Loading...
HomeMy WebLinkAboutPublicWorksPipeline_Late2026_Web_1 (1)PUBLIC WORKS Pipeline LATE 2026 Your Drinking Water Is Certified Safe Monitoring done on Edina’s and Minneapolis’ drinking water last year shows that it is safe. The City’s goal is to provide residents with water that surpasses both state and federal requirements for safety and quality. This year’s report shows Edina water surpasses regulatory standards on all counts. Morningside Neighborhood residents who receive their water from the City of Minneapolis will find information detailing the quality of Minneapolis’ water in the report, too. Read the detailed report at EdinaMN.gov/WaterReport. 2 Citywide Water Meter Replacement Program Continues The City is replacing water meters in phases over several years. Each year, a different group of meters is scheduled for replacement. Installations began earlier this year and are expected to continue through 2029. There is no separate charge for the new meter. The cost is covered by the City’s Utility Fund, so it will not appear on your bill. Meters that have been replaced in the last five years are not included in the replacement plan. This year, about 5,000 properties are included. If your property is part of this year’s group, you will receive a letter from the City with instructions to schedule your appointment. Notifications will be mailed on a rolling basis throughout the year. Learn more at EdinaMN.gov/MeterReplacement. If you’re unsure whether a letter, phone call or visit is legitimate, contact the Edina Public Works Department’s Utilities Division at 952-826-0375 to verify. — Compiled by Brittany Bader Why Meters Are Being Replaced • Water meters in Edina were last replaced between 2012 and 2014 and are now approaching the end of their useful life. • Replacing meters now helps prevent billing inaccuracies caused by failing batteries. • Replacing meters now allows the City to collect water use data more efficiently and identify potential water leaks sooner. What to Expect Watch Your Mail You will receive a letter from the City when it’s your property’s turn for meter replacement. Schedule Your Appointment Use the instructions in the letter to schedule your appointment. Verified scheduling and contact information is posted at EdinaMN.gov/MeterReplacement. Please do not attempt to schedule unless you have received a letter asking you to do so. Prepare for Installation Confirm that your water shutoff valves on your incoming water service are working properly and can be fully shut off. The technician will need access to the water meter inside your home or business, so please make sure the area around the meter is clear and accessible. 3. 4. 1. 2. Get the Meter Replaced During the appointment, a technician will replace your water meter and install an externally mounted antenna as part of this upgrade. An adult 18 years or older must be present for the entire appointment. Most installations take about one hour, and your water will be shut off briefly during that time. Who Is Doing the Work The City has contracted with Ferguson Waterworks and RMR Services. Technicians performing installations will: Wear uniforms and arrive in marked vehicles Have completed background checks Be employees of RMR Services Wear City-issued vendor ID badges 2 3 How do I apply for a block party? Go to EdinaMN.gov/BlockParty for the application. It must be submitted at least five business days before your event. Block parties are allowed on low-volume residential streets, dead-end streets or cul-de-sacs. An entire block must be blocked off; partially blocking a street (such as in front of a few houses) is not allowed. This is to avoid traffic issues on the street being blocked. Block parties are allowed only twice per calendar year per block, not counting Night to Unite events. Streets