Loading...
HomeMy WebLinkAbout0611621120005-042619830 feet feet feet 90833 908.00 900 00 Top of Foundation = Garage Floor Elevation = Basement Floor Elevation L11-0 g Tivvi 6 erjrictie Total Area: 17,557 square feet (0.40 acre) Note: Proposed elevations at lot corners will be the same as existing elevations. FILE NO. Folder JOB NO. 304-340A BOOK 15/70-72 Building Permit Survey For DICK ANDRON Lot 5, Block 1, THE TIMBERS I hereby certify that this is a true and correct representation of a survey of the boundaries of: Lot 5, Block 1, THE TIMBERS, according to the recorded plat thereof, Hennepin County, Mninnesota. and the location of the proposed building as shown. As surveyed by me this /,-,day of Awie 198JL. Alvin R. Rehder, Land Surveyor Minnesota Reg. No. 13295 • Denotes Iron Monument Found o Denotes Iron Monument Set o Denotes Hub With Tack s./ Denotes Existing Elevation Denotes Proposed Elevation Denotes Proposed Surface Drainage Scale: 1 inch = 30 feet Bench. Mark; Top of hydrant 5 feet east of the northeast corner of Lot 3, Block 1, The Timbers — Elevation = 907.34 feet. ISRAELSON AND ASSOCIATES, INC. CONSULTING ENGINEERS - LAND SURVEYORS SUITE 185, 9100 WEST BLOOMINGTON FREEWAY BLOOMINGTON, MINNESOTA 55431 0 PROPCIS-E,0 l/DUSE \ \ •Ci4 ▪ ss, \ '. \-1N '1 • %\ -.Nrt N\ fr-6,f_NN /f s'3 C-2 APPROVED Date 1.6 Ir3 By City of Edina Bldg. Dept. _ AK ‘P#1 sib / A / -T;•• II 7/4449, ,1,?. ID GE 10 1 1 eb 5 I A45"g-21:52 R=t2o.o6).. _- 240/ - er oto. (i) c91 ..deaf/.0 \o "../•.3.3„ 9 .... ..* 903 9 0 \ 4-901.6'