Loading...
HomeMy WebLinkAbout1902824110020-11192015tc:C poC 566.52 DRAINAGE IMPERVIOUS SURFACE COMPARISON: L.. EXISTING CONDITION vs PROPOSED CONDITION ' I EXISTING (SF) PROPOSED (SF) HOUSE FOOTPRINT = 1,277 1,730 DRIVEWAY = 742 863 SIDEWALKS/STOOPS = 558 21 PATIO/DECK = 206 150 SHED = 62 62 TOTAL IMPERVIOUS SURFACE = 2,845 2,826 IMPERVIOUS SURFACE DECREASE = 19 SF (EXISTING vs PROPOSED) L------- 0'7 % AREA TO FRONT YARD = 2,845 2,826 AREA TO REAR YARD = 0 0 ,3ara,3e floor, 569,0 Proposed Wall� • '����` - peak- No, eakNo, 542 i gob. SILT FENCE ;, .(01 1} --------- '---- -N 1 i7W ROCK CONSTRUCTION ENTRANCE I SILT FENCE `_.... / ..... _...... - __..........._ _... ..... ._- INSTALL INLET PROTECTION I N 'I CATCH BASIN ' ( � I l � i NOTES: ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1 OR CA -2 COURSE AGGREGATE. (WASHED) A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT MIGRATION OF THE UNDERLYING SOIL INTO THE STONE. ROCK CONSTRUCTION ENTRANCE DETAIL Proposed impervious surface is 19 sf less than existing condition. Storm water runoff and volume reduction is therefore not required for this project. LEGAL DESCRIPTION LOT 4, BLOCK 1, ELMWOOD TERRACE, HENNEPIN COUNTY, MINNESOTA PROJECT LOCATION PART OF SECTION 19, TOWNSHIP 28, RANGE 24, HENNEPIN COUNTY, MINNESOTA SITE LEGEND: Existing Property Line ................................... .......... I........................ Existing Adjacent Property Line ------,t __-- Existing Contour w/Eley. Text ------### ----- Proposed Contour w/Elev. Text Proposed Building ■M■■■■N■■■NE■ Proposed Silt Fence 0 10 20 30 =° Proposed Inlet Protection EROS/ON CONTROL NOTES 1. All devices necessary to control erosion and sediment (I.E. perimeter silt fence, rock construction entrances, swoles, ponds, berms, ETC.) shall be installed prior to any other construction operations. 2. Temporary erosion control soil stabilization shall be completed within 72 hours of disturbed areas that are to remain fallow and in an unfinished temporary condition. Temporary stabilization to be completed in compliance with MnDOT 2575 fir' ^ I I I I I i specifications. 3. After completion of final grading, exposed soils must be permanently stabilized within 72 hours. Stabilization shall consist of disc -anchored seed & mulch or sod as allowed by 674„'' ��� I II I I j ; 7° City, or as proposed on City approved landscape plan for the SILT FENCE I I I; I I project. I I I I II! !r 4. The site must be kept in a well drained condition at all I ® 1,5G,98Measure times. The contractor shall be responsible for temporary _ _ V. =,\,T- \ �`�� ditches, or her means necessary to ensure proper drainage. h of er ■ ■ ■ j j ' ■ ■'r� 1� i ■ ■ ■�� ■'■ ■ ■ ■ ■, �� -X / _ I, / The building pad must be provided with a positive outflow. � ............... X-- x x: R. x _ } ........ _.__ X x k , I 1 I / �/ /.. This work shall be incidental to the grading contract. i 1 5. Entering/exiting of the site shall occur only at rock X /j construction entrance to reduce tracking of dirt onto paved streets. Sediment tracked onto streets during working hours ssm MISS INS i �il:.� I I ( , must be reclaimed via street scraping and sweeping at the 6.2 I I I'� I end of each working day. .• �T j,t- f `I I I 6. Temporary dewatering pump out to be discharged to \, Q Q1~ 1 I , constructed Temporary Dewatering Discharge per detail this r i � � •�(I 1 sheet, or sediment filter bag constructed of min. Boz NI r i I I' I non -woven filter fabric, to provide silt and sediment removal from storwater prior to discharge to appropriate drainage area. O `-I I POLLUTION PREVENTION NOTES Mc t:` ef >; 1. Solid waste: collected sediment, asphalt and concrete millings, TEMP0 RARY ( floating debris, paper, plastic, fabric, construction debris and Proposed � � � � other wastes must be disposed of properly off-site and must \� comply with MPCA requirements. STOCKPILE ` 2. Hazardous materials: oils, gasoline, paint, and any hazardous substance must be properly stored, including secondary Residence , �I STOCKPILE T,-� .