HomeMy WebLinkAboutExhibit A NMC-Edina_Phase I Record Drawings_2017Item Description Unit Reach 1 Reach 2 Reach 3 Reach 4 Reach 5 Reach 6 Reach 8 Reach 9 Reach 10 Reach 11 A Mobilization/Demobilization L.S. 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 B Control of Water L.S. 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 C Traffic Control L.S. 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Civil D Construction Entrance Each 2 1 2 1 1 1 1 0 2 1 E Access and Haul Road L.S. -- -- -- -- -- -- -- -- -- -- F Silt Fence L.F. 145 320 275 60 190 320 170 295 320 120 G Sediment Log L.F. 520 1,755 695 710 1,785 465 140 695 460 560 H Rock Filter Dike Each 2 2 0 1 1 1 1 1 1 1 I Tree Protection Fencing L.F. 100 0 0 100 0 0 0 100 100 100 J Inlet Protection Each 4 1 0 4 2 0 2 0 2 2 K Clearing and Grubbing Acre 0.27 2.63 1.00 0.65 1.82 0.49 0.23 1.20 0.51 1.42 L Buckthorn Removal and Chemical Treatment of Stumps Acre 0.65 0.00 0.00 0.54 0.00 0.00 0.20 0.00 0.00 0.75 M Street Sweeping L.S. -- -- -- -- -- -- -- -- -- -- N Temporary Mulch Acre 0.00 0.28 0.67 0.00 0.08 0.00 0.05 0.07 0.00 0.13 O Remove and Replace Fence L.F. 0 0 0 0 0 0 0 0 0 0 P Import and Install Root Wad Each 0 8 2 1 2 1 1 2 1 5 Q Clear and Salvage Trees and Install as Root Wad Each 0 15 4 1 0 1 1 3 1 8 R Clear and Salvage Trees and Install as Log Vane Each 0 0 0 10 0 0 0 0 2 0 S Clear and Salvage Trees and Install as Toe Wood L.F. 0 0 0 0 0 0 0 257 0 0 T Relocate Sprinkler Heads L.S. -- -- -- -- -- -- -- -- -- -- U Channel Cleanup, Debris Removal, and Disposal L.S. -- -- -- -- -- -- -- -- -- -- V Grading S.Y. 597 4,823 543 1,155 1,643 246 0 932 418 1,734 W Import Topsoil C.Y.50 402 45 96 137 20 0 78 35 144 X Furnish and Install Storm Sewer Flared End Section Each 1 0 0 0 0 0 0 0 0 0 Y Furnish and Install Storm Sewer Extension L.S. 0 0 0 0 0 0 0 0 0 1 Z Vegetated Reinforced Soil Slope (VRSS)S.F.F.1,683 0 0 0 0 0 0 0 0 0 AA Import Riprap, CL. III Ton 12 0 0 497 0 0 74 46 121 65 BB Construct Stream Crossing Each 0 2 0 0 1 0 0 1 0 4 CC Construct Cross Vane-Single Boulder L.F. 46 46 92 92 92 0 0 46 0 92 DD Construct Cross Vane-Double Boulder L.F.0 184 0 0 0 0 0 92 0 0 EE Construct Rock Vane-Single Boulder L.F.144 0 24 0 24 96 0 72 72 168 FF Excavation, Bank Slope (P)C.Y. 123 1,506 88 272 560 34 0 41 107 0 GG Excavation, Riprap (P)C.Y. 13 0 0 531 0 0 79 50 129 69 HH Excavation, New Creek Channel (P)C.Y. 0 408 0 0 0 0 0 60 0 590 II Fill, Old Creek Channel (P)C.Y. 0 410 0 0 0 0 0 350 0 833 Landscape JJ Seed Area Acre 0.65 2.51 0.92 0.54 1.34 0.51 0.20 1.32 0.38 1.56 KK Seed Mix 1: Wet Meadow Lbs. 0 24 6 0 12 2 0 2 0 11 KK Seed Mix 2: Floodplain Forest Lbs. 4 0 0 3 0 2 1 9 6 2 KK Seed Mix 3: Upland Construction Restoration Lbs. 2 1 3 1 2 3 1 0 0 0 KK Seed Mix 4: Wet Meadow South and West Lbs. 0 0 1 0 0 0 0 0 0 3 KK Seed Mix 5: Low Maintenance Turf Lbs. 0 0 0 0 0 0 8 8 0 0 KK Seed Mix 6: Cover Crop Lbs. 77 251 92 54 134 52 20 152 87 197 LL Sod S.Y. 0 0 0 0 0 0 0 0 116 0 MM Live Stake Each 22 22 22 22 22 22 15 30 29 35 NN Plant #5 Container Tree Each 6 6 5 6 6 6 5 12 7 12 OO Plant #2 Container Shrub Each 22 22 15 22 22 22 10 38 33 38 PP Shredded Hardwood Mulch C.Y.50 50 36 50 50 50 27 89 71 89 QQ Erosion Control Blanket S.Y.1,111 4,506 1,014 1,967 3,708 998 280 1,680 911 2,181 RR Vegetation Establishment and Warranty Period-Years One and Two L.S.0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 SS Vegetation Maintenance Period- Years Three to Five L.S. 