may not be barricaded for longer than six hours or past 10 p.m. There is no fee for a block party. There is a pothole on my street. When will it be fixed? Potholes are repaired during the summer blacktop season. Service requests submitted by residents on the Edina311 app or via EdinaMN.gov/Edina311 help us identify areas in need of a repair. If you notice a pothole, please report it on the app, online or call Public Works at 952-826-0376. Frequently Asked Questions I need a dumpster on my property. What are my options? There are two options for placement: 1. Place on private property (driveway or yard). With this option, you can leave the items 24 hours a day until the project is done. 2. Place in a designated “Street Parking” lane. This is allowed for a maximum of 12 daytime hours before it needs to be removed. No exceptions. Refuse containers placed illegally will be ticketed and removed at the owner’s expense. You may not block a lane of traffic, bike lane or bus lane, and there is no permit allowing you to do so. If you live in an area with a homeowner’s association, you should check their rules as well. For more information, contact the Planning Division at 952-826-0369. There’s a tree or tree limb in contact with a power line. Who do I call to handle that? The City does not clear trees from power lines. Contact Xcel Energy for safe removal. Visit XcelEnergy.com/trees for information about tree pruning and other vegetation management. After a storm, who picks up the tree branches and other debris in my yard? The City does not pick up and does not have room to accept tree branches or yard waste. If you have yard waste service, place the branches and other vegetation in your bin. Or contact a contractor or your garbage hauler about removal. Do not put yard waste or storm debris in your organics bin. In winter, if a plow hits and damages my mailbox, who is responsible for fixing it? If you believe your mailbox was damaged during snow removal, report the damage at EdinaMN.gov/MailboxRepair. Public Works will review the information submitted. If the City determines the mailbox was directly struck by City snowplow equipment, the City may either replace the mailbox with a standard- size, non-decorative metal mailbox and replace the support post, if necessary, or reimburse the cost of repair parts up to $100 with a submitted receipt. Damage caused by the weight of snow, aging or weakened materials or other factors such as private snow removal or vehicle accidents are not the City’s responsibility. — Compiled by Holly Conwell and Tom Swenson 3 4 Six Street and Pedestrian Projects Coming Up in Edina 4 ¹» ¹» ¹º¹º ¹º ñ ñ ¹»¹º ¹º ¹º ¹º ¹º ¹º ñ ¹» ñ ñ ñ ñTRACY AVEVERNON AVEWOODDALE AVEHANSEN RD70TH ST W FRANCE AVE SVALLEYVIEWRDMINNESOTA DRGLEASONRDEdinaCommunity Center AvailAcademy Golden YearsMontessori CityHall St Peter's LutheranChurch & School South ViewMiddle School NormandaleElementary ConcordSchool CorneliaSchool SouthdaleLibrary FireStation Public Works & Park Maintenance Creek ValleySchool FireStation Valley ViewMiddle School EdinaHighSchool CountrysideSchool HighlandsSchool Edina CommunityLibrary Our Lady ofGrace Church& School M in n ehahaCreek NineMileCreek N ine MileCreek SouthdaleCenter Canadian Pacific RailroadCanadian Pacific RailroadBLAKE RDSCHAEFER RDVERN O N AVE CAHILL RD66TH ST W YORK AVE SINTERLACHEN BLVD MALONEY AVE 44TH ST W 50TH ST W 54TH ST W 58TH ST W 70TH ST W 76TH ST W DEWEY HILL RD VALLEY VIE W R D VALLEY VIEW RD 78TH ST W I-494 HWY 100HWY 169HWY 169HWY 100HWY 62 HWY 62 April 2019 ±Legend 0 2,000 Feet 3 4 56 1 2 Presidents Rolling Green Rosland Park Pedestrian Bridge 72nd St.Prospect Knolls Interlachen 5 From roadway reconstruction and utility improvements to trail connections and bridge replacement, several Public Works projects are underway