� containment, to prevent spills, leaks or otherdischarge. l \ ' Restricted access to storage areas must be d to prevent (dimensions to main Hoar} ' ��/ �;� X vandalism. Storage and disposal must be in compliance with / �- SILT FEN C E MPCA regulations. Re5ldence No, 5429 raqo floor, - .4 2" x 2" WOOD POSTS FILTER FABRIC 4.0' O.C. (MI APPROVED FENCE OR APPROVED EQUAL) MIN. 30' - MAX. 36" ABOVE GRADE DIRECTION OF I I DRAINAGE BACKFILL 6" x 6" TRENCH lz N I I UNDISTURBED SOIL SILT FENCE NOTES CG -23 HIGH-FLOW INLET INSERT . 3. External washingof trucks or other construction vehicles is not allowed on site. No engine degreasing is allowed on site. r 4. No concrete washouts are allowed on site. L VEG/TAT/ON GROUND COVER SCHEDULE Permanent turf ground cover shall include all disturbed areas be n ell covered with a minimum 4" topsoil and sodded or seeded as 0- `fix < allowed by City, or as proposed on City approved landscape plan for the project. r�� ` 2. Temporary ground cover shall be MnDOT seed mix 150 shall be x_...........,� ... _ X X _................. x .......-...� X _ r I ■ ■ ■ N. ■ ■ ■ ■ ■ ■ ■ ■ ■ �� ■ ■I■ ■ ■ ■ ■ ■ applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied _ at 2 tons/ac and disc anchored in areas not covered by sod it i 47.10 / / / - ` or erosion blanket. -- r0 A M¢a.5 ure / / , ' 55.E . I / / / // // / 3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200 SILT FENCE i ki6' f'l t i / / hG'd lbs/ac. Disc fertilizer into top 3" of soil. Specification reference is MnDOT 2575. 4. Dormant seed mix shall be used after November 1 or when temperatures do not exceed 40" F, using some rates specified above. No seed shall be placed on snow or ice greater than 2" in depth. 5. Any seeded areas that do not become established with vegetation shall be reseeded at Contractor's expense. 6. Erosion blanket shall be installed in seed areas with ground surface slopes of 5H: 1 V or steeper. DEFLECTOR PLATE OVERFLOW ,#2 - TOP OF CURB BOX OVERFLOW # I - CENTER OF FILTER ASSEMBLY 1. SILT FENCE SHALL BE BLACK IN COLOR. NOTES: 2. DIG A 6"X6" TRENCH ALONG THE INTENDED FENCE LINE, OR MACHINE SLICE TO 6" DEPTH. 3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 1) CONTRACTOR OPTION TO USE WIMCO INLET 4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL. PROTECTION INSERT OR EQUAL. 5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC 6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED. SILT FENCE DETAIL INLET PROTECTION DETAIL GRAPHIC SCALE IN FEE Survey Data By: Benchmark: Lot Surveys Company Top nut of hydrant at NE 7601 73rd Avenue North corner of Halifax Avenue Minneapolis, MN 55428 and 54th. 763-560-3093 Elevation = 877.0 feet GENERAL GRADING NOTES: 1. Specifications applicable for this project: Current standard specifications for the City of Edina; the latest Minnesota Department of Transportation Specifications for Highway Construction; and all NPDES requirements except where modified by these documents. 2. OSHA requirements shall be followed for all work on this project. 3. The Contractor shall notify "Gopher State One Call" 48 hours prior to any excavation (1-800-252-1166.) 4. The Grading Contractor shall verify all locations and elevations of underground utilities with utility companies prior to any construction, and immediately notify the Engineer of any conflicts. 5. Final Plat shall govern for easements and lot dimensions. 6. Any erosion control items necessary to protect adjacent properties shall be constructed prior to the start of excavation or grading work. 7. Erosion control maintenance shall be performed by the Grading Contractor, and removed as per the Contract Documents or as directed by the Owner, followed by all necessary restoration of disturbed area. 8. The Grading contractor shall provide positive drainage on the site at all times. Grading tolerances shall be 0.10' for hard surface areas. Grading tolerances for the remainder of the site shall be 0.25'. 9. The Grading Contractor shall keep public streets, parking lots, and travel ways clear of soil and debris. Daily cleaning at the construction entrance shall be performed, especially at the end of each day's work. EROSION CONTROL INSTALLATION SCHEDULE 1. Silt fence shall be installed or restored prior to any construction. Silt fence shall be located as shown to intercept runoff. The area located beyond the perimeter silt fence shall not be disturbed during construction. 