HomeMy WebLinkAbout2003-2007 Capital Improvement Plan��" : +�e�"- P '.��` Ci '.: f� .... s h� CAPITAL PLAN City of Edina, MN PROJECTS BY YEAR 2003 thm 2007 Project Name Department Project # Priority Project Value Miscellaneous Equipment Braemar Golf Course GC -00 -007 0 30,000 2003 Golf Course GC -00 -012 0 50,000 Maintenance Equipment Braemar Golf Course GC-00 -002 0 100,000 Miscellaneous Equipment Braemar Golf Course GC -00 -007 0 28,000 Replace Maintenance Building: Richards Golf Course GG-00 -009 0 170,000 Redesign Holes 19 -27: Braemar Golf Course GC -00 -010 Total for 2003 298,000 2004 Maintenance Equipment Braemar Golf Course GC -00 -002 0 110,000 Miscellaneous Equipment Braemar Golf Course GC -00 -007 0 30,000 Braemar Range Automation Golf Course GC -00 -012 0 50,000 Driving Range Renovation Golf Course GG-02 -001 0 500,000 Maintenance Equipment Braemar Golf Course GC -00 -002 Total for 2004 690,000 2005 Maintenance Equipment Braemar Golf Course GC -00 -002 0 125,000 Miscellaneous Equipment Braemar Golf Course GC-00 -007 0 30,000 Total for 2005 155,000 2006 Maintenance Equipment Braemar Golf Course GC -00 -002 0 128,000 Miscellaneous Equipment Braemar Golf Course GC -00 -007 0 30,000 Redesign Holes 19 -27: Braemar Golf Course GC -00 -010 0 800,000 Total for 2006 958,000 2007 Maintenance Equipment Braemar Golf Course GC -00 -002 0 131,000 Miscellaneous Equipment Braemar Golf Course GC -00 -007 0 32,000 Clubhouse Expansion - East Side: Braemar Golf Course GC -00 -008 0 450,000 Expand Cart Storage: Braemar Golf Course GC -00 -011 0 50,000 Total for 2007 663,000 I k gt��l'L � 2 A. o e <z. , h N Ffv fy? a0 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS TABLE OF CONTENTS: DESCRIPTION PAGE POLICY FINANCING FINANCIAL TABLES • Summary of Revolving Fund Balance • Projects Financed Through Enterprise Funds • Capital Improvement Program • Projects by Funding Source • Projects by Department CIP PROJECT DESCRIPTIONS 2 3 City of Edina Page 1 <v91N�.f�1. oen, U) Nr O � a CAPITAL IMPROVEMENT PROGRAM FISCAL POLICY GOAL: The goal of the City of Edina's Capital Improvement Program is to develop a comprehensive capital improvement program for use by decision makers to guide capital investments based on an assessment of the Community's needs taking into account the best use of limited resources while providing efficient and effective municipal services. PROCESS: The Capital Improvement Program process includes analyzing projects contributing to the public health and welfare; projects helping to maintain and improve the efficiency of the existing systems; and projects that define a future need within the community. All capital improvements will be consistent with this program, and will be coordinated through a multi -year plan in conjunction with the City budgeting process. City of Edina - CIP Page 2 FINANCING CAPITAL IMPROVEMENT PROGRAM INTRODUCTION: Implementing capital improvements requires sound and economical financing. The City of Edina is able to utilize several financing mechanisms ranging from cash reserves to special - purpose funds as well as borrowing through bond sales. The exact financing method for each improvement is based on the general policies, jurisdictions and legal requirements. The final selection and scheduling of proposed capital improvements is then based on the ability of the City to draw upon various funds. The total cost for each project includes construction costs, administration costs and interest. In analyzing the financial viability of the capital improvements in the 2001 -2005 program, the following methods of financing were examined: INTERNAL METHODS: Special Assessments - Special assessments are based on the concept that when land is benefited from a particular improvement, all or part of the costs of the improvement should be levied against those properties to finance such improvements. Special assessment bonds are retired through special assessment collections but may be backed by the full faith and credit of the City. Enterprise Fund - Capital Improvements and equipment purchased in the Enterprise funds are financed through enterprise fund revenues derived from user charges for the respective services. Enterprise funds are designed for self- sustaining operations. Utility Funds - Capital improvements to the water and sewer utilities are financed through utility fund revenues derived from user charges for the respective services. Revenue bonds are used to finance large projects. Tax Increment Funds - These funds are derived from tax increment districts include 50th and France, Southeast Edina, Grandview, and 70"' Street and Cahill Road. In tax increment districts, property owners pay ad valorem taxes City of Edina - CIP Page 3 FINANCING CAPITAL IMPROVEMENT PROGRAM at the full rate levied by the units of local government within the taxing jurisdiction. At the time the tax increment district is created, property values are `frozen ". The units of local government receive taxes based on the frozen property values. Any additional taxes paid by property. owners based on the increase in property values since the . district was created is known as the "increment ". The increment revenue is then used to finance physical improvements within the district. These improvements can be financed on a cash basis after sufficient increment revenues have been collected, or through a bond issuance with increment tax revenues dedicated to retire the bonds. Lease /Revenue Bonds - These bonds are backed by the full faith and credit of the City and supported through an ad valorem special levy by an annual appropriation. The debt would be issued through the Housing and Redevelopment Authority to - procure capital equipment or facilities supported with a lease purchase relationship agreement with the City. Equipment Certificates — These certificates are capital notes, subject to the city debt limit. They can be used to purchase public safety equipment, ambulance and other medical equipment, road construction and maintenance equipment, and other capital equipment having an expected useful life at least as long as the term of the notes. The notes shall be payable in not more than five years. A tax levy shall be made for the payment of the principal and interest on the notes. Revolving. Fund - This fund is designed to provide financing for capital improvements. Revenues for this fund may be derived from such sources as investment income, rental income and operating transfers from other funds. Other - Other funding options available are excess levy on property taxes, interest income on City investments, and transfer from reserves. City of Edina Page 4 F� a FINANCING CAPITAL IMPROVEMENT PROGRAM EXTERNAL METHODS: Municipal State Aid - The Minnesota Department of Transportation provides funding assistance for improvements to those municipal streets which are designated as part of its Municipal State Aid (MSA) system. Money for this fund is supplied with a dedicated portion of revenues collected from road use and gasoline taxes. Funds are released for improvements on those streets on the system whose design and construction meet MSA standards. Funds may be expended for any street on the MSA system at any time, and MSA funds may be accumulated over several years. Minnesota Department of Transportation - The Minnesota Department of Transportation provides financing assistance for maintenance and improvements on those highways included in the Mn /DOT trunk highway system and federal interstate system. These improvements could include intersecting local or county streets. In the City of Edina, these highways are Nos. 62, 100, 169 and 494. Improvements on these highways must meet State trunk highway standards before Mn /DOT releases funds. Other - Other sources of financing come from bonds, which are backed by the full faith and credit of the City, grants, donations, and other municipalities who share boundaries. City of Edina Page 5 & A, 0 tj� o CORP tees Financial Tables Expenditures Hennepin County MNDOT MSA Bridge Equipment Municipal Buildings Arena Art Center Edinborough /CL City-Wide Parks Public Safety Public Works Assessments Revenues Hennepin County MNDOT MSA Bridge Assessments General Fund Liquor Utility Equipment Certificates Parking Permits Current Due From: MSA Utility Developer Hennepin County City Interest - 2, 3, 4% Balance Revolving Fund Beginning Ending 2003 - 2007 Summary of Revolving Fund Balance 2003 2004 2005 2006 2007 Total 350,000 0 0 0 0 350,000 580,000 0 0 0 0 580,000 1,730,000 2,521,000 1,119,000 1,086,000 733,000 7,189,000 0 80,000 320,000 250,000 0 650,000 1,493,000 0 130,000 485,000 210,000 2,318,000 12,286,000 10,000 10,000 15,000 15,000 12,336,000 25,000 25,000 25,000 90,000 25,000 190,000 14,300 8,000 15,000 10,000 40,000 87,300 225,000 73,000 69,000 65,000 80,000 512,000 0 50,000 50,000 50,000 50,000 200,000 575,000 625,000 514,000 550,000 529,000 2,793,000 1,693,000 435,000 40,000 80,000 340,000 2,588,000 180,000 425,000 115,000 215,000 75,000 1,010,000 615.000 576,000 646,000 590,000 580,000 3,007,000 2003 2004 2005 2006 2007 Total 332,500 17,500 0 0 0 350,000 551,000 29,000 0 0 0 580,000 1,643,500 2,481,450 1,189,100 1,087,650 750,650 7,152,350 0 0 80,000 320,000 250,000 650,000 919,846 772,681 965,955 1,028,995 1,088,077 4,775,554 50,000 75,000 100,000 125,000 150,000 500,000 100,000 100,000 100,000 100,000 100,000 500,000 100,000 100,000 100,000 100,000 100,000 500,000 1,493,000 0 130,000 485,000 210,000 2,318,000 16,000 16,000 16,000 16,000 16,000 80,000 4,730,000 247,567 0 0 0 4,977,567 60,300 92,036 100,843 0 0 253,179 0 0 14,000 0 0 14,000 661,000 34,735 0 0 0 695,735 5,278 0 0 0 0 5,278 277,745 151,833 174,036 170,713 168,608 942,934 10.940.169 4.117.801 2.969.934 3.433,358 2,833,335 24,294,597 13,887,226 5,061,095 4,350,896 4,267,831 4,215,189 5,061,095 4,350,896 4,267,831 4,215,189 4,371,523 Page 6 Projects Financed through Enterprise Funds Aquatic Center 2003 2004 2005 2006 2007 Total Begin Cash Balance 573,018 707,881 807,469 828,163 951,319 Revenue 709,500 744,975 782,224 821,335 862,402 3,920,436 Expense (434,138) (452,517) (471,699) (491,719) (512,615) (2,362,688) Other Rev /(Exp) (140,499) (152,870) (149,831) (156,460) (162,539) (762,199) Operating Cash 134,863 139,588 160,694 173,156 187,248 608,301 CIP 0 (40,000) (140,000) (50,000) (50,000) (280,000) End Cash Balance 707,881 807,469 828,163 951,319 1,088,567 2,137,138 Golf Course 2003 2004 2005 2006 2007 Total Begin Cash Balance 77,426 217,236 11,227 419,000 113,564 (1,269,643) Revenue 3,512,500 3,675,940 3,847,187 4,026,620 4,214,638 19,276,885 Expense (2,457,560) (2,548,657) (2,643,159) (2,741,195) (2,842,898) (13,233,469) Other Rev /(Exp) (617,130) (643,292) (641,255) (632,861) (623,149) (3,157,687) Operating Cash 437,810 483,991 562,773 652,564 748,591 2,137,138 CIP (298,000) (690,000) (155,000) (958,000) (663,000) (2,764,000) End Cash Balance 217,236 11,227 419,000 113,564 199,155 Golf Dome 2003 2004 2005 2006 2007 Total Begin Cash Balance 101,632 32,563 10,451 30,655 30,267 Revenue 339,145 355,900 373,487 391,947 411,323 1,871,802 Expense (235,112) (244,163) (253,564) (263,330) (273,474) (1,269,643) Other Rev /(Exp) (68,102) (68,849) (64,719) (68,005) (70,986) (340,661) Operating Cash 35,931 42,888 55,204 60,612 66,863 194,635 Op Transfer (25,000) 0 (15,000) (61,000) (67,000) (168,000) CIP (80,000) (65,000) (20,000) 0 0 (165,000) End Cash Balance 32,563 10,451 30,655 30,267 30,130 Liquor Operations 2003 2004 2005 2006 2007 Total Begin Cash Balance 632,329 759,531 936,103 1,157,350 1,451,292 Revenue 2,367,700 2,479,628 2,578,813 2,681,965 2,789,244 12,897,350 Expense (1,426,498) (1,480,256) (1,536,071) (1,594,023) (1,654,194) (7,691,042) Other Rev /(Exp) 0 0 0 0 0 0 Operating Cash 941,202 999,372 1,042,742 1,087,942 1,135,050 4,071,258 Op Tran/Rent (809,000) (767,500) (769,495) (778,000) (786,030) (3,123,995) CIP (5,000) (55,300) (52,000) (16,000) (75,000) (203,300) End Cash Balance 759,531 936,103 1,157,350 1,451,292 1,725,312 Utilities 2003 2004 2005 .2006 2007 Total Begin Cash Balance 5,283,329 6,742,906 3,968,095 3,601,772 3,922,930 Revenue 8,895,500 9,338,778 9,758,240 10,198,158 10,583,097 48,773,773 Expense (6,887,107) (7,160,052) (7,443,870) (7,738,997) (8,045,885) (37,275,911) Other Rev /(Exp) 2,441,184 (673,537) (735,693) (743,003) (735,026) (446,075) Operating Cash 4,449,577 1,505,189 1,578,677 1,716,158 1,802,186 9,249,601 Rent (100,000) (100,000) (100,000) (100,000) (100,000) (500,000) CIP (2,890,000) (4,180,000) (1,845,000)• (1,295,000) (785,000) (10,995,000) End Cash Balance 6,742,906 3,968,095 3,601,772 3,922,930 4,840,116 Page 7 CAPITAL PLAN City of Edina, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Department Project# Priority 2003 2004 2005 2006 2007 Total Aquatic Center Trellis AQC-00 -005 0 40,000 40,000 Create Step-In Entry AOC -00 -006 0 140,000 140,000 Upgrades and Replacements AOC-00 -007 0 50,000 50,000 100,000 Aquatic Center Total 40,000 140,000 50,000 50,000 280,000 Arena Bathroom Remodel (Arena) A -00 -001 0 25,000 25,000 Truck With Snow Plow A -00-002 0 25,000 25,000 Replace Zamboni A -00 -006 0 90,000 90,000 Building Maintenance A -00 -008 0 25,000 25,000 50,000 Arena Total 25,000 25,000 25,000 90,000 25,000 190,000 Art Center Roof Repair. Art Center ART -00 -002 0 8,000 8,000 Kiln Replacement Art Center ART -00-008 0 6,300 6,300 Energy Efficient Window Replace Art Center ART -00-009 0 8,000 8,000 Fire Suppression Art Center ART -00-012 0 40,000 40,000 Parking Lot Expansion ART -01 -001 0 15,000 10,000 25,000 Art Center Total 14,300 81000 15,000 10,000 40,000 87,300 Citywide Citywide Fiber Optic Cabling CW -02 -001 0 50,000 50,000 50,000 50,000 200,000 Citywide Total 50,000 50,000 50,000 50,000 200,000 Edinborough Pk/Centennial Lks Tot Lot (Edin) ECL -00 -002 0 200,000 200,000 Paver Replac ment (Edin) ECL -00 -004 0 15,000 14,000 29,000 Greensmowers (Centen) ECL -00 -013 0 10,000 10,000 Replaster Pool EP ECL -00 -017 0 30,000 30,000 In- Ground Speakers at CL ECL -00 -018 0 7,000 7,000 Window Glazing - Edinbomugh Park ECL -00 -020 0 10,000 10,000 Energy Management System ECL -00 -021 0 14,000 14,000 Refurbish Sound System - Centennial Lakes Park ECL -00 -022 0 8,000 8,000 Thursday, January, 02, 2003 Page 8 Department Project# Priority 2003 2004 2005 2006 2007 Total Refurbish Sound System - Edinborough Park ECL -00 -023 0 12,000 Braemar Range Automation GC -00 -012 0 Driving Range Renovation 12,000 Replace Pool Heater - Edinborough Park ECL -00 -025 0 14,000 50th - Store Remodel LIQ -02 -005 0 800,000 14,000 Remodel Locker Rooms - Edinborough Park ECL -00 -026 0 9,000 50,000 15,000 15,000 Replace Boller - Edinborough Park ECL -00 -027 0 500,000 20,000 20,000 Pool Filter Room Exhaust ECL -00 -028 0 663,000 2,764,000 9,000 9,000 4X4 Truck -Centennial Lakes ECL -00 -029 0 25,000 25,000 Replace Telephone System ECL -00 -032 0 10,000 10,000 Replace Skate Tile - Centennial Lakes ECL -00.93 0 7,000 7,000 Reshingle Centrum Building ECL -02 -002 0 60,000 60,000 Replace Toro Groundsmaster Mower ECL -02 -003 0 22,000 22,000 Cushman Vehicle ECL -02 -004 0 10,000 10,000 Edinborough Pk/Centennial Lks Total 225,000 73,000 69,000 65,000 80,000 512,000 Golf Course Maintenance Equipment: Braemar GC-00 -002 0 Miscellaneous Equipment Braemar GC-00 -007 0 Clubhouse Expansion - East Side: Braemar GC -00 -008 0 Replace Maintenance Building: Richards GC-00 -009 0 Redesign Holes 19 -27: Braemar GC -00 -010 0 Expand Cart Storage: Braemar GC -00 -011 0 Braemar Range Automation GC -00 -012 0 Driving Range Renovation GC-02 -001 0 Golf Course Total Golf Dome 100,000 110,000 125,000 128,000 131,000 594,000 28,000 30,000 30,000 30,000 32,000 150,000 York: Replace Counter Tops LIQ -01 -006 0 Vernon - Digital Recorder 450,000 450,000 170,000 50th - Wine Shelving LIQ -02 -003 0 50th - Security & Digital Cameras 170,000 50th - Store Remodel LIQ -02 -005 0 800,000 25,000 800,000 5,000 9,000 50,000 50,000 50,000 75,000 50,000 500,000 500,000 298,000 690,000 155,000 958,000 663,000 2,764,000 Upgrade Electrical Service & Lighting GD-00 -001 0 20,000 20,000 Heating & Inflation System GD -00 -002 0 80,000 80,000 Upgrade Bathrooms To ADA Standards GD -00 -003 0 65,000 65,000 Golf Dome Total 80,000 65,000 20,000 165,000 Liquor Stores 50th: Tile In Front of Beer Cooler LIQ-00 -015 0 50th: Replace carpet LIQ -01 -001 0 50th: Replace 2 Compressors LIO-01 -002 0 York: Office Addition LIO-01 -004 0 York: Replace Carpet LIQ -01 -005 0 York: Replace Counter Tops LIQ -01 -006 0 Vernon - Digital Recorder LIQ -02 -001 0 York - Enclose Loading Dock LIQ -02 -002 0 50th - Wine Shelving LIQ -02 -003 0 50th - Security & Digital Cameras LIQ -02 -004 0 50th - Store Remodel LIQ -02 -005 0 Thursday, January 02. 2003 Page 9 5,000 5,000 12,000 12,000 16,000 16,000 15,000 15,000 25,000 25,000 10,000 10,000 6,300 6,300 25,000 25,000 5,000 5,000 9,000 9,000 75,000 75,000 Thursday, January 02. 2003 Page 9 Department Project# Priority 2003 2004 2005 2006 2007 Total 12,286,000 Misc Fumishing/Remodels MB -00 -002 0 700,000 10,000 Liquor Stores Total 5,000 55,300 52,000 16,000 75,000 203,300 Municipal Buildings City Hall and Police Building MB -00 -001 0 12,286,000 12,286,000 Misc Fumishing/Remodels MB -00 -002 0 700,000 10,000 10,000 15,000 15,000 750,000 Municipal Buildings Total 12,986,000 10,000 10,000 15,000 15,000 13,036,000 Park & Recreation Playground: Nornandale Park PK -00 -023 0 115,000 115,000 Pathway Repairs/Additions: Arneson Acres PK -00 -028 0 30,000 30,000 Pathway Repairs/Additions: Cornelia School Park PK -00 -029 0 50,000 50,000 Pathway replacement: Walunt Ridge Park PK -00 -030 0 60,000 60,000 Playground: Alden Park PK -00-031 0 110,000 110,000 Parking Lot Arneson Park PK -00 -032 0 68,000 68,000 Renovate senior soccer field: Pamela Park PK -00 -033 0 250,000 250,000 Parking Lot Weber Park PK -00 -035 0 77,000 77,000 Replace/Upgrade Concessions Bldg: Courtney PK -00 -036 0 250,000 250,000 Playground: McGuire Park PK -00 -037 0 120,000 120,000 Senior Center Indoor Furnishings PK -00 -EXT 0 52,000 52,000 Renovate softball field: Todd Park PK -01 -001 0 91,000 91,000 Renovate soccer field: Braemar Park PK -01 -003 0 312,000 312,000 Renovate west baseball field: Countryside Park PK -01 -004 0 138,000 138,000 Skate Park Development - Yorktown Park/YMCA PK -0I -EXT 0 100,000 100,000 Playground: Sherwood Park PK -02 -001 0 100,000 100,000 Cahill School & Grange building repairs PK -02 -002 0 128,000 128,000 Showmob0e PK -02 -003 0 100,000 100,000 New Entrance: Arneson Acres Park PK -02 -004 0 35,000 35,000 Lift Station (Sanitary): Arneson Greenhouse PK -02 -005 0 45,000 45,000 Renovate west soccer field: Lewis Park PK -02 -006 0 280,000 280,000 Lewis Park west soccer field lighting PK -02 -007 0 40,000 40,000 New Maintenance Garage: Courtney Fields PK -02 -008 0 92,000 92,000 Exterior walls, windows & doors Creek Valley PK -02 -009 0 150,000 150,000 Log Loader PK -02-048 0 140,000 140,000 Aerial Bucket Truck PK -02-049 0 110,000 110,000 Vermeer Brush Chipper PK -02 -050 0 20,000 20,000 Ford 4630 Tractor PK -02 -051 0 45,000 45,000 Chev C-60 Cargo Truck PK -02 -052 0 40,000 40,000 Toro 580-D Mower PK -02 -053 0 60,000 60,000 John Deere 2355 Tractor PK -02 -054 0 45,000 45,000 Park & Recreation Total 715,000 625,000 644,000 595,000 674,000 3,253,000 Public Safety Digital Mugshot System PS -00 -002 0 26,000 26,000 City Radio Communications Infrastructure PS -00 -003 2 1,500,000 1,500,000 Thursday, January 02. 2003 Page 10 Department . Project# Priority 2003 2004 2005 2006 2007 Total Addition (Women's Locker Room, Etc.): Station #1 PS -00 -005 2 300,000 300,000 Roof Replacement: Fire Station #1 PS -00 -013 3 40,000 40,000 Install Generator @ Fire Station #1 PS -00 -014 2 20,000 20,000 Sprinkler System: Fire Station #1 PS -00 -015 2 30,000 30,000 Rehab Parking Lot: Fire Station #1 PS -00 -016 3 17,000 17,000 Carpeting: Fire Station #1 PS -00 -018 3 15,000 15,000 SCBA Air Compressor PS -00 -019 2 40,000 40,000 Training CtrBumer Unit PS -01 -001 3 40,000 40,000 Additional Vehicle Bay to Fin; Station #2 PS 411 -002 4 250,000 250,000 In -Squad Video System PS -01 -003 0 50,000 50,000 Digital Fingerprint System PS -01 -004 0 40,000 40,000 Computerized Emergency Medical Dispatch PS -02 -001 2 30,000 30,000 800 mhz Fiber Optic Connection PS-02 -002 0 150,000 150,000 Fire Department Pumper PS -02 -003 2 350,000 350,000 Outdoor Warning System PS -02 -004 0 40,000 40,000 Fire Department Pumper PS-02 -005 0 265,000 265,000 Public Safety Total .1,958,000 435,000 40,000 430,000 340,000 3,203,000 Public Works Mill & Oveday:Benton Ave. (Hansen - Hwy 100) PW -00 -004 0 34,000 34,000 .Mill & Overlay: Dewey Hill Road (Gleason - Cahill) PW -00 -005 0 51,000 51,000 Mill & Overlay: Valley View (TH100- Wooddale) PW -00 -007 0 60,000 60,000 ReconstructValley View Rd ( Wooddale - 64th ST) PW -00 -008 0 1,480,000 1,480,000 M11 & Overlay: Valley Lane (Tracy - 66th) PW -00 -009 0 43,000 43,000 M81 & Overlay: Vernon (Lincoln Dr. - Gleason) PW -00 -010 0 78,000 78,000 Mill & Overlay: W. 50th SL (TH 100 - France) PW -00 -011 0 80,000 80,000 Reconstruct 44th Ave. (TH 100 - France) PW -00 -012 0 400,000 400,000 Mill & Overlay: Brookside (Interlachen - RR) PW -00 -013 0 38,000 38,000 Reconstruct: Wooddale (Valley View -Tower Ave.) PW -00-014 0 480,000 480,000 Concrete Rehab: Tracy Ave. (Vernon - TH62) PW -00 -015 0 242,000 242,000 Mill & Overlay: Valley View (Tracy - Gleason) PW -00 -016 0 72,000 72,000 Concrete Rehab: W. 70th St. (TH100 - France) PW -00 -017 0 283,000 283,000 Mill & Overlay: Wooddale Ave. (Tower - 50th SL) PW -00-018 0 54,000 54,000 Signals: Edinborough Way @ 76th SL PW -00 -020 0 210,000 210,000 Signals, Rehab: TH 62 @ France Ave. PW -00-025 0 1,200,000 1,200,000 Neighborhood Street Recon. Program PW -00 -026 0 400,000 400,000 400,000 400,000 400,000 2,000,000 Street Lighting Highlands Area PW -00 -027 0 50,000 50,000 Browndale Bridge PW -00-028 0 80,000 320,000 400,000 56th Street Bridge PW -00 -029 0 250,000 250,000 Sidewalks/Pathways (MSA) PW -00-030 0 130,000 130,000 130,000 130,000 130,000 650,000 Sidewalks/Pathways: City Costs PW -00 -031 0 50,000 50,000 50,000 50,000 200,000 Public Works Building Improvements PW -00 -069 0 25,000 375,000 25,000 25,000 25,000 475,000 Reconstruct: Valley View Rd & TH62 PW -00 -073 0 400,000 400,000 Concrete Rehab: Parklawn Ave. (France to W 77) PW -00 -074 0 300,000 300,000 Thursday, January 02, 2003 Page 11 Department Project# Priority 2003 2004 2005 2006 2007 Total Signals: W 76th St & York Ave PW -01 -005 0 290,000 290,000 Pedistrian Bridge - Valley Lane & VV Rd PW -01 -008 0 18,000 Lift Station #5 (5601 Code Avenue) UT -00 -001 18,000 Reconstruct West 70th St. & Metro Blvd. PW -01 -010 0 500,000 500,000 Reconstruct W. 62nd St. (Oaklawn - France) PW -01 -011 0 320,000 320,000 M81 & Overlay: Eden Ave. (Vernon to Arcadia) PW -01 -013 0 0 150,000 18,000 18,000 Mill & Overlay: Gleason Rd. (Valley View to TH62) PW -01 -014 0 Lift Station # 15 (6100 Olinger) 55,000 0 55,000 Reconstruct: W. 58th St. (Concord to France) PW -02 -001 0 550,000 150,000 700,000 Reconstruct: Concord Ave (VVRD to Southview Ln) PW -02 -002 0 600,000 500,000 500,000 Reconstruct: Southview Ln (TH100 to Concord) PW -02 -003 0 120,000 1,300,000 400,000 400,000 M81 & Overlay: Blake Rd (Interlachen to Hopkins) PW -02 -004 0 120,000 0 120,000 Landscaping: W 54th St at Minnehaha Creek PW -02 -005 0 65,000 Waterrnain /Sanitary: Nine Mile Village UT -00-021 65,000 Public Works: Braemar Cold Storage: Concrete Floor PW -02 -006 0 40,000 40,000 80,000 Public Works: Braemar Work Site - Lead Removal PW -02 -007 0 100,000 200,000 200,000 Sidewalk: Wilson Road ( Southview Lane to Eden Ave) PW -02 -008 0 90,000 900,000 90,000 Sidewalk: Wooddale Ave (at W 44 St) PW -02 -009 0 20,000 UT -00 -025 0 20,000 #25 -437 Pull - Behind Paver PW -02 -010 0 28,000 600,000 Sanitary Sewer. Manhole Rehabilitation 28,000 #25-404 Grader PW -02 -011 0 130,000 50,000 50,000 130,000 #25-449 Traffic Paint Striper PW -02 -012 0 110,000 110,000 #25 459 Front End Loader PW -02 -013 0 120,000 0 50,000 120,000 #25-453: Sealcoat Chip Spreader PW -02 -014 0 250,000 Pond & Lake TreatmenUDredging 90,000 90,000 #25-456 Pneumatic Roller PW -02 -015 0 60,000 60,000 65,000 65,000 Public Works Total 3,863,000 3,602,000 2,200,000 2,331,000 1,453,000 13,449,000 Utility Department Lift Station #5 (5601 Code Avenue) UT -00 -001 0 100,000 100,000 Lift Station#13 (4720 W. 65th St) UT-00 -004 0 75,000 75,000 Lift Station # 14 (7433 Metro Blvd) UT -00 -005 0 150,000 150,000 Lift Station # 15 (6100 Olinger) UT -00 -006 0 100,000 100,000 Van Valkenburg Water Tower (paint) UT -00-008 0 600,000 600,000 Filter Plant #2 (5901 Ruth Drive) UT -00-011 0 120,000 1,300,000 1,420,000 Waterrnain/Sanitary: Country Club Area UT -00-020 0 300,000 300,000 Waterrnain /Sanitary: Nine Mile Village UT -00-021 0 300,000 300,000 Utility Data Collection System (Water) UT -00 -023 0 800,000 100,000 900,000 Utility Data Collection System (Sanitary) UT -00 -024 0 900,000 900,000 Water Main Improvements (Service Lines) UT -00 -025 0 100,000 100,000 100,000 200,000 100,000 600,000 Sanitary Sewer. Manhole Rehabilitation UT -00-026 0 50,000 50,000 50,000 50,000 50,000 250,000 Storm Sewer. W. 59th Street & Ashcroft Ave. UT -00 -028 0 120,000 120,000 Stone Sewer. Catch Basin Repair/Replace UT -00 -029 0 50,000 50,000 50,000 50,000 50,000 250,000 Pond & Lake TreatmenUDredging UT -00-030 0 60,000 60,000 60,000 60,000 60,000 300,000 Storm Sewer Upgrade - Drain Tile System UT -00 -034 0 120,000 120,000 120,000 120,000 120,000 600,000 Stone Sewer - Pipe and Grading Improvements UT -01 -003 0 60,000 60,000 60,000 60,000 60,000 300,000 Sanitary Sewer. Pipe replacement UT -01 -004 0 60,000 60,000 60,000 60,000 60,000 300,000 Portable Generator. 