HomeMy WebLinkAbout1958-09-04 Park Board Minutesdv
0,, o s of B'ark Board feeting
AUX 1!, 7 00 in'
J.Jeyibc--z�s present- %zsrs. 1111.bbe-rt Hill, ch-airmn; M.A. Crinkley; WillUm Lewis
V,7,e rp
,eetirig
.ZSt�Out a uormbgo 1p bars being out of toren and
the bom m.' having ora vacanay., Stevens was detained but cam in at 800 pm...
approx-Irately.-
Tire JaUst plan for relocatting, highway #169 was shown to the Park Board,
This plan if iVlemented woUd Wke the present, 16-aere Edina park site called
Garden Park, virtuaUT of no -value at a3l, The proposed path of #i6q nearly
bisects Garden Fark longitudinally. Outside of mWessed concern for possible
loss of this and the lack' og possroili-ty to find suitable replacement.* no &etiOn
vlas �Gn,
I'bz Ple-nting FUL, for the triangles adjacent to 466th Stmt and south of
Cornelia. Pailc eras pteselfoed, It was reported that these triaMles were in that
portion of the Cornelia Paine k tran eti.on jgdAch the Village bought; themfore&
they aoOA be s6ld,.. lir,: order to reduce imintenance costs the Fark Board is
studiing Vac poasibility of selling, the most westerly triazw_-U for a residential
1�-ot are, use the proceeds to AMrov-e Vas, remaining two triAngleso
nen; overall Plan for Wooddale, Park was presented,. This will be studUd
- port x4h-ly i�r
A't t)"'3 -nee, mme-stilIg y_,. Ilarrison is ampected to attend. InPrOft-
T,,m--eu rioAz at N-orm&n.-dale Park was reported to be coming along nicely- ThO grading
ils- nearly- aomp2sted, seeding -uilll start nein geek,
O-iker,fall L-Pprove-immit, projects, were covered in a vritten report which is
attmeh(i,id. to, these minutes,. Illese r-rOJOcts Were discussed* No action necessary.
7ho rattrar of fencing of certain sections of park area boumlarles was
discussad in relat-son to a recovwnanfttlon of the landscape architect to consider
ptirchase of a swat-mtial quantity of split rail type fencing. The board felt
that other needs at present wereLgreater than fencing.. The board asked that &
specific. report be prepared ukul, regard to the exact site locations of proposed
fences_ l: feet of fencing neededl. etc.
I
The carr eirb vacancy on the Park Board resulting from the resignation of
George
-si.rjr.an all is to discims with the Mayor
s=a possibili-.es in -aiis regard,
Respectfully sulmitted.,
C3A-(,'ton B. French
W- trifu Director of FAcreation & Parke
rkMu INFRO"AAD"'T WORK
(Bond U'oney)
55th & `cork
To,Be Accoviplished This Fall
Ssedb3d -Prepam-tvion A Seediw,
Stonin S6wer &. eros -5 -on repair
ftneral
Sodding
Futwe
1 Baseball. backstop.
Wat
r, PIC er for glooding
Play equi-nment--
Planting,
Storm scm7ex,
Fall `,,�Toek Estimates
Fano -lark.
1*,W.
L50
no charcge,
2aO
m
3.O
.
35c,
5,00
,.07
.29
L Im
401�00
56,600
56.00
20,OC,
FAL1401a,' - TOIAL ESTIFAIND COST
To Zo �gSST
91- stted Valis
nunk .06
cover v -14th topsoi.1
See6 holes and stock pi.1c, arwas
Sol rami mixiv diamoad"i
Anocated
Expended
BaUnce
JEER
m.0291.00
S -75A00.007
69..677.00
$ 5,323.00?
clay
i0o 0-.Y.
Topsoil
150 0,Y.
Catch Basin
Pipe,
4o
Labor
hata�i
etc. 48
5tomm sc-T-Ter
i6 MAIr.
Lq
Tractor
WuOk
Ea ckh Ge
4 hr*
Contracted Sarvicea,
Seeding (bid)
0 (bid.):.
42,500 &,,17.
1-!
SodAing (bid)
1000 3..Y.
Fano -lark.
1*,W.
L50
no charcge,
2aO
m
3.O
.