or in development across the community. Together, these efforts aim to improve road conditions, replace aging infrastructure, enhance drainage and increase safety and accessibility for people walking, biking and driving throughout Edina. — Compiled by Lum Chi, Lauren Siebenaler and Brittany Bader 5 1 Presidents Where: Harrison Avenue, Tyler Avenue, Tyler Court, Belmore Lane east of Van Buren Avenue to Dearborn Court Construction Timeline: March through July About: Roughly 20% of the Presidents A & B Neighborhood roadway project remains to be finished on the roads listed above. The reconstruction was necessary because of poor roadway pavement and watermain conditions. The goal is to completely reconstruct the roadway asphalt pavement, replace concrete curb and gutters, add new watermain and water services, improve sanitary sewer systems, and modify the roadway and storm sewers to improve drainage. Website: BetterTogetherEdina.org/presidents-ab Contact: Graduate Engineer Chris Moore, cmoore@EdinaMN.gov or 952-826-0444 2 Prospect Knolls Where: West 70th Street, Antrim Court, Antrim Road, Antrim Terrace, Down Road, Dublin Circle, Dublin Road, Fleetwood Drive, Kemrich Drive, Kerry Road, Lanham Lane, Lee Valley Circle, Lee Valley Road, Parklawn Court, Shannon Drive, Tara Road, Tralee Drive, Village Drive, Weston Circle, Wexford Road Construction Timeline: April to mid-November About: The Prospect Knolls A/C/D Neighborhood Roadway project will include complete reconstruction of the roadway asphalt pavement; partial replacement of watermain; full replacement of water services, fire hydrants and valves; improvements to the sanitary sewer system; modifications to roadway and storm sewers to improve drainage; and replacement of concrete curb and gutters. The reconstruction of the Parklawn Court cul-de-sac is included in this project. The reconstruction is meant to improve roadway pavement conditions and is expected to conclude in mid-November. Website: BetterTogetherEdina.org/prospect-knolls Contact: Graduate Engineer Chris Moore, cmoore@EdinaMN.gov or 952-826-0444 6901 520 306 300 307 6707 412 6528 65216525 6520 308 609 508 406408 407 516 605 304 516 524 532 305 6512 309 24 422 308 304 301 6521 317 404 411 315 408 512 316 323 407 415 303 322 401 308 308 312 314 419 302 510 322 306 313 320 504 309 299 300 311 414 6624 425 6612 312 419418 401 304 300 513 421 400 301-03 6615 6512 298 310 505 409 6615 417-19 305 408 500 313-15 420 501 421-23 509 309-11 613 302 312 417 300 323 305-07 500 301 410408 317-19 314 6517 416 420 304 318319 308 318 422 411 415 321 315 406 6600312315 301 411 405 409 316 405 314 304 311 319 306 413 308 317 401 306 424 317 425 301 305 307 404 401 414 418 422 408 421 412 407 411 423 423419 305 405 6616 400 424 323 413 415 323 419 411 422 406 311 411 415 315 540 425 404 415 419 404 410 413 309 414 405 423 301 403 424 410 419 409 412 305 411 418 414 409 420 6601404 410409 416 313 402 409 416 317 423 401 416 407 6606414 414 408 418 411 319 404 415 418 412 420 402 418 425 416 303 416 400 408 415 408 403 417 409 421 422 424 400 415 301 319 405 401 6605423 6609309 400 323 424425 303 417 318 305 311 419 320 6655 402 322 425 423422 310 314316315 304 6651 417 310 412 302 318 306 318 320 404 405 400 409 306 312 308 316 404 414 314 402402 317 406 400 405 416 424 300 319 300 421 302 306 424 403 308 317 420 320 311 300 322 405 313 309 300 321 401 401403 315 404 322 407 425 305307 323 406406 325 307 403 6721 69406938 6750 306 6528 517 Project Limits BELMORE LN MALONEY AVE ALDEN PARK 3RD ST S +¡ 2ND ST S WASHINGTON AVE SADAMS AVEJEFFERSON AVEMADISON AVEMONROE AVEJACKSON AVEVAN BUREN AVEHARRISON AVETYLER AVETYLER CTCity of HopkinsCity of Edina / Engineering DeptJune 2024 2025 Project AreaPresidents A & B Neighborhood Roadway and Alley ReconstructionCITYOFEDINAMINNESOTAINCORPORATED1888 ,e 7317 7250 7215 8 7224 7100 7308 7024 5420 5905 7017 7431 54155809 7004 5712 7150-60 5526-38 5510-24 5515-235525-355537-45 5540-54 5556-705572-84 5547-59 5500-08 7175 5545-5539 7101-15 7401 7200 6 2 5901 4 7000 7100 70007012 7017-29 7121 7012 7202 7104 7140 7009 7100-12 7305 5501 7100 7028 5912 7016 7020 7024 7016 7101 7105 7300 7104 5900 7070-82 7205 7117 7028 5809 7037 7016 7005 7001 7209 7008 70217020 7021 7141 5908 59205912 5813 7145 7301 7024 7205 7001 6013 7013 5416 7017 6909 7460 7119 6982 5601 5900 7005 5904 7012 6832 7011 5517 7109 5812 5905 7115 7032 7000 7115 5432 7137 6005 7401 5721 7105 7019 7221 7400 6012 6986 5916 7304 7009 7121 7101 70217001 6009 7009 7201 7001 7123 7308 5605 7001 7312 7033 7201 6994 6916 7008 7017 5600 5829 7401 7101 6920 7013 5532 7015 6909 6913 5804 7041 7019 7305 7209 5601 5808 7023 6005 5729 7220 5524 5805 58085812 5604 7115 5800 7020 7310 6998 5816 6836 7029 5812 5716 5617 7012 7131 7302 5805 6912 5801 5616 5528 5725 7109 7309 7208 5920 7301 7009 7129 7109 6990 7000 5708 5833 7125 7309 5609 7128 7315 5613 7212 7005 5704 7100 5705 56085612 7012 7015 7220 5816 7313 7021 7028 5716 57175801 7022 7216 7122 5713 7200 7304 7220 7305 5800 5709 5708 5721 5712 7020 7013 7225 7001 7015 5820 5720 5820 7001 5912 7301 5700 7000 7004 7212 7306 7305 7300 7313 5701 5640731260007209 7308 7025 6112 7308 7204 5920 7100 7040 5805 7133 7215 7224 7219 5908 7029 7101 6113 7203 7213 5709 5708 7112 7314 7217 7304 5705 7108 7205 6008 5911 7221 7318 7300 6009 7322 5426 7204 5700 7101 7124 7021 7120 7304 7209 5811 5917 7208 7401 60047108 7205 7400 7123 5924 5701 7216 5717 7209 7028 7105 59216001 7109 7017 7200 7223 7324 7116 7120 7213 7301 7044 7108 7200 7104 7121 7112 5704 7117 7100 7205 5416 7208 7000 7133 7016 7005 7117 5721 5704 7201 7401 7326 7113 5824 7105 7104 7004 5404 7113 7120 7104 7009 7217 5724 7116 7000 7316 7121 60056009 7112 7201 7105 5412 7101 7117 5713 7109 7116 7113 5804 7008 5728 7125 7045 7212 5414 7129 73005800 7204 7216 6840 7320 542460136021 6913602569086017 5736 54027300 7305 6029 58285720 5500-026001 7012 7004 7309 54187008 5504-0654205508-105422540070757234-7240 7227-7233 72 3 2 - 7 2 2 0 5549 5501-5511 5545 5553-5561 55395551- 5565 5515-55275535 5541 553170407300 7068-7096 70327044-706470365521-5527 5530-5536 5555-5547 5529-5537 5538-55485511-5519 7121-55 5916 PROJECT LIMITS W 70TH STANTRIM RDDUBLIN CIR DUBLIN RD KERRY RD WEXFORD RDANTRIM T E R ANTRIM CTDOWN RD LEE V A L L E Y RD SHANNON DRTRALEE DRSHANNON DRKEMRICH DR DEWEY HILL RD W 70TH ST ANTRIM RDLANHAM LN FLEETWOOD DRLANHAM LNTARA RDLEE WESTON C I R VILLAGE DR CAHILL RDVALLEYCIR /Engineering DeptJune 2025 2026 Project AreaProspect Knolls ACD Neighborhood Roadway ReconstructionImprovement No. BA-458CITYOFEDINAMINNESOTAINCORPORATED1888 ,e 4401 4145 440141414435 4201 4100-20 4351 7600 7625 4451 4480 44254350 4440 44 1 54280 4251 4250 4456 4456 4452438042004300-28 7337 7401 740374107404 7400 7326732873307334733273367338734073234444444644484450 4400 Project Limits PARKLAW N C T W 76TH ST PARKLAWN AVE PARKLAWN AVE/Engineering DeptMay 2025 2026 Project AreaParklawn Ct Neighborhood Roadway ReconstructionCITYOFEDINAMINNESOTAINCORPORATED1888 ,e 6 4 Rosland Park Pedestrian Bridge Where: Rosland Park Pedestrian Bridge over Minnesota Highway 62 Construction Timeline: Summer 2026 through Summer 2027 About: Construction on the new Rosland Park Pedestrian Bridge over Highway 62 is beginning this summer. Originally built in the early 1960s, the existing bridge must be replaced because of its age, condition and accessibility limitations. The replacement bridge will include access ramps on both sides of the highway to improve access for people walking, biking and rolling to and from Rosland Park. It will also be built with greater clearance above the highway to help prevent