2. Rock Construction Entrance shall be installed prior to grading operations. 3. All storm sewer inlets shall have inlet protection inserts installed. Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter" inlet protection devices as manufactured by WIMCO (or approved equal) and installed per manufacture's recommendations. 4. All erosion contra' 'r,stallations shall remain in place and be mai.ntclned in good condition by tree contractor until the site has been re -vegetated, at which time it shall be removed by the contractor. For proposed paved surface areas, the contractor may remove necessary silt fencing to construct roadway, while maintaining adequate erosion control in adjacent areas. 5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil for disturbed areas to be re -vegetated. 6. The contractor shall schedule site grading, utility installation and site construction so that the general site can be mulched and sodded or re -seeded as soon as possible soon after disturbance. Areas that will not be subject to construction traffic shall be seed and mulched or sodded within 72 hours of final grading. EROSION CONTROL MAINTENANCE SCHEDULE 1. Erosion control measures shall be inspected by the contractor's representative and maintained by the contractor every Friday and within 24 hours after any rainfall event larger than 1/2" until the project is completed. Maintenance requirements are as follows: silt fence - 1/3 height of fence or damaged, remove sediment and/or repair fence within 24 hours; rock entrance - refresh as necessary to conform to detail; inlet protection inserts - remove sediment after each rain event, clean or replace filter when clogged; surface water - drain and stabilize, within 72 hours of discovery; street sweeping - remove all sediment tracked onto paved surfaces within 24 hours or as directed by City Engineer. 2. Replacement - Fabric shall be replaced promptly when it decomposes or becomes ineffective before the barrier is no longer necessary. 3. Any sediment remaining in place after silt fence is no longer required shall be dressed to conform with the existing grade, prepared, and seeded with appropriate seed mix, as directed by the engineer. 4. Removal of the silt fence- Silt fences shall be removed when they have served their useful purpose, but not before the upward sloping area has been permanently stabilized. RESPONSIBLE PARTY Contact information for the responsible party for erosion control is: CITY DESIGN + BUILD, LLC - General Contractor Chris Molooly - Project Coordinator 612-363-0633 phone chris@cityhomeslic.com i, Nal CH na MM is OMAN iwwrio[ S lY ewom qua toot NO W MOM CM TEMPORARY DEWATERING DISCHARGE DETAIL CLIENT: I L.. 57/.5 ' I BUILD, LLC 4220 Crocker Ave top wall I ..... I I CO I CID I Rif I i - " Cantilever � I Q SILT FENCE `_.... / ..... _...... - __..........._ _... ..... ._- INSTALL INLET PROTECTION I N 'I CATCH BASIN ' ( � I l � i NOTES: ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1 OR CA -2 COURSE AGGREGATE. (WASHED) A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT MIGRATION OF THE UNDERLYING SOIL INTO THE STONE. ROCK CONSTRUCTION ENTRANCE DETAIL Proposed impervious surface is 19 sf less than existing condition. Storm water runoff and volume reduction is therefore not required for this project. LEGAL DESCRIPTION LOT 4, BLOCK 1, ELMWOOD TERRACE, HENNEPIN COUNTY, MINNESOTA PROJECT LOCATION PART OF SECTION 19, TOWNSHIP 28, RANGE 24, HENNEPIN COUNTY, MINNESOTA SITE LEGEND: Existing Property Line ................................... .......... I........................ Existing Adjacent Property Line ------,t __-- Existing Contour w/Eley. Text ------### ----- Proposed Contour w/Elev. Text Proposed Building ■M■■■■N■■■NE■ Proposed Silt Fence 0 10 20 30 =° Proposed Inlet Protection EROS/ON CONTROL NOTES 1. All devices necessary to control erosion and sediment (I.E. perimeter silt fence, rock construction entrances, swoles, ponds, berms, ETC.) shall be installed prior to any other construction operations. 