Loading...
HomeMy WebLinkAbout3211721130011-09092014BUILDING DEPARTMENT SEF' - 2014 - CITY JF EDINA► INSTALL INLET PROTECTION IN 2 CB )S AT SE CURB RETURN ON WARDEN AVE AT TRACY AVE 2" x 2" WOOD POSTS F(ILTER FABRIC RAFI-ENVIRO FENCE 4.0' O.C.[--,-ABOVE PR ADE QUAL) MIN. 30" - MAX. 36" GRADE DIRECTION OF I DRAINAGE BACKFILL 6" x 6" TRENCH E UNDISTURBED SOIL N SILT FENCE NOTES: 1. SILT FENCE SHALL BE BLACK IN COLOR. 2. DIG A 6X6 TRENCH ALONG THE INTENDED FENCE LINE OR MACHINE SLICE TO 6" DEPTH. 3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL. 5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC. 6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED. SILT FENCE DETAIL STORM - CASTING (TYP) CG -23 HIGH-FLOW INLET INSERT - , PLATE ASSEMBLY OVERFLOW 12 - TOP OF CURB BOX so-- EROSION -° BIO -ROLL WARDEN AVEN U E "- 6" DIA. EXISTING RECONSTRUCT EROSION `�� SANITARY'APRON BIO -ROLL �� WATER �.a g 6" DIA.TC SERVICES ----- . - INLET PROTECTION TC IN ELEV. = 908.52 !I in ■ N 909.15. rAl -' SILT FENCE 090" � ---�--' =------- ll ■ ,,.._•_.--• _-• )ROCK ■ INSTALL NSTALL STANDARD NDARD t_ CONSTRUCTION ') IMPERVIOUS ■0a. ENTRANCE 09 PAVEMENT DRIVEWAY ' I ""0"""r •s '� AND SIDEWALK. t,". -)i ����r� j -- i 1��� O SILT �� 1 ,.. / Lh 9i FENCE �` - 6- '= SILT FENCE 909.1 ■ % / or 06.Ooo 11.7 1 .� �- .00 910.4 91(19 d9 0�4 y X10.6 9104 1 �.1•TEMPORARY 10 2 0.3•2 `�' STOCKPILE 910.6 I orI GARAGE FLR. I ELEV. = 912.3 5 7-'/ _, 1 f - 4 GSI RA GE I EX15 7-ING M _ -. O `� ' ` HOUSE 1 6, PROPOSED �/ 13.7 _ � 906 3 0 � 911 � , ION 90 .6 - - -- _ i'\7 ® y . _ _ HOUSE 1 1 . 09 , . �.� Y04- O 1 Ln 1 � 91 I . � 909.2 �D' TEMPORARY IJ OVERFLOW #1- ■ ■ CENTER OF FILTER ASSEMBLY C S T O C K P I L E FABRIC NOTES: 1) CONTRACTOR OPTION TO USE WIMCO INLET PROTECTION INSERT OR EQUAL. INLET PROTECTION DETAIL AP_ ),5.96-1 902 �9 - 90 .6 1 10.3.. _ :_ 37.��4 �� _ - 7T- 2.4 - _ 902.x• O SILT / DECK .._ �•. 1 ,� .._. i 1�-- S I LT FENCE JIM1 FENCEcio��- / / •, 1 r 9093 899.8 900.8// / •. �� �. 07.41 I z .90 SILT '•, / // / / /FENCE ..■■ INSTALL POROUS • .� / // ��,■■r■.•■ PAVEMENT PATIO, ` I •. � / � .••'���� � � I SEE SHEET 2 2 O �'� /' ,..•••3 °� T ,'F. 9,16.1 6, 5 I iU L WM:)r1GU RUUN NOTES: ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1 OR CA -2 COURSE AGGREGATE. (WASHED) A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT MIGRATION OF THE UNDERLYING SOIL INTO THE STONE. 'OCK CONSTRUCTION ENTRANCE DETAIL 1 � " A A •••• � PROPOSED SOIL ' • 1 ��a�R E AMENDMENT AREA .r.1-- -RU- E _. PIC LF--- 1,250 S F, - l Ln UTIV ITY EASE SEE DETAILS ON It I t t 1 I 1( ba ....,._. . _ ` SHEET 2--- '_777 966.0 N1189 5 / �� W 19J. 00 j ALJ O I 0 I PROJECT LOCATION PART OF SECTION 32, TOWNSHIP 117, RANGE 21, HENNEPIN COUNTY, MINNESOTA. LEGAL DESCRIPTION LOT 8, GREENLEAF MANOR, HENNEPIN COUNTY, MINNESOTA. SITE LEGEND: • Existing Property Line -- -- -- Existing Adjacent Property Line EXISTING CONDITION vs PROPOSED CONDITION Existing Contour w/Elev. Text ------ ### Proposed Contour w Elev. Text EXISTING (SF) Proposed Building ■mommommom■■■ Proposed Silt Fence 2,596 Proposed Inlet Protection DRIVEWAY = 864 EROSION CONTROL NOTES 1. All devices necessary to control erosion and sediment (I.E. perimeter silt fence, rock construction entrances, swales, ponds, berms, ETC.) shall be installed prior to any other construction operations. 2. Temporary erosion control soil stabilization shall be completed within 72 hours of disturbed areas that are to remain fallow and in an unfinished temporary condition. Temporary stabilization to be completed in compliance with MnDOT 2575 specifications. 3. After completion of final grading, exposed soils must be permanently stabilized within 72 hours. Stabilization shall consist of disc -anchored seed & mulch or sod as allowed by City, or as proposed on City approved landscape plan for the project. 4. The site must be kept in a well drained condition at all times. The contractor shall be responsible for temporary ditches or other means necessary to ensure proper drainage. The building pad must be provided with a positive outflow. This work shall be incidental to the grading contract. 