms and
arrive in marked vehicles
Have completed
background checks
Be employees of
RMR Services
Wear City-issued
vendor ID badges
2
3
How do I apply for a block party?
Go to EdinaMN.gov/BlockParty for the application. It must be submitted at least five business days before your event. Block parties are allowed on low-volume residential streets, dead-end streets or cul-de-sacs. An entire block must be blocked off; partially blocking a street (such as in front of a few houses) is not allowed. This is to avoid traffic issues on the street being blocked.
Block parties are allowed only twice per
calendar year per block, not counting
Night to Unite events. Streets may not
be barricaded for longer than six hours
or past 10 p.m. There is no fee for a
block party.
There is a pothole on my street.
When will it be fixed?
Potholes are repaired during the summer
blacktop season. Service requests
submitted by residents on the Edina311
app or via EdinaMN.gov/Edina311 help
us identify areas in need of a repair. If
you notice a pothole, please report it
on the app, online or call Public Works
at 952-826-0376.
Frequently Asked Questions
I need a dumpster on my property.
What are my options?
There are two options for placement:
1. Place on private property (driveway
or yard). With this option, you can
leave the items 24 hours a day until
the project is done.
2. Place in a designated “Street Parking”
lane. This is allowed for a maximum
of 12 daytime hours before it needs
to be removed. No exceptions.
Refuse containers placed illegally
will be ticketed and removed at the
owner’s expense.
You may not block a lane of traffic, bike
lane or bus lane, and there is no permit
allowing you to do so. If you live in an
area with a homeowner’s association,
you should check their rules as well.
For more information, contact the
Planning Division at 952-826-0369.
There’s a tree or tree limb in contact with a
power line. Who do I call to handle that?
The City does not clear trees from
power lines. Contact Xcel Energy for
safe removal. Visit XcelEnergy.com/trees
for information about tree pruning and
other vegetation management.
After a storm, who picks up the tree branches
and other debris in my yard?
The City does not pick up and does
not have room to accept tree branches
or yard waste. If you have yard waste
service, place the branches and other
vegetation in your bin. Or contact a
contractor or your garbage hauler
about removal. Do not put yard waste
or storm debris in your organics bin.
In winter, if a plow hits and damages my
mailbox, who is responsible for fixing it?
If you believe your mailbox was damaged
during snow removal, report the damage
at EdinaMN.gov/MailboxRepair. Public
Works will review the information
submitted. If the City determines the
mailbox was directly struck by City
snowplow equipment, the City may either
replace the mailbox with a standard-
size, non-decorative metal mailbox and
replace the support post, if necessary,
or reimburse the cost of repair parts
up to $100 with a submitted receipt.
Damage caused by the weight of snow, aging or weakened materials or other factors such as private snow removal or vehicle accidents are not the City’s responsibility.
— Compiled by Holly Conwell
and Tom Swenson
3
4
Six Street and Pedestrian
Projects Coming Up in Edina
4
¹»
¹»
¹º¹º
¹º
ñ
ñ
¹»¹º
¹º
¹º
¹º
¹º
¹º
ñ
¹»
ñ
ñ
ñ
ñTRACY AVEVERNON AVEWOODDALE AVEHANSEN RD70TH ST W
FRANCE AVE SVALLEYVIEWRDMINNESOTA DRGLEASONRDEdinaCommunity
Center
AvailAcademy
Golden
YearsMontessori
CityHall
St Peter's LutheranChurch & School
South ViewMiddle School
NormandaleElementary
ConcordSchool
CorneliaSchool
SouthdaleLibrary
FireStation
Public Works &
Park Maintenance
Creek ValleySchool
FireStation
Valley ViewMiddle School
EdinaHighSchool
CountrysideSchool
HighlandsSchool
Edina
CommunityLibrary
Our Lady ofGrace Church& School
M in n ehahaCreek
NineMileCreek
N ine MileCreek
SouthdaleCenter
Canadian Pacific RailroadCanadian Pacific RailroadBLAKE RDSCHAEFER RDVERN
O
N
AVE
CAHILL RD66TH ST W
YORK AVE SINTERLACHEN BLVD
MALONEY AVE
44TH ST W
50TH ST W
54TH ST W
58TH ST W
70TH ST W
76TH ST W
DEWEY HILL RD
VALLEY VIE
W
R
D
VALLEY VIEW RD
78TH ST W
I-494 HWY 100HWY 169HWY 169HWY 100HWY 62
HWY 62
April 2019
±Legend
0 2,000
Feet
3
4
56
1
2
Presidents
Rolling Green
Rosland Park Pedestrian Bridge
72nd St.Prospect Knolls
Interlachen
5
From roadway reconstruction and utility improvements to trail connections and bridge replacement, several Public Works projects are
underway or in development across the community.