2. Temporary erosion control soil stabilization shall be completed within 72 hours of disturbed areas that are to remain fallow and in an unfinished temporary condition. Temporary stabilization to be completed in compliance with MnDOT 2575 fir' ^ I I I I I i specifications. 3. After completion of final grading, exposed soils must be permanently stabilized within 72 hours. Stabilization shall consist of disc -anchored seed & mulch or sod as allowed by 674„'' ��� I II I I j ; 7° City, or as proposed on City approved landscape plan for the SILT FENCE I I I; I I project. I I I I II! !r 4. The site must be kept in a well drained condition at all I ® 1,5G,98Measure times. The contractor shall be responsible for temporary _ _ V. =,\,T- \ �`�� ditches, or her means necessary to ensure proper drainage. h of er ■ ■ ■ j j ' ■ ■'r� 1� i ■ ■ ■�� ■'■ ■ ■ ■ ■, �� -X / _ I, / The building pad must be provided with a positive outflow. � ............... X-- x x: R. x _ } ........ _.__ X x k , I 1 I / �/ /.. This work shall be incidental to the grading contract. i 1 5. Entering/exiting of the site shall occur only at rock X /j construction entrance to reduce tracking of dirt onto paved streets. Sediment tracked onto streets during working hours ssm MISS INS i �il:.� I I ( , must be reclaimed via street scraping and sweeping at the 6.2 I I I'� I end of each working day. .• �T j,t- f `I I I 6. Temporary dewatering pump out to be discharged to \, Q Q1~ 1 I , constructed Temporary Dewatering Discharge per detail this r i � � •�(I 1 sheet, or sediment filter bag constructed of min. Boz NI r i I I' I non -woven filter fabric, to provide silt and sediment removal from storwater prior to discharge to appropriate drainage area. O `-I I POLLUTION PREVENTION NOTES Mc t:` ef >; 1. Solid waste: collected sediment, asphalt and concrete millings, TEMP0 RARY ( floating debris, paper, plastic, fabric, construction debris and Proposed � � � � other wastes must be disposed of properly off-site and must \� comply with MPCA requirements. STOCKPILE ` 2. Hazardous materials: oils, gasoline, paint, and any hazardous substance must be properly stored, including secondary Residence , �I STOCKPILE T,-� .� containment, to prevent spills, leaks or otherdischarge. l \ ' Restricted access to storage areas must be d to prevent (dimensions to main Hoar} ' ��/ �;� X vandalism. Storage and disposal must be in compliance with / �- SILT FEN C E MPCA regulations. Re5ldence No, 5429 raqo floor, - .4 2" x 2" WOOD POSTS FILTER FABRIC 4.0' O.C. (MI APPROVED FENCE OR APPROVED EQUAL) MIN. 30' - MAX. 36" ABOVE GRADE DIRECTION OF I I DRAINAGE BACKFILL 6" x 6" TRENCH lz N I I UNDISTURBED SOIL SILT FENCE NOTES CG -23 HIGH-FLOW INLET INSERT . 3. External washingof trucks or other construction vehicles is not allowed on site. No engine degreasing is allowed on site. r 4. No concrete washouts are allowed on site. L VEG/TAT/ON GROUND COVER SCHEDULE Permanent turf ground cover shall include all disturbed areas be n ell covered with a minimum 4" topsoil and sodded or seeded as 0- `fix < allowed by City, or as proposed on City approved landscape plan for the project. r�� ` 2. Temporary ground cover shall be MnDOT seed mix 150 shall be x_...........,� ... _ X X _................. x .......-...� X _ r I ■ ■ ■ N. ■ ■ ■ ■ ■ ■ ■ ■ ■ �� ■ ■I■ ■ ■ ■ ■ ■ applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied _ at 2 tons/ac and disc anchored in areas not covered by sod it i 47.10 / / / - ` or erosion blanket. -- r0 A M¢a.5 ure / / , ' 55.E . I / / / // // / 3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200 SILT FENCE i ki6' f'l t i / / hG'd lbs/ac. Disc fertilizer into top 3" of soil. Specification reference is MnDOT 2575. 4. Dormant seed mix shall be used after November 1 or when temperatures do not exceed 40" F, using some rates specified above. No seed shall be placed on snow or ice greater than 2" in depth. 5. Any seeded areas that do not become established with vegetation shall be reseeded at Contractor's expense. 