Loading...
HomeMy WebLinkAboutComm NewBldgSub epr 04112017SP-026-B Page 1 of 2 I:\Building\SafetyPoliciesInformation\2017\Website\Comm NewBldgSub epr 04112017. Use with electronic submittals only Purpose: Establish submission requirements at the time of permit application to enable accurate, timely review. Scope: All new commercial buildings and commercial building additions Instructions: A licensed design professional must check the items submitted in the space provided and include a copy of the signed form with all plan submittals. The Building Inspections Department can be reached at 952.826.0372 from 7:00am-4:30pm, Monday through Friday. Site Address: ___________________________________________________________________________________ Required for Approval Check if Submitted General Items Yes 1.Service Availability Charge (SAC) determination application submitted to Metropolitan Council Environmental Services May be required Check With Bldg Dept 2.Edina City Council approval Case # ___________________ Yes 3.Watershed District permit: Minnehaha or Nine Mile Creek. Yes 4.Survey prepared by a MN licensed surveyor Yes 5.Tree survey and protection plan Ordinance No. 2014-25 Yes 6.Completed Minnesota Energy Code (MEC) lighting power budget requirements in accordance with the 2015 MN Energy Code Yes 7.Completed Minnesota Energy Code (MEC) exterior envelope energycalculations in accordance with the 2015 MN Energy Code Yes 8.Completed Special Structural Testing and Inspection Schedule (Note: SST&IS required for all med gas installations) (Guidelines) Yes 9.Geotechnical Report Yes 10.800 Mhz radio coverage requirements in accordance with Edina CityCode Chapter 10 Article XV Yes 11.Completed contact list with names, phone numbers, email addresses and physical addresses of building owner, contractor, tenants and all designprofessionals Required for Approval Check if Submitted Plan Requirements Yes 12.Plans and specifications Yes 13.Civil Plans to include Erosion Control Drainage and Utility Plans Yes 14.All sheets are signed by the appropriate design professional (electronicsignature is ok) Title sheet or first plan sheet includes: Yes 15.Name and address of building EDINA BUILDING SAFETY POLICY/INFORMATION1Application Submittal Requirements – New Building, Building Addition subject 2015 MSBC 1300.0130 code reference Inspections Department department approval SP-0026epr-B2 policy number 04/11/2017 revision date 06/30/2015 effective date 1 of 2 page number 1. All Building Safety sheets adopted by Fire Department and Inspections Department. 2. Sheet numbers with B suffix developed by Inspections Dept. Sheet numbers with F suffix developed by Fire Dept. SP-026-B Page 2 of 2 Required for Approval Check if Submitted Plan Requirements Code analysis includes: Yes 16.Description of occupancy/use Yes 17.IBC occupancy classification: Section 302. Yes 18.IBC construction type classification: Section 602. Yes 19.Number of square feet in space and on building floor Yes 20.Number of stories above and below grade: Section 504. Yes 21.Allowable area: Section 503. Yes 22.Occupant load: Section 1004. Yes 23.Number of required exits and provided exits: Section 1021. Yes 24.Indicate: Sprinklers certified, cert letter received, sprinklers not certified,sprinklers partial or no sprinklers. Yes 25.Common path of egress travel, use right angles: Section 1014.3. Yes 26. Separated/non-separated uses with supporting information: Section 508. Yes 27.Plumbing fixture count: Section 2902. Building key plan includes: Yes 28.Exit path to the exterior and to the public way Yes 29.Occupancy classification of adjacent tenants: Section 302. Yes 30.Location of space in building Yes 31.Direction indicator (North, South, East or West) with arrow Floor plans include: Yes 32.Scale each plan and/or detail. Include linear or bar scales at all details. Yes 33.Rooms marked with number and room name or use Yes 34.Fire-rated and smoke-rated assemblies: Sections 706 – 711. Other items: Yes 35.Reflected ceiling plan with exit signs and emergency lighting located Yes 36. Material specifications Yes 37.Room finish schedule Yes 38.Door and hardware schedules, including all locking arrangements Yes 39.Details of all required accessible components including data on required 20% accessible upgrades: Section 1112.7. Yes 40.Furniture/fixture/equipment layout plan Plans may need to be reviewed and approved by the Planning, Engineering and Health Departments in addition to the Fire and Building Inspections Departments. Plan review time will vary, but in all cases permit applicants should allow a minimum of three weeks of plan review time after application and completed submittals have been forwarded to the Building Inspections Department. I acknowledge that the items checked on the list above are included on or with the submitted plans: Licensed Design Professional Signature ____________________________________________________________________ Print Name ___________________________________________________________________________________________ Work Phone _______________________ Cell Phone _______________________ Email _____________________________________________________________ Company Name ____________________________________________________ Address ______________________________________ Zip _________________ Date ________________ I:\Building\SafetyPoliciesInformation\2017\Website\Comm NewBldgSub epr 04112017.