Together, these efforts aim to improve road conditions, replace aging infrastructure, enhance drainage and increase safety and
accessibility for people walking, biking and driving throughout Edina.
— Compiled by Lum Chi, Lauren Siebenaler and Brittany Bader
5
1 Presidents
Where: Harrison Avenue, Tyler Avenue, Tyler Court, Belmore Lane east
of Van Buren Avenue to Dearborn Court
Construction Timeline: March through July
About: Roughly 20% of the Presidents A & B Neighborhood roadway
project remains to be finished on the roads listed above. The
reconstruction was necessary because of poor roadway pavement and
watermain conditions. The goal is to completely reconstruct the roadway
asphalt pavement, replace concrete curb and gutters, add new watermain
and water services, improve sanitary sewer systems, and modify the
roadway and storm sewers to improve drainage.
Website: BetterTogetherEdina.org/presidents-ab
Contact: Graduate Engineer Chris Moore, cmoore@EdinaMN.gov or 952-826-0444
2 Prospect Knolls
Where: West 70th Street, Antrim Court, Antrim Road, Antrim Terrace,
Down Road, Dublin Circle, Dublin Road, Fleetwood Drive, Kemrich Drive,
Kerry Road, Lanham Lane, Lee Valley Circle, Lee Valley Road, Parklawn
Court, Shannon Drive, Tara Road, Tralee Drive, Village Drive, Weston Circle,
Wexford Road
Construction Timeline: April to mid-November
About: The Prospect Knolls A/C/D Neighborhood Roadway project will include complete reconstruction of the roadway asphalt pavement; partial replacement of watermain; full replacement of water services, fire hydrants and valves; improvements to the sanitary sewer system; modifications to roadway and storm sewers to improve drainage; and replacement of concrete curb and gutters. The reconstruction of the Parklawn Court cul-de-sac is included in this project. The reconstruction is meant to improve roadway pavement conditions and is expected to conclude in mid-November.
Website: BetterTogetherEdina.org/prospect-knolls
Contact: Graduate Engineer Chris Moore, cmoore@EdinaMN.gov or 952-826-0444
6901
520
306
300
307
6707
412
6528
65216525
6520
308
609
508
406408 407
516
605
304
516
524
532
305
6512
309
24
422
308
304 301
6521
317
404
411
315
408
512
316
323
407
415
303
322
401
308 308
312 314
419
302
510
322
306
313
320
504
309
299
300
311
414
6624
425
6612
312
419418
401
304
300
513
421
400
301-03
6615
6512
298
310
505
409
6615
417-19
305
408
500
313-15
420
501
421-23
509
309-11
613
302
312
417
300
323
305-07
500
301
410408
317-19 314
6517
416
420
304
318319
308
318
422
411
415
321
315
406 6600312315
301
411
405
409
316
405
314
304
311
319
306
413
308
317
401
306
424
317
425
301
305 307
404
401
414
418
422
408
421
412
407
411
423 423419
305
405
6616
400
424
323
413 415
323
419
411
422
406
311
411
415
315
540
425
404
415
419
404
410
413
309
414
405
423
301
403
424
410
419
409
412
305
411
418
414
409
420
6601404
410409
416
313
402
409
416
317
423
401
416
407 6606414 414
408
418
411
319
404
415
418
412
420
402
418
425
416
303
416
400
408
415
408
403
417
409
421 422 424
400
415
301
319
405
401
6605423
6609309
400
323
424425
303
417
318
305
311
419
320
6655
402
322
425 423422
310
314316315
304
6651
417
310
412
302
318
306
318 320
404 405
400
409
306
312
308
316
404
414
314
402402
317
406
400
405
416
424
300
319
300
421
302
306
424
403
308
317
420
320
311
300
322
405
313
309