6. Erosion blanket shall be installed in seed areas with ground surface slopes of 5H: 1 V or steeper. DEFLECTOR PLATE OVERFLOW ,#2 - TOP OF CURB BOX OVERFLOW # I - CENTER OF FILTER ASSEMBLY 1. SILT FENCE SHALL BE BLACK IN COLOR. NOTES: 2. DIG A 6"X6" TRENCH ALONG THE INTENDED FENCE LINE, OR MACHINE SLICE TO 6" DEPTH. 3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 1) CONTRACTOR OPTION TO USE WIMCO INLET 4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL. PROTECTION INSERT OR EQUAL. 5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC 6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED. SILT FENCE DETAIL INLET PROTECTION DETAIL GRAPHIC SCALE IN FEE Survey Data By: Benchmark: Lot Surveys Company Top nut of hydrant at NE 7601 73rd Avenue North corner of Halifax Avenue Minneapolis, MN 55428 and 54th. 763-560-3093 Elevation = 877.0 feet GENERAL GRADING NOTES: 1. Specifications applicable for this project: Current standard specifications for the City of Edina; the latest Minnesota Department of Transportation Specifications for Highway Construction; and all NPDES requirements except where modified by these documents. 2. OSHA requirements shall be followed for all work on this project. 3. The Contractor shall notify "Gopher State One Call" 48 hours prior to any excavation (1-800-252-1166.) 4. The Grading Contractor shall verify all locations and elevations of underground utilities with utility companies prior to any construction, and immediately notify the Engineer of any conflicts. 5. Final Plat shall govern for easements and lot dimensions. 6. Any erosion control items necessary to protect adjacent properties shall be constructed prior to the start of excavation or grading work. 7. Erosion control maintenance shall be performed by the Grading Contractor, and removed as per the Contract Documents or as directed by the Owner, followed by all necessary restoration of disturbed area. 8. The Grading contractor shall provide positive drainage on the site at all times. Grading tolerances shall be 0.10' for hard surface areas. Grading tolerances for the remainder of the site shall be 0.25'. 9. The Grading Contractor shall keep public streets, parking lots, and travel ways clear of soil and debris. Daily cleaning at the construction entrance shall be performed, especially at the end of each day's work. EROSION CONTROL INSTALLATION SCHEDULE 1. Silt fence shall be installed or restored prior to any construction. Silt fence shall be located as shown to intercept runoff. The area located beyond the perimeter silt fence shall not be disturbed during construction. 2. Rock Construction Entrance shall be installed prior to grading operations. 3. All storm sewer inlets shall have inlet protection inserts installed. Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter" inlet protection devices as manufactured by WIMCO (or approved equal) and installed per manufacture's recommendations. 4. All erosion contra' 'r,stallations shall remain in place and be mai.ntclned in good condition by tree contractor until the site has been re -vegetated, at which time it shall be removed by the contractor. For proposed paved surface areas, the contractor may remove necessary silt fencing to construct roadway, while maintaining adequate erosion control in adjacent areas. 5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil for disturbed areas to be re -vegetated. 6. The contractor shall schedule site grading, utility installation and site construction so that the general site can be mulched and sodded or re -seeded as soon as possible soon after disturbance. Areas that will not be subject to construction traffic shall be seed and mulched or sodded within 72 hours of final grading. EROSION CONTROL MAINTENANCE SCHEDULE 1. Erosion control measures shall be inspected by the contractor's representative and maintained by the contractor every Friday and within 24 hours after any rainfall event larger than 1/2" until the project is completed. Maintenance requirements are as follows: silt fence - 1/3 height of fence or damaged, remove sediment and/or repair fence within 24 hours; rock entrance - refresh as necessary to conform to detail; inlet protection inserts - remove sediment after each rain event, clean or replace filter when clogged; surface water - drain and stabilize, within 72 hours of discovery; street sweeping - remove all sediment tracked onto paved surfaces within 24 hours or as directed by City Engineer. 