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 BID QTY 1 1 1 12 1 2,215 7,785 11 500 17 10.73 2.14 1 1.28 0 23 34 12 257 1 1 12,092 1,008 1 1 1,683 955 8 506 276 600 2,890 1,021 1,567 2,102 9.93 58 26 15 4 16 1,175 116 241 71 244 562 18,356 1 1 AS-BUILT QUANTITY 1/30/2020 1 1 1 12 1 0 535 2 0 2 10.54 2.14 0.8 1.71 0 0 53 11 138 1 1 12,092 0 2 1 758 1,019.8 8 545 220 457 2,890 1,021 1,567 2,102 9.93 58 26 15 4 0 1,175 108 32 71 264 3 15,296 0.5 1 STRUCTURE FIRST CONTROL POINTE1 SECOND CONTROL POINTE2 THIRD CONTROL POINTE3 BEDDING MATERIAL FILTERMATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 28+54 867.80 28+39 865.80 28+50 867.80 CLASS II 18 6 3' DIAMETER BOULDERS ROCK VANES - SEE DETAIL 2 ON D-05 1 22+42 866.50 22+58 868.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 23+29 866.50 23+45 868.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 23+52 866.50 23+68 868.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 4 25+68 866.50 25+84 868.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 5 26+29 866.50 26+45 868.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 6 26+80 866.50 26+96 868.50 ––CLASS II 18 6 3' DIAMETER BOULDERS N N STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 33+11 868.30 32+94 865.40 33+06 868.30 CLASS II 18 6 3' DIAMETER BOULDERS 2 0+13 865.40 0+00 863.40 0+15 865.40 CLASS II 18 6 3' DIAMETER BOULDERS 3 2+94 864.80 2+80 862.80 2+93 864.80 CLASS II 18 6 3' DIAMETER BOULDERS 4 45+49 863.10 45+49 862.10 45+49 863.10 CLASS II 18 6 3' DIAMETER BOULDERS 5 48+44 862.30 48+31 860.20 48+46 862.30 CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 31+29 868.50 31+38 867.00 ––––– 2 31+53 868.50 31+64 867.00 ––––– 3 31+71 868.50 31+82 867.00 ––––– 4 35+88 866.70 35+94 865.20 ––––– 5 35+97 866.70 36+02 865.20 ––––– 6 36+05 866.70 36+06 865.20 ––––– 7 38+81 865.10 38+90 863.60 ––––– 8 38+90 865.10 38+90 863.60 ––––– 9 38+97 865.10 38+96 863.60 ––––– 10 39+04 865.10 39+05 863.60 ––––– 11 39+12 865.10 39+19 863.60 ––––– 12 0+63 864.00 0+65 862.50 ––––– 13 0+71 864.00 0+75 862.50 ––––– 14 0+80 864.00 0+84 862.50 ––––– 15 0+90 864.00 0+94 862.50 ––––– 16 42+84 864.30 49+91 862.80 ––––– 17 42+96 864.30 43+04 862.80 ––––– 18 43+11 864.30 43+21 862.80 ––––– 19 43+82 863.10 43+83 861.60 ––––– 20 43+90 863.10 43+94 861.60 ––––– 21 44+00 863.10 44+04 861.60 ––––– 22 44+12 863.10 44+15 861.60 ––––– 23 44+24 863.10 44+25 861.60 ––––– STREAM CROSSINGS - SEE DETAIL 3 ON D-05 1 37+61 863.80 37+80 863.60 ––––– 2 43+21 862.20 43+37 862.00 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 65+03 859.40 64+89 858.20 65+03 859.40 CLASS II 18 6 3' DIAMETER BOULDERS 2 66+27 858.80 66+09 856.40 66+27 858.80 CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 56+79 861.40 56+82 859.90 ––––– 2 56+84 861.40 56+90 859.90 ––––– 3 66+25 858.80 66+63 857.30 ––––– 4 66+31 858.80 66+70 857.30 ––––– 5 67+00 858.80 66+79 857.30 ––––– 6 67+04 858.80 66+91 857.30 ––––– ROCK VANES - SEE DETAIL 2 ON D-05 1 56+63 858.55 56+77 861.40 ––CLASS II 18 6 3' DIAMETER BOULDERS STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIALTHICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 84+81 855.50 84+66 853.60 84+78 855.50 CLASS II 18 6 3' DIAMETER BOULDERS 2 86+87 854.10 86+70 852.40 86+83 854.10 CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 84+10 855.50 84+16 854.00 ––––– 2 84+30 855.50 84+46 854.00 ––––– LOG VANES - SEE DETAIL 1 ON D-01 1 81+00 855.20 81+14 855.90 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 81+81 854.40 81+93 855.90 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 82+84 853.80 82+97 855.90 ––CLASS II 18 6 3' DIAMETER BOULDERS 4 83+35 853.40 83+47 855.20 ––CLASS II 18 6 3' DIAMETER BOULDERS 5 85+34 852.60 85+46 855.30 ––CLASS II 18 6 3' DIAMETER BOULDERS 6 85+83 852.20 85+95 855.