vehicle strikes like those that occurred in 2022. The approximately $8 million project is expected to be completed in summer 2027. Once construction begins, the current pedestrian bridge will close for the duration of the project. Rosland Park amenities, including the Edina Aquatic Center, will operate as normal during construction. Traffic impacts to Highway 62 are expected to be minimal, though a few overnight closures and occasional lane closures may occur during construction. Website: BetterTogetherEdina.org/Rosland-Park-Bridge Contact: Public Works Director & City Engineer Chad Millner, cmillner@EdinaMN.gov or 952-826-0318 3 72nd Street Where: 72nd Street from just past Cornelia Drive on the west, and across France Avenue on the east Construction Timeline: Summer to fall 2026; dates to be announced About: The 72nd Street reconstruction project is being done to repair and upgrade sanitary, water, storm sewer and streets. The project will cover street reconstruction and trunk sewer repair, upgrading 72nd Street from just past Cornelia Drive on the west and across France Avenue on the east. Website: BetterTogetherEdina.org/72nd-street-improvements Contact: Engineering Services Manager Ross Bintner, rbintner@EdinaMN.gov or 952-903-5713 7000 7320-30 7340 7300-10 7333-55 7128 7201 70084208 42167205 4401 7203 7025 72077207 7207 7350-60 3680-3484 72007010 4040 3950 7000695071104000 4001 7001 7101 7136 7212 7216 3861-817015 7000 70087205 6996 7007 6953 71014225 421742214221 4000421369496941 6937 4401 4217 7000 7108 7129 7108 4304 7209 7200 4308 4401 4309 7013 7204 6945 4200 4305 4400 4301 4209 3910 7208 7001 7116 440144004224 7208 4400 7001 7201 7201 4300 7137 7004 7021 7200 7007 7129 7016 7012 7133 7004 7017 7117 710942164220 7005 7128 7100 712542017000 7009 7013 7004 7204 7001 71084212 71217129 7008 7124 7201 7005 7101 7125 7009 7200 7213 7217 7120 7206 7109 7209 7128 7009 7128 4200 7125 7012 7121 7016 7137 7105 7113 7205 7117 7105 7117 71247124 7204 71214209 7204 7206 7205 7133 7111 7208 7116 7104 7104 7112 7205 7100 7116 7120 7132 7101 7120 7112 7102 7209 7129 7100 7201 7109 7125 4204 7128 7105 7124 420142127104 7121 7113 4208720442057112 7120 7200 7221 7301 7017 4400 7305 7309 7313 7317 7321 7325 7329 7333 73374401 7213 7217 7221 7301 7305 7309 7313 7317 7321 7225 7212 7216 7220 7224 7300 7304 7308 7312 7316 7320 7324 7212 7216 7220 7224 7300 7304 7308 7312 7316 7320 7213 72177219 7303 7305 73097311 7317 732 1 7211 7215 7221 7301 7307 73137315 7319 7326732873307334733273367338734073237208 7208 72107212 72097209 7250 73007380 W 72ND ST Project Limits CORNELIA DRGLOUCHESTER DRHEATHERTONCIRHEATHERTON TRLBRISTOL BLVDBRI S T O L C I R FRANCE AVELYNMAR LNGLOUCHESTER AVEOAKLAWN AVE/Engineering DeptNovember 2025 Project AreaSouth Trunk Sanitary Phase 1 CITYOFED INA MIN N ESOTAINCORPORATED1888 ,e 7 5 Rolling Green (2027) Where: Annaway Drive, Bywood West, Crescent Terrace, Merilane Avenue, Mait Lane, Paddock Road, Rolling Green Parkway Construction Timeline: Summer 2027 to mid-November 2027 About: The Rolling Green reconstruction project will include complete reconstruction of the roadway asphalt pavement; partial replacement of watermain and water services; full replacement of fire hydrants and gate valves; partial improvements to the sanitary sewer system; modifications to roadway and storm sewers to improve drainage, including the installation of a sump drain pipe where feasible; and installation of concrete curb and gutter. Website: Coming Soon Contact: Assistant City Engineer Aaron Ditzler, aditzler@EdinaMN.gov or 952-826-0443 6 Interlachen (2027) Where: Interlachen Boulevard from Blake Road to Mirror Lakes Drive Construction Timeline: Summer 2027 About: The Interlachen reconstruction project will include complete reconstruction of the roadway asphalt pavement; installation