300
321
401 401403
315
404
322
407
425
305307
323
406406
325
307
403
6721
69406938
6750
306
6528
517
Project Limits
BELMORE LN
MALONEY AVE
ALDEN PARK
3RD ST S
+¡
2ND ST S
WASHINGTON AVE SADAMS AVEJEFFERSON AVEMADISON AVEMONROE AVEJACKSON AVEVAN BUREN AVEHARRISON AVETYLER AVETYLER CTCity of HopkinsCity of Edina
/
Engineering DeptJune 2024
2025 Project AreaPresidents A & B Neighborhood Roadway and Alley ReconstructionCITYOFEDINAMINNESOTAINCORPORATED1888
,e
7317
7250 7215
8
7224
7100
7308
7024
5420
5905
7017
7431 54155809
7004
5712
7150-60
5526-38
5510-24
5515-235525-355537-45
5540-54
5556-705572-84
5547-59 5500-08
7175
5545-5539
7101-15
7401
7200
6 2
5901
4
7000
7100
70007012
7017-29
7121
7012
7202
7104
7140
7009
7100-12
7305
5501
7100
7028
5912
7016
7020
7024
7016
7101
7105
7300
7104
5900
7070-82
7205
7117
7028
5809
7037 7016
7005
7001
7209
7008
70217020
7021
7141
5908
59205912
5813
7145
7301
7024
7205
7001
6013
7013
5416
7017
6909
7460
7119
6982
5601
5900
7005
5904
7012
6832
7011
5517
7109
5812
5905
7115
7032
7000
7115
5432
7137
6005
7401
5721
7105
7019
7221
7400
6012
6986
5916
7304
7009
7121
7101
70217001
6009
7009
7201
7001
7123
7308
5605
7001
7312
7033
7201
6994
6916
7008
7017
5600
5829 7401
7101
6920
7013
5532
7015
6909
6913
5804
7041
7019
7305
7209
5601
5808
7023
6005
5729
7220
5524
5805
58085812
5604
7115
5800
7020
7310
6998
5816
6836
7029
5812
5716
5617
7012
7131
7302
5805
6912
5801
5616 5528
5725
7109
7309
7208
5920
7301
7009
7129
7109
6990
7000
5708
5833
7125
7309
5609
7128
7315
5613
7212
7005
5704
7100
5705
56085612
7012
7015
7220
5816
7313
7021
7028
5716
57175801
7022
7216
7122
5713
7200
7304
7220
7305
5800
5709
5708
5721
5712
7020
7013
7225
7001
7015
5820 5720
5820
7001
5912
7301
5700
7000
7004
7212 7306
7305
7300
7313
5701
5640731260007209
7308
7025
6112
7308
7204
5920
7100 7040
5805
7133
7215
7224
7219
5908
7029
7101
6113
7203
7213
5709
5708
7112
7314
7217
7304
5705
7108
7205
6008
5911
7221
7318
7300
6009
7322
5426
7204
5700
7101
7124
7021
7120
7304
7209
5811
5917
7208
7401 60047108
7205
7400
7123
5924
5701
7216
5717
7209
7028
7105
59216001
7109
7017
7200
7223
7324
7116
7120
7213
7301
7044
7108
7200
7104
7121
7112
5704
7117
7100
7205
5416
7208
7000
7133
7016
7005
7117
5721
5704
7201
7401
7326
7113
5824
7105
7104
7004
5404
7113
7120
7104
7009
7217
5724
7116
7000
7316
7121
60056009
7112
7201
7105
5412
7101
7117
5713
7109
7116
7113
5804
7008
5728
7125
7045
7212
5414
7129
73005800
7204
7216
6840
7320 542460136021 6913602569086017
5736 54027300
7305
6029
58285720 5500-026001
7012
7004
7309 54187008 5504-0654205508-105422540070757234-7240
7227-7233
72
3
2
-
7
2
2
0
5549 5501-5511
5545
5553-5561
55395551-
5565
5515-55275535
5541
553170407300
7068-7096 70327044-706470365521-5527 5530-5536
5555-5547
5529-5537
5538-55485511-5519
7121-55
5916
PROJECT LIMITS
W 70TH STANTRIM RDDUBLIN CIR
DUBLIN RD
KERRY RD
WEXFORD RDANTRIM
T
E
R
ANTRIM CTDOWN RD
LEE
V
A
L
L
E
Y
RD SHANNON DRTRALEE DRSHANNON DRKEMRICH DR
DEWEY HILL RD
W 70TH ST
ANTRIM RDLANHAM LN
FLEETWOOD DRLANHAM LNTARA RDLEE
WESTON C
I
R
VILLAGE DR
CAHILL RDVALLEYCIR
/Engineering DeptJune 2025
2026 Project AreaProspect Knolls ACD Neighborhood Roadway ReconstructionImprovement No. BA-458CITYOFEDINAMINNESOTAINCORPORATED1888
,e
4401 4145
440141414435
4201
4100-20
4351
7600 7625 4451
4480
44254350
4440
44
1
54280 4251
4250
4456
4456