300 KW UT -01 -005 0 75,000 75,000 Portable Generator. 400 KW Wtr Trtmt Pnt No 3 UT -01 -008 0 100,000 100,000 Thursday, January 02, 2003 Page 12 Department Project# Priority 2003 2004 2005 2006 2007 Total Portable Generator. 400 KW Wtr Trtmt Pnt No 4 UT -01 -009 0 100,000 100,000 Well #8 (6600 Ridgeview Drive) UT -02 -001 0 205,000 205,000 Dublin Road Revservoir Rehabilitation UT -02 -002 0 100,000 100,000 Stonnwater Lift Station (Highlands Lake) UT -02 -003 0 75,000 75,000 Annual Vehicle Replacements UT -02 -004 0 55,000 75,000 55,000 185,000 Well #7 (5241 Eden Circle) UT -02 -005 0 100,000 100,000 Well #14 (6367 Dewey Hill Road) UT -02 -006 0 160,000 160,000 well #19 (6754 Valley View Road) UT -02 -007 0 120,000 120,000 Well #3 (5233 Halifax Avenue) UT -02 -008 0 160,000 160,000 Well #6 (5849 Ruth Street) UT -02 -009 0 65,000 65,000 Well #12 (6721 2nd Street) UT -02 -010 0 65,000 65,000 Well #16 (6301 Gleason Road) UT -02 -011 0 160,000 160,000 Well #17 (5900 Park Place) UT -02 -012 0 160,000 160,000 Portable Generator Replacement 25OKW UT -02 -013 0 100,000 100,000 Well #10 (4500 West 76th Street) UT -02 -014 0 65,000 65,000 Well #11 (4500 West 76th Street) UT -02 -015 0 65,000 65,000 Well #17 Piping to Filter Plant #2 UT -02 -016 0 300,000 300,000 Lift Station #22 (7701 France Avenue) UT -02 -017 0 100,000 100,000 Lift Station #21(5970 Walnut Drive) UT -02 -018 0 100,000 100,000 Water Treatment Plant #1 Roof Repair UT -02 -019 0 60,000 60,000 Generator Storage Area UT -02 -020 0 40,000 40,000 Stone Sewer. City Hall UT -02 -021 0 90,000 90,000 Watennain Extension - Oxford Avenue UT -02 -022 0 100,000 100,000 Watennain extension - York Avenue UT -02 -023 0 100,000 100,000 Stone Sewer. Swimming Pool 8J Pt of France Pond UT -02 -024 0 200,000 200,000 Stone Sewer. Schaeffer Road UT -02 -025 0 160,000 160,000 Utility Department Total 2,870,000 4,180,000 1,845,000 1,195,000 785,000 10,875,000 GRAND TOTAL 23,039,300 9,858,300 5,265,000 5,805,000 4,250,000 48,217,600 Report criteria: All Project Types All Departments All Categories All Priority Levels All category names data All data Page 13 Thursday. January 02. 2003 CAPITAL PLAN City of Edina, MN PROJECTS BY FUNDING SOURCE 2003 thru 2007 Source Project# Priority 2003 2004 2005 2006 2007 Total Enterprise Funds Trellis AQC -00 -005 0 383,000 850,300 367,000 1,024,000 788,000 3,412,300 40,000 40,000 Create Step -In Entry AQC -00 -006 0 Log Loader PK -02.048 140,000 140,000 140,000 Aerial Bucket Truck 140,000 Upgrades and Replacements AQC-00 -007 0 PK -02 -050 0 20,000 20,000 50,000 50,000 100,000 Maintenance Equipment: Braemar GC-00 -002 0 100,000 110,000 125,000 128,000 131,000 594,000 Miscellaneous Equipment Braemar GC -00-007 0 28,000 30,000 30,000 30,000 32,000 150,000 Clubhouse Expansion - East Side: Braemar GC-00 -008 0 450,000 450,000 Replace Maintenance Building: Richards GC-00-009 0 170,000 170,000 Redesign Holes 19 -27: Braemar GC-00-010 0 800,000 800,000 Expand Cart Storage: Braemar GC-00 -011 0 50,000 50,000 Braemar Range Automation GC-00 -012 0 50,000 50,000 Driving Range Renovation GC -02 -001 0 500,000 500,000 Upgrade Electrical Service & Lighting GD -00 -001 0 20,000 20,000 Heating & Inflation System GD-00 -002 0 80,000 80,000 Upgrade Bathrooms To ADA Standards GD -00-003 0 65,000 65,000 50th: Tile In Front of Beer Cooler LIQ -00 -015 0 5,000 5,000 50th: Replace carpet LIQ-01 -001 0 12,000 12,000 50th: Replace 2 Compressors LIO-01 -002 0 16,000 16,000 York: Office Addition LIQ -01 -004 0 15,000 15,000 York: Replace Carpet LIQ-01 -005 0 25,000 25,000 York: Replace Counter Tops LI041 -006 0 10,000 10,000 Vernon - Digital Recorder LIQ-02 -001 0 6,300 6,300 York - Enclose Loading Dock LIQ-02 -002 0 25,000 25,000 50th - Wine Shelving LIQ-02 -003 0 5,000 5,000 50th - Security & Digital Cameras LIQ -02 -004 0 9,000 9,000 50th - Store Remodel LIQ -02 -005 0 75,000 75,000 Enterprise Funds Total 383,000 850,300 367,000 1,024,000 788,000 3,412,300 Equipment Certificates Misc Fumishing/Remodels MB -00 -002 0 700,000 700,000 Log Loader PK -02.048 0 140,000 140,000 Aerial Bucket Truck PK -02 -049 0 110,000 110,000 Vermeer Brush Chjpper PK -02 -050 0 20,000 20,000 Ford 4630 Tractor PK -02 -051 0 45,000 45,000 Chev C-60 Cargo Truck PK -02 -052 0 40,000 40,000 Thursday, January 01. 2003 Page 14 Source Prqject# Priority 2003 2004 2005 2006 2007 Total Toro 580 -D Mower PK -02 -053 0 60,000 60,000 John Deere 2355 Tractor PK -02 -054 0 350,000 45,000 45,000 Fire Department Pumper PS -02 -003 2 350,000 350,000 350,000 Fire Department Pumper PS -02 -005 0 265,000 265,000 #25-437 Pull- Behind Paver PW -02 -010 0 28,000 28,000 #25404 Grader PW -02 -011 0 130,000 130,000 #25-449 Traffic Paint Striper PW -02 -012 0 110,000 110,000 #25459 Front End Loader PW -02 -013 0 120,000 34,000 120,000 #25453: Sealcoat Chip Spreader PW -02 -014 0 90,000 90,000 #25 -456 Pneumatic Roller PW -02 -015 0 60,000 65,000 65,000 Equipment Certificates Total 1,493,000 130,000 485,000 210,000 2,318,000 Hennepin County Signals, Rehab: TH 62 @ France Ave. PW -00 -025 0 350,000 350,000 Hennepin County Total 350,000 350,000 Mn/DOT Signals, Rehab: TH 62 @ France Ave. PW -00 -025 0 580,000 580,000 Mn/DOT Total 580,000 580,000 Municipal State Aid Mill & Oveday:Benton Ave. (Hansen - Hwy 100) PW -00 -004 0 34,000 34,000 Mill & Overlay: Dewey Hill Road (Gleason - Cahill) PW -00 -005 0 51,000 51,000 Mill & Overlay. Valley View (TH100= Wooddale) PW -00-007 0 60,000 60,000 Reconstruct:Valley View Rd (Wooddale - 64th ST) PW -00 -008 0 1,480,000 1,480,000 Mill & Overlay: Valley Lane (Tracy - 66th) PW -00 -009 0 43,000 43,000 Mill & Overlay: Vernon (Lincoln Dr. - Gleason) PW -00 -010 0 78,000 78,000 Mill & Overlay: W. 50th St (TH 100 - France) PW -00-011 0 80,000 80,000 Reconstruct: 44th Ave. (TH 100 - France) PW -00 -012 0 320,000 320,000 Mill & Overlay: Brookside (Interlachen - RR) PW -00-013 0 38,000 38,000 Reconstruct Wooddale (Valley View -Tower Ave.) . PW -00 -014 0 384,000 384,000 Concrete Rehab: Tracy Ave. (Vernon - TH62) PW -00-015 0 162,000 162,000 Mill & Overlay: Valley View (Tracy - Gleason) PW -00 -016 0 72,000 72,000 Concrete Rehab: W. 70th St (TH100 - France) PW -00-017 0 203,000 203,000 Mill & Overlay: Wooddale Ave. (Tower - 50th St) PW-00 -018 0 54,000 54,000 Signals: Edinborough Way @ 76th St PW -00-020 0 105,000 105,000 Signals, Rehab: TH 62 @' France Ave. PW -00 -025 0 270,000 270,000 Sidewalks/Pathways (MSA) PW -00-030 0 130,000 130,000 130,000 130,000 130,000 650,000 Reconstruct Valley View Rd & TH62 PW -00 -073 0 400,000 400,000 Concrete Rehab: Parklawn Ave. (France to W 77) PW -00 -074 0 240,000 240,000 Signals: W 76th St & York Ave PW -01 -005 0 290,000 290,000 Pedistrian Bridge - Valley Lane & VV Rd PW -01 -008 0 18,000 18,000 Reconstruct West 70th St. & Metro Blvd. PW -01 -010 0 420,000 420,000 Reconstruct: W. 62nd St. ( Oaklawn - France) PW -01 -011 0 264,000 264,000 Thursday, January 02, 2003 Page 15 Source Project# Priority 2003 2004 2005 2006 2007 Total Mill & Overlay: Eden Ave. (Vernon to Arcadia) PW -01 -013 0 18,000 18,000 Mill & Overlay: Gleason Rd. (Valley View to TH62) PW -01 -014 0 55,000 55,000 Reconstruct W. 58th St. (Concord to France) PW -02 -001 0 440,000 100,000 540,000 Reconstruct Concord Ave (VVRD to Southview Ln) PW -02 -002 0 400,000 400,000 Reconstruct Southview Ln (TH100 to Concord) PW -02 -003 0 340,000 340,000 Mill & Overlay: Blake Rd (Interlachen to Hopkins) PW -02 -004 0 120,000 120,000 Municipal State Aid Total 1,730,000 2,521,000 1,119,000 1,086,000 733,000 7,189,000 Revolving Fund Bathroom Remodel (Arena) A -00 -001 0 25,000 25,000 Truck With Snow Plow A -00 -002 0 25,000 25,000 Replace Zamboni A -00 -006 0 90,000 90,000 Building Maintenance A -00 -008 0 25,000 25,000 50,000 Roof Repair. Art Center ART -00 -002 0 8,000 8,000 Kiln Replacement Art Center ART -00 -008 0 6,300 6,300 Energy Efficient Window Replace Art Center ART -00-009 0 8,000 8,000 Fire Suppression Art Center ART -00 -012 0 40,000 40,000 Parking Lot Expansion ART -01 -001 0 15,000 10,000 25,000 Citywide Fiber Optic Cabling CW -02-001 0 50,000 50,000 50,000 50,000 200,000 Tot Lot (Edin) ECL -00-002 0 200,000 200,000 Paver Replacement (Edin) ECL -00 -004 0 15,000 14,000 29,000 Greensmowers (Centen) ECL -00-013 0 10,000 10,000 Replaster Pool EP ECL -00 -017 0 30,000 30,000 In -Ground Speakers at CL ECL -00 -018 0 7,000 7,000 Window Glazing - Edinborough Park ECL -00 -020 0 10,000 10,000 Energy Management System ECL -00 -021 0 14,000 14,000 Refurbish Sound System - Centennial Lakes Park ECL -00 -022 0 8,000 8,000 Refurbish Sound System - Edinborough Park ECL -00-023 0 12,000 12,000 Replace Pool Heater- Edinborough Park ECL -00 -025 0 14,000 14,000 Remodel Locker Rooms - Edinborough Park ECL -00-026 0 15,000 15,000 Replace Boiler - EdinboroughPark ECL -00-027 0 20,000 20,000 Pool Filter Room Exhaust ECL -00 -028 0 9,000 9,000 4X4 Truck - Centennial Lakes ECL -00 -029 0 25,000 25,000 Replace Telephone System ECL -00 -032 0 10,000 10,000 Replace Skate Tile - Centennial Lakes ECL -00-33 0 7,000 7,000 Reshingle Centrum Building ECL -02 -002 0 60,000 60,000 Replace Toro Groundsmaster Mower ECL -02 -003 0 22,000 22,000 Cushman Vehicle ECL -02 -004 0 10,000 10,000 City Hall and Police Building MB-00 -001 0 12,286,000 12,286,000 Misc Furnishing/Remodels MB -00 -002 0 10,000 10,000 15,000 15,000 50,000 Playground: Normandale Park PK -00 -023 0 115,000 115,000 Pathway Repairs/Additions: Amason Acres PK -00 -028 0 30,000 30,000 Pathway Repairs/Additions: Cornelia School Park PK -00 -029 0 50,000 50,000 Pathway replacement: Walunt Ridge Park PK -00 -030 0 60,000 60,000 Thursday. January 02. 3003 Page 16 Source Project# Priority 2003 2004 2005 2006 2007 Total Playground: Alden Park PK -00 -031 0 110,000 110,000 Parking Lot Arneson Park PK -00-032 0 68,000 68,000 Renovate senior soccer field: Pamela Park PK -00 -033 0 250,000 250,000 Parking Lot Weber Park PK -00 -035 0 77,000 77,000 Replace/Upgrade Concessions Bldg: Courtney PK -00 -036 0 250,000 250,000 Playground: McGuire Park PK -00 -037 0 120,000 120,000 Senior Center Indoor Furnishings PK -00 -EXT 0 52,000 52,000 Renovate softball field: Todd Park PK -01 -001 0 91,000 91,000 Renovate soccer field: Braemar Park PK -01 -003 0 312,000 312,000 Renovate west baseball field: Countryside Park PK -01 -004 0 .138,000 138,000 Skate Park Development - Yorktown Park1YMCA PK -0 I-EXT 0 100,000 100,000 Playground: Sherwood Park PK -02 -001 0 100,000 100,000 Cahill School & Grange building repairs PK -02 -002 0 128,000 128,000 Showmoble PK -02 -003 0 100,000 100,000 New Entrance: Arneson Acres Park PK -02 -004 0 35,000 35,000 Lift Station (Sanitary): Arneson Greenhouse PK -02 -005 0 45,000 45,000 Renovate west soccer field: Lewis Park PK -02 -006 0 280,000 280,000 Lewis Park west soccer field lighting PK -02 -007 0 40,000 40,000 New Maintenance Garage: Courtney Fields PK -02 -008 0 92,000 92,000 Exterior walls, windows & doors Creek Valley PK -02 -009 0 150,000 150,000 Digital Mugshot System PS-00 -002 0 26,000 26,000 City Radio Communications Infrastructure PS -00-003 2 1,500,000 1,500,000 Addition (Women's Locker Room, Etc.): Station #1 PS-00 -005 2 300,000 300,000 Roof Replacement Fire Station #1 PS-00-013 3 40,000 40,000 Install Generator @ Fire Station #1 PS -00 -014 2 20,000 20,000 Sprinkler System: Fire Station #1 PS -00 -015 2 30,000 30,000 Rehab Parking Lot Fire Station #1 PS-00 -016 3 17,000 17,000 Carpeting: Five Station #1 PS -00 -018 3 15,000 15,000 SCBA Air Compressor PS -00 -019 2 40,000 40,000 Training Ctr Burner Unit PS -01 -001 3 40,000 40,000 Additional Vehicle Bay to Fin; Station #2 PS -01 -002 4 250,000 250,000 In-Squad Video System PS -01 -003 0 50,000 50,000 Digital Fingerprint System PS -01 -004 0 40,000 40,000 Computerized Emergency Medical Dispatch PS -02 -001 2 30,000 30,000 800 mhz Fiber Optic Connection PS -02 -002 0 150,000 150,000 Outdoor Warning System PS -02 -004 0 40,000 40,000 Sidewalks/Pathways: City Costs PW -00 -031 0 50,000 50,000 50,000 50,000 200,000 Public Works Building Improvements PW -00 -069 0 25,000 375,000 25,000 25,000 25,000 475,000 Landscaping: W 54th St at Minnehaha Creek PW -02 -005 0 45,000 45,000 Public Works: Braemar Cold Storage: Concrete Floor PW -02-006 0 40,000 40,000 80,000 Public Works: Braemar Work Site - Lead Removal PW -02 -007 0 100,000 100,000 Sidewalk: Wilson Road (Southview Lane to Eden Ave) PW -02 -008 0 90,000 90,000 Sidewalk: Wooddale Ave (at W 44 St) PW -02 -009 0 20,000 20,000 Thursday, January 02, 2003 Page 17 Source Project# Priority 2003 2004 2005 2006 2007 Total Revolving Fund Total 14,998,300 1,651,000 ,838,000 1,075,000 1,154,000 19,716,300 Special Assessments Reconstruct: 44th Ave. (TH 100 -France) PW -00 -012 0 80,000 80,000 Reconstruct: Wooddale (Valley View -Tower Ave.) PW -00 -014 0 96,000 96,000 Concrete Rehab: Tracy Ave. (Vernon - TH62) PW -00 -015 0 80,000 80,000 Concrete Rehab: W. 70th SL (TH100 - France) PW -00 -017 0 80,000 80,000 Signals: Edinborough Way @ 76th St. PW -00 -020 0 105,000 105,000 Neighborhood Street Recon. Program PW -00 -026 0 400,000 400,000 400,000 400,000 400,000 2,000,000 Street Lighting Highlands Area PW -00 -027 0 50,000 50,000 Concrete Rehab: Parklawn Ave. (France to W 77) PW -00 -074 0 60,000 60,000 Reconstruct: West 70th SL & Metro Blvd. PW -01 -010 0 80,000 80,000 Reconstruct: W. 62nd St. (Oaklawn - France) PW -01 -011 0 56,000 56,000 Reconstruct: W. 58th St. (Concord to France) PW -02 -001 0 110,000 50,000 160,000 Reconstruct: Concord Ave (VVRD to Southview Ln) PW -02 -002 0 100,000 100,000 Reconstruct Southview, Ln (TH100 to Concord) PW -02 -003 0 60,000 60,000 Special Assessments Total 615,000 576,000 646,000 590,000 580,000 3,007,000 State Bridge Bond Browndale Bridge PW -00-028 0 80,000 320,000 400,000 56th Street Bridge PW -00 -029 0 250,000 250,000 State Bridge Bond Total 80,000 320,000 250,000 650,000 Utility Funds Landscaping: W 54th St at Minnehaha Creek PW -02 -005 0 20,000 20,000 Public Works: Braemar Work Site - Lead Removal PW -02 -007 0 100,000 100,000 Lift Station #5 (5601 Code Avenue) UT -00 -001 0 100,000 100,000 Lift Station#13 (4720 W. 65th St) UT -00 -004 0 75,000 75,000 Lift Station # 14 (7433 Metro Blvd) UT -00 -005 0 150,000 150,000 Lift Station # 15 (6100 Olinger) UT -00 -006 0 100,000 100,000 Van Valkenburg Water Tower (paint) UT -00 -008 0 600,000 600,000 Filter Plant #2 (5901 Ruth Drive) UT -00 -011 0 120,000 1,300,000 1,420,000 Watermain/Sanitary: Country Club Area UT -00 -020 0 300,000 300,000 Watennain /Sanitary: Nine Mile Village UT -00 -021 0 300,000 300,000 Utility Data Collection System (Water) UT -00 -023 0 800,000 100,000 900,000 Utility Data Collection System (Sanitary) UT -00 -024 0 900,000 900,000 Water Main Improvements (Service Lines) UT -00 -025 0 100,000 100,000 100,000 200,000 100,000 600,000 Sanitary Sewer. Manhole Rehabilitation UT -00 -026 0 50,000 50,000 50,000 50,000 50,000 250,000 Storm Sewer. W. 59th Street & Ashcroft Ave. UT -00 -028 0 120,000 120,000 Storm Sewer. Catch Basin Repair/Replace UT -00 -029 0 50,000 50,000 50,000 50,000 50,000 250,000 Pond & Lake TreatmentfDredging UT -00 -030 0 60,000 60,000 60,000 60,000 60,000 300,000 Storm Sewer Upgrade - Drain Tile System UT -00 -034 0 120,000 120,000 120,000 120,000 120,000 600,000 Stone Sewer - Pipe and Grading Improvements UT -01 -003 0 60,000 60,000 60,000 60,000 60,000 300,000 Sanitary Sewer. Pipe replacement UT -01 -004 0 60,000 60,000 60,000 60,000 60,000 300,000 Thursday. January 02. 2003 Page 18 Source Project# Priority 2003 2004 2005 2006 2007 Total Portable Generator. 300 KW UT -01 -005 0 75,000 75,000 Portable Generator. 400 KW Wtr Trtrnt Pnt No 3 UT -01 -008 0 100,000 100,000 Portable Generator. 400 KW Wtr Trtmt Pnt No 4 UT -01 -009 0 100,000 100,000 Well #8 (6600 Ridgeview Drive) UT -02 -001 0 205,000 205,000 Dublin Road Revservoir Rehabilitation UT -02 -002 0 100,000 100,000 Stonnwater Lift Station (Highlands Lake) UT -02 -003 0 75,000 75,000 Annual Vehicle Replacements UT -02 -004 0 55,000 75,000 55,000 185,000 Well #7 (5241 Eden Circle) UT -02 -005 0 100,000 100,000 Well #14 (6367 Dewey Hill Road) UT -02 -006 0 160,000 160,000 well #19 (6754 Valley View Road) UT -02 -007 0 120,000 120,000 Well #3 (5233 Halifax Avenue) UT -02 -008 0 160,000 160,000 Well #6 (5849 Ruth Street) UT -02 -009 0 65,000 65,000 Well #12 (6721 2nd Street) UT -02 -010 0 65,000 65,000 Well #16 (6301 Gleason Road) UT -02 -011 0 160,000 160,000 Well #17 (5900 Park Place) UT -02 -012 0 160,000 160,000 Portable Generator Replacement: 25OKW UT -02 -013 0 100,000 100,000 Well #10 (4500 West 76th Street) UT -02 -014 0 65,000 65,000 Well #11(4500 West 76th Street) UT -02 -015 0 65,000 65,000 Well #17 Piping to Filter Plant #2 UT -02 -016 0 300,000 300,000 Lift Station #22 (7701 France Avenue) UT -02 -017 0 100,000 100,000 Lift Station #21 (5970 Walnut Drive) UT -02 -018 0 100,000 100,000 Water Treatment Plant #1 Roof Repair UT -02 -019 0 60,000 60,000 Generator Storage Area UT -02 -020 0 40,000 40,000 Stone Sewer. City Hall UT -02 -021 0 90,000 90,000 Watenmain Extension - Oxford Avenue UT -02 -022 0 100,000 100,000 Watermain extension - York Avenue UT -02 -023 0 100,000 100,000 Storm Sewer. Swimming Pool 8l Pt of France Pond UT -02 -024 0 200,000 200,000 Stone Sewer. Schaeffer Road UT -02 -025 0 160,000 160,000 Utility Funds Total 2,890,000 4,180,000 1,845,000 1,295,000 785,000 10,995,000 GRAND TOTAL 23,039,300 9,858,300 5,265,000 5,805,000 4,250,000 48,217,600 Report criteria: All Project Types All Departments All Categories All Priority Levels All category names data All data Page 19 Thursday, January 02, 2003 �Z�A,1Ll� F -k oi \`moo \ lo�l V:t-� m 0 a� CIP PROJECT DESCRIPTIONS i o� \moo Cl) \ 't%t I o .V)) 2003 CAPITAL PLAN City of Edina, MN rProject # A -00 -008 Project Name Building Maintenance _..... _ .. ..... ........ _..._.. Type Improvement Priority Useful Life Contact Category Department category names Description West Arena board kick plate replacement - $8,000. Lobby handicap door opener - $7,000. East Arena rink lights - $10,000. Arena Total Project Cost $50,000 Justification 8" kick plate is worn out from using the power edging machine. mdicap door needed to serve our special population (those with disabilities). This is not required by ADA (currently compliance), however, we have received requests. Arena rink lights are old and less energy efficient. Expenditure 2003 2004 2005 2006 2007 Total Future Construction/Maintenance 25,000 25,000 50,000 �0 Total 25,000 25,000 50,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Revolving Fund 25,000 25,000 50,000 0 Total 25,000 25,000 50,000 Total CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # ART -00 -008 Project Name Mn Replacement Art Center Type improvement Priority n/a Useful Life Contact Category Department Art Center category names Total Project Cost S6,300 ku ldln needs to be replaced. Has been in use since 1992 and was converted to natural gas in 1998. A car -kiln will built utilizing current burners. Justification Che rake kiln is very inefficient and difficult to use. Demands on its use have grown with the student population. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Furnishings 6,300 6,300 Total 6,300 6,300 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 6,300 6,300 Total 6,300 6,300 CAPITAL PLAN 2003 thnr 2007 City of Edina, MN Project # ART -00 -009 Project Name Energy Efficient Window Replace Art Center Type Improvement Priority n/a Useful Life Contact Category Department Art Center category names Total Project Cost $8,000 Replace loft windows. Seven windows up there plus some damaged sills. Need to consider Diana's office for sure and possibly main bathroom and front kitchen windows. Justification Windows are original to the house which is 50+ years old. The 2nd floor windows are in especially bad mechanical - ondition. They are difficult to close, rotting in places and very inefficient. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 8,000 8,000 Total 8,000 8,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 8,000 8,000 Total 8,000 8,000 CAPITAL PLAN City of E j Project # Project Name Type Useful Life Category dina, MN ECL -00 -002 Tot Lot (Edin) Improvement Priority Contact Department category names 2003 rhru 2007 n/a Park & Recreation Edinborough Pk/Centennial Lks Total Project Cost $200,000 Install a large playground equipment structure over the existing ice rink. Justification to current Edinborough Park tot lot was installed in 1987 and is one of the heaviest used playground equipment sites Edina. It is becoming very worn, and several key components of the structure have broken and been removed. There no replacement parts available for most of the structure. The existing tot lot structure does not comply with current tyground codes. The replacement sturcture would go ove the existing ice rink. Prior Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 200,000 200,000 Total Total 200,000 200,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 0 Revolving Fund 200,000 200,000 Total Total 200,000 200,000 CAPITAL PLAN City of Edina, MN ECL -00 -004 Project # Project Name paver Replacment (Edin) Type Improvement Priority Useful Life Contact Category Department category names Description replacing the ouside walkway pavers at Edinborough park. 2003 thru 2007 n/a Park & Recreation Edinborough Pk/Centennial Lks Total Project Cost $39,000 i Justification _ Sidewalk pavers on the outside pathways are heaving and in need of repair. Several tripping incidents have occurred in he past few years. Replacement of the worst pavers started in 2001 and will be finished in 2003. 2006, the main entrance pavers will be 20 years old and in need of replacement. They are cracked and uneven. Prior Expenditure 2003 2004 2005 2006 2007 Total F--1-0—,000-1 EquipNehides/Fumishings 15,000 14,000 29,000 Total Total 15,000 14,000 29,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 10,000 Revolving Fund 15,000 14,000 29,000 Total Total 15,000 14,000 29,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # ECL -00 -020 Project Name window Glazing - Edinborough Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Edinborough Pk/Centennial Lks category names the windows at Edinborough Park that are leaking. Justification Total Project Cost $10,000 The roof windows at Edinborough Park are 16 years old and leak when it rains. The windows need to be reglazed (caulking) around the edges to stop the leaking. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 10,000 10,000 Total 10,000 10,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 10,000 10,000 Total 10,000 10,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # GC -00 -002 Project Name Maintenance Equipment: Braemar Type Improvement Priority Na Useful Life Contact Park & Recreation Category Department Golf Course category names Total Project Cost $993,500 Description I _ Routine equipment replacement purchases for mowers, and other smaller miscellaneous maintenance equipment. Justification These are routine equipment replacement purchases for mowers, and other miscellaneous maintenance equipment that are on a 10 -15 year replacement schedule. Prior Expenditure 2003 2004 2005 2006 2007 Total 399,500 EquipNehides/Fumishings 100,000 110,000 125,000 128,000 131,000 594,000 Total Total 100,000 110,000 125,000 128,000 131,000 594,000 Prior Funding Sources 399,500 Enterprise Funds Total 2003 2004 2005 100,000 110,000 125,000 2006 2007 128,000 131,000 Total 594,000 Total 100,000 110,000 125,000 128,000 131,000 594,000 CAPITAL PLAN City of Edina, MN Project # GC -00 -007 LP.vject Name Miscellaneous Equipment: Braema Type Improvement Priority Useful Life Contact Category Department category names Description 2003 thru 2007 i r n/a Park & Recreation Golf Course Total Project Cost $210,000 equipment replacement purchases for driving range equipment and small utility vehicles. Justification ,se are routine equipment replacement purchases for cushmans, ball pickers, and other small utility equipment that on a 10 year replacement schedule. Prior Expenditure 2003 2004 2005 2006 2007 Total 667500 EquipNehicles/Fumishings 28,000 30,000 30,000 30,000 32,000 150,000 Total Total 28,000 30,000 30,000 30,000 32,000 150,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total F-6-0—,00-01 Enterprise Funds 28,000 30,000 30,000 30,000 32,000 150,000 Total Total 28,000 30,000 30,000 30,000 32,000 150,000 CAPITAL PLAN 2003 thn, 2007 City of Edina, MN Project # GC -00 -009 Project Name Replace Maintenance Building: Richards Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Golf Course category names Total Project Cost $170,000 .e new Maintenance Building will replace an old an structurally questionable building that has reached its life pectancy. It will be a permanent structure, capable of storing expensive maintenance equipment and golf cars, as well allow for parts storage and a work bench area. Justification _I The existing building is in need of replacement to allow for safe and adequate storage of maintenance equipment and golf cars. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 170,000 170,000 Total 170,000 170,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 170,000 170,000 Total 170,000 170,000 CAPITAL PLAN City of Edina, MN Project # GD -00 -002 j Project Name �.. - - - -- Heating & Inflation System Type Improvement Priority Useful Life Contact Category Building Improvements Department category names 2003 thru 2007 I I I n/a Park & Recreation Golf Dome Total Project Cost $80,000 Description [replace 20 year old inflation/heating system at the Golf Dome. The heating system went out in 2002 and can not be Justification Che inflation system is at the end of its useful life. The Dome can be damaged Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 80,000 80,000 Total 80,000 80,000 CAPITAL PLAN City of Edina, MN ;Project # LIQ -02 -003 Project Name 50th - Wine Shelving Type Improvement Useful Life Category Equipment Replacement category names 2003 thn, 2007 Priority n/a Contact Liquor Stores Department Liquor Stores Total Project Cost $5,000 Description J -- - - - - -- - -- Replace existing wine racks on south wall with shelving down to floor. Move wine racks where displays are currently. LJustification— - jIncrease selection of imported wines and to get like items together on shelf. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicies /Fumishings 5,000 5,000 Total 5,000 5,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 5,000 5,000 Total 5,000 5,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # MB-00-001 Project Name City Hall and Police Building Type Improvement Priority n/a Useful Life Contact Asst City Manager Category Building Improvements Department Municipal Buildings category names Total Project Cost $14,420,000 Build a new City Hall and Police Department facility to replace the current building. ... .......... Justification A new City Hall and Police Department building is necessary due to age, condition and space limitations of present Prior Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 12,286,000 12,286,000 Total Total 12,286,000 12,286,000 Prior Funding Sources Revolving Fund Total 2003 2004 2005 2006 2007 Total Future 12,286,000 12,286,000 Total 12,286,000 12,286,000 Total CAPITAL PLAN City of Edina, MN Project # MB -00 -002 Project Name Misc FurnishingMemodels Type improvement Priority Useful Life Contact Category Department category names Description 2003 thnr 2007 ------ ----- _ i n/a Municipal Buildings Total Project Cost $750,000 2003 expenditure is for furnishings for the new City Hall/Police Building. Future funds are necessary for ges /additions to files area, workstations and record storgae for City Hall and the Police Department. Justific lion Expenditure 2003 2004 2005 2006 2007 Total Equip/Vehides /Furnishings 700,000 10,000 10,000 15,000 15,000 750,000 Total 700,000 10,000 10,000 15,000 15,000 750,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 700,000 700,000 Revolving Fund 10,000 10,000 15,000 15,000 50,000 TOtal 700,000 10,000 10,000 15,000 15,000 750,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # PK -00 -023 Project Name Playground: Normandale Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Park & Recreation category names Total Project Cost $115,000 Meet with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid. Includes removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete border and adding new playground equipment with accessible path to transfer stations. Justification current playground equipment was installed in 1986 and is becoming wom from age and use. Playground pment is currently on a 15 year replacement schedule. In 2002, Normandale Park's equipment will be 16 years old. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 115,000 115,000 Total 115,000 115,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 115,000 115,000 Total 115,000 115,000 CAPITAL PLAN City of Edina, MN Project # PK- 00 -EXT Project Name Senior Center Indoor Furnishings Type Improvement Priority Useful Life Contact Category Building Improvements Department category names 2003 rhru 2007 I n/a Park & Recreation Park & Recreation Total Project Cost $202,000 indoor furnishings for the new Senior Citizen Center at Grandview that are not eligible for funding through tax t financing. Furnishings include items such as chairs, tables, pool tables, clocks, cabinets, lamps, whiteboards, s, kitchen utensils, etc. Justification The new Senior Citizen Activities Center at Grandview will be complete and ready for use in early 2002. The new facility will need numerous furnishings, which have been prioritized by the Edina Senior Citizen's Adviory Committee. I Prior 150,000 Total Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Furnishings 52,000 52,000 Total 52,000 52,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total F-150—,00-01 Revolving Fund 52,000 52,000 Total Total 52,000 52,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # PK- 01 -EXT Project Name I Skate Park Development - Yorktown Park/YMCA Type Improvement Priority n/a Useful Life Contact Category Park Development Department Park & Recreation category names Description Total Project Cost $180,000 Develop a tri -city outdoor skate park for in -line skates, skateboards, and trick bikes. This would be a Tier II level outdoor skate park made entirely of concrete. The cities of Edina, Bloomington and Richfield, and the Southdale YMCA would cooperatively fund the project. The facility would be run by the Southdale YMCA. The tri -city skate park would be a for fee facility. Justification several years, we have received requests via phone calls, petitions anti a -malls for a skate park m tsalna. l lie blue ion Committee also validated the need for a skate park in Edina. This recreational facility offers opportunities for - traditional athletic play. Prior Expenditure 2003 2004 2005 2006 2007 Total F--8-0,-000-1 Construction/Maintenance 100,000 100,000 Total Total 100,000 100,000 Prior Funding Sources 85,000 Revolving Fund Total 2003 2004 2005 2006 2007 Total 100,000 Total 100,000 100,000 100,000 CAPITAL PLAN City of Edina, MN Project a PK -02 -001 Project Name Playground: Sherwood Park Type Improvement Priority Useful Life Contact Category Park Development Department category names 9 2003 thru 2007 n/a Park & Recreation Park & Recreation Total Project Cost $100,000 with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid. ies removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete r and adding new playground equipment with accessible path to transfer stations. Justification The current playground equipment was installed in 1991. Playground equipment is currently on a 15 year replacement schedule. If replaced in the year 2006, the equipment will have been 16 years old. In some cases, even if equipment appears to be structurally sound after 15 years, the equipment will likely no longer conform to current safety standards and will need a new look. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN j Project # PK -02 -002 Project Name Cahill School & Grange building repairs Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Park & Recreation category names Total Project Cost $128,000 Description - - - -- - - - - - -- -. -- The historic Cahill School and Grange buildings need roof replacement, custom wood window replacement, exterior wall painting that includes some wood siding replacement, and drain tile work on both buildings. Justification Both roofs are in need of replacement, there is water constantly seeping into the basements of both buildings, the windows are falling out of the rotted wood panes, and the exterior walls need painting while some exterior boards need to be replaced. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 128,000 128,000 Total 128,000 128,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 128,000 128,000 Total 128,000 128,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PK -02 -004 Project Name New Entrance: Arneson Acres Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Park & Recreation category names Total Project Cost $35,000 JViden public entrance /exit, install island for incoming and outgoing traffic, remove berm along 70th Street, and install tew park identification sign. Justification _ this park improvement is needed to improve the safety and visibility for those wishing to use Arneson Acres Park, )rovide recognition for the Edina Historical Society and Edina Garden Council, and will make the entrance area easier :o maintain. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 35,000 35,000 Total 35,000 35,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 35,000 35,000 Total 35,000 35,000 CAPITAL PLAN 2003 thn, 2007 City of Edina, MN Project # PK-02-005 Project Name Lift Station (Sanitary): Arneson Greenhouse Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Park & Recreation category names Total Project Cost 545,000 19 the Arneson Acres Park Greenhouse restroom facility to the sanitary sewer system. The below-street level s will require a lift station. Justification Correct potential health hazard (septic tank overflow). Reduce sanitary sewer costs long term (no longer pay to pump out septic tank). Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 45,000 45,000 Total 45,000 45,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 45,000 45,000 Total 45,000 45,000 CAPITAL PLAN City of Edina, MN I Project # PK -02 -048 I Project Name Log Loader Type Equipment Useful Life Category Equipment Replacement category names Description j 2003 thru 2007 Priority n/a Contact Park & Recreation Department Park & Recreation Total Project Cost $140,000 Zeplace existing 1988 International Log Loader. Justification The 1988 log loader will be 16 years old and is in need of replacement. The log loader is used year around by the Forestry Department to pick up and transport tree debris from parks, streets, and private property (storm damaged trees). This is considered to be an emergency piece of equipment and is also used by the Electrical Department to transport and .set light poles. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Furnishings 140,000 140,000 Total 140,000 140,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 140,000 140,000 Total 140,000 140,000 CAPITAL PLAN City of Edina, MN ;Project # PS -00 -002 Project Name Digital Mugshot System Type Improvement Useful Life Category Police category names 2003 rhru 2007 Priority n/a Contact Police Department Department Public Safety Total Project Cost $26,000 The Police Department would purchase the digital equipment and hardware to connect with the system administered by the Hennepin County Sheriffs Office. The system tracks all arrestees on a county -wide basis and offers computerized search and retrieval capabilities. Justification 'he present Polaroid system for photographing defendants and suspects is an inefficient system that consumes ignificant officer time when identifying suspects, setting up photo lineups and developing investigative leads. Current .chnology allows digital storage and retreieval of photgraphs on a shared basis. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Furnishings 26,000 26,000 Total 26,000 26,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 26,000 26,000 Total 26,000 26,000 CAPITAL PLAN 2003 thnr 2007 City of Edina, MN Project a pS -00 -003 Project Name City Radio Communications Infrastructur Type Improvement Priority 2 Very Important Useful Life Contact Police Department Category Police Department Public Safety category names Total Project Cost $],500,000 Description Existing base stations, mobile and portable VHF radios would be replaced with digital 800mHz trunked radios that will )e compatible with the Hennepin County/Metro system currently being constructed. The new system will allow nteroperability among all users. Justification ' Project would enable participation in the 800mHz trunked radio project. Replacement of outdated police /fire /public works radio systems would occur. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 1,500,000 1,500,000 Total 1,500,000 1,500,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 1,500,000 1,500,000 Total 1,500,000 1,500,000 CAPITAL PLAN 2003 thrit 2007 City of Edina, MN i Project # PS-00-016 Project Name Rehab Parking Lot: Fire Station #1 Type Improvement Priority 3 Important Useful Life 20 years Contact Fire Department Category Fire Department Public Safety category names Total Project Cost $17,000 project is to resurface the EFD west parking lot. The parking lot would have underground drains from the runoff i the roof and would be resurfaced. Curbing would be added to help drain the lot, extending the life of the lot Justification The west parking lot at fire Station #1 is in need of repair and needs to have some draining control done to prevent ice build up in the winter months. The ice build up has caused injuries due to falls to employees and guest. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 17,000 17,000 Total 17,000 17,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 17,000 17,000 Total 17,000 17,000 CAPITAL PLAN City of Edina, MN rProject # PS -02 -002 Project Name 800 mhz Fiber Optic Connection 2003 thnr 2007 Type Improvement Priority n/a Useful Life Contact Asst City Manager Category Police Department Public Safety category names Total Project Cost $150,000 This item is the cost to run fiber optic cabling from the new City Hall Facility to the Radio Tower located south of Braemar Arena. This provides the most aesthetically pleasing way to connect into the metro radio systems. It also has very little annual operating costs. Alternatives to fiber optic cabling include - 1. Large antennas on the City Hall property 2. Cabling to the ECC water tower and placing a microwave dish on the tower 3. Use of phone lines (T1's) to connectto sytem (very expensive annually). Until all of our analysis of the radio system is complete, we need to budget for the potential impact of running the fiber optic lines. Justification Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 150,000 150,000 Total 150,000 150,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 150,000 150,000 Total 150,000 150,000 CAPITAL PLAN City of Edina, MN Project # PS_02_005 Project Name Fire Department Pumper Type Equipment Priority Useful Life Contact Category Equipment Replacement Department category names 2003 thru 2007 n/a Fire Department Public Safety Total Project Cost $265,000 Description _ This project would be to replace 1977 Fire Department Engine /1500 gpm Pumper with a new pumper. Justification __ J The new pumper is needed to replace the 21 year old pumper which will be at the end of it's useful life. The new 3umper will have greater pupming capacity and needed safety features not available on the current vehicle. The cost to maintain the current pumper is increasing and the reliability is decreasing. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 265,000 265,000 Total 265,000 265,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 265,000 265,000 Total 265,000 265,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN i Project # PW -00 -007 Project Name Mill & Overlay: Valley View (TH100- Wooddale) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $60,000 Description Phis project involves the milling of distressed surface and the repaving of a new surface on Valley View Road from 3wv 100 to Wooddale Avenue. Justification The need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 60,000 60,000 Total 60,000 60,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # pW -00 -009 j LP-M Name Mill & Overlay: Valley Lane (Tracy - 66th) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $43,000 F i Description This project involves the milling of distressed surface and the repaving of a new surface on Valley Lane from Tracy Avenue to W. 66th Street. Justification The need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 43,000 43,000 Total 43,000 43,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 43,000 43,000 Total 43,000 43,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # PW -00 -018 Project Name Mill & Overlay: Wooddale Ave. (Tower - 50th St.) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $54,000 This project involves the milling of distressed surface and the repaving of a new surface on Wooddale Avenue from Tower Avenue to W. 50th Street.. Justification need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 54 ,000 54,000 Total 54,000 54,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 54,000 54,000 Total 54,000 54,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project #' PW_00_020 Project Name Signals Edinborough Way @ 76th St. Type Improvement Priority n/a Useful Life Contact Public Work Category Municipal State Aid Department Public Work: category names MSA Total Project Cost $210,000 X11 17� � Description I This project provides for the installation of a permanent traffic signal at the intersection of Edinborough Way and W. 76th Street. This project also involves the interconnect between York Ave. and Edinborough Way on 76th Street. to the volume of traffic making turning movements to and from Edinborough Way onto W. 76th Street, a lanent traffic signal would provide long -term traffic control at this intersection. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 210,000 210,000 Total 210,000 210,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 105,000 105,000 Special Assessments 105,000 105,000 Total 210,000 210,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN I Project# PW-00-025 i Project Name Signals, Rehab: TH 62 @ France Ave. .. . ... . ... ...... Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $1,200,000 1, Description project provides for the rehabilitation of traffic signals at the intersection of TH-62 and France Avenue. 1 Justification jDue to the volume of traffic along France Avenue, entering and exiting Hwy 100, rehabilitating these traffic signals will 1provide long-term traffic control at this intersection. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 1,200,000 1,200,000 Total 1,200,000 1,200,000 Funding Sources 2003 2004 2005 2006 2007 Total Hennepin County 350,000 350,000 Mn/DOT 580,000 580,000 Municipal State Aid 270,000 270,000 Total 1,200,000 1,200,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW_00 -026 Project Name Neighborhood Street Recon. Program Type Improvement Priority n/a Useful Life Contact Public Works Category Local Streets Department Public Works category names Total Project Cost $2,400,000 Description Chis project will provide for the reconstruction and rehabilitation of various local streets throughout the City in a cost affective manner. Justification i the need to reconstruct these streets are initiated by the recommendations of Staff. These recommendations are based )n condition and age of pavement, and also ratings compared with other local neighborhoods. Prior 400,000 Total Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 400,000 400,000 400,000 400,000 400,000 2,000,000 Total 400,000 400,000 400,000 400,000 400,000 2,000,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total —400—,00-01 Special Assessments 400,000 400,000 400,000 400,000 400,000 2,000,000 Total Total 400,000 400,000 400,000 400,000 400,000 2,000,000 rAlD . ITAL PLAN 2003 thn, 2007 City of Edina, NM [Project # PW-00-027 Project Name Street Lighting Highlands Area . ............... Type Improvement Priority n/a Useful Life Contact Public Works Category Local streets Department Public Works category names Total Project Cost $50,000 These projects will provide for the reinstallation and installation of local street lighting projects. Justification I These projects are initiated by the recommendations of Staff. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 50,000 50,000 Total Funding Sources 50,000 2003 2004 50,000 2005 2006 2007 Total Special Assessments 50,000 50,000 Total 50,000 50,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN -- -------------------------------------- i Project # PW -00 -030 Project Name Sidewalks/Pathways (MSA) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $1,010,000 sidewalks along MSAS designated streets as petitioned from residents. Justification These projects will provide separation of pedestrians and vehicles along the designated routes. Prior Expenditure 2003 2004 2005 2006 2007 Total F-36-0—,0001 construction/Maintenance 130,000 130,000 130,000 130,000 130,000 650,000 Total Total 130,000 130,000 130,000 130,000 130,000 650,000 Prior Funding Sources 200,000 Municipal State Aid Total 2003 2004 2005 2006 2007 Total 130,000 130,000 130,000 130,000 130,000 650,000 Total 130,000 130,000 130,000 130,000 130,000 650,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -00 -069 Project Name Public Works Building Improvements Type Improvement Priority n/a Useful Life Contact Public Works Coordinator Category . Building Improvements Department Public Works category names Total Project Cost $550,000 Description This improvement includes the following potential improvements: 1. Improve truck washing area. 2. Remodel Public Works office space to accommodate removal of Tri-City Lab. 3. Reinsulating the Danen Building ceiling. 