5. Entering/exiting of the site shall occur only at rock construction entrance to reduce tracking of dirt onto paved streets. Sediment tracked onto streets during working hours must be reclaimed via street scraping and sweeping at the end of each working day. 6. Temporary dewatering pump out to be discharged to a sediment filter bag constructed of min. 8oz non -woven filter fabric to provide silt and sediment removal from storwater prior to discharge to appropriate drainage area. POLLUTION PREVENTION NOTES 1. Solid waste: collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction debris and other wastes must be disposed of properly off-site and must comply with MPCA requirements. 2. Hazardous materials: oils, gasoline, paint, and any hazardous substance must be properly stored, including secondary containment, to prevent spills, leaks or other discharge. Restricted access to storage areas must be provided to prevent vandalism. Storage and disposal must be in compliance with MPCA regulations. 3. External washing of trucks or other construction vehicles _ is not allowed on site. No engine degreasing is allowed on site. 4. No concrete washouts are allowed on site. VEGITATION GROUND COVER SCHEDULE 1. Permanent turf ground cover shall include all disturbed areas be covered with a minimum 4" topsoil and sodded or seeded as allowed by City, or as proposed on City approved landscape plan for the project. 2. Temporary ground cover shall be MnDOT seed mix 150 shall be applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied at 2 tons/ac and disc anchored in areas not covered by sod or erosion blanket. 3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200 lbs/ac. Disc fertilizer into top 3" of soil. Specification reference is MnDOT 2575. 4. Dormant seed mix shall be used after November 1 or when temperatures do not exceed 40' F, using some rates specified above. No seed shall be placed on snow or ice greater than 2" in depth. 5. Any seeded areas that do not become established with vegetation shall be reseeded at Contractor's expense. 6. Erosion blanket shall be installed in seed areas with ground surface slopes of 5HAV or steeper. RESPONSIBLE PARTY Contact information for the responsible party for erosion control is: CORNERSTONE HOMES, LLC - General Contractor Gennodiy Sizonenko - Project Manager 612-598-5255 mobile cornerstonehomes®hotmail.com PROPOSED ELEVATIONS: GARAGE FLOOR= 91 1.2 LOWEST FLOOR=903.5 FIRST FLOOR=913.0 TOP OF FOUNDATION=911.5 PEAK OF ROOF = 945.2 AVE. FRONT GRADE= 910.4 AVE. REAR GRADE= 906.3 VERIFY WITH CONTRACTOR BEFORE CONSTRUCTION 0 10 20 30 GRAPHIC SCALE IN FEET Survey Data By: Taylor an Surveyors 213 W. Broadway PO Box 179 Monticello, MN 55362 763-295-3388 DRAINAGE HARD SURFACE COMPARISON: CORNERSTONE EXISTING CONDITION vs PROPOSED CONDITION LLC 5609 Warden Avenue EXISTING (SF) PROPOSED (SF) HOUSE FOOTPRINT = 1,745 2,596 DRIVEWAY = 864 1,280 .o SIDEWALKS/STOOPS = 167 170 O PATIO = 418 150 �► SHED = 144 144 oft SUB -TOTAL = 3,338 4,340 W ADJUSTMENT VIA W POROUS PAVEMENT = -150 TOTAL HARD SURFACE = 4,190 HARD SURFACE INCREASE = 852 SF (EXISTING vs PROPOSED) 25.5 O AREA TO FRONT YARD = 1,826 2,515 AREA TO REAR YARD = 1,512 1,675 Benchmark: Spot on top back of curb at catch basin, located near NE corner of Lot 8. Elevation = 909.15 feet GENERAL GRADING NOTES: 1. Specifications applicable for this project: Current standard specifications for the City of Edina; the latest Minnesota Department of Transportation Specifications for Highway Construction; and all NPDES requirements except where modified by these documents. 2. OSHA requirements shall be followed for all work on this project. 3. The Contractor shall notify "Gopher State One Call" 48 hours prior to any excavation (1-800-252-1166.) 4. The Grading Contractor shall verify all locations and elevations of underground utilities with utility companies prior to any construction, and immediately notify the Engineer of any conflicts. 5. Final Plot shall govern for easements and lot dimensions. 