4452438042004300-28
7337
7401
740374107404
7400 7326732873307334733273367338734073234444444644484450
4400
Project Limits
PARKLAW
N
C
T
W 76TH ST
PARKLAWN AVE
PARKLAWN AVE/Engineering DeptMay 2025
2026 Project AreaParklawn Ct Neighborhood Roadway ReconstructionCITYOFEDINAMINNESOTAINCORPORATED1888
,e
6
4 Rosland Park Pedestrian Bridge
Where: Rosland Park Pedestrian Bridge over Minnesota Highway 62
Construction Timeline: Summer 2026 through Summer 2027
About: Construction on the new Rosland Park Pedestrian Bridge over Highway 62 is beginning this summer. Originally built in the
early 1960s, the existing bridge must be replaced because of its age, condition and accessibility limitations. The replacement bridge
will include access ramps on both sides of the highway to improve access for people walking, biking and rolling to and from Rosland
Park. It will also be built with greater clearance above the highway to help prevent vehicle strikes like those that occurred in 2022.
The approximately $8 million project is expected to be completed in summer 2027. Once construction begins, the current pedestrian
bridge will close for the duration of the project. Rosland Park amenities, including the Edina Aquatic Center, will operate as normal
during construction. Traffic impacts to Highway 62 are expected to be minimal, though a few overnight closures and occasional lane
closures may occur during construction.
Website: BetterTogetherEdina.org/Rosland-Park-Bridge
Contact: Public Works Director & City Engineer Chad Millner, cmillner@EdinaMN.gov or 952-826-0318
3 72nd Street
Where: 72nd Street from just past Cornelia Drive on the west, and across
France Avenue on the east
Construction Timeline: Summer to fall 2026; dates to be announced
About: The 72nd Street reconstruction project is being done to repair and
upgrade sanitary, water, storm sewer and streets. The project will cover street
reconstruction and trunk sewer repair, upgrading 72nd Street from just past
Cornelia Drive on the west and across France Avenue on the east.
Website: BetterTogetherEdina.org/72nd-street-improvements
Contact: Engineering Services Manager Ross Bintner, rbintner@EdinaMN.gov or 952-903-5713
7000
7320-30
7340
7300-10
7333-55
7128
7201
70084208
42167205
4401 7203
7025
72077207 7207
7350-60
3680-3484
72007010
4040 3950
7000695071104000
4001
7001
7101
7136
7212
7216
3861-817015
7000
70087205
6996
7007
6953
71014225
421742214221
4000421369496941
6937
4401
4217
7000
7108
7129
7108
4304
7209
7200
4308
4401 4309
7013
7204
6945
4200
4305
4400
4301
4209
3910
7208
7001
7116
440144004224
7208
4400
7001
7201 7201
4300
7137
7004
7021
7200
7007
7129
7016
7012
7133
7004
7017
7117 710942164220 7005
7128
7100
712542017000
7009
7013
7004
7204
7001
71084212
71217129
7008
7124
7201
7005
7101
7125
7009
7200
7213
7217
7120
7206
7109
7209
7128
7009
7128
4200
7125
7012
7121
7016
7137
7105
7113
7205
7117
7105
7117
71247124
7204
71214209
7204
7206
7205
7133
7111
7208
7116
7104 7104
7112
7205
7100
7116
7120
7132
7101
7120
7112
7102
7209
7129
7100
7201
7109
7125
4204
7128
7105
7124 420142127104
7121
7113 4208720442057112
7120
7200
7221
7301
7017
4400
7305
7309
7313
7317
7321
7325
7329
7333
73374401
7213
7217
7221
7301
7305
7309
7313
7317
7321
7225
7212
7216
7220
7224
7300
7304
7308
7312
7316
7320
7324
7212
7216
7220
7224
7300
7304
7308
7312
7316
7320
7213
72177219