35c,
5,00
,.07
.29
L Im
401�00
56,600
56.00
20,OC,
FAL1401a,' - TOIAL ESTIFAIND COST
To Zo �gSST
91- stted Valis
nunk .06
cover v -14th topsoi.1
See6 holes and stock pi.1c, arwas
Sol rami mixiv diamoad"i
Anocated
Expended
BaUnce
JEER
m.0291.00
S -75A00.007
69..677.00
$ 5,323.00?
2. ,,tads F ,rk continued
Ne 'Lear ?
Pl.antitlg (froom andale )
Fencing 2
Baseball. backstops
Fall Work Eatit&ates
MAterials
Sand Fill
Glay Cover
Topsoil
Tabor
afotf-Disa goods
lbaer on dw.V
u -i Yent
Tractor
Dozer
Contraeted
Sodding (bid)
Seeding (bid)
3, Corrlellfla park
(est. 750A.F0
1:50 0,Y6 .5o
600 C.Y6 180
300 C -Y, 1.30
10 H.Hl * 2.50
10 N,,Hro 2.5®
10 I r- . 3.50
10 hr. 5.00
1000 S.T. ..2907
900 SAO .
;ec sod Thcj Tria l.es) (balance 1.000.00)
lancing on Triangles )
Drainage Structures in parking lot
Re—Seed parking lot .i.s al ds
C0gg3lete 01a ybr 3 seeding around pool.)
Build retaining walls arotuid pool. j
Fall York Estimates
j-.�teri.als
Fl—ant materials around pool;
Asphalt- for drainage structures
Materials for redwood retaining wall.
Febor
planting around pool..
64 m,,. Hr.
planting - triangles
60 M,Hre
Retaining wa3-1s - pool.
60 14Aa.Hr.
tl . t CharM
Fucks 6o ice.
3.5o
Ili -actor 30 Hr,.
3.5o
Backhoa 1.6: Fera
5100
Gontraeted
2500
25,00
35,00
50"00
29000®
63a00
•�.�
11,433.00
(as required/
$12,434,00
i6
c ung (bid) 3,000saYb s07 21:0600
Sodding (bid) 600 &1, X29 232,00
FALL WO F - TOTAL ESTIMATED COST $lo932.00
I
li.fooddale Faek
Fall IjTork
Page 3 -
Al-loeated W*00
Expended 15,85D,00
Balance $ 2,M.00 -
deed 14ast area - sod his
Clean up L, trim trees
Drainage (enlarga or -all catch basin on 50th "'Ste
Fau Work- Estirate
Mtorial
Clay fill around marlioles
on creek bank. 100 GOY6 080
$80,00
Topso-I'Ll 50o ca. 1,,5o
75o.00
labor
Spread-Di-sc seeding. area
16 M.Hr. 2#50
40#00
rjean up.,,. trim trees
32 M. fir. 2 *50
86.00
Tractor
16 ffrd 3.50,
56600
Tracy.5 W
16 Kri 1,50
5600
Dozer
a Hr. 10 X00
80000
Contracted
Seeding 3000 S -Y6
.07
210600
Sodding 1000
d29
290,00
FALL WORK
C, OTAL ESTIMTED COSTS
Hays Farm
AVooated
Balame
Builld Access Road
C-IFr 9!i;fd.-r.,,g Fill
Prov els Pa:O-r-ir4,
Fall Work,FzUtrmte
Road Rook (t-mn Our pit)
200 C®
L,00
Fill from excavation for
wat'l-,er rosei7oir
?
Ubor
Grade road & Parlc-i r area
32 Mr.
2.50
Haul rock
32 X,Rr®
2,50
clear Sliding Hills
200 14.Hr.
2,50
of
Dozer (D-4)
10 Hr.
10000
Blade
1-6 Hr.
8100
T-rmks (4)
32 Hr,
3.50
Loader (1)
40 Mrs
8000
Ckentra.cted
Dozer
40 11r,
L5.-00
LI
FAI L W10M
TGUL ESIMMM) COST
& Jackson and De3iriore Zane
Allocated
&q:)ended
Balance
Haul Fill ?
111c
,-11 Pill ?
6
0 FMIT M . S
EXAM&WA
II , is
so,$ m
600.00
. $2.1120,00
!OO!0
300*00
PA1700,00
-4
NazrRlis
clay
200 _ ,,iY ,
rj
r�
400,00
..
VlFni:y ta.
21. °f,rrA
/.q
5
iV/
�rpso.»
16 S'Fja:
Ffy�
C :b -a vyC-�
vLabor
..
Sod
WOO FY,
20
224.00
Can