2. Replacement - Fabric shall be replaced promptly when it decomposes or becomes ineffective before the barrier is no longer necessary. 3. Any sediment remaining in place after silt fence is no longer required shall be dressed to conform with the existing grade, prepared, and seeded with appropriate seed mix, as directed by the engineer. 4. Removal of the silt fence- Silt fences shall be removed when they have served their useful purpose, but not before the upward sloping area has been permanently stabilized. RESPONSIBLE PARTY Contact information for the responsible party for erosion control is: CITY DESIGN + BUILD, LLC - General Contractor Chris Molooly - Project Coordinator 612-363-0633 phone chris@cityhomeslic.com i, Nal CH na MM is OMAN iwwrio[ S lY ewom qua toot NO W MOM CM TEMPORARY DEWATERING DISCHARGE DETAIL CLIENT: _ - L.. 2g011 DESIGN + BUILD, LLC 4220 Crocker Ave I 952-920-8250 ..... I CO .................. CID I Rif Landing �= =-, ► ,� withCM j 0 Q planter .. / J CC I L------- I !V � IW- J ZUNION Co IN iti4'iitl■■Ion NONE ' i■■■■■■■■ ■Ti■■■■ ■ ■ =w Co SILT FENCE `_.... / ..... _...... - __..........._ _... ..... ._- INSTALL INLET PROTECTION I N 'I CATCH BASIN ' ( � I l � i NOTES: ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1 OR CA -2 COURSE AGGREGATE. (WASHED) A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT MIGRATION OF THE UNDERLYING SOIL INTO THE STONE. ROCK CONSTRUCTION ENTRANCE DETAIL Proposed impervious surface is 19 sf less than existing condition. Storm water runoff and volume reduction is therefore not required for this project. LEGAL DESCRIPTION LOT 4, BLOCK 1, ELMWOOD TERRACE, HENNEPIN COUNTY, MINNESOTA PROJECT LOCATION PART OF SECTION 19, TOWNSHIP 28, RANGE 24, HENNEPIN COUNTY, MINNESOTA SITE LEGEND: Existing Property Line ................................... .......... I........................ Existing Adjacent Property Line ------,t __-- Existing Contour w/Eley. Text ------### ----- Proposed Contour w/Elev. Text Proposed Building ■M■■■■N■■■NE■ Proposed Silt Fence 0 10 20 30 =° Proposed Inlet Protection EROS/ON CONTROL NOTES 1. All devices necessary to control erosion and sediment (I.E. perimeter silt fence, rock construction entrances, swoles, ponds, berms, ETC.) shall be installed prior to any other construction operations. 2. Temporary erosion control soil stabilization shall be completed within 72 hours of disturbed areas that are to remain fallow and in an unfinished temporary condition. Temporary stabilization to be completed in compliance with MnDOT 2575 fir' ^ I I I I I i specifications. 3. After completion of final grading, exposed soils must be permanently stabilized within 72 hours. Stabilization shall consist of disc -anchored seed & mulch or sod as allowed by 674„'' ��� I II I I j ; 7° City, or as proposed on City approved landscape plan for the SILT FENCE I I I; I I project. I I I I II! !r 4. The site must be kept in a well drained condition at all I ® 1,5G,98Measure times. The contractor shall be responsible for temporary _ _ V. =,\,T- \ �`�� ditches, or her means necessary to ensure proper drainage. h of er ■ ■ ■ j j ' ■ ■'r� 1� i ■ ■ ■�� ■'■ ■ ■ ■ ■, �� -X / _ I, / The building pad must be provided with a positive outflow. � ............... X-- x x: R. x _ } ........ _.__ X x k , I 1 I / �/ /.. This work shall be incidental to the grading contract. i 1 5. Entering/exiting of the site shall occur only at rock X /j construction entrance to reduce tracking of dirt onto paved streets. Sediment tracked onto streets during working hours ssm MISS INS i �il:.� I I ( , must be reclaimed via street scraping and sweeping at the 6.2 I I I'� I end of each working day. .