7303
7305
73097311
7317
732
1
7211
7215
7221
7301
7307
73137315
7319
7326732873307334733273367338734073237208 7208 72107212 72097209
7250
73007380
W 72ND ST
Project Limits
CORNELIA DRGLOUCHESTER DRHEATHERTONCIRHEATHERTON TRLBRISTOL BLVDBRI
S
T
O
L
C
I
R FRANCE AVELYNMAR LNGLOUCHESTER AVEOAKLAWN AVE/Engineering DeptNovember 2025
Project AreaSouth Trunk Sanitary Phase 1
CITYOFED INA MIN
N
ESOTAINCORPORATED1888
,e
7
5 Rolling Green (2027)
Where: Annaway Drive, Bywood West, Crescent Terrace, Merilane Avenue,
Mait Lane, Paddock Road, Rolling Green Parkway
Construction Timeline: Summer 2027 to mid-November 2027
About: The Rolling Green reconstruction project will include complete
reconstruction of the roadway asphalt pavement; partial replacement of
watermain and water services; full replacement of fire hydrants and gate
valves; partial improvements to the sanitary sewer system; modifications to
roadway and storm sewers to improve drainage, including the installation of a
sump drain pipe where feasible; and installation of concrete curb and gutter.
Website: Coming Soon
Contact: Assistant City Engineer Aaron Ditzler, aditzler@EdinaMN.gov or 952-826-0443
6 Interlachen (2027)
Where: Interlachen Boulevard from Blake Road to Mirror Lakes Drive
Construction Timeline: Summer 2027
About: The Interlachen reconstruction project will include complete
reconstruction of the roadway asphalt pavement; installation of new
watermain for a portion of the project; replacement of water services,
fire hydrants and gate valves and adding more hydrants where necessary;
improvements to the sanitary sewer system; modifications to roadway and
storm sewers to improve drainage; installation of new concrete curb and
gutter; installation of a new 8-foot shared-use concrete path; and installation
of 5-foot concrete bicycle lanes.
Website: BetterTogetherEdina.org/interlachen-blvd
Contact: Public Works Director & City Engineer Chad Millner,
cmillner@EdinaMN.gov or 952-826-0318
7
8
2
9
7
4608
5804
4605
49055801
4904
5600
5800
6
5
13
4
9
7
16
11
18
10
20
5005
33
4600
11
19
15
4912
25
17
14
12
27
4812
4904
4801
4800
4908
4909
5100
4700
4801
4724
29
4705
5725
4901
4700
4603
4915
4812
4616 4602
4701
4900
4808
4715
4733
4712
4604
4877
4708
4820
4704
4800
5924
4820
255808
4909
4729
4817
4708
5608
4904
4725
4913
4805
4917
4601 4604
4811
27
4612
4721
5920
5804
5805
5733
4808
5808
4908
4912
4602
4916
4810
5002 5020
50005000
5040
5908 5904
4603
5524
5610
5633
5637
5801
5528
5805 5601
5621
5641
5645
5649
56135629
5646
5642
5636
5625
5609
5603
4615
4705
5526
Mait Ln
Annaw
ay
D
r
By
w
o
o
d
W
e
s
t
Crescent
T
e
r
Merila
n
e
A
v
e
Paddock RdRo
l
l
i
n
g
G
r
e
e
n
P
k
w
y
Interlachen Blvd
Mirror Lakes DrInterlachen Cir
CITYOFEDINAMINN
E
SOTAINCORPORATED1888
,e
Engineering DeptApril 2026
2027 Project AreaRolling Green NeighborhoodRoadway ReconstructionImprovement No. BA-469
8
A New Host for an Old Pest:
Two-Lined Chestnut Borer in Edina
By Edie Weinstein
When City Forester Luther Overholt saw
oaks with dying branches across Edina,
he assumed it was oak wilt, a common
disease he fights to keep Edina’s urban
forest healthy. Then, he realized the
problem wasn’t as simple.
“A lot of the oaks I first noticed are
100-plus-year-old trees that should need
no watering, no monitoring and no outside
help,” he said. “That’s what started to
pique my interest.”
