Loading...
HomeMy WebLinkAboutRes Retaining Wall epr 04102017I:\Building\SafetyPoliciesInformation\2017\Website\Res Retaining Wall epr 04102017. For electronic submittals only Purpose: To provide adequate and accurate site information to all City Departments involved in the review and approval of projects, as well as providing information for future reference to obtain a building permit. Scope: All new home structures for which a building permit is required. Instructions: Please fill out completely before submitting your plans. If you have any questions before or during the review process, please contact the appropriate department. Building Department can be reached at 952-826-0372 from 7:00am – 4:30pm Monday through Friday Planning Department can be reached at 952-826-0369 from 8:00am – 4:30pm Monday through Friday Engineering Department can be reached at 952-826-0371 from 7:00am – 3:30pm Monday through Friday Site Address: ___________________________________________________________________________________ Check if Submitted Items Required to be Submitted for Plan Approval Full-size site survey complying with City Survey/Site SP005B Tree Protection Plan required per Ordinance No. 2014.25 (Tree Survey May Be Required) If retaining wall greater than 4-feet is proposed, submit drawings, cross-section and calculations prepared and signed by a Minnesota licensed professional engineer. Evidence of application for applicable watershed permit. NOTE: Actual permit required for approval. Nine Mile Watershed District: www.ninemilecreek.org or Minnehaha Creek Watershed District: www.minnehahacreek.org Comply with Erosion and Sediment Control for Single/Double Dwelling Units Policy and Floodplain Development – Residential Policy. Contact the Engineering Department at 952-826-0371 for details. Evidence of plat approval from Planning/Zoning Department required for newly platted lots. (If applicable) Evidence of variance approval from Planning/Zoning Department. (If applicable) Proof of contractor licensure or State licensing exemption. Temporary Heat Permit from Fire Department(If applicable) Plans will be reviewed and approved by the Building, Engineering and Planning Departments. Review time will vary, but in all cases permit applicants should allow at least two weeks of plan review time if application packet and submittals are accurate and complete. Submitting incomplete plans and documents will cause delays to the review process. I acknowledge that the items checked on the list above are included on or with the submitted plans: Contact person: ____________________________________ Contractor: ________________________________________________________ Signature: ____________________________________________________________________________________________________________ Phone Number:____________________________________ Email:_______________________________________________________________ EDINA BUILDING SAFETY GUIDELINES/INFORMATION Application Submittal Requirements- Residential Retaining Wall subject 2015 MSBC 1300.0130 code reference Inspections Department department approval RRWepr policy number 04/10/2017 revision date 01/04/2016 effective date 1 of 1 page number