of new watermain for a portion of the project; replacement of water services, fire hydrants and gate valves and adding more hydrants where necessary; improvements to the sanitary sewer system; modifications to roadway and storm sewers to improve drainage; installation of new concrete curb and gutter; installation of a new 8-foot shared-use concrete path; and installation of 5-foot concrete bicycle lanes. Website: BetterTogetherEdina.org/interlachen-blvd Contact: Public Works Director & City Engineer Chad Millner, cmillner@EdinaMN.gov or 952-826-0318 7 8 2 9 7 4608 5804 4605 49055801 4904 5600 5800 6 5 13 4 9 7 16 11 18 10 20 5005 33 4600 11 19 15 4912 25 17 14 12 27 4812 4904 4801 4800 4908 4909 5100 4700 4801 4724 29 4705 5725 4901 4700 4603 4915 4812 4616 4602 4701 4900 4808 4715 4733 4712 4604 4877 4708 4820 4704 4800 5924 4820 255808 4909 4729 4817 4708 5608 4904 4725 4913 4805 4917 4601 4604 4811 27 4612 4721 5920 5804 5805 5733 4808 5808 4908 4912 4602 4916 4810 5002 5020 50005000 5040 5908 5904 4603 5524 5610 5633 5637 5801 5528 5805 5601 5621 5641 5645 5649 56135629 5646 5642 5636 5625 5609 5603 4615 4705 5526 Mait Ln Annaw ay D r By w o o d W e s t Crescent T e r Merila n e A v e Paddock RdRo l l i n g G r e e n P k w y Interlachen Blvd Mirror Lakes DrInterlachen Cir CITYOFEDINAMINN E SOTAINCORPORATED1888 ,e Engineering DeptApril 2026 2027 Project AreaRolling Green NeighborhoodRoadway ReconstructionImprovement No. BA-469 8 A New Host for an Old Pest: Two-Lined Chestnut Borer in Edina By Edie Weinstein When City Forester Luther Overholt saw oaks with dying branches across Edina, he assumed it was oak wilt, a common disease he fights to keep Edina’s urban forest healthy. Then, he realized the problem wasn’t as simple. “A lot of the oaks I first noticed are 100-plus-year-old trees that should need no watering, no monitoring and no outside help,” he said. “That’s what started to pique my interest.” When he noticed a characteristic pattern of branch tips dying first, he realized he was dealing with a pest that already had a storied history: the two-lined chestnut borer. The two-lined chestnut borer was responsible for the death of millions of chestnut trees in the late 19th and early 20th centuries. Overholt had never seen an infestation of the bug before, since its host is all but wiped out in this part of the country. Now, the insect has adapted to attack a whole new type of tree. Two-lined chestnut borers are drawn to trees in distress. The two-year drought from the summers of 2021 and 2023 weakened Edina’s oak trees enough for the borers to enter a tree from the top branches, where the bark is the thinnest. From there, they infest the “circulatory system” of the tree, or the routes water takes moving through the tree. So far, Overholt is treating over 100 infected trees at Rosland Park with an injection that kills the insects and saves the tree. As more trees on City property are found to have the disease, they will also receive this injection treatment. Two- lined chestnut borers have spread widely across the metro area to trees on both public and private property, and all of the thousands of oaks in Edina are susceptible. How can you tell if your oak is suffering from two-lined chestnut borers and not the commonly found oak wilt? First, check what kind of oak tree you have. Oak wilt primarily affects red oaks, so dead leaves on that variety can more commonly be attributed to oak wilt. If you have a white oak that looks sick, the chance of two-lined chestnut borers is higher. Then, check the leaves. Oak wilt causes “green islands” on leaves, where the edges of the leaves wilt but the center closest to the stem remains green. Trees suffering from two-lined chestnut borer will have completely dead leaves or branches, especially at the top of the tree, a