Loading...
HomeMy WebLinkAbout2002824240023-10302013COVERAGE = 2,496 SQ.FT. (22.7%) ENGINEERING CONSULTING ENGINEERS, ,., ROBE PLANNERS and LAND SURVEYORS tNGINEERING COMPANY, INC. 1000 EAST 146th ST., STE. 240, BURNSVILLE, MN 55337 PH (952)432-3000 4 I I G 904.2 EXISTING HOUSE 892.0 LU 1(892.7) 1892.7FE 893.9 1 x890.8 89\ .5 2.50 \10 " E AND UNDLITY EASEMENT \ \ \ \ \ re) \ 1,70 \ 0 d \\ N (-9\ x (f)-- \ 892A \ \ \ \ \ p891.9 \F\ENCE 97.6 REVISED I 0-29-13: MOVE I-15E 0.5PT NORTH, ADD 1W 4 BW NOTES, AND LOWERED PROP GAR ELEV NORTH SIDE. PER CITY REVIEW. I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of IFTh sot YECE oa-aol3 Date Reg. No. 'VW 5113 try)1d- 1263 z/7_ (PROPOSED AREAS) LOT AREA: 10,869 SQ.FT. HOUSE AREA: 2,119 SQ.FT. (19.5%) DRIVEWAY AREA: 1,027 SQ.FT. DECK AREA: 172 SQ.FT. COVERAGE = 3,318 SQ.FT. (30.5%) cc ADDRESS: 5713 YORK AVE. (EXISTING CONDMONS AREAS) LOT AREA: 10,869 SQ.FT. HOUSE AREA: 783 SQ.FT. (7.2%) GARAGE AREA: 455 SQ.FT. (4.2%) DRIVEWAY AREA: 823 SQ.FT. DECK AREA: 245 SQ.FT. SIDEWALKS & PATIO AREA: 163 SQ. PREPARED FOR: DONNAY HOMES DENOTES EXISTING ELEVATION DENOTES PROPOSED ELEVATION INDICATES DIRECTION 0-- SURFACE DRAINAGE I = FINISHED GARAGE FLOOR ELEVATI5IN CIO CO (r) = TOP OF FOUNDATION E EVATION C5) < = BASEMENT FLOOR EL TION - • Li = MAIN FLOOR ELEVATION c\J 00 = MAIN FLOOR ELEVATIO ORIGINAL HOUSE 903.3 (903.2)x 903.1x 903.2 co 8.50 201 x902.E 903(8904.5 FD IF •899.6 1-03 < x --I ii, / (905.0)nl I a_ o e / 21 0 (..),/ 904.4 o-) • -.-1.,(;- x 1 0 1--- " (905-0)1 'UN 41.50 904.0 \ ? ID IP SILT F7CV3024.,0(09 (165;70,3 7 903.9 a90 r7 903.5 (903.5) 8 /904.3 0 4.63 S 10.50 1 5\5.0(:) 0 12 I ST- 44.00 902.2 -r- t•Th .\ I x899, ' \ " 11011T 0 6 03.0) \ (900.5) 901 >1902.2 8°26 2" ISI 14.50 901. 1 903.9 N 88°17'48"E \ L. 0 IT 18x I 900.6 '70 x903.0 0 oo Bwd,oto 8"5FACE (-__)4 89,579:10 _J TW9 3.0 0.0 ö "TK i E n E 1 .0 TW902.0 903.0 x9Ti .2 6901.9 3"5PKUCE am. 4.90 . 1 4 .EEN.Lesi , BW901.0 98.21 E-RicErm &Ea's, n 8"SPRIACE \ 897.0\ w 900.3\ \ \I\ z 2"5PIKU\F r \ t4 C\I (71 899.3 \ \u x 896.9 (89CN9 898.7 890. I FD IP SEDIMENT 4 EROSION CONTROL NOTES I. All exposed soil areas, including temporary stockpiles, must be stabilized as soon as possible but in no case later than I 4 days after construction activity in that portion of the site has temporarily or permanently ceased. Stabilize with temporary seed and straw mulch applied at 2 tons per acres. 2. Silt fence shall be installed and at the locations shown on the plan and around any stockpiles. Silt fence shall be inspected and maintained weekly (and withiri 24 Firs of a 0.5" rainfall) until final seeding and mulching (or sodding) of lot. 3. A rock construction entrance shall be installed and maintained at the location shown on the plan. 4. Contractor or Permitee shall provide and maintain inlet protection on all storm drain inlets that will receive sediment laden flow as a result of construction. Inlet protection and maintenance shall remain in place until all sources with potential for discharge into the inlet have been stabilized. Inlet protection may be removed From a particular inlet if a specific safety concern (such as flooding) has been identified. The permitee must receive written correspondence from the City of Edina verifying the need For removal. Permitee shall conduct a visual inspection to determine which inlets need protection. 5. If down gradient sediment practices are overloaded, additional up gradient erosion control practices will be installed to reduce loading. G. Dust control is the responsibility of the permit holder. The permit holder must eliminate dust problems upon receiving notice from the Building Official that there 15 a dust problem. 7. MINNEHAHA CREEK WATERSHED DISTRICT. (952) G41-4532 8. Street cleaning shall occur daily or as needed. STORM WATER This Storrnwater Management Plan (in narrative Form) must detail how stormwater will be controlled to prevent damage to adjacent property and adverse impacts to the public stormwater drainage System. 1. Permit holder shall inspect and maintain sediment and erosion control devices (ie: silt fence and inlet protection) weekly (or within 24 Firs of a 1/2" or more rainfall). Sediment must be removed when it isY3 the height of the sediment and erosion control device. 2. final grading on the lot shall minimize • concentrated flow and shall promote sheet flow to the front and the rear. Final drainage patterns shown are similar to the existing conditions of the lot. PROJECT NO. 15333.00 STORMWATER & EROSION CONTROL PLAN 000,0 (000.0) (906.62) (906.95) (898.28) (907,3 ) 906.30 SCALE : 1" = 20' Legal Description: LOT 19, BLOCK 2, BROOKLINE ADDITION, HENNEPIN COUNTY, MINNESOTA 30.00 461, 41.75 903.0 c- 41-t-o (f) EXISTING HOUSE INEVilliVd3G 5Y. U) yr: 902 894.8 \892.9 \FD IP