• �T j,t- f `I I I 6. Temporary dewatering pump out to be discharged to \, Q Q1~ 1 I , constructed Temporary Dewatering Discharge per detail this r i � � •�(I 1 sheet, or sediment filter bag constructed of min. Boz NI r i I I' I non -woven filter fabric, to provide silt and sediment removal from storwater prior to discharge to appropriate drainage area. O `-I I POLLUTION PREVENTION NOTES Mc t:` ef >; 1. Solid waste: collected sediment, asphalt and concrete millings, TEMP0 RARY ( floating debris, paper, plastic, fabric, construction debris and Proposed � � � � other wastes must be disposed of properly off-site and must \� comply with MPCA requirements. STOCKPILE ` 2. Hazardous materials: oils, gasoline, paint, and any hazardous substance must be properly stored, including secondary Residence , �I STOCKPILE T,-� .� containment, to prevent spills, leaks or otherdischarge. l \ ' Restricted access to storage areas must be d to prevent (dimensions to main Hoar} ' ��/ �;� X vandalism. Storage and disposal must be in compliance with / �- SILT FEN C E MPCA regulations. Re5ldence No, 5429 raqo floor, - .4 2" x 2" WOOD POSTS FILTER FABRIC 4.0' O.C. (MI APPROVED FENCE OR APPROVED EQUAL) MIN. 30' - MAX. 36" ABOVE GRADE DIRECTION OF I I DRAINAGE BACKFILL 6" x 6" TRENCH lz N I I UNDISTURBED SOIL SILT FENCE NOTES CG -23 HIGH-FLOW INLET INSERT . 3. External washingof trucks or other construction vehicles is not allowed on site. No engine degreasing is allowed on site. r 4. No concrete washouts are allowed on site. L VEG/TAT/ON GROUND COVER SCHEDULE Permanent turf ground cover shall include all disturbed areas be n ell covered with a minimum 4" topsoil and sodded or seeded as 0- `fix < allowed by City, or as proposed on City approved landscape plan for the project. r�� ` 2. Temporary ground cover shall be MnDOT seed mix 150 shall be x_...........,� ... _ X X _................. x .......-...� X _ r I ■ ■ ■ N. ■ ■ ■ ■ ■ ■ ■ ■ ■ �� ■ ■I■ ■ ■ ■ ■ ■ applied at 100 lbs/ac. MnDOT Type 1 mulch shall be applied _ at 2 tons/ac and disc anchored in areas not covered by sod it i 47.10 / / / - ` or erosion blanket. -- r0 A M¢a.5 ure / / , ' 55.E . I / / / // // / 3. Fertilizer shall be MnDOT Type 1 10-10-20 and applied at 200 SILT FENCE i ki6' f'l t i / / hG'd lbs/ac. Disc fertilizer into top 3" of soil. Specification reference is MnDOT 2575. 4. Dormant seed mix shall be used after November 1 or when temperatures do not exceed 40" F, using some rates specified above. No seed shall be placed on snow or ice greater than 2" in depth. 5. Any seeded areas that do not become established with vegetation shall be reseeded at Contractor's expense. 6. Erosion blanket shall be installed in seed areas with ground surface slopes of 5H: 1 V or steeper. DEFLECTOR PLATE OVERFLOW ,#2 - TOP OF CURB BOX OVERFLOW # I - CENTER OF FILTER ASSEMBLY 1. SILT FENCE SHALL BE BLACK IN COLOR. NOTES: 2. DIG A 6"X6" TRENCH ALONG THE INTENDED FENCE LINE, OR MACHINE SLICE TO 6" DEPTH. 3. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH. 1) CONTRACTOR OPTION TO USE WIMCO INLET 4. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL. PROTECTION INSERT OR EQUAL. 5. WOOD POSTS MAY BE SPACED UP TO 4 FEET APART TO SUPPORT THE FABRIC 6. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED. SILT FENCE DETAIL INLET PROTECTION DETAIL GRAPHIC SCALE IN FEE Survey Data By: Benchmark: Lot Surveys Company Top nut of hydrant at NE 7601 73rd Avenue North corner of Halifax Avenue Minneapolis, MN 55428 and 54th. 763-560-3093 Elevation = 877.0 feet GENERAL GRADING NOTES: 1. Specifications applicable for this project: Current standard specifications for the City of Edina; the latest Minnesota Department of Transportation Specifications for Highway Construction; and all NPDES requirements except where modified by these documents. 2. OSHA requirements shall be followed for all work on this project. 3. The Contractor shall notify "Gopher State One Call" 48 hours prior to any excavation (1-800-252-1166.) 4. The Grading Contractor shall verify all locations and elevations of underground utilities with utility companies prior to any construction, and immediately notify the Engineer of any conflicts. 5. Final Plat shall govern for easements and lot dimensions. 