Loading...
HomeMy WebLinkAboutWeber Park ribbon cutting City of Edina 4801 W. 50th St. Edina, MN 55424 Contact: Debbie Townsend, Communications Assistant Phone 952-826-0396 dtownsend@EdinaMN.gov EdinaMN.gov FOR IMMEDIATE RELEASE Ribbon Cutting June 1 For New Playground At Weber Park Edina, Minn., May 24, 2017 – People are invited to a June 1 ribbon cutting for a larger playground with new equipment, including multiple slides, a raft swing and a 20-foot zip line in Weber Park. The playground equipment, designed to serve children ages 2-12, replaces the previous playground structure that had been installed in 1997 in the park, located in the Morningside Neighborhood. “Residents will enjoy this updated playground,” said Edina Recreation Supervisor Eric Boettcher. “The Morningside Neighborhood Association was very involved in the design and they should be proud of what they came up with.” Residents helped the City save money on the project by choosing an engineered wood fiber safety surface instead of the rubber one originally planned. They also gave feedback that resulted in changes including taller climbing areas, a longer zip line, a higher center structure (now 8 feet) and more balance activities, including the raft swing and a wobble sphere. For parents, the playground includes two benches to sit back and relax while keeping watch on the kids. The new playground is roughly 400 square feet larger than the old one and now includes an ADA-accessible path and parking spot. It costs $100,000, well under the original $175,000 budgeted for it. Northland Recreation, which also designed the playgrounds at Pamela and McGuire parks, worked with the City on this project. People are welcome to attend the ribbon cutting at 4 p.m. Thursday, June 1, at Weber Park, 4115 Grimes Ave. S. Light refreshments will be served. The new playground is already open for use. For more information, contact the Parks & Recreation Department at 952-826-0367. -30-