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 7 87+29 851.80 87+42 856.30 ––CLASS II 18 6 3' DIAMETER BOULDERS 8 88+05 851.60 88+17 855.20 ––CLASS II 18 6 3' DIAMETER BOULDERS 9 88+74 851.50 88+86 854.70 ––CLASS II 18 6 3' DIAMETER BOULDERS 10 89+39 851.40 89+53 855.30 ––CLASS II 18 6 3' DIAMETER BOULDERS STRUCTURE FIRST CONTROL POINTE1 SECOND CONTROL POINTE2 THIRD CONTROL POINTE3 BEDDING MATERIAL FILTERMATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 91+69 853.90 91+53 851.50 91+65 853.90 CLASS II 18 6 3' DIAMETER BOULDERS 2 93+60 852.40 93+45 850.50 93+68 852.40 CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 95+61 852.00 95+68 850.50 ––––– 2 95+72 852.00 95+76 850.50 ––––– 3 101+77 850.50 101+88 849.00 ––––– 4 101+87 850.50 101+92 849.00 ––––– 5 103+23 850.50 103+30 849.00 ––––– 6 103+37 850.50 103+40 849.00 ––––– 7 103+44 850.50 103+52 849.00 ––––– ROCK VANES - SEE DETAIL 2 ON D-05 1 95+40 849.40 95+56 852.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 104+38 847.90 104+54 849.70 ––CLASS II 18 6 3' DIAMETER BOULDERS STREAM CROSSINGS - SEE DETAIL 3 ON D-05 1 94+40 850.30 94+63 850.20 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROOT WADS - SEE DETAIL 2 ON D-01 1 112+53 848.20 112+65 849.70 ––––– 2 114+27 847.80 114+38 849.30 ––––– ROCK VANES - SEE DETAIL 3 ON D-05 1 110+90 849.30 111+08 848.40 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 111+74 849.30 111+92 847.90 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 113+08 849.70 113+26 847.90 ––CLASS II 18 6 3' DIAMETER BOULDERS 4 114+82 849.30 115+00 847.60 ––CLASS II 18 6 3' DIAMETER BOULDERS STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIALTHICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROOT WADS - SEE DETAIL 2 ON D-01 1 159+40 844.10 159+45 842.60 ––––– 2 159+55 844.10 159+65 842.60 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIALTHICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 183+29 841.40 183+16 840.50 183+30 841.40 CLASS II 18 6 3' DIAMETER BOULDERS 2 0+13 840.60 0+00 839.90 0+19 840.60 CLASS II 18 6 3' DIAMETER BOULDERS 3 1+99 840.40 1+81 839.50 1+93 840.40 CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 184+15 840.60 184+23 839.10 ––––– 2 184+25 840.60 184+35 839.10 ––––– 3 184+38 840.60 184+45 839.10 ––––– 4 184+48 840.60 184+55 839.10 ––––– 5 184+55 840.60 185+65 839.10 ––––– ROCK VANES - SEE DETAIL 2 ON D-05 1 0+79 839.00 0+93 840.10 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 190+29 838.00 190+43 839.40 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 191+49 836.30 191+61 839.20 ––CLASS II 18 6 3' DIAMETER BOULDERS TOE WOOD - SEE SHEET D-04 1 183+32 842.60 183+65 839.70 ––––– 2 190+42 840.90 190+69 838.00 ––––– 3 191+61 840.60 191+90 837.60 ––––– 4 193+23 840.40 193+79 836.40 ––––– STREAM CROSSINGS - SEE DETAIL 3 ON D-05 1 0+38 839.50 0+53 839.30 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROOT WADS - SEE DETAIL 2 ON D-01 1 202+92