When he noticed a characteristic pattern
of branch tips dying first, he realized he
was dealing with a pest that already
had a storied history: the two-lined
chestnut borer.
The two-lined chestnut borer was
responsible for the death of millions of
chestnut trees in the late 19th and early
20th centuries. Overholt had never seen
an infestation of the bug before, since its
host is all but wiped out in this part of the
country. Now, the insect has adapted to
attack a whole new type of tree.
Two-lined chestnut borers are drawn to
trees in distress. The two-year drought
from the summers of 2021 and 2023
weakened Edina’s oak trees enough for
the borers to enter a tree from the top
branches, where the bark is the thinnest.
From there, they infest the “circulatory
system” of the tree, or the routes water
takes moving through the tree.
So far, Overholt is treating over 100
infected trees at Rosland Park with an
injection that kills the insects and saves
the tree. As more trees on City property
are found to have the disease, they will
also receive this injection treatment. Two-
lined chestnut borers have spread widely
across the metro area to trees on both
public and private property, and all of the
thousands of oaks in Edina are susceptible.
How can you tell if your oak is suffering from two-lined chestnut borers and not the commonly found oak wilt?
First, check what kind of oak tree you have.
Oak wilt primarily affects red oaks, so dead
leaves on that variety can more commonly
be attributed to oak wilt. If you have a
white oak that looks sick, the chance of
two-lined chestnut borers is higher.
Then, check the leaves. Oak wilt causes
“green islands” on leaves, where the
edges of the leaves wilt but the center
closest to the stem remains green. Trees
suffering from two-lined chestnut borer
will have completely dead leaves or
branches, especially at the top of the tree,
a condition known as dieback. Spring is
a good time to keep an eye out for these
dead leaves since healthy trees should be
developing lots of leaves during this time.
If you think your tree has two-lined
chestnut borer, call an arborist to talk
through treatment options to make sure
your oak stays strong and sturdy. If you
catch the disease early enough, the tree
can be treated with the same injection
method the City is using. If left untreated,
the tree worsens and eventually dies.
You can also take action to help lessen the risk of two-lined chestnut borers infecting your tree. For instance, avoid tree trimming during critical times of the year. Trimming creates “wounds,” or open spots in the bark that leave the tree vulnerable.
“The bugs are attracted to open wounds.
When you trim your tree, that’s an open
wound,” explained Overholt. “That’s how
they get in there. Don’t prune your oaks
in April, May, June—all summer, if you can
avoid it. Winter is the best time to prune.”
If your tree is harmed unavoidably—such
as during a storm—use tree wound paint
to cover the area so the wound is exposed
for as little time as possible.
If you notice symptoms of two-lined
chestnut borers in other trees in your
area, it might be worth getting your tree
treated preemptively.
To reduce the spread of all invasive pests and diseases, never move firewood from one location to another, such as from your house to a cabin or campsite. If wood comes from a tree that was cut down because it was infected by two-lined chestnut borers or other sicknesses, like Emerald Ash Borers, it is especially important to never move it.
9
The extra effort to take care of Edina’s urban forest can protect oaks that have stood over Edina for hundreds of years.
“I get lots of calls about two-lined chestnut borer because people love their oaks,” Overholt reflected. “Everyone knows the mighty
oak is the ‘master of the forest’—they’re big, majestic trees, and people care about them.”
If you see dead branches on the top of otherwise leafy oak trees on private property, contact an arborist to make a plan for treatment. If you see a tree that looks like it is suffering from two-lined chestnut borer on public property like a park, contact Overholt at 952-826-0308.
White Oak Red OakOak WiltDieback*
*Dieback is a
symptom of two-
lined chesnut borer
The shape and
color of leaves
can help tell not
only what type
of oak the tree
is but the health
of the tree.
9
10
Illegal Parking Leads to Tickets, Towing and
Delayed Snow Clearing
Put this on your calendar for Nov. 1:
• No parking on Edina streets between
1 and 6 a.m.
• Or when 1.5 inches or more of snow
has fallen, until it’s plowed to the curb.
Set the expiration for March 31. Repeat
each year.
Those are the winter parking rules in Edina.
And for good reason. Vehicles on roads
interfere with plowing, which slows road
clearing and can lead to delays for emergency
vehicles if they must take another route.