condition known as dieback. Spring is a good time to keep an eye out for these dead leaves since healthy trees should be developing lots of leaves during this time. If you think your tree has two-lined chestnut borer, call an arborist to talk through treatment options to make sure your oak stays strong and sturdy. If you catch the disease early enough, the tree can be treated with the same injection method the City is using. If left untreated, the tree worsens and eventually dies. You can also take action to help lessen the risk of two-lined chestnut borers infecting your tree. For instance, avoid tree trimming during critical times of the year. Trimming creates “wounds,” or open spots in the bark that leave the tree vulnerable. “The bugs are attracted to open wounds. When you trim your tree, that’s an open wound,” explained Overholt. “That’s how they get in there. Don’t prune your oaks in April, May, June—all summer, if you can avoid it. Winter is the best time to prune.” If your tree is harmed unavoidably—such as during a storm—use tree wound paint to cover the area so the wound is exposed for as little time as possible. If you notice symptoms of two-lined chestnut borers in other trees in your area, it might be worth getting your tree treated preemptively. To reduce the spread of all invasive pests and diseases, never move firewood from one location to another, such as from your house to a cabin or campsite. If wood comes from a tree that was cut down because it was infected by two-lined chestnut borers or other sicknesses, like Emerald Ash Borers, it is especially important to never move it. 9 The extra effort to take care of Edina’s urban forest can protect oaks that have stood over Edina for hundreds of years. “I get lots of calls about two-lined chestnut borer because people love their oaks,” Overholt reflected. “Everyone knows the mighty oak is the ‘master of the forest’—they’re big, majestic trees, and people care about them.” If you see dead branches on the top of otherwise leafy oak trees on private property, contact an arborist to make a plan for treatment. If you see a tree that looks like it is suffering from two-lined chestnut borer on public property like a park, contact Overholt at 952-826-0308. White Oak Red OakOak WiltDieback* *Dieback is a symptom of two- lined chesnut borer The shape and color of leaves can help tell not only what type of oak the tree is but the health of the tree. 9 10 Illegal Parking Leads to Tickets, Towing and Delayed Snow Clearing Put this on your calendar for Nov. 1: • No parking on Edina streets between 1 and 6 a.m. • Or when 1.5 inches or more of snow has fallen, until it’s plowed to the curb. Set the expiration for March 31. Repeat each year. Those are the winter parking rules in Edina. And for good reason. Vehicles on roads interfere with plowing, which slows road clearing and can lead to delays for emergency vehicles if they must take another route. Sometimes the parked cars prevent clearing the road at all, which can make the vehicle owner very unpopular with their neighbors, notes Public Works Assistant Director Dave Goergen. And on rare occasions, a plow strikes a car, knocking off a side mirror or scraping off some paint. “Early in the snow season, we always have more cars illegally parked. But it happens when we go a couple weeks without snow,” Goergen said. “We had a big snow in February, and even though we put out blasts in advance advising people, I bet I fielded 30 calls from plow drivers about parked cars that first night.” Two year-round reminders: • Street parking is not allowed for six or more consecutive hours any time of year, unless otherwise signed. • Trash and recycling cans should never be in the street or on the sidewalk. Place them at the edge of your driveway (not in the sidewalk area) or in your