4. Revise mechanics area. Justification Currently trucks are being washed outside. This method is inefficient and dangerous especially during the winter . With the Tri-City Lab being relocated to Bloomington in 2002, office space will be available where the lab currently xists. This remodel will enable a more efficient location of the supervisors for both Public Works and Parks. .Currently the Danen Bldg is heated to 50 degree fahrenheight to maintain the snowplows during the winter months. be existing ceiling is falling off and needs replacement. . Since the 1960's the fleet has expanded in both numbers and size. A revised layout will provide "straight in" work talls that would allow all units to enter the shop resulting in a major improvement in efficiency. Expenditure 2003 2004 2005 2006 2007 Total Future Construction/Maintenance 25,000 375,000 25,000 25,000 25,000 475,000 75,000 Total 25,000 375,000 25,000 25,000 25,000 475,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Revolving Fund 25,000 375,000 25,000 25,000 25,000 475,000 75,000 Total 25,000 375,000 25,000 25,000 25,000 475,000 Total CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -00 -073 Project Name Reconstruct: Valley View Rd & TH62 Type Improvement Priority n/a Useful Life Contact Engineering Category Municipal State Aid Department Public Works category names MSA Total Project Cost $950,000 This project provides for the reconstruction of Valley View Road - East bound ramp of TH62 and West 65th Street. Justification project will relieve the conjestion that occurs along France Avenue from TH 62 to West 66th Street. This project also be required for the local Southdale Area improvements. Prior Expenditure 2003 2004 2005 2006 2007 Total 550,000 Construction/Maintenance 400,000 400,000 Total Total 400,000 400,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total F--55-0—,00-01 Municipal State Aid 400,000 400,000 Total Total 400,000 400,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN i Project # PW -00 -074 Project Name Concrete Rehab: Parklawn Ave. (France to W 77) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $300,000 Description Rehab existing concrete roadway. Justification Chis roadway is over 30 years old and is in need of concrete repair. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 300,000 300,000 Tom 300,000 300,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 240,000 240,000 Special Assessments 60,000 60,000 Total 300,000 300,000 CAPITAL PLAN City of Edina, MN category names MSA 2003 thnr 2007 n/a Public Works Total Project Cost $290,000 l� Description This project provides for new left turn lanes for south -bound to east -bound traffic and also for the west -bound to northbound traffic. This project will also update the signal system for the new turn lanes. Justification The current capacity of this intersection requires additional turn lanes... This project will help reduce the conjestion to his area. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 290,000 290,000 Total 290,000 290,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 290,000 290,000 Total 290,000 290,000 Project # PW -01 -005 Project Name _ _.- _... Signals: W 76th St & York Ave - - -- - - Type Improvement Priority Useful Life Contact Category Municipal State Aid Department category names MSA 2003 thnr 2007 n/a Public Works Total Project Cost $290,000 l� Description This project provides for new left turn lanes for south -bound to east -bound traffic and also for the west -bound to northbound traffic. This project will also update the signal system for the new turn lanes. Justification The current capacity of this intersection requires additional turn lanes... This project will help reduce the conjestion to his area. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 290,000 290,000 Total 290,000 290,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 290,000 290,000 Total 290,000 290,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project 0 PW-01-008 Project Name Pedistrian Bridge - Valley Lane & VV Rd Type Improvement Priority n/a Useful Life Contact Engineering Category Sidewalk - Pathways Department Public Works category names MSA Total Project Cost $18,000 aging pedestrian bridge over Nine Mile Creek at Valley View Road. Justification Mis bridge is at the end of its useful life. The steel supports is becoming very corroded and is beyond repair. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 18,000 18,000 Total 18,000 18,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 18,000 18,000 Total 18,000 18,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN F Project # PW-02-004 Project Name Mill & Overlay: Blake Rd (Interlachen to Hopkins) Type Improvement Priority n/a Useful Life Contact Engineering Category Municipal State Aid Department Public Works category names Total Project Cost 4� = $120,000 cr umxmg 4XX N U Ar�I M K. RLY D-- • project involves the milling of distressed surface and the repaving of a new surface on Blake Road from lachen Boulevard to City of Hopkins. Justification i Phis roadway was turned back to the City in 2002 and is in need of rehabilitation. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 120,000 120,000 Total 120,000 120,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 120,000 120,000 Total 120,000 120,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -02 -005 Project Name Landscaping: W 54th St at Minnehaha Creek Type Improvement Useful Life Category Street New Construction category names Description Priority n/a Contact Engineering Department Public Works Total Project Cost $65,000 Landscape boulevard area, improve roadway and storm sewer system at West 54th Street and Minneahaha Creek. Justification This is a local resident petitioned project. This area is currently utilized by Edina Public Works at a temporary street sweeping deposit area. The area is adjacent to the Minnehaha Creek making this a very environmentaly sensitive area. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 65,000 65,000 Total 65,000 65,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 45,000 45,000 Utility Funds 20,000 20,000 Total 65,000 65,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW-02-008 Project Name Sidewalk: Wilson Road (Southview Lane to Eden Ave) Type Improvement Priority n/a Useful Life Contact Engineering Category Sidewalk - Pathways Department Public Works category names Total Project Cost $90,000 Description .onstruct bituminous pathway from South View Lane to Eden Avenue along the westerly side of Normandale / Willson Justification IThe Edina City Council initiated this project. The sidewalk / pathway is needed due to the volume of vehicles and -! 1pedestrians that utilize this frontage road. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 90,000 90,000 Total 90,000 90,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 90,000 90,000 Total 90,000 90,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW_02 -009 Project Name Sidewalk: Wooddale Ave (at W 44 St) Type Improvement Priority n/a Useful Life Contact Engineering Category Sidewalk - Pathways Department Public Works category names Total Project Cost $20,000 sidewalk along easterly side of Wooddale Avenue at West 44th Street, between alley and West 44th Street. Justification ds sidewalk was requested by Edina City Council during the summer of 2002. This is a missing segment of sidewalk pedestrians travel north from the Country Club area of Edina along Woodale Avenue. St. Louis Park is scheduled to nstruct the missing segment located on the westerly side of Wooddale at West 44th Street during the summer of 2003. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 20,000 20,000 Tom 20,000 20,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 20,000 20,000 Total 20,000 20,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -02 -010 Project Name #25437 Pull- Behind Paver Type Equipment Priority n/a Useful Life Contact Public Works Coordinator Category Equipment Replacement Department Public Works category names Description Total Project Cost $28,000 equipment #25 -437 Layton Pull- behind Paver, purchased in 1988. Justification This piece of equipment is within the "15115 Category" where a piece of equipment is worth over $15,000 and its useful life is over 15 years. All other Public Works equipment is replaced within the equipment replacement account of the yearly budget based on useful life replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 28,000 28,000 Total 28,000 28,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 28,000 28,000 Total 28,000 28,000 CAPITAL PLAN City of Edina, MN Project # PW -02 -011 Project Name #25404 Grader Type Equipment Useful Life Category Equipment Replacement category names Description 2003 thru 2007 Priority n/a Contact Public Works Coordinator Department Public Works Total Project Cost $28,000 equipment #25 -404 Caterpillar Tandem Grader, purchased in 1982. Justification s piece of equipment is within the "15115 Category" where a piece of equipment is worth over $15,000 and its useful is over 15 years. All other Public Works equipment is replaced within the equipment replacement account of the rly budget based on useful life replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 130,000 130,000 Total 130,000 130,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 130,000 130,000 Total 130,000 130,000 CAPITAL PLAN City of Edina, MN Project # PW- 02-012 Project Name #25 -449 Traffic Paint Striper Type Equipment Priority Useful Life Contact Category Equipment Replacement Department category names 2003 thru 2007 n/a Public Works Coordinator Public Works Total Project Cost $110,000 equipment #25 -449: GM 4W Paint Stripper, purchased in 1989. Justification This piece of equipment is within the "15/15 Category" where a piece of equipment is worth over $15,000 and its useful life is over 15 years. All other Public Works equipment is replaced within the equipment replacement account of the yearly budget based on useful life replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 110,000 110,000 Total 110,000 110,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 110,000 110,000 Total 110,000 110,000 CAPITAL PLAN City of Edina, MN Project # PW_02 -013 Pro ject Name #25459 Front End Loader Type Equipment Priority Useful Life Contact Category Equipment Replacement Department category names 2003 thru 2007 n/a Public Works Coordinator Public Works Total Project Cost $120,000 equipment #25 -459 Caterpiller 938F Loader, purchased in 1994. Justification s piece of equipment is within the "15115 Category" where a piece of equipment is worth over $15,000 or its useful is over 15 years. All other Public Works equipment is replaced within the equipment replacement account of the rly budget based on useful life replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 120,000 120,000 Total 120,000 120,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 120,000 120,000 Total 120,000 120,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT -00 -001 IProject Name Lift Station #5 (5601 Code Avenue) Type Improvement Priority n/a Useful Life Contact Utility Supt Category Lift Stations Department Utility Department category names Station Replacement Justification Total Project Cost $100,000 I:I i r— station is an older station with high maintenance costs due to obsolete parts. This makes the station unreliable. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN City of Edina, MN [ Project # UT-00-004 Project Name Lift Station#13 (4720 W. 65th St) Type Improvement Priority Useful Life 30 years Contact Category Lift Stations Department category names Description Zevlace Station. 2003 thru 2007 n/a Utility Supt Utility Department Total Project Cost $75,000 Justification Lift station is an older station with high maintenance costs due to obsolete parts. This makes the station unreliable. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 75,000 75,000 Total 75,000 75,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 75,000 75,000 Total 75,000 75,000 CAPITAL PLAN City of Edina, MN Project a UT -00 -005 Project Name Lift Station # 14 (7433 Metro Blvd) Type Improvement Priority Useful Life Contact Category Lift Stations Department category names Station. 2003 rhru 2007 n/a Utility Supt Utility Department Total Project Cost $150,000 I I i r Justification _ Lift station is an older station with high maintenance costs due to obsolete parts. This makes the station unreliable. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 150,000 150,000 Total 150,000 150,000 CAPITAL PLAN City of Edina, MN Project # UT- 00-006 Project Name Lift Station # 15 (6100 Olinger) Type Improvement Priority Useful Life 30 years Contact Category Lift Stations Department category names Replace Station i Justification 2003 thru 2007 -- . ..._..... ...... n/a ': I Utility Supt Utility Department Total Project Cost $100,000 station is an older station with high maintenance costs due to obsolete parts. This makes the station unreliable. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN 2007 Total Construction/Maintenance 120,000 Project # UT -00 -011 1,420,000 Project Name Filter Plant #2 (5901 Ruth Drive) 120,000 2003 Type Improvement Priority n/a Useful Life 30 years Contact Utility Supt Category Filter Plants Department Utility Department category names Total Project Cost 1,300,000 $1,420,000 Totally refurbish filter plant and update to new technology. Justification Needs refurbishing to restore high iron removal capacity. The internal componenets are at the end of their useful life. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 120,000 1,300,000 1,420,000 Total Funding Sources 120,000 2003 1,300,000 2004 2005 2006 1,420,000 2007 Total Utility Funds 120,000 1,300,000 1,420,000 Total 120,000 1,300,000 1,420,000 CAPITAL PLAN 2003 rhra 2007 City of Edina, MN Project # UT_00 -023 i Project Name _- ...._._ - - -... Utility Data Collection System (Water) .. .....I.. .. .. _ ..----- .._.__._ -._. .._.._...... ........_ Type Improvement Priority n/a Useful Life Contact Utility Supt Category Water Main Department Utility Department category names Description data collection system on all wells, pumps and filters. Justification Total Project Cost $900,000 Provides for an efficient operation and control of water system. Will provide security of system and failure alarms. Will also provide operational and performance data. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 800,000 100,000 900,000 Total 800,000 100,000 900,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 800,000 100,000 900,000 Total 800,000 100,000 900,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN 2003 2004 [Project UT -00 -025 roject Name water Main Improvements (Service Lines) Type improvement Priority n/a Useful Life Contact Utility Supt Category Water Main Department Utility Department category names service lines. Justification Total Project Cost $780,000 water service line failure rates due to age and deterioration. x i i Prior Expenditure 2003 2004 2005 2006 2007 Total 180,000 Construction/Maintenance 100,000 100,000 100,000 200,000 100,000 600,000 Total Tom 100,000 100,000 100,000 200,000 100,000 600,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 180,000 Utility Funds 100,000 100,000 100,000 200,000 100,000 600,000 Total Total 100,000 100,000 100,000 200,000 100,000 600,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT -00 -026 Project Name Sanitary Sewer: Manhole Rehabilitation Type Improvement Priority n/a Useful Life Contact Utility Supt Category Sanitary Sewer Improvements Department Utility Department category names manhole covers and rehabilitate manholes. Justification Total Project Cost $500,000 ri is inflow and infiltration into sanitary sewer system due to deteriorating sanitary manholes and leaking covers. Prior 100,000 Total Expenditure 2003 2004 2005 2006 2007 Total Future Construction/Maintenance 50,000 50,000 50,000 50,000 50,000 250,000 150,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Total Prior Funding Sources 2003 2004 2005 2006 2007 Total Future 100,000 Utility Funds 50,000 50,000 50,000 50,000 50,000 250,000 200,000 Total Total 50,000 50,000 50,000 50,000 50,000 250,000 Total CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project# UT-00-028 Project Name Storm Sewer: W. 59th Street & Ashcroft Ave. ® ®� Type Improvement Priority n/a Useful Life Contact Utility Supt Category Storm Sewer Improvements Department Utility Department category names Total Project Cost $120,000 Description Provide a pump outlet for this low area. Justification This was a result of residential flooding due to a no-outlet low area along the rear property lines. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 120,000 120,000 Total 120,000 120,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 120,000 120,000 Total 120,000 120,000 CAPITAL PLAN 2003 thn, 2007 City of Edina, MN Project# UT-00-029 Project Name Storm Sewer: Catch Basin Repair/Replace ------ - ----- Type Improvement Priority n/a Useful Life Contact Utility Supt Category Storm Sewer Improvements Department Utility Department category names Total Project Cost $350,000 Description or replace catch basins and grates. Justification Storm sewer catch basins are failing structurally due to age and the effect of street chemicals (salt). Performance of inletswill be improved by installing high capacity grates. Prior Expenditure 2003 2004 2005 2006 2007 Total F-1-0010-001 Construction/Maintenance 50,000 50,000 50,000 50,000 50,000 250,000 Total Total 50,000 50,000 50,000 50,000 50,000 250,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total F 100,000 Utility Funds 50,000 50,000 50,000 50,000 50,000 250,000 Total Total 50,000 50,000 50,000 50,000 50,000 250,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project N UT -00 -030 Project Name Pond & Lake Treatment/Dredging Type Improvement Priority n/a Useful Life Contact Utility Supt Category Storm Sewer Improvements Department Utility Department category names Total Project Cost $375,000 ponds as necessary. Justification These projects are necessary due to the aging of the City's ponds and lakes. This process involves the lakes filling in from sediment inot the systme and natural life of organic material. Prior Expenditure F-775-,0-0-01 Construction/Maintenance Total Total 60,000 60,000 60,000 60,000 60,000 300,000 2003 2004 2005 2006 2007 Total 60,000 60,000 60,000 60,000 60,000 300,000 Prior Funding Sources 75,000 Utility Funds Total 2003 2004 2005 2006 2007 Total 60,000 60,000 60,000 60,000 60,000 300,000 Total 60,000 60,000 60,000 60,000 60,000 300,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT-00-034 Project Name Storm Sewer Upgrade - Drain Tile System Type Improvement Priority n/a Useful Life Contact Utility Supt Category Storm Sewer Improvements Department Utility Department category names Total Project Cost $720,000 boulevard drain tile systems for clear water discharges such as sump pump discharges. Justification I In 1998 the City undertook a sump pump inspection program that included inspections of all properties in the City to eleminate any clear water connections into the City's sanitary sewer system. The program identified all homes in the City that have sump pumps and other asement water problems. These new Storm sewer improvemms will provide a place for clear water discharges especially during the winter months. Prior Expenditure 2003 2004 2005 2006 2007 Total F-12-0.000-1 Construction/Maintenance 120,000 120,000 120,000 120,000 120,000 600,000 Total Total 120,000 120,000 120,000 120,000 120000 600,000 Prior Funding Sources F- —12-0—,00-01 Utility Funds Total 2003 2004 2005 2006 2007 Total 120,000 120,000 120,000 120,000 120,000 600,000 Total 120,000 120,000 120,000 120,000 120,000 600,000 CAPITAL PLAN 2003 thru 2007 City of - -- Edina, MN - - -- -- - - -- - -- - -- __. Project # UT -01 -003 i Project Name Storm Sewer - Pipe and Grading Improvements Type Improvement Priority n/a Useful Life Contact Engineering Category Storm Sewer Improvements Department Utility Department category names Total Project Cost $360,000 Provide replacement storm sewer for aging system. Justification roadways are reconstructed within the City storm sewers will require updating. Drainage swales also need to be Prior Expenditure 2003 2004 2005 2006 2007 Total —60,000-1 Construction/Maintenance 60,000 60,000 60,000 60,000 60,000 300,000 Total Total 60,000 60,000 60,000 60,000 60,000 300,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 60,000 Utility Funds 60,000 60,000 60,000 60,000 60,000 300,000 Total Total 60,000 60,000 60,000 60,000 60,000 300,000 CAPITAL PLAN City of Edina, MN I Project # UT -01 -004 Project Nam, ame Sanitary Sewer: Pipe replacement Type Improvement Priority Useful Life Contact Category Sanitary Sewer Improvements Department category names Description 2003 thru 2007 n/a Engineering Utility Department Total Project Cost $360,000 Replace aging / failed pipes as roadways are reconstructed or as the pipes fail. Justification Most of the sanitary sewer system consists of clay pipe that was installed upto the 1970's. This type of pipe is more .3rone to failure than the current poly - vinyl - chloride and concrete pipes. The clay pipe is typically more suceptable to .-oot intrusion, which decreases the capacity of a pipe. Prior Expenditure 2003 2004 2005 2006 2007 Total 60,000 Construction/Maintenance 60,000 60,000 60,000 60,000 60,000 300,000 Total Total 60,000 60,000 60,000 60,000 60,000 300,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 60,000 Utility Funds 60,000 60,000 60,000 60,000 60,000 300,000 Total Total 60,000 60,000 60,000 60,000. 60,000 300,000 CAPITAL PLAN City of Edina, MN 2003 thru 2007 n/a Utility Supt. Utility Department Total Project Cost $75,000 300 KW Portable Generator to operate water facilities (wells, treatment plants). Justification The City currently has one 250 KW generator. Additional generators are needed to provide emergency power to 3perate the water system for normal domestic use. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 75,000 75,000 Total 75,000 75,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 75,000 75,000 Total 75,000 75,000 Project # UT -01 -005 Project Name Portable Generator: 300 KW Type Equipment Priority Useful Life 20 years Contact Category Utility Equipment Replacement Department category names 2003 thru 2007 n/a Utility Supt. Utility Department Total Project Cost $75,000 300 KW Portable Generator to operate water facilities (wells, treatment plants). Justification The City currently has one 250 KW generator. Additional generators are needed to provide emergency power to 3perate the water system for normal domestic use. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 75,000 75,000 Total 75,000 75,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 75,000 75,000 Total 75,000 75,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN I FProject #- - --- ------ -UT-02-001 Project Name Well #8 (6600 Ridgeview Drive) Type Improvement Priority n/a Useful Life 15 years Contact Utility supt. Category Wells Department Utility Department category names Total Project Cost $100,000 Redevelop well hole and create a cavity. Rebuild pump and upgrade electrical, mechanical, and chemical equipment. Justification The well is pumping sand and its water production has been reduced. Electrical, mechanical, and chemical feed -quipment is obsolete and not compatible with the SCADA system. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 205,000 205,000 Total 205,000 205,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 205,000 205,000 Total 205,000 205,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT -02 -002 Project Name Dublin Road Revservoir Rehabilitation Type Improvement Priority n/a Useful Life 10 years Contact Utility Supt Category Wells Department Utility Department category names Description Total Project Cost $100,000 the pumping station at the Dublin Rd reservoir. Replace both 200hp motors with two new energy efficient , rebuild pumps and replace obsolete electrical equipment. Justification facility was built in 1959 and has never been rehabbed. The proposed work will reduce operating costs, reestablish ping capabilities, and increase the life of the facility. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT-02-003 Project Name Stormwater Lift Station (Highlands Lake) Type Improvement Priority n/a Useful Life 20 years Contact Utility Supt Category Storm Sewer Improvements Department Utility Department category names Total Project Cost $75,000 Description lift station with one that has two larger pumps and automatic controls. Justification Existing station collects dirt and debris which affects its operation. Larger pumping capibilities are needed to prevent flooding of public and private property. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 75,000 75,000 Total 75,000 75,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 75,000 75,000 Total 75,000 75,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT-02-019 Project Name Water Treatment Plant #1 Roof Repair ......... . Type Improvement Priority n/a Useful Life 50 years Contact Utility Supt Category Filter Plants Department Utility Department category names Total Project Cost $60,000 or replaced structural beams holding up the roof. A report will be developed by a Structural Engineer , the City's options. Justification The beams holding up the roof are split and could collapse. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 60,000 60,000 Total 60,000 60,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT -02 -020 Project Name Generator Storage Area Type Improvement Priority n/a Useful Life Contact Utility Supt Category Water Main Department Utility Department category names Description Total Project Cost $40,000 a storage area at Water Treatment Plant No. 3 (Fred Richard's Golf Course) for Generator Storage. Justification will be a shared structure with the golf course maintenance people. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT-02 -021 Project Name Storm Sewer: City Hall Type Improvement Priority n/a Useful Life Contact Engineering Category Storm Sewer Improvements Department Utility Department category names Description Justification Expenditure 2003 Total Project Cost $90,000 2004 2005 2006 2007 Total Construclion/Maintenance 90,000 90,000 Total 90,000 90,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 90,000 90,000 Total 90,000 90,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT -02 -023 Project Name watermain extension - York Avenue - - - -._ _. ,_., ....... .._— __._....._,.._... _ ._..... .... ... ..__ .._ ...... Type Improvement Priority n/a Useful Life Contact Engineering Category Water Main Department Utility Department category names Total Project Cost $100,000 watermain from York Avenue at West 62nd Street to Zenith Avenue. Justification current watermain on York Avenue is a dead -end watermain causing many brown water problems in the area. Ding the watermain will keep the water circulating within the pipes and will reduce the brown water issue. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN City of Edina, MN Project # UT -02 -025 Project Name Storm Sewer: Schaeffer Road Type Improvement Priority Useful Life Contact Category Storm Sewer Improvements Department category names Description 2003 thru 2007 Total Project Cost $160,000 storm sewer or drain tile along Schaeffer Road from Westwood Court to Haroldswood Lane. Justification y the properties along this roadway are pumping both their sump pumps and pumps from their ponds onto the , thus creating a hazard along the roadway. This project will allow the homeowners to connect to an ►und storm sewer pipe. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 160,000 160,000 Total 160,000 160,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 160,000 160,000 Total 160,000 160,000 Ao oi ;000", \`moo m 0 .a )) 2004 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # AQC -00 -005 Project Name Trellis Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Aquatic Center category names Total Project Cost $40,000 Description ?rovide large shade structures over north and west side of pool deck. Justification Shade has become a necessity as more and more people have become conscientious of the sun and its harmful rays. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # A -00 -002 Project Name Truck With Snow Plow .... - - -- ..._..-- - -._.. - -.. -........... - -- Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Department Arena category names Total Project Cost $25,000 purchase of a 1 ton pickup truck with a snow plow attachment. Justification need to be self - sufficient with plowing snow around the facility before the Street Department is able to plow the .. This will similar to the current Braemar Golf Course self - sufficient snow removal operations. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 25,000 25,000 Total 25,000 25,000 CAPITAL PLAN 2003 thn, 2007 City of Edina, MN Project # ART -00 -002 Project Name Roof Repair: Art Center Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Art Center category names Total Project Cost $8,000 .Art Center roof, along the old section, is in need of minor repair to avoid a complete roof replacement. Some gles and flashing in various areas should stop the minor roof leaks on the south side of the building. Justification The roof on the old section of the Art Center is over 20 years old and in need of repair. It is anticipated that a minor ,-epair will keep the roof in working order for another 4 to 5 years. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 8,000 8,000 Total 8,000 8,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 8,000 8,000 Total 8,000 8,000 CAPITAL PLAN City of Edina, MN Project # CW- 02-001 Project Name Citywide Fiber Optic Cabling Type Improvement Priority Useful Life Contact Category Computer Network Department category names n/a Asst City Manager Citywide Total Project Cost . $200,000 This represents the cost of running fiber optic cabling to a number of our offsite facilities. Currently, we connect to many of our facilities through the use of Tl phone lines which cost us around $3,000 per T1 line. Some of our facilities have multiple T1 lines to accommodate both voice and data transmissions. By running fiber optic cabling to these facilites, the City could remove the operating expense of the T 1 lines from the offsite budgets. There would be a small offset of annual costs associated with service contracts on the equipment needed at each end of the cabling. Most of the ,larger facilities (Fire and Public Works) have a 3-4 year paybcak of the capital costs inoperating cost reductions. Justification Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 50,000 50,000 50,000 50,000 200,000 Total 50,000 50,000 50,000 50,000 200,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 50,000 50,000 50,000 50,000 200,000 Total 50,000 50,000 50,000 50,000 200,000 CAPITAL PLAN City of Edina, MN ....---....__-- - - -- Project # ECL -00 -021 Project Name Energy Management System Type Improvement Priority Useful Life Contact Category Building Improvements Department category names Replace the 1991 energy management system. Justification 2003 thru 2007 n/a Park & Recreation Edinborough Pk/Centennial Lks Total Project Cost $14,000 I I : energy management system at Edinborough Park was installed in 1991 and is obsolete. Replacement componenets very difficult to find. Energy management system controls and monitors set points of HVAC units, rink ipressors, and pool water & air. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Furnishings 14,000 14,000 Total 14,000 14,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 14,000 14,000 Total 14,000 14,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN _ - -- - --- -- - - -- -- -- - - - - - - - - - - -_ . -- - - - - - -- Project # ECL-00 -022 Project Name Refurbish Sound System Centennial Lakes Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Edinborough Pk/Centennial Lks category names Description sound system at Centennial Lakes Park in 2004. Justification Total Project Cost $8,000 park sound sytem was installed in 1991. Outdoor speakers tend to have a life expectancy of 5 -8 years and then I replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Furnishings 8,000 8,000 Total 8,000 8,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 8,000 8,000 Total 8,000 8,000 CAPITAL PLAN 2003 thnr 2007 City of Edina, MN Project N ECL- 00-023 Project Name Refurbish Sound System - Edinborough Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Edinborough Pk/Centennial Lks category names Total Project Cost $12,000 Description [replace the sound system at Edinborough Park. Justification Che Edinborough Park sound system will be 17 years old in 2004. Many of the parts of the system do not work and are )ecoming obsolete. The system will be in need of replacement to function properly. Expenditure 2003 2004 2005 2006 2007 Total Equip/Vehides/Fumishings 12,000 12,000 Total 12,000 12,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 12,000 12,000 Total 12,000 12,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project a ECL -00 -025 Project Name Replace Pool Heater - Edinborough Park . I.... I .. __......... _ __.__. — — ._. -,.._ ..._.._ ,..._ _ _.. _,. ..... - -__. ...... Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Edinborough Pk/Centennial Lks category names the pool heater. Total Project Cost $14,000 Justification This is a routine equipment replacement purchase. The pool heater will be 20 years old and in need of replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 14,000 14,000 Total 14,000 14,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 14,000 14,000 Total 14,000 14,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project a ECL -00 -029 Project Name 4X4 Truck - Centennial Lakes Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Department Edinborough Pk/Centennial Lks category names Total Project Cost $25,000 is a routine equipment replacement purchase, in this case a 4X4 pickup truck. Justification The 4X4 truck at Centennial Lakes Park will be 13 years old and in need of replacement. It is preferred to replace vehicles every 10 years. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 25,000 25,000 Total 25,000 25,000 CAPITAL PLAN City of Edina, MN Project # GC- 00-012 Project Name Braemar Range Automation Type Improvement Priority Useful Life Contact Category Department category names 2003 thru 2007 n/a Park & Recreation Golf Course Total Project Cost $50,000 plan is to add a small building with automated ball dispenser machines. Justification Jsing an automated ball dispenser machine reduces labor costs, increases cash control, and better serves our driving 'ange customers. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 50,000 50,000 Total 50,000 50,000 CAPITAL PLAN City of Edina, MN Project # GC -02 -001 Project Name Driving Range Renovation Type Improvement Priority Useful Life Contact Category Golf Course Redevelopment Department category names 2003 thru 2007 n/a Park & Recreation Golf Course Total Project Cost $500,000 plan calls for the expansion and renovation of the existing driving range. Justification range is 35 years old and often times cannot safely keep up with the demand. The current configuration a safety issue that needs to be corrected. An expanded driving range will allow us to better serve the growing for outdoor grass surface driving range golf. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 500,000 500,000 Total 500,000 500,000 CAPITAL PLAN City of Edina, MN Project # GD -00 -003 Project Name Upgrade Bathrooms To ADA Standards Type Improvement Useful Life Category Building Improvements category names 2003 rhru 2007 Priority n/a Contact Park & Recreation Department Golf Dome Total Project Cost $65,000 the mens and womens bathrooms at the Golf dome to make them ADA compliant. Justification current bathrooms at the Golf Dome facility are not handicap accessible and, therefore, not ADA compliant. It is plan to make these ADA compliant as soon as funds are available. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 65,000 65,000 Total 65,000 65,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 65,000 Enterprise Funds 65,000 65,000 Total Total 65,000 65,000 CAPITAL PLAN City of Edina, MN Project a LIQ -01 -004 Project Name York: Office Addition Type Improvement Useful Life Category Building Improvements category names 2003 thru 2007 Priority n/a Contact Liquor Stores Department Liquor Stores Total Project Cost $15,000 office space above beer cooler for Liquor Director. Justification _ need office space for Liquor Director to conduct business without sharing space with 3 other employees. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 15,000 15,000 Total 15,000 15,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 15,000 15,000 Total 15,000 15,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # LIQ -02 -001 Project Name Vernon - Digital Recorder Type Improvement Priority n/a Useful Life Contact Liquor Stores Category Equipment Replacement Department Liquor Stores category names Total Project Cost $6,300 Description Replace VCR recorder with Digital Recorder. Justification recorder will allow us to get better images. Does not require tapes and is always running. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 6,300 6,300 Total 6,300 6,300 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 6,300 6,300 Total 6,300 6,300 CAPITAL PLAN City of Edina, MN Project # LIQ -02 -002 Project Name York - Enclose Loading Dock 2003 th,u 2007 Type Improvement Priority n/a Useful Life Contact Liquor Stores Category Building Improvements Department Liquor Stores category names Total Project Cost $25,000 existing loading dock and enclose it by adding walls and roof. Will also install mechanical leveling gate. Justification _ need bigger opening and area for checking in merchadise. Wastes energy by always having door open for deliveries. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 25,000 25,000 Total 25,000 25,000 CAPITAL PLAN City of Edina, MN rProject# LIQ -02 -004 Project Name 50th - Security & Digital Cameras Type Improvement Priority Useful Life Contact Category Equipment Replacement Department category names 2003 thru 2007 n/a Liquor Stores Liquor Stores Total Project Cost $9,000 Description j Keplace older cameras with new color ones. Add digital recorder to replace Justification cameras will increase the range we can see of the store right now. Digital recorder is running all the time vs. a that can't. Upgrades our system with current technology. Expenditure 2003 2004 2005 2006 2007 Total Equip/Vehicles /Fumishings 9,000 9,000 Total 9,000 9,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 9,000 9,000 Total 9,000 9,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PK -00 -030 1 Project Name Pathway replacement: Walunt Ridge Park - --- -- - - - - -- - - _ - - - - -- - -- - -. - -.- ... ...- - -- - -- - -- - .... .._..... - - -- —..... - -- —1 Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Park & Recreation category names Total Project Cost $60,000 existing pathway and use for a new sub base and construct a new asphalt pathway on top of the new base. Justification existing pathway will be in need of total replacement by the year 2003. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 60,000 60,000 Total 60,000 60,000 CAPITAL PLAN City of Edina, MN Protect # PK -00 -032 j Project Name Parking Lot: Arneson Park Type Improvement Priority Useful Life Contact Category Park Development Department category names 2003 thru 2007 n/a Park & Recreation Park & Recreation Total Project Cost $68,000 (or do internally) a complete overlay of the Arneson Acres lower parking lot and entryway. Justification Arn eson Park has 2 parking lots (upper and lower). The lower lot is in need of re- paving and re- lining. For safety purposes, the park entrance should be widened to allow for easier and safer entrance into the park. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 68,000 68,000 Total 68,000 68,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 68,000 68,000 Total 68,000 68,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Construction/Maintenance Project # PK -00 -035 77,000 Project Name Parking Lot: Weber Park 77,000 2004 2005 2006 Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Park & Recreation category names Total Project Cost $77,000 Description Contract (or do internally) a complete overlay of the Weber Park parking lot and entryway. - - -_� Justification Currently, the parking lot entrance and parking lot are in need of a complete overlay. The Calvin Christian School may ' assist in some of the maintenance expense due to the new joint use agreement. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 77,000 77,000 Total Funding Sources 2003 77,000 2004 2005 2006 77,000 2007 Total Revolving Fund 77,000 77,000 Total 77,000 77,000 CAPITAL PLAN City of Edina, MN Project # PK -02 -003 Project Name Showmobile Type Improvement Useful Life Category Park Development category names 2003 thru 2007 Priority n/a Contact Park & Recreation Department Park & Recreation Total Project Cost $100,000 existing showmobile (traveling portable stage large enough for 60 piece band) with a new showmobile. Justification current showmobile is over 30 years old and according to the Minnesota Department of Transportation may not be A outside of the City of Edina limits due to its poor road - worthy condition. The portable stage is used for music, ches, grand openings, and performing arts in the parks. It is also used by the Edina School District and St. Stephens rch. There are numerous requests to rent the showmobile by other communities throughout the year. )rtunately, it can no longer be used outside the city limits of Edina. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PK -02 -006 Project Name Renovate west soccer field: Lewis Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Ballfield Improvements Department Park & Recreation category names Total Project Cost $280,000 the soccer field turf and provide new sand and peat mixture sub -soils and re- install the underground irrigation system. Justification This soccer field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The irrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced use of herbicides. Lewis Park's athletic fields have concrete debris buried in its sub -soils which periodically surface due to the frost. All three Lewis Park soccer fields need to have a new three foot base of clean and stable sub- soils for proper drainage and a quality foundation for turf. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 280,000 280,000 Total 280,000 280,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 280,000 280,000 Total 280,000 280,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN j Project # PK-O2 -007 Project Name Lewis Park west soccer field lighting Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Ballfield Improvements Department Park & Recreation category names Total Project Cost $40,000 light fixtures to existing poles on the west side of the Lewis Park central soccer field and add new poles and light res on the west side of Lewis Park west soccer field. Justification There is a shortage of multi- purpose soccer /football fields. The Lewis Park west soccer field is in need of major renovation to correct poor sub - soils, uneven surface, poor drainage, lack of irrigation and poor and unsafe turf conditions. Adding lighting to the field is like adding another field to the compliment of play surfaces. To add to the number of fields, field lighting is an inexpensive investment compared to purchasing additional land and constructing another new field. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PS-00 -005 Project Name Addition (Women's Locker Room, Etc.): Station #1 Type Improvement Priority 2 Very Important Useful Life 100 years Contact Fire Department Category Fire Department Public Safety category names Total Project Cost $300,000 Description [his project would require the hiring of an architect to design an addition to Fire Station #1. It would involve hiring a ;onstruction firm to build an addition, consisting of a Women's locker room/shower room and restroom. Justification Fire Station #1 was designed and constructed for the exclusive use of male firefighters. There is one small (4x6) women's public restroom and no shower facility for women to use. The showers are located in the men's restroom along with the men's locker room. We would like to accommodate our women firefighters /paramedics of the future by preparing a facility for their needs. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 300,000 300,000 Total 300,000 300,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 300,000 300,000 Total 300,000 300,000 CAPITAL PLAN City of Edina, MN category names Description 2003 rhru 2007 3 Important Fine Department Public Safety Total Project Cost $40,000 e project would include tearing off the old roofing material and replacing it with insulation and new roofing material the apperatus area of the station. Justification roof is 30 years old, is leaking and in need of replacement. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 Total 40,000 40,000 Project # PS-00 -013 Project Name Roof Replacement: Fire Station #1 Type Improvement Priority Useful Life 30 years Contact Category Fire Department category names Description 2003 rhru 2007 3 Important Fine Department Public Safety Total Project Cost $40,000 e project would include tearing off the old roofing material and replacing it with insulation and new roofing material the apperatus area of the station. Justification roof is 30 years old, is leaking and in need of replacement. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PS-00 -014 Project Name Install Generator @ Fire Station #1 Type Improvement Priority 2 Very Important Useful Life 30 years Contact Fire Department Category Fire Department Public Safety category names Total Project Cost $20,000 s project would involve the installation of a 50k natural gas- powered electrical generator at Fire Station #1 to replace current 30k generator. Justification The back -up electrical generator at Fire Station #1 is over 30 years old and is in need of replacement. This generator is the original unit, installed when the Station was built. It does not presently have the capacity to run our vital Fire Station equipment. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 20,000 20,000 Total 20,000 20,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 20,000 20,000 Total 20,000 20,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN j Project # PS -00 -015 Project Name Sprinkler System: Fire Station #1 Type Improvement Priority 2 Very Important Useful Life 50 years Contact Fire Department Category Fire Department Public Safety category names Total Project Cost $30,000 This project would involve the installation of an automatic commercial fire sprinkler system in Fire Station #1 (including the present structure and any additional portions of the Station). Justification Fire Station #1 currently has no fire sprinkler system. With the addition of the women's locker room, the addition of a sprinkler system would be required by Fire Code. We would also be setting a good example to the rest of the community. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 30,000 30,000 Total 30,000 30,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 30,000 30,000 Total 30,000 30,000 CAPITAL PLAN City of Edina, MN Project # PS -00 -018 Project Name Carpeting: Fire Station #1 Type Improvement Priority Useful Life 10 years Contact Category Fire Department category names 2003 rhru 2007 3 Important Fire Department Public Safety Total Project Cost $15,000 project involves the removal of the old carpeting and the installation of a new, commercial -grade carpeting. Justification IThe current carpeting in Station #1 will be over 10 years old and due for replacement. Expenditure 2003 2004 2005 2006 2007 Total Equip/Vehicles/Fumishings 15,000 15,000 Total 15,000 15,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 15,000 15,000 Total 15,000 15,000 CAPITAL PLAN City of Edina, NN Project # PS -02 -001 Project Name Computeri Type Equipment Useful Life Category Police Description 2003 thnr 2007 zed Emergency Medical Dispatch Priority 2 Very Important Contact Police Department Department Public Safety category names Total Project Cost $30,000 Computerized Emergency Medical Dispatch (EMD) System - a computer server, software and CAD interface would be purchased to replace the manual flip card system presently used by the 9 -1 -1 dispatchers. Justification Edina's 9 -1 -1 dispatchers provide emergency medical instructions to callers on all medical emergencies. In 2001, the dispatchers provided 2,389 callers EMD using the flip card system. A computerized EMD system interfaced with our Computer Aided Dispatch software would enable dispatchers to process EMD calls faster and more accurately. Timely diatmoses and instruction are critical factors when the call is a true life or death situation. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 30,000 30,000 Total 30,000 30,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 30,000 30,000 Total 30,000 30,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # PW-00_008 Project Name Reconstruct:Valley View Rd ( Wooddale - 64th ST) l Type Improvement Priority n/a Useful Life Contact Engineering Category Municipal State Aid Department Public Works category names Total Project Cost $1,480,000 Description Phis project provides for the reconstruction of Valley View Road from Wooddale Avenue to West 64th Street. This ) roject will provide new concrete curb & gutters, pavement and sidewalks along both sides of Valley View Road. Justification This project was initiated by the Pavement Management Systam due to the roadway paement reaching a point of failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 1,480,000 1,480,000 TOW 1,480,000 1,480,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 1,480,000 1,480,000 Total 1,480,000 1,480,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -00 -011 Project Name Mill & Overlay: W. 50th St. (TH 100 - France) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $80,000 o: This project involves the milling of distressed surface and the repaving of a new surface on West 50th Street from Hwy 100 to France Avenue. Justification The need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 80,000 80,000 Total 80,000 80,000 CAPITAL PLAN City of Edina, MN Project # Pw -00 -012 2003 thru 2007 Protect Name Reconstruct 44th Ave. (TH 100 France) - - - - - -- - - - --- -..._ _.. -- Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $400,000 Description Chis project provides for the reconstruction of W. 44th Street from Hwy 100 to France Avenue. This project will )rovide new concrete curb and gutters, pavement, and sidewalks along the northerly side. Justification project was initiated by the Pavement Management System due to the roadway pavement reaching a point of re. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 400,000 400,000 Total 400,000 400,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 320,000 320,000 Special Assessments 80,000 80,000 Total 400,000 400,000 t r CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # PW -00 -014 Project Name Reconstruct: Wooddale (Valley View -Tower Ave.) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $480,000 project provides for the reconstruction of Wooddale Avenue from Valley View Road to Tower Road. This project provide new concrete curb and gutters, pavement, and sidewalks along the easterly side. Justification This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 480,000 480,000 Total 480,000 480,000 Funding Sources 2003 2004 2005 2006 . 2007 Total Municipal State Aid 384,000 384,000 Special Assessments 96,000 96,000 Total 480,000 480,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -00 -016 Project Name Mill & Overlay: Valley View (Tracy - Gleason) Type improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $72,000 project involves the milling of distressed surface and the repaving of a new surface on Valley View Road from Y Avenue to Gleason Road. Justification need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 72,000 72,000 Total 72,000 72,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 72,000 72,000 Total 72,000 72,000 CAPITAL PLAN City of Edina, MN Project # PW -00 -028 Project Name Browndale Bridge Type Improvement Useful Life Category Local Streets category names 2003 thru 2007 Priority n/a Contact Public Works Department Public Works Total Project Cost $400,000 This project provides for reconstructing this bridge and possible abutments. Justification The need to rehabilitate this bridge was determined by the annual bridge certification program. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 80,000 320,000 400,000 Total 80,000 320,000 400,000 Funding Sources 2003 2004 2005 2006 2007 Total State Bridge Bond 80,000 320,000 400,000 Total 80,000 320,000 400,000 CAPITAL PLAN City of Edina, MN 2004 2005 Project # PW -00 -031 Project Name Sidewalks /Pathways: City Costs Type Improvement Priority Useful Lire Contact Category Sidewalk - Pathways Department category names Description 2003 thru 2007 n/a Public Works Public Works Total Project Cost $400,000 These projects will provide separation of pedestrians and vehicles along the designated routes. Justification projects are initiated by petitions from residents only. Prior Expenditure 2003 2004 2005 2006 2007 Total Future F-1-00—,00-01 Construction /Maintenance 50,000 50,000 50,000 50,000 200,000 100,000 Total Total 50,000 50,000 50,000 50,000 200,000 Total Prior Funding Sources 2003 2004 2005 2006 2007 Total Future 100,000 Revolving Fund 50,000 50,000 50,000 50,000 200,000 Total Total 50,000 50,000 50,000 50,000 200,000 Total CAPITAL PLAN 2003 rhru 2007 City of Edina, MN _ —. -- -- _ _ - -- - -- - - - .... ..... ...._ -- Project # PW -01 014 �. Project Name Mill & Overlay: Gleason Rd. (Valley View to TH62) Type Improvement Priority n/a v.. _ Useful Life Contact Engineering j Category Municipal State Aid Department Public Works category names MSA Total Project Cost ^a , $55,000 Description This project involves the milling of distressed surface and the repaving of a new surface on Gleason Road from Valley View Road to TH62. Justification jThe need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 55,000 55,000 Total 55,000 55,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 55,000 55,000 Total 55,000 55,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # UT -00 -020 Project Name Watermain/Sanitary: Country Club Area J Type Improvement Priority n/a Useful Life Contact Utility Supt Category Water Main Department Utility Department category names Total Project Cost $300,000 water mains, services and sanitary sewers. Justification Sanitary sewer and water mains are deteriorating due to age. This is a high maintenance area of the City utility system. Sanitary sewer pipes should be upgraded. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 300,000 300,000 Total 300,000 300,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 300,000 300,000 Total 300,000 300,000 CAPITAL PLAN 2003 rh►u 2007 City of Edina, MN fProject # UT -00 -021 Project Name Watermain/Sanitary: Nine Mile Village Type Improvement Priority n/a Useful Life Contact Utility Supt Category Water Main Department Utility Department category names water mains, services and sanitary sewers. Justification Total Project Cost $300,000 sewer and water mains are deteriorating due to age. This is a high maintenance area of the City utility system. sewer pipes should be upgraded. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 300,000 300,000 Total 300,000 300,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 300,000 300,000 Total 300,000 300,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT-00-024 Project Name Utility Data Collection System (Sanitary) Type Improvement Priority n/a Useful Life Contact Utility Supt Category Sanitary Sewer Improvements Department Utility Department category names Total Project Cost $900,000 data collection system on all liftstations and other flow meters. Justification Provides for an efficient operation and control of sanitary sewer system. Will provide security of system and failure alarms. Will also provide operational and performance data. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 900,000 900,000 Total 900,000 900,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 900,000 900,000 Total 900,000 900,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT-01-009 Project 111a-e Portable Generator: 400 KW Wtr Trtmt Pnt No 4 Type Improvement Priority n/a Useful Life Contact Utility Supt. Category Utility Equipment Replacement Department Utility Department category names Total Project Cost $100,000 Description 100 KW Portable Generator to operate Water Treatment Plant No. 4. Justification power outages this generator would operate Water Treatment Plant No. 4 to help provide the City with its I water requirements. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN City of Edina, MN Project # UT -02 -005 2003 thru 2007 Project Name well #7 (5241 Eden Circle) Type Improvement Priority n/a Useful Life 15 years Contact Utility Supt Category Wells Department Utility Department category names Total Project Cost $100,000 Description well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical Justification is rehab has a 15 year life on the pump and 30 plus years on the other equipment and well hole. Operating cost will lower and water production will be higher. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT -02 -006 Project Name Well #14 (6367 Dewey Hill Road) i__.._ _ _. _.... _..- ........_.... _.... _... -_. - - - - -- _. ..... _ -..._ ...._ Type Improvement Priority n/a Useful Life 15 years Contact Utility Supt Category Wells Department Utility Department category names Total Project Cost $160,000 lop well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical Justification Phis rehab has a 15 year life on the pump and 30 plus years on the other equipment and well hole. Operating costs will )e lower and water production will be higher. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 160,000 160,000 Total 160,000 160,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 160,000 160,000 Total 160,000 160,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN [—P11Project # UT-02 1i -007 - Project Name well #19 (6754 Valley View Road) Type Improvement Priority n/a Useful Life 15 years Contact Utility Supt Category Wells Department Utility Department category names Total Project Cost $120,000 well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical Justification This rehab has a 15 year life on the pump and 30 plus years on the other equipment and well hole. Operating cost will be lower and water production will be higher. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 120,000 120,000 TOW 120,000 120,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 120,000 120,000 Total 120,000 120,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN I Project# UT-02-022 Project Name watermain Extension - Oxford Avenue Type Improvement Priority n/a Useful Life Contact Engineering Category Water Main Department Utility Department category names Total Project Cost $100,000 watermain at southerly end of Oxford Avenue. Justification The current watermain is a dead-end watermain causing many brown water problems in the area. Looping the watermain will keep the water circulating within the pipes and will reduce the brown water issue. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN - -- -- - - -._. - -- - - - - -- - -. _..._---------- - - - -- Project # UT -02 -024 Project Name Storm Sewer: Swimming Pool &/ Pt of France Pond Type Improvement Priority n/a Useful Life Contact Engineering Category Storm Sewer Improvements Department Utility Department category names Total Project Cost 5200,000 a portion of Pt. Of France Pond and the Swimming Pool Pond per Ninemile Watershed Agreement. Justification Extra volume is requireded as a surface waterquality component to redevelop property. These pond dredgings will fulfill this requirement and allow future redevelopmnent within the area. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 200,000 200,000 Total 200,000 200,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 200,000 200,000 Total 200,000 200,000 9ZNA� � o`� H N:. AA jF-f kyjA � loco Pow �9 s 188$ 2005 0 .2 CAPITAL PLAN City of Edina, MN Project # AQC -00 -006 Project Name Create Step -In Entry Type Improvement Useful Life Category Park Development category names Priority Contact Department 2003 thru 2007 n/a Park & Recreation Aquatic Center Total Project Cost $140,000 step -in -entry and additional shallow water where original waterslide existed. Justification Currently, the main pool body is not very user friendly especially for the physically challenged when entering or exiting. The Edina Aquatic Center is also missing intermediate water (2' deep). Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 140,000 140,000 Total 140,000 140,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 140,000 140,000 Total 140,000 140,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # A -00 -001 Project Name Bathroom Remodel (Arena) Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Department- Arena category names Total Project Cost $25,000 Description East Arena lower lobby bathrooms need new fixtures from the 1984 remodeling project. Needs new fixtures and ceiling Justification [be bathrooms have not been updated for 20 years. Expenditure 2003 2004 2005 2006 2007 Total Future Construction/Maintenance 25,000 25,000 0 Total 25,000 25,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Revolving Fund 25,000 25,000 �0 Total 25,000 25,000 Total CAPITAL PLAN City of Edina, MN Project # ART -01 -001 Project Name _Parking Lot Expansion Type Improvement Useful Life Category category names Priority Contact Department 2003 thru 2007 n/a Art Center Total Project Cost $25,000 ve parking lot closer to street in front (need variance). Pave and improve entry. Possibly extend lot to path on west Justification Student base has grown to the point where they must park as far away as the tennis courts at night. Curbs at entry are worn away. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 15,000 10,000 25,000 Total 15,000 10,000 25,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 15,000 10,000 25,000 Total 15,000 10,000 25,000 CAPITAL PLAN City of Edina, MN Project # ECL -00 -017 Project Name Rep laster Pool E Type Improvement Useful Life Category Building Improvements category names 2003 thru 2007 P Priority n/a Contact Park & Recreation Department Edinborough Pk/Centennial Lks Total Project Cost $30,000 and restore pool shell at Edinborough Park. Justification The pool shell at Edinborough Park has deteriorated over the past 18 years and needs a new surface coat of gunite. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 30,000 30,000 Total 30,000 30,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 30,000 30,000 Total 30,000 30,000 CAPITAL PLAN City of Edina, MN Project # ECL- 00-032 Project Name Replace Telephone System Type Improvement Priority Useful Life Contact Category Building Improvements Department category names 2003 thru 2007 n/a Park & Recreation Edinborough Pk/Centennial Lks Total Project Cost $10,000 Description Zeplace the existing telephone system at Edinborough Park and Centennial Lakes Park. Justification The existing telephone system was installed in 1991. The system frequently breaks down and replacement parts are becoming increasingly more difficult to find. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 10,000 10,000 Total 10,000 10,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 10,000 10,000 Total 10,000 10,000 CAPITAL PLAN City of Edina, MN Project # ECL -00 -33 Project Name Replace Skate Tile - Centennial Lakes 2003 thrtr 2007 Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Department Edinborough Pk/Centennial Lks category names Total Project Cost $7,000 the skate tile flooring for the Centrum Building at Centennial Lakes Park. Justification Che skate tile flooring for the Centrum Building at Centennial Lakes Park was purchased and installed in 1990 and is -apidly deteriorating. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 7,000 7,000 Total 7,000 7,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 7,000 7,000 Total 7,000 7,000 CAPITAL PLAN 2003 thnr 2007 City of Edina, MN Project # ECL -02 -003 Project Name Replace Toro Groundsmaster Mower Type Equipment Priority n/a Useful Life Contact Park & Recreation Category Equipment Replacement Department Edinborough Pk/Centennial Lks category names the 1990 Toro Goundsmaster mower. Justification Total Project Cost $22,000 is a routine equipment replacement purchase, in this case a 1990 Toro Groundsmaster. This equipment will be 17 old and will have over 10,000 hours of use. This machine is used to mow grass, sweep pathways, and sweep ice Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 22,000 22,000 Total 22,000 22,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 22,000 22,000 Total 22,000 22,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # GD -00 -001 Project Name Upgrade Electrical Service & Lighting Type Improvement Priority n/a Useful Life Contact Category Department Golf Dome category names Total Project Cost $20,000 the interior lighting in Dome. This would require additional wiring in the Dome and (12) 1,000 watt fixtures. Justification _ fhe lighting at the Dome has been insufficient since it was built. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 20,000 20,000 Total 20,000 20,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 20,000 20,000 Total 20,000 20,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN ;Project# LIQ- 00-015 --- - - - - -- -- -- i Project Name 50th: Tile In Front of Beer Cooler Type Improvement Priority n/a Useful Life Contact Liquor Stores Category Department Liquor Stores category names Total Project Cost $5,000 Description Replace carpet in front of beer cooler with Quarry tile to match existing entrance tile. Justification �arpet is being damaged when product breaks near beer cooler. It is easier to clean up tile vs. carept. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 5,000 5,000 Total 5,000 5,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 5,000 5,000 Total 5,000 5,000 CAPITAL PLAN City of Edina, MN Project # LIQ-01 -001 Project Name 50th: Replace carpet Type Improvement Useful Life Category category names Description Zeplace carpet on sales floor. 2003 thru 2007 — - - -- - - - - -- - -- _ - - - - I Priority n/a Contact Department Liquor Stores Total Project Cost $12,000 Justification Zeplace due to useful life of carpet. Seams and fraying have started to occur. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 12,000 12,000 Total Funding Sources 2003 12,000 2004 2005 2006 12,000 2007 Total Enterprise Funds 12,000 12,000 Total 12,000 12,000 CAPITAL PLAN City of Edina, MN Project # LIQ -01 -005 Project Name York: Replace Carpet Type improvement Priority Useful Life Contact Category Department category names Description Fear up and replace current carpet with new carpet. 2003 thnr 2007 n/a Liquor Stores Total Project Cost $25,000 Justification Carpet is almost 10 years old and cannot be cleaned effectively any more. Has permanent wear patterns. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 25,000 25,000 Total 25,000 25,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # LIQ -01 -006 Project Name York: Replace Counter Tops Type Improvement Priority n/a Useful Life Contact Category Department Liquor Stores category names Total Project Cost $10,000 existing counter tops and replace with a longer lasting surface. Justification Counter tops are close to 10 years old and are starting to wear through. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 10,000 10,000 Total 10,000 10,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 10,000 10,000 Total 10,000 10,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PK -00 -031 Project Name Playground: Alden Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Park & Recreation category names Total Project Cost $110,000 with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid. ies removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete r and adding new playground equipment with accessible path to transfer stations. Justification The current playground equipment was installed in 1987 and is becoming worn from age and use. Playground equipment is currently on a 15 year replacement schedule. In 2003, Alden Park's equipment will be 16 years old. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 110,000 110,000 Total 110,000 110,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 110,000 110,000 Total 110,000 110,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project tF PK -01 -003 Project Name Renovate soccer field: Braemar Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Ballfield Improvements Department Park & Recreation category names Total Project Cost $91,000 Regrade the soccer field turf and provide new sand and peat mixture sub -soils and re- install the underground irrigation Justification T soccer field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The irrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced use of herbicides. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 312,000 312,000 Total Funding Sources 2003 2004 312,000 2005 2006 312,000 2007 Total Revolving Fund 312,000 312,000 Total 312,000 312,000 CAPITAL PLAN 2003 thru 2007 City of Edina, NM I Project# PK-02-008 Project Name New Maintenance Garage: Courtney Fields . . . ... . ..... . . ..... Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Park & Recreation category names Total Project Cost $92,000 plan is to tear down the existing garage and replace it with a new and larger garage that will support the itenance needs of four heavily-scheduled baseball fields at the Courtney Complex. Project Propose: Staff Justification garage is at the point where the roof needs replacement and, from an operations standpoint, the garage needs Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 92,000 92,000 Total 92,000 92,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 92,000 92,000 Total 92,000 92,000 CAPITAL PLAN City of Edina, MN Project # - PK -02 -049 Project Name Aerial Bucket Truck Park & Recreation Type Equipment Useful Life Category Equipment Replacement category names Description_ Replace the 1990 aerial bucket truck. 2003 thru 2007 Priority n/a Contact Park & Recreation Department Park & Recreation Total Project Cost $110,000 Justification Phis is a routine equipment replacement purchase. The 1990 aerial bucket truck will be 16 years.old in 2005. This is a valuable piece of equipment for the Park Maintenance Department and is used year around for trees, light poles, and )uilding maintenance. This is also used by the Electrical Department for signal lights and light maintenance. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 110,000 110,000 Total 110,000 110,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 110,000 110,000 Total 110,000 110,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PK- 02-050 Project Name Vermeer Brush Chjpper Type Equipment Priority n/a Useful Life Contact Park & Recreation Category Equipment Replacement Department Park & Recreation category names Total Project Cost $20,000 the 1990 Vermeer brush chipper. Justification _ This is a routine equipment replacement purchase. This chipper is used by the Forestry Department during storm clean- up and for buckthorn abatement, as well as, routine tree and brush clean-up in the parks. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 20,000 20,000 Total Funding Sources 2003 2004 20,000 2005 2006 20,000 2007 Total Equipment Certificates 20,000 20,000 Total 20,000 20,000 CAPITAL PLAN City of Edina, MN Project # pS -00 -019 Project Name SCBA Air Compressor Type Equipment Useful Life 30 years Category Fire category names Priority 2 Very Important Contact Fire Department Department Public Safety Total Project Cost $40,000 project is to purchase a new air compressor (6000psi) to fill high pressure SCBA bottles. This replaces the old non- [A compliant air compressor. Justification Our current SCBA compressor was purchased to fill our old SCBA bottles at a low pressure (2200 psi). Our new SCBA bottles require 4500psi. We are only able to fill 6 SCBA's to maximum pressure with our current compressor. In addition OSHA indicates they will be regiuring SCBA compressors to meet new standards in 2005, which our current compressor does not meet. The new compressor would meet the new OSHA standards and would meet our needs in filling SCBA's during emergency operations. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project# PW-00-004 Project Name Mill & Overlay:Be nt o n Ave. (Hansen Hwy 1 00 Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $34,000 I 1) r is project involves the milling of distressed surface and the repaving of a new surface on Benton Ave. from Hansen .. to Hwy 100. Justification The need to rehabilitate this segment of roadway was determined by the Pavement Management System. 4. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 34,000 34,000 Total 34,000 34,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 34,000 34,000 Total 34,000 34,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW-00-005 Project Name Mill & Overlay: Dewey Hill Road (Gleason-Cahill) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $51,000 This project involves the milling of distressed surface and the repaving of a new surface on Dewey Hill Road from Gleason Road to Cahill Road. Justification I The need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 0 2003 2004 2005 2006 2007 Total Construction/Maintenance 51,000 51,000 Total 51,000 51,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 51,000 51,000 Total 51,000 51,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN I Project # Pw -00 -013 Project Name Mill & Overlay: Brookside (Interlachen - RR) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $38,000 n�1�Iinn u� �-i�� . in• M nw Description I _ Phis project involves the milling of distressed surface and the repaving of a new surface on Brookside Avenue from hterlachen Boulevard to SOO Line Railroad tracks. L Justification The need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 38,000 38,000 Total Funding Sources 2003 2004 38,000 2005 2006 38,000 2007 Total Municipal State Aid 38,000 38,000 Total 38,000 38,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # Pw -00 -015 Project Name Concrete Rehab: Tracy Ave. (Vernon - TH62) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Description Total Project Cost $242,000 r ai �= cl� Gc project provides for the rehabilitation of concrete pavement along Tracy Avenue from Vernon Avenue to TH 62. existing pavement is showing signs of deterioration and this rehab will protect the structural integrity of the Justification The need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 242,000 242,000 Total 242,000 242,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 162,000 162,000 Special Assessments 80,000 80,000 Total 242,000 242,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW-01 -011 Project Name Reconstruct: W. 62nd St. ( Oaklawn - France) Type Improvement Priority n/a Useful Life Contact Engineering Category Municipal State Aid Department Public Works category names MSA Total Project Cost $320,000 This project provides for the reconstruction of West 62nd Street from Oaklawn Avenue to France Avenue. This project will provide a new roadway section and will bring this road into compliance with State -Aid Standards. Sidewalks will also be proposed with this reconstruction. Justification This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also considered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 320,000 320,000 Total 320,000 320,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 264,000 264,000 Special Assessments 56,000 56,000 Total 320,000 320,000 CAPITAL PLAN City of Edina, MN Project a PW -02 -001 2003 thru 2007 Project Name Reconstruct: W. 58th St. (Concord to France) Type Improvement Useful Life Category Municipal State Aid category names Description Priority n/a Contact Engineering Department Public Works Total Project Cost $700,000 project provides for the reconstruction of West 58th Street from Concord Avenue to France Avenue. This project provide a new roadway section and will bring this road into compliance with State -Aid Standards. Sidewalks will be analyzed with this reconstruction. Justification This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also considered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 550,000 150,000 700,000 Total 550,000 150,000 700,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 440,000 100,000 540,000 Special Assessments 110,000 50,000 160,000 Total 550,000 150,000 700,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -02 -006 Project Name Public Works: Braemar Cold Storage: Concrete Floor Type Improvement Priority n/a Useful Life Contact Public Works Coordinator Category Building Improvements Department Public Works category names Total Project Cost $80,000 Complete construction of concrete floor at Braemar Public Works Cold Storage Building. Justification Braemar Public Works Cold Storage Building was constructed in 1998 -99 to store off - season equipment for both is Works and Park Maintenance. Public Works staff has placed concrete on the center drive isle to reduce dust ugh the buildig. The remaining storage areas are also in need of a hard surface floor. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 40,000 40,000 80,000 Total 40,000 40,000 80,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 80,000 Total 40,000 40,000 80,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # 1JT_00_008 Project Name Van Valkenburg Water Tower (paint) Type Improvement Priority n/a Useful Life Contact Utility Supt Category Water Towers Department Utility Department category names Total Project Cost $600,000 pressure tank and structure. Justification - oating is nearly 20 years old and has deteriorated sugnificantly. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 600,000 600,000 Total 600,000 600,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 600,000 600,000 Total 600,000 600,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project a UT -01 -008 Project Name Portable Generator: 400 KW Wtr Trtmt Pnt No 3 Type Improvement Priority n/a Useful Life Contact Utility Supt Category Utility Equipment Replacement Department Utility Department category names Total Project Cost $100,000 Description 100 KW Portable Generator to operate Water Treatment Plant No. 3. Justification During power outages this generator would operate Water Treatment Plant No. 3 to help provide the City with its minimal water requirements. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN City of Edina., MN 2006 2007 Project # UT -02 -004 Project Name Annual Vehicle Replacements Type Equipment Priority Useful Life 10 years Contact Category Utility Equipment Replacement Department category names 2003 thru 2007 n/a Utility Supt Utility Department Total Project Cost $185,000 of small vehicles that are 10 years old or 100,000 miles. Justification ehicles have reached their life expectancy. Expenditure 2003 2004 2005 2006 2007 Total EquipNehioles/Fumishings 55,000 75,000 55,000 185,000 Total 55,000 75,000 55,000 185,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 55,000 75,000 55,000 185,000 Total 55,000 75,000 55,000 185,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT_02 -008 Project N Well #3 (5233 Halifax Avenue) Type Improvement Priority n/a Useful Life 15 years Contact Utility Supt Category Wells Department Utility Department category names Total Project Cost $160,000 well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical Justification rhis rehab has a 15 year life on the pump and 30 plus years on the other equipment and well hole. Operating costs will )e lower and water will be higher. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 160,000 160,000 Total 160,000 160,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 160,000 160,000 Total 160,000 160,000 CAPITAL PLAN City of Edina., MN Project # UT_02 -009 Project Name well #6 (5849 Ruth Street) 2003 thru 2007 Type Improvement Priority n/a Useful Life 10 years Contact Utility Supt Category Wells Department Utility Department category names Total Project Cost $65,000 Description 2edevelop well hole, create a cavity on the bottom and rebuild pump.. Justification This well is operated year around and has a 7 year life expectancy. The last time this well was rehabbed was 1998. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 65,000 65,000 Total 65,000 65,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 65,000 65,000 Total 65,000 65,000 CAPITAL PLAN City of Edina, MN Project # UT -02 -010 Project Name well #12 (6721 2nd Street) Type Improvement Priority Useful Life 10 years Contact Category Wells Department category names 2003 thru 2007 n/a Utility Supt Utility Department Total Project Cost $65,000 well hole, create a cavity on the bottom, and rebuild pump. Justification This well is operated year around and has a 7 year life expectancy. The last time this was rehabbed was 1997. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 65,000 65,000 Total 65,000 65,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 65,000 65,000 Total 65,000 65,000 CAPITAL PLAN City of Edina, MN Project # UT -02 -016 Project Name Well #17 Piping to Filter Plant #2 Type Improvement Priority Useful Life 100 years Contact Category Water Main Department category names Description 2003 thru 2007 n/a Utility Supt Utility Department Total Project Cost $300,000 well directly to filter plant #2 so that the radium levels can be reduced to meet the new federal standards effective . This includes street restoration and engineering costs. Justification quality standards will not be met starting in 2008 (testing as of 2007). By filtering the water radium will be d and the standards will be met. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 300,000 300,000 Total 300,000 300,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 300,000 300,000 Total 300,000 300,000 0� w N \'moo 1tt�` Cl) ��1 0 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # AQC -00 -007 Project Name Upgrades and Replacements Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Aquatic Center category names Total Project Cost $100,000 These are upgrades and replacements of mechanical and small capital items that unexpectedly fail or become worn or damaged and in need of replacement, repair, or upgrade. Equipment could include bath house water heaters, pumps, lifeguard chairs etc. Justification and small capital items can unexpectedly fail or wear out before their scheduled time for replacement. This budget will help serve as a rainy day fund for those unexpected failures or losses. Expenditure 2003 2004 2005 Construction/Maintenance Total 2006 2007 50,000 50,000 50,000 50,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 50,000 50,000 100,000 Total 50,000 50,000 100,000 CAPITAL PLAN City of Edina, MN Project # A -00 -006 Project Name Replace Zamboni Type Improvement Useful Life Category Building Improvements category names 2003 thru 2007 Priority n/a Contact Park & Recreation Department Arena Description Keplace the 1997 ice resurfacing machine. Total Project Cost $90,000 Justification Ms is a routine equipment replacement purchase. The 1997 Zamboni will be 10 years old in 2006. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Furnishings 90,000 90,000 Total 90,000 90,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 90,000 90,000 Total 90,000 90,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # ECL -00 -018 Project Name In- Ground Speakers at CL Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Edinborough Pk/Centennial Lks category names Total Project Cost $7,000 the in- ground speakers around the walkways of Centennial Lakes Park. Justification [be in- ground walkway speakers around Centennial Lakes Park typically last about 5 years. Expenditure 2003 2004 2005 2006 2007 Total EquiplVehicles/Fumishings 7,000 7,000 Total 7,000 7,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 7,000 7,000 Total 7,000 7,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # ECL-00 -026 Project Name Remodel Locker Rooms - Edinborough Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Ballfield Improvements Department Edinborough Pk/Centennial Lks category names Total Project Cost $15,000 Description Zeplace and repair floor tile and wall tile, and replace the countertops and fixtures in the mens and womens locker '-- - - - -._ _ ._....--------- - - - -- Justification The floors, walls, countertops and fixtures will be 20 years old and in need of replacement. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 15,000 15,000 Total 15,000 15,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 15,000 15,000 Total 15,000 15,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN EquipNehicles /Fumishings Project # ECL -00 -027 20,000 Project Name Replace Boiler - Edinborough Park 20,000 2005 2006 Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Edinborough Pk/Centennial Lks category names Total Project Cost $20,000 the 20 year old boiler at Edinborough Park. Justification Mis is a routine equipment replacement purchase. The boiler will be 20 years old and in need of replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 20,000 20,000 Total Funding Sources 2003 2004 20,000 2005 2006 20,000 2007 Total Revolving Fund 20,000 20,000 Total 20,000 20,000 CAPITAL PLAN City of E ProjeM # Project Name Type Useful Life Category Description diva, MN ECL -00 -028 Pool Filter Room Exhaust Improvement Priority Contact Building Improvements Department category names 2003 thru 2007 n/a Park & Recreation Edinborough Pk/Centennial Lks Total Project Cost $9,000 a new exhaust system in the pool filter /mechanical room. Justification The Edina Fire Marshall has long recommended that an exhaust system be installed in the pool filter room to allow vapors from the chemicals to be drawn outside, rather than into the park. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 9,000 9,000 Total 9,000 9,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 9,000 9,000 Total 9,000 9,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # GC -00 -010 Project Name Redesign Holes 19 -27: Braemar Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Department Golf Course category names Total Project Cost $800,000 renovation of several holes on the new nine would include widening of some fairways and possibly shortening holes. The actual configuration would be determined by an architect and the ability to work around existing ands. The total cost of $800,000 is just an estimate that could be slightly more or less than the actual amount. Justification The plan is to redesign several fairways on the new nine (holes 19 -27) to make the course more forgiving and enjoyable for the average golfer. There are several holes on the new nine that experience has taught us are simply too challenging and unforgiving for the average player. Unlike holes 1 -18, an errant shot on several new nine holes result in a lost ball and a penalty stroke. The fairways are too narrow and the hazards are too severe. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 800,000 800,000 Total 800,000 800,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 800,000 800,000 Total 800,000 800,000 CAPITAL PLAN City of Edina, MN Project# LIQ -01 -002 Project Name 50th: Replace 2 Compressors Type Improvement Priority Useful Life Contact Category Department category names both cooler compressors in basment. Justification 2003 thru 2007 n/a Liquor Stores eed to replace due to age. Replace before they break down. Total Project Cost 516,000 Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 16,000 16,000 Total 16,000 16,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 16,000 16,000 Total 16,000 16,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # PK -00 -029 Project Name Pathway Repairs /Additions: Cornelia School Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Park & Recreation category names Total Project Cost $50,000 Description _ Break up and remove damaged pathway, extend, grade and repave existing pathway and complete the pathway - onnections within the park. Justification are certain sections of the current pathway that are cracked and broken and in need of repair, and the current hard pathway from the pump house needs to be connected to the main pathway within the park. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 50,000 50,000 Total 50,000 50,000 CAPITAL PLAN 2003 thnr 2007 City of Edina, MN Project a PK -00 -033 Project Name Renovate senior soccer field: Pamela Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Ballfield improvements Department Park & Recreation category names Total Project Cost $250,000 Regrade the soccer field turf and provide new sand and peat mixture sub -soils and re- install the underground irrigation system. Justification This soccer field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The irrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced use of herbicides. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 250,000 250,000 Total 250,000 250,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PK -00 -036 Project Name Replace/Upgrade Concessions Bldg: Courtney Type Improvement Priority rJa Useful Life Contact Park & Recreation Category Building Improvements Department Park & Recreation category names Total Project Cost $77,000 Description R -_ teplace existing concessions stand building at Courtney Fields baseball complex in Braemar Park. Justification Che existing concessions building does not meet ADA specifications for restrooms; the stairway leading to the scoring )ooth on the second level is too steep and dangerous; the concessions area is too small for the volume of customers, and t new building will help resolve the dangerous errant baseballs (mostly foul balls) issue. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 250,000 250,000 Total 250,000 250,000 CAPITAL PLAN City of Edina, MN Project # PK- 02-051 Project Name Ford 4630 Tractor Type Equipment Useful Life Category Equipment Replacement category names Description _ Kenlace the 1991 Ford tractor. Justification 2003 thru 2007 Priority n/a Contact Park & Recreation Department Park & Recreation Total Project Cost $45,000 is is a routine equipment replacement purchase. This vehicle is used daily for rink maintenance and also for turf Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 45,000 45,000 Total 45,000 45,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 45,000 45,000 Total 45,000 45,000 CAPITAL PLAN City of Edina, MN Project # PS -01 -001 Project Name Training Ctr Burner Unit Type Equipment Useful Life 30 years Category Building Improvements category names Description 2003 thru 2007 Priority 3lmportant Contact Fire Department Department Public Safety Total Project Cost $40,000 project would install an additional burner unit into the proposed Public Safety Training Center. The burner unit d be installed in the Fire Tower. Justification ie Fire Training Center only has two burner units to simulate fires. A third burner unit is required in the fire tower rtion of the facility to simulate high -rise structure fires. The Training Ctr is designed for additional burner units, due funding shortages, some burner units will not be installed in the intial construction of the project. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PS -01 -004 Project Name Digital Fingerprint System Type Improvement Priority n/a Useful Life - Contact Police Department Category Police Department Public Safety category names Total Project Cost $40,000 Description live -scan fingerprint unit consists of the cabinat, printer, monitor and CPU. System would be housed in the Police apartment booking area. Justification printing is presently done with ink and paper. This method is time consuming and error prone when dealing with perative defendants. Digital systems electronically control the quality of the prints and speed the process. tted fingerprinting has increased to include a variety of misdemeanors, juveniles and records checks for sensitive itions, in addition to felonies and gross misdemeanors. This system will improve fingerprint quality and reduce time devoted to fingerprinting . Expenditure 2003 2004 2005 2006 2007 Total EquipNehicies/Fumishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # PS -02 -003 Project Name Fire Department Pumper Type Equipment Priority 2 Very Important Useful Life 20 years Contact Fire Department Category Equipment Replacement Department Public Safety category names Description Total Project Cost $350,000 project would be to replace 1986 Fire Department Engine /1500 gpm Pumper with a new Pumper. Justification new pumper is needed to replace the 20 year old pumper which will be at the end of it's useful life. The new per will have greater pumping capacity and needed safety features not available on the current vehicle. The cost to stain the current pumper is increasing and the reliablity is decreasing. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Furnishings 350,000 350,000 Total 350,000 350,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 350,000 350,000 Total 350,000 350,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -00 -010 Project Name Mill & Overlay: Vernon (Lincoln Dr. - Gleason) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $78,000 u."Y -7r e r - - -. Description This project involves the milling of distressed surface and the repaving of a new surface on Vernon Avenue from Londonderry Road to Gleason Road. Justification The need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 78,000 78,000 Total 78,000 78,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 78,000 78,000 Total 78,000 78,000 CAPITAL PLAN City of Edina, MN Project # PW -00 -029 Project Name 56th Street Bridge Type Improvement Useful Life Category Local Streets category names 2003 thru 2007 m t� Priority n/a Contact Public Works Department Public Works Total Project Cost $250,000 Description Chis project provides for reconstructing this bridge and possible abutments. Justification Che need to rehabilitate this bridge was determined by the annual bridge certification program Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2003 2004 2005 2006 2007 Total State Bridge Bond 250,000 250,000 Total 250,000 250,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -01 -010 Project Name Reconstruct: West 70th St. & Metro Blvd. Type Improvement Priority n/a Useful Life Contact Engineering Category Municipal State Aid Department Public Works category names MSA Total Project Cost $500,000 / Rehabiliate the roadway and signals at West 70th St. from TH100 to Metro Boulevard. Justification Ibis project will provide additional capicity to both intersections; Metro Blvd and Rabun Drive, Currently vehicles accessing West 70th St. from Rabun Drive have difficulty entering and exiting due to the peak hour traffic. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 420,000 420,000 Special Assessments 80,000 80,000 Total 500,000 500,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -01 -013 Project Name Mill & Overlay: Eden Ave. (Vernon to Arcadia) Type Improvement Priority n/a Useful Life Contact Engineering Category Municipal State Aid Department Public Works category names MSA Total Project Cost $18,000 Description Phis project involves the milling of distressed surface and the repaving of a new surface on Eden Avenue from Vernon Avenue to Arcadia Avenue. Justification the need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 18,000 18,000 Total 18,000 18,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 18,000 18,000 TOW 18,000 18,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -02 -003 Project Name Reconstruct: Southview Ln (TH100 to Concord) Type Improvement Priority n/a Useful Life Category Municipal State Aid category names Contact Public Works Department Public Works Total Project Cost $400,000 �A I .. Description This project provides for the reconstruction of South View Lane from Normandale Road to Concord Avenue. This project will provide a new roadway section and will bring this road into compliance with State -Aid Standards. Sidewalk condition will also be analyzed with this reconstruction. Justification This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also considered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 400,000 400,000 Total 400,000 400,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 340,000 340,000 Special Assessments 60,000 60,000 Total 400,000 400,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project -# pW_02 -007 Project Name public Works: Braemar Work Site - Lead Removal Type Improvement Priority n/a Useful Life Contact Public Works Category Building Improvements Department Public Works category names Total Project Cost $200,000 Description kemove existing stabilized lead contaminated soil located at Braemar Public Works Site. Justification The lead abatement project for the Brian Wipperman Gun Range left approximately 2000 cubic yards of stabilized lead soil at this location. The construction of the Braemar Public Safety Training Facility has drastically reduced the amount of space needed for the Public Works and Parks maintenance operation. This soil removal will free -up approximately 15,000 square feet of working area. This area is used for sorting soils and debris from watermain breaks, construction projects, leaf storage, etc. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 200,000 200,000 Total 200,000 200,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 100,000 100,000 Utility Funds 100,000 100,000 Total 200,000 200,000 CAPITAL PLAN City of Edina, MN Project # PW -02 -014 Project Name #25453: Sealcoat Chip Spreader Type Improvement Priority Useful Life Contact Category Equipment Replacement Department category names Description 2003 thru 2007 n/a Public Works Coordinator Public Works Total Project Cost $90,000 equipment #25 -453: Etnyre Chip Spreader, purchased in 1991. Justification This piece of equipment is within the "15115 Category" where a piece of equipment is worth over $15,000 and its useful life is over 15 years. All other Public Works equipment is replaced within the equipment replacement account of the yearly budget based on useful life replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Furnishings 90,000 90,000 Total 90,000 90,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 90,000 90,000 Total 90,000 90,000 CAPITAL PLAN City of Edina, MN Project # UT -02 -011 Project Name Well #16 (6301 Gleason Road) Type Improvement Priority Useful Life 15 years Contact Category Wells Department category names 2003 thru 2007 n/a Utility Supt Utility Department Total Project Cost $160,000 well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical Justification This rehab has a 15year life on the pump and 30 plus years on the other equipment and well hole. Operating costs will )e lower and water production will be higher. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 160,000 160,000 Total 160,000 160,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 160,000 160,000 Total 160,000 160,000 CAPITAL PLAN City of Edina, MN Project # UT -02 -012 Project Name Well #17 (5900 Park Place) Type Improvement Priority Useful Life 15 years Contact Category Wells Department category names 2003 thru 2007 n/a Utility Supt Utility Department Total Project Cost $160,000 Redevelop well hole and create a cavity on the bottom. Rebuild pump and upgrade electrical, mechanical, and chemical Justification This rehab has a 15 year life on the pump and 30 plus years on the other equipment and well hole. Operating costs will be lower and water production will be higher. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 160,000 160,000 Funding Sources Total 160,000 160,000 2003 2004 2005 2006 2007 Total Utility Funds 160,000 160,000 Total 160,000 160,000 CAPITAL PLAN City of Edina, MN 2003 thru 2007 Justification generator will be 21 years old was purchased used and has high maintenance cost. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 .2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project a UT -02 -017 Project Name Lift Station #22 (7701 France Avenue) Type Improvement Priority n/a Useful Life 20 years Contact Utility Supt Category Lift Stations Department Utility Department category names Description Replace lift station and add more storage capacity. Justification Total Project Cost $100,000 t is station uses old and obsolete parts as well as has a short down time because of lack of storage capacity. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 Op� CORP 2007 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project of ART -00 -012 Project Name Fire Suppression Art Center Type Improvement Priority n/a Useful Life Contact Category Department Art Center category names Total Project Cost $40,000 Description [nstall a fire suppression sprinkler system in the building. Justification — -- — fhe entire Edina Art Center facility needs an automated fire suppression sprinkler system. A fire suppression system ,vould serve to insure that the building would survive a fire. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN City of Edina, MN Project # ECL -00 -013 Project Name Greensmowers (Centen) Type Improvement Priority Useful Life Contact Category Department category names 2003 thru 2007 n/a Park & Recreation Edinborough Pk/Centennial Lks Total Project Cost $10,000 the greensmower at Centennial Lakes Park. Justification Chese are routine replacement or maintenance items that need to be done that are not part of the Operating Budget. This )iece of equipment is needed to mow the greens at Centennial Lakes Park Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 10,000 10,000 Total 10,000 10,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 10,000 10,000 Total 10,000 10,000 CAPITAL PLAN City of Edina, MN [Project # ECL -02 -002 Project Name Reshingle Centrum Building Type Improvement Priority Useful Life Contact Category Building Improvements Department category names 2003 thru 2007 I n/a Park & Recreation Edinborough Pk/Centennial Lks Total Project Cost $60,000 Description I - -- Replace the roofing material on the Centrum Building. The cedar shakes will be replaced with architectural asphalt Justification The Centrum Building at Centennial Lakes Park has several leaks in its roof. The roof slope is such that it does not drain well enough to support cedar shakes. Asphalt shakes should correct the problem. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 60,000 60,000 Funding Sources Total 60,000 60,000 2003 2004 2005 2006 2007 Total Revolving Fund 60,000 60,000 Total 60,000 60,000 CAPITAL PLAN City of Edina, MN Project # ECL -02 -004 Project Name Cushman Vehicle Type Equipment Useful Life Category Equipment Replacement category names the Cushman utility vehicle. Justification 2003 rhru 2007 Priority n/a Contact Park & Recreation Department Edinborough Pk/Centennial Lks Total Project Cost $10,000 This is a routine equipment replacement purchase, in this case a 1985 Cushman utility vehicle. This maintenance vehicle is used to haul grass clippings, leaves and plant materials out of the park. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles/Fumishings 10,000 10,000 Total 10,000 10,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 10,000 10,000 Total 10,000 10,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN l Project # GC -00 -008 Project Name Clubhouse Expansion - East Side: Braemar Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Building Improvements Department Golf Course category names Total Project Cost $450,000 o include increase in the indoor capacity of the Braemar Room by 100 people, bringing the total capacity to ?proximately 250. The exterior deck would be expanded to the south side of the building, allowing for larger groups to e outside during favorable weather. The expanded deck would overlook the 8th and 19th tees and the 7th green. Justification expansion will generate more rentals and thus more revenue. It will make the Braemar Room more marketable for rentals (e.g., wedding receptions, business meetings, parties, etc.). Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 450,000 450,000 Total 450,000 450,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 450,000 450,000 Total 450,000 450,000 CAPITAL PLAN City of Edina, MN Project # GC -00 -011 Project Name Expand Cart Storage: Braemar Type Improvement Priority Useful Life Contact Category Department category names an additional storage facility for golf cars. 2003 rhru 2007 Total Project Cost $50,000 Justification With the addition of the new nine holes, Braemar has had to increase its fleet of golf cars and needs more secured indoor storage to house these investments. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 50,000 50,000 Total 50,000 50,000 Funding Sources 2003 2004 2005 2006 2007 Total Enterprise Funds 50,000 50,000 Total 50,000 50,000 CAPITAL PLAN City of Edina, MN Project # LIQ -02 -005 Project Name 50th - Store Remodel Type Improvement Useful Life Category Building Improvements category names 2003 rhru 2007 ...... _. _- _ - - -- I i i _.. - - ........ Priority n/a Contact Liquor Stores Department Liquor Stores Total Project Cost $75,000 ce current lighting with brighter and more efficient lighting. Replace all wood shelving on liquor wall with Lozier shelving. Replace wood interior with lighter material. Justification Store was last remodeled in 1998. We need to brighten up the interior and get better lighting for how the store is currently laid out. Expenditure 2003 2004 2005 2006 2007 Total Construction /Maintenance 75,000 75,000 Funding Sources Total 75,000 75,000 2003 2004 2005 2006 2007 Total Enterprise Funds 75,000 75,000 Total 75,000 75,000 CAPITAL PLAN 2003 rhru 2007 City of Edina, MN Project # PK -00 -028 Project Name Pathway Repairs /Additions: Arneson Acres j I....._.... _ ._.......... Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Park Development Department Park & Recreation category names Total Project Cost $30,000 in and level class five rock, pave and pack asphalt pathway. Justification Currently we have a gravel pathway that goes from the Arneson Acres Terrace Room down to the gazebo and formal gardens area of the park. For ease of walking and long term maintenance we need to pave the pathway. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 30,000 30,000 Total 30,000 30,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 30,000 30,000 Total 30,000 30,000 CAPITAL PLAN City of Edina, MN Project # PK- 00-037 Project Name Playground: McGuire Park Type Improvement Priority Useful Life Contact Category Park Development Department category names 2003 rhru 2007 I n/a Park & Recreation Park & Recreation Total Project Cost $120,000 with neighborhood group, gather thoughts and ideas, contract landscape architect, bid project, accept desired bid. ies removing existing concrete curb and playground equipment and replacing with a new ADA compliant concrete r and adding new playground equipment with accessible path to transfer stations. Justification Che current playground equipment was installed in 1989 and is becoming worn from age and use. Playground ,quipment is currently on a 15 year replacement schedule. In 2005, McGuire Park's equipment will be 16 years old. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 120,000 120,000 Total 120,000 120,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 120,000 120,000 Total 120,000 120,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PK-01-001 Project Name Renovate softball field: Todd Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Ballfield Improvements Department Park & Recreation category names Total Project Cost $91,000 adult softball field with existing soils and install underground irrigation system. Justification Phis adult softball ball field is in need of re-grading for proper drainage purposes and to correct uneven turf conditions. the irrigation system is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced use of herbicides. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 91,000 91,000 Total 91,000 91,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 91,000 91,000 Total 91,000 91,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN eroject # PK -01 -004 -- ---- - - - - -- ---- - 1 Project Name Renovate west baseball field: Countryside Park Type Improvement Priority n/a Useful Life Contact Park & Recreation Category Ballfield Improvements Department Park & Recreation category names Total Project Cost $138,000 Description I Regrade the ball field, provide underground irrigation and replace backstop fencing. Justification ball field is in need of re- grading for proper drainage purposes and to correct uneven turf conditions. The irrigation em is in keeping with the Turf Management Plan which relies on proper irrigation and drainage to allow for reduced of herbicides. The backstop is worn and in need of replacement. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 138,000 138,000 Total 138,000 138,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 138,000 138,000 Total 138,000 138,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PK -02 -009 Project Name Exterior walls, windows & doors Creek Valley Type Improvement Priority n/a Useful Lire Contact Park & Recreation Category Building Improvements Department Park & Recreation category names Total Project Cost $150,000 ce exterior wood walls with new permanent brick walls that match the rest of the building, and add windows and to the Creek Valley Park shelter building. Justification existing maintenance building has old and worn wood exterior walls that do not match the rest of the brick exterior s. This park shelter building also needs more secure and energy efficient doors, which are currently plywood. This :er building has a well on the north side of the building. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 150,000 150,000 Total 150,000 150,000 CAPITAL PLAN City of Edina, MN Project # PK -02 -052 Project Name Chev C -60 Cargo Truck Type Equipment Priority Useful Life Contact Category Equipment Replacement Department category names Description I keplace the 1987 Chevrolet Cargo Truck. 2003 rhru 2007 n/a Park & Recreation Park & Recreation Total Project Cost $40,000 Justification ['his is a routine equipment replacement purchase. The 1987 Chevrolet Cargo Truck is used for hauling bulk tree stock iom nurseries, voting booths, John Phillip Sousa Band equipment, and a variety of equipment by many of the City's ;nterprise facilities and various Departments. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN City of Edina, MN Project # pK- 02-053 Project Name Toro 580-D Mower Type Equipment Useful Life Category Equipment Replacement category names 2003 thru 2007 Priority n/a Contact Park & Recreation Department Park & Recreation Total Project Cost $60,000 Justification is a routine equipment replacement purchase. The 580 -D Toro mower is used to cut grass in the parks. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 60,000 60,000 Total 60,000 60,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 60,000 60,000 Total 60,000 60,000 CAPITAL PLAN City of Edina, MN Project# PK-02-054 Project Name John Deere 2355 Tracto Type Equipment Useful Life Category Equipment Replacement category names 2003 thru 2007 r ------------- Priority n/a Contact Park & Recreation Department Park & Recreation Description .,evlace the 1992 John Deere 2355 tractor. Total Project Cost $45,000 Justification This is a routine equipment replacement purchase. This vehicle is used daily for fink maintenance and also for turf Expenditure 2003 2004 2005 2006 2007 Total EquipNehides/Fumishings 45,000 45,000 Total 45,000 45,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 45,000 45,000 TOW 45,000 45,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN I Project # PS-01 -002 Project Name Additional Vehicle Bay to Fire Station #2 Type Improvement Priority 4 Less Important Useful Life 100 years Contact Fire Department Category Building Improvements Department Public Safety category names Total Project Cost $40,000 project would involve constructing an additional vehicle bay onto Fire Station #2. Justification ?ire Station #2 was designed to have an additional vehicle bay on the south side of the station. Due to a funding >hortage, the bay was not built. Fire Station #2 was built as a small remote fire station staffed 25% of the time, it is now staffed 24 hour a day and is located in a high call volume area. Station #2 zone now accounts for 63.2% of all calls. The addition would allow an increase in the capablities of that station. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 250,000 250,000 Total 250,000 250,000 CAPITAL PLAN 2003 rhru 2007 D. City of Edina, MN Project # PS -01 -003 i Project Name In -Squad Video System Type Improvement Priority n/a Useful Life Contact Police Department Category Police Department Public Safety category names Total Project Cost $40,000 ruggedized video system, consisting of a camera, microphones, and recorder would be purchased for each of our ,elve patrol squads. Station equipment would include a supply of tapes, storage space and a player that can view, copy ,d print images. Justification ideo recording systems in squad cars provide audio and visual documentation of events for evidentiary purposes in iminal and civil cases. The video provides an impartial record of disputed events. Expenditure 2003 2004 2005 2006 2007 Total EquipNehides /Fumishings 50,000 50,000 Total 50,000 50,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 50,000 50,000 Total 50,000 50,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # pS -02 -004 Project Name Outdoor Warning System Type Equipment Priority n/a Useful Life Contact Police Department Category Warning System Department Public Safety category names Total Project Cost $40,000 A network of ten sirens and radio controlled decoders are used to alert the public of impending or an existing emergency such as severe weather, floods or national attack. The sirens are activated from the Hennepin County Sheriffs Radio Center in Golden Valley via the radio controller. The sirens have an expected life span of 25 years and are on a staggered replacement schedule. The oldest siren is 23 years old. The current replacement cost per siren is $15,000. radio control units were purchased in 1986. The manufacturer is not in the siren control business any more and acement parts are nonexistent for both the sending and receiving units. The control system will be replaced on a rtywide basis in the next 2 -5 years. There have been no cost estimates yet for the replacement system. The &cement cost for the current units was $3,875. Justification The outdoor warning system is an integral part of the City's emergency response plan. The ability to warn the public of impending disaster allows people to take immediate action to reduce their risk of jarm. The primary use of the warning system has been for severe weather emergencies, such as tornado warnings, in which prompt warning can mean the difference between life and death. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicles /Fumishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Revolving Fund 40,000 40,000 Total 40,000 40,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project a PW -00 -017 Project Name Concrete Rehab: W. 70th St. (TH100 - France) Type Improvement Priority n/a Useful Life Contact Public Works Category Municipal State Aid Department Public Works category names MSA Total Project Cost $283,000 L his project provides for the rehabilitation of concrete pavement along W. 70th Street from Hwy 100 to France venue. The existing pavement is showing signs of deterioration and this rehab will protect the structural integrity of to roadway. Justification The need to rehabilitate this segment of roadway was determined by the Pavement Management System. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 283,000 283,000 Total 283,000 283,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 203,000 203,000 Special Assessments 80,000 80,000 Total 283,000 283,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # PW -02 -002 Project Name Reconstruct: Concord Ave (VVRD to Southview Ln) Type Improvement Priority n/a Useful Life Contact Engineering Category Municipal State Aid Department Public Works category names Total Project Cost $500,000 Description This project provides for the reconstruction of Concord Avenue from West 58th Street to Valley View Road. This project will provide a new roadway section and will bring this road into compliance with State -Aid Standards. Sidewalks will also be analyzed with this reconstruction. Justification This project was initiated by the Pavement Management System due to the roadway pavement reaching a point of failure. Maintenance of the roadway such as overlays or seal -coats are no longer feasible. The roadway section is also considered inadequate per the Municipal State -Aid Standards as set by the Minnesota Department of Transportation. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2003 2004 2005 2006 2007 Total Municipal State Aid 400,000 400,000 Special Assessments 100,000 100,000 Total 500,000 500,000 CAPITAL PLAN City of Edina, MN FP.,JeC,tt # PW -02-015 Name #25456 Pneumatic Roller 2003 thru 2007 Type Improvement Priority n/a Useful Life Contact Public Works Coordinator Category Equipment Replacement Department Public Works category names Total Project Cost $65,000 equipment #25 -456: Caterpillar Asphalt Roller PS180 -11 Wheel, purchased in 1992. Justification piece of equipment is within the "15115 Category" where a piece of equipment is worth over $15,000 and its useful is over 15 years. All other Public Works equipment is replaced within the equipment replacement account of the -ly budget based on useful life replacement. Expenditure 2003 2004 2005 2006 2007 Total EquipNehicies /Fumishings 65,000 65,000 Total 65,000 65,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 65,000 65,000 Total 65,000 65,000 CAPITAL PLAN City of Edina, MN Project # UT- 02-014 Project Name Well #10 (4500 West 76th Street) Type Improvement Priority Useful Life 10 years Contact Category wells Department category names 2003 thru 2007 n/a Utility Supt Utility Department Total Project Cost $65,000 Description Zedevelop well hole, create a cavity on the bottom, and rebuild pump. Justification _ This well is a year around well and has a 7 year life expectancy. The last time this well was rehabbed was 1999. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 65,000 65,000 Total 65,000 65,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 65,000 65,000 Total 65,000 65,000 CAPITAL PLAN 2003 thru 2007 City of Edina, A4N___ Project # UT-02-015 Project Name Well #11 (4500 West 76th Street) Type Improvement Priority n/a Useful Life 10 years Contact Utility Supt Category Wells Department Utility Department category names Total Project Cost $65,000 Redevelop well hole, create a cavity on the bottom, and rebuild the pump. Justification This well is operated year around and has a 7 year life expectancy. The last time this well was rehabbed was 1998. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 65,000 65,000 Total 65,000 65,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 65,000 65.000 Total 65,000 65,000 CAPITAL PLAN 2003 thru 2007 City of Edina, MN Project # UT- 02-018 Project Name Lift Station #21 (5970 Walnut Drive) i Type Improvement Priority n/a Useful Life 20 years Contact Utility Supt Category Lift Stations Department Utility Department category names Total Project Cost F $100,000 Description Lift Station. Justification Station is using old and obsolete parts. Expenditure 2003 2004 2005 2006 2007 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total Utility Funds 100,000 100,000 Total 100,000 100,000 The City of Edina is "Building a Stronger Community." In 2002, the City completed new construction or renovations of several municipal facilities. Featured on the cover (clockwise from upper left) are a new cable ride and water slides at the Edina Aquatic Center, renovated Edina Liquor -- Grandview, renovated Braemar Golf Course Clubhouse and new Edina Senior Center. Construction began late in the year on a new Edina City Hall. An artist's rendering of the building appears in the middle of the cover. City of Edina 4801 West 50th Street Edina, Minnesota 55424 www.cityofedina.com