6. Any erosion control items necessary to protect adjacent properties shall be constructed prior to the start of excavation or grading work. 7. Erosion control maintenance shall be performed by the Grading Contractor, and removed as per the Contract Documents or as directed by the Owner, followed by all necessary restoration of disturbed area. 8. The Grading contractor shall provide positive drainage on the site at all times. Grading tolerances shall be 0.10' for hard surface areas. Grading tolerances for the remainder of the site shall be 0.25'. 9. The Grading Contractor shall keep public streets, parking lots, and travel ways clear of soil and debris. Daily cleaning at the construction entrance shall be performed, especially at the end of each day's work. EROSION CONTROL INSTALLATION SCHEDULE 1. Silt fence shall be installed or restored prior to any construction. Silt fence shall be located as shown to intercept runoff. The area located beyond the perimeter silt fence shall not be disturbed during construction. 2. Rock Construction Entrance shall be installed prior to grading operations. 3. All storm sewer inlets shall have inlet protection inserts installed. Inserts shall be "Road rain -Top Slab" or "Road Drain -Curb & Gutter" inlet protection devices as manufactured by WIMCO (or approved equal) and installed per manufacture's recommendations. 4. All erosion contra' 'r,stallations shall remain in place and be mai.ntclned in good condition by tree contractor until the site has been re -vegetated, at which time it shall be removed by the contractor. For proposed paved surface areas, the contractor may remove necessary silt fencing to construct roadway, while maintaining adequate erosion control in adjacent areas. 5. Sufficient topsoil shall be stockpiled to allow for the replacement of 4" topsoil for disturbed areas to be re -vegetated. 6. The contractor shall schedule site grading, utility installation and site construction so that the general site can be mulched and sodded or re -seeded as soon as possible soon after disturbance. Areas that will not be subject to construction traffic shall be seed and mulched or sodded within 72 hours of final grading. EROSION CONTROL MAINTENANCE SCHEDULE 1. Erosion control measures shall be inspected by the contractor's representative and maintained by the contractor every Friday and within 24 hours after any rainfall event larger than 1/2" until the project is completed. Maintenance requirements are as follows: silt fence - 1/3 height of fence or damaged, remove sediment and/or repair fence within 24 hours; rock entrance - refresh as necessary to conform to detail; inlet protection inserts - remove sediment after each rain event, clean or replace filter when clogged; surface water - drain and stabilize, within 72 hours of discovery; street sweeping - remove all sediment tracked onto paved surfaces within 24 hours or as directed by City Engineer. 2. Replacement - Fabric shall be replaced promptly when it decomposes or becomes ineffective before the barrier is no longer necessary. 3. Any sediment remaining in place after silt fence is no longer required shall be dressed to conform with the existing grade, prepared, and seeded with appropriate seed mix, as directed by the engineer. 4. Removal of the silt fence- Silt fences shall be removed when they have served their useful purpose, but not before the upward sloping area has been permanently stabilized. RESPONSIBLE PARTY Contact information for the responsible party for erosion control is: CITY DESIGN + BUILD, LLC - General Contractor Chris Molooly - Project Coordinator 612-363-0633 phone chris@cityhomeslic.com i, Nal CH na MM is OMAN iwwrio[ S lY ewom qua toot NO W MOM CM TEMPORARY DEWATERING DISCHARGE DETAIL CLIENT: CITY HOMES DESIGN + BUILD, LLC 4220 Crocker Ave Edina, MIN 55416 952-920-8250 6 CO Z Rif a J . 'f" Z a j 0 Q J CC m cc C � IW- ZUNION Co IN U UNION =w Co Z 0 O CION. o 0 tQ O N W oc W It o 00 40 � q) N N I V) p(0 C W O Cp Ln 0 W Z ti o y o w l o xQ) A I mm o�> C' t/1� 1v q) O N W i+ N U W L O [� O U Q j) _c c ° r/' 1 �' 00 0 0 3 I c o v , m q) 3 rS S � LL a W J !U!�� �l Q II U j W -. n /® / X (n N � o i"J, O - ' � O N N 00 m � m e► m QEli Q � Z v Q Q C U FILE NO. 00577 Storm Water and Erosion Control Plan