yard by the curbline. Do police place warning signs on cars when they are parked on the street overnight or are in the way of plows? Vehicles found in violation of the overnight parking ordinance between Nov. 1 and March 31 are typically issued a one-time warning, said Police Sgt. Anna Eckstein. This warning is provided in the form of a yellow notice card placed on the vehicle. Do you issue a ticket on the first offense, or does it depend? A citation is generally issued on the second offense, following the initial warning. Do you ever tow cars that are in the way of plows? Yes. Vehicles that are obstructing snowplows and creating a safety concern, particularly if they prevent proper clearing of the street, may be towed, Eckstein said. When feasible, efforts are made to contact the vehicle owner prior to towing. Approximately how many tickets are issued each winter for illegal overnight street parking? During the 2025-2026 winter season (Nov. 1 through March 31), a total of 301 citations were issued for violations of both the overnight parking ordinance and the snowfall removal ordinance, Eckstein said. This number can vary from year to year depending on the amount of snowfall during the winter season. What is the fine for this offense? The fine for each of the violations of the parking ordinances is $30. If a vehicle is towed, there are significantly more fees for the towing, storage and retrieval. How early before a snowstorm should I move my vehicle? If you don’t want your vehicle possibly sprayed with anti-icing solutions, it’s best to move it off streets anytime a snowstorm is forecast. Public Works treats streets before snowstorms, when possible, to make snow removal faster and easier. The spray can inadvertently drift to vehicles parked on the street. Why can’t trash and recycling cans be on the street or sidewalk, especially in summer? Blocking a sidewalk, even partially, can prevent or impede those who walk with a cane, walker, use a wheelchair or other mobility device. It violates the law. As for streets, trash or recycling cans interfere with street sweepers in the warmer months. In winter, they can be hard for plow drivers to see and can get clipped by the plow wing, Goergen said. That tends to scatter them – and all their contents – all over the road. The resident is responsible for picking up the trash or recycling that gets spread and replacing the can if needed with their hauler. For more information about winter parking and plowing, visit EdinaMN.gov/SnowPlowing. — Compiled by Debbie Townsend 11 Winter Garbage Placement & Snow Storage PROHIBITEDPROHIBITED Manual Trash Collection If your waste hauler manually collects cans, notch a “parking spot” in your yard to place cans for collection. Automated Trash Collection Place cans on apron or driveway edge for automated haulers (The mechanical arm can reach 3 to 5 feet.) Snow Storage (on property) Snow removed from a property’s driveway must be stored outside of trash collection path, within property lines. Snow Storage (off property) Snow cannot be stored across the street on private or public (City-owned) land. Snow can be hauled to a private location owned or authorized for use by contractor. Winter Trash Placement Rules 11 PipelinePUBLIC WORKS City of Edina Public Works & Park Maintenance Facility 7450 Metro Blvd. Edina, MN 55439 EdinaMN.gov/PublicWorks Iskaan-garee koodhkan oo ku fiiri soomaali Escanee este código para ver en español What do the different colored flags in my yard mean? Flags in your yard mark various infrastructure. Here is a key for what each color typically means: Blue Potable water Purple Irrigation Red Electric power lines, cables, etc. Orange Communication lines (phone, internet) White Proposed excavation Yellow Gas and oil Green Sewer and drain lines Pink Temporary survey markings