Sometimes the parked cars prevent clearing the road at all, which can make the vehicle owner very unpopular with their neighbors, notes Public Works Assistant Director Dave Goergen. And on rare occasions, a plow strikes a car, knocking off a side mirror or scraping off some paint.
“Early in the snow season, we always have
more cars illegally parked. But it happens
when we go a couple weeks without snow,”
Goergen said. “We had a big snow in
February, and even though we put out
blasts in advance advising people, I bet I
fielded 30 calls from plow drivers about
parked cars that first night.”
Two year-round reminders:
• Street parking is not allowed for six or
more consecutive hours any time of
year, unless otherwise signed.
• Trash and recycling cans should never
be in the street or on the sidewalk.
Place them at the edge of your
driveway (not in the sidewalk area)
or in your yard by the curbline.
Do police place warning signs on cars when
they are parked on the street overnight or
are in the way of plows?
Vehicles found in violation of the overnight parking ordinance between Nov. 1 and March 31 are typically issued a one-time warning, said Police Sgt. Anna Eckstein. This warning is provided in the form of a yellow notice card placed on the vehicle.
Do you issue a ticket on the first offense,
or does it depend?
A citation is generally issued on the second offense, following the initial warning.
Do you ever tow cars that are in the way
of plows?
Yes. Vehicles that are obstructing snowplows and creating a safety concern, particularly if they prevent proper clearing of the street, may be towed, Eckstein said. When feasible, efforts are made to contact the vehicle owner prior to towing.
Approximately how many tickets are issued each
winter for illegal overnight street parking?
During the 2025-2026 winter season (Nov. 1 through March 31), a total of 301 citations were issued for violations of both the overnight parking ordinance and the snowfall removal ordinance, Eckstein said. This number can vary from year to year depending on the amount of snowfall during the winter season.
What is the fine for this offense?
The fine for each of the violations of the parking ordinances is $30. If a vehicle is towed, there are significantly more fees for the towing, storage and retrieval.
How early before a snowstorm should I
move my vehicle?
If you don’t want your vehicle possibly sprayed with anti-icing solutions, it’s best to move it off streets anytime a snowstorm is forecast. Public Works treats streets before snowstorms, when possible, to make snow removal faster and easier. The spray can inadvertently drift to vehicles parked on the street.
Why can’t trash and recycling cans be on the
street or sidewalk, especially in summer?
Blocking a sidewalk, even partially, can
prevent or impede those who walk with
a cane, walker, use a wheelchair or other
mobility device. It violates the law.
As for streets, trash or recycling cans interfere
with street sweepers in the warmer months.
In winter, they can be hard for plow drivers
to see and can get clipped by the plow wing,
Goergen said. That tends to scatter them
– and all their contents – all over the road.
The resident is responsible for picking up
the trash or recycling that gets spread and
replacing the can if needed with their hauler.
For more information about winter parking and plowing, visit EdinaMN.gov/SnowPlowing.
— Compiled by Debbie Townsend
11
Winter Garbage
Placement &
Snow Storage
PROHIBITEDPROHIBITED
Manual Trash Collection
If your waste hauler manually collects cans, notch a
“parking spot” in your yard to place cans for collection.
Automated Trash Collection
Place cans on apron or driveway edge for automated
haulers (The mechanical arm can reach 3 to 5 feet.)
Snow Storage (on property)
Snow removed from a property’s driveway must be stored
outside of trash collection path, within property lines.
Snow Storage (off property)
Snow cannot be stored across the street on private or
public (City-owned) land. Snow can be hauled to a private
location owned or authorized for use by contractor.
Winter Trash Placement Rules
11
PipelinePUBLIC WORKS
City of Edina
Public Works & Park Maintenance Facility
7450 Metro Blvd.
Edina, MN 55439
EdinaMN.gov/PublicWorks
Iskaan-garee koodhkan oo ku fiiri soomaali
Escanee este código para ver en español
What do the different colored flags in my yard mean?
Flags in your yard mark various infrastructure. Here is a key for what each color typically means:
Blue
Potable water
Purple
Irrigation
Red
Electric power
lines, cables, etc.
Orange
Communication lines
(phone, internet)
White
Proposed
excavation
Yellow
Gas and oil
Green
Sewer and
drain lines
Pink
Temporary survey
markings