6. Any erosion control items necessary to protect adjacent properties shall be constructed prior to the start of excavation or grading work. 7. Erosion control maintenance formed b e once shall be per y the Grading Contractor, and removed as per the Contract Documents or as directed by the Owner, followed by all necessary restoration of disturbed area. 8. The Grading contractor shall provide positive drainage on the site at all times. Grading tolerances shall be 0.10' for hard surface areas. Grading tolerances for the remainder of the site shall be 0.25'. 9. The Grading Contractor shall keep public streets, parking lots, and travel ways clear of soil and debris. Daily cleaning at the construction entrance shall be performed, especially at the end of each day's work. EROSION CONTROL INSTALLATION SCHEDULE 1. Silt fence shall be installed or restored prior to any construction. Silt fence shall be located as shown to intercept runoff. The area located beyond the perimeter silt fence shall riot be disturbed during construction. 2. Rock Construction Entrance shall be installed prior to grading operations. 3. All storm sewer inlets shall have inlet protection inserts installed. Inserts shall be "Rood rain -Top Slob" or Road Drain -Curb dt Gutter" inlet protection devices as manufactured by WIMCO (or approved equal) and installed per manufacture's recommendations. 4. All erosion control installations shall remain in place and be maintained in good condition by the contractor until the site has been re -vegetated, at which time it shall be removed by the contractor. For proposed paved surface areas, the contractor may remove necessary silt fencing to construct roadway, while maintaining adequate erosion control in adjacent areas. 5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil for disturbed areas to be re -vegetated. 6. The contractor shall schedule site grading, utility installation and site construction so that the general site can be mulched and sodded or re -seeded as soon as possible soon after disturbance. Areas that will not be subject to construction traffic shall be seed and mulched or sodded within 72 hours of final grading. EROSION CONTROL MAINTENANCE SCHEDULE 1. Erosion control measures shall be inspected by the contractor's representative and maintained by the contractor every Friday and within 24 hours after any rainfall event larger than 1/2" until the project is completed. Maintenance requirements are as follows: silt fence - 1/3 height of fence or damaged, remove sediment and/or repair fence within 24 hours; rock entrance - refresh as necessary to conform to detail; inlet protection inserts - remove sediment after each rain event, clean or replace filter when clogged; surface water - drain and stabilize, within 72 hours of discovery; street sweeping - remove all sediment tracked onto paved surfaces within 24 hours or as directed by City Engineer. 2. Replacement - Fabric shall be replaced promptly when it decomposes or becomes ineffective before the barrier is no longer necessary. 3. Any sediment remaining in place after silt fence is no longer required shall be dressed to conform with the existing grade, prepared, and seeded with appropriate seed mix, as directed by the engineer. 4. Removal of the silt fence- Silt fences shall be removed when they have served their useful purpose, but not before the upward sloping area has been permanently stabilized. Porous pavement is proposed for rear yard patio improvements in an effort to reduce storm water runoff from the site adjacent rear and side properties. Standard impervious pavement is proposed for the driveway and sidewalk in the front yard. Rear yard area proposed hard surface is 163sf larger than existing condition. Rear yard area storm water runoff and volume reduction proposed by soil amendment based on guidance from MPCA Minnesota Storm Water Manual and other sources. Proposed soil amendment area to provide runoff and volume control equivalent to 3.9 inch rainfall event on 163sf hard surface area. See calculations on Sheet 2. IT a4, 1 00 11 CLIENT: CORNERSTONE HOMES, LLC 5609 Warden Avenue Edina, MN 55436 612-598-5255 4 0 d' C � N 4 0 .o 0 O V �► ��„ Z O O oft 0 O W m W d' N 4 0 O � � m O m W O O V O O O U FILE N0. 00499 -112 Storm Water and e'sErosion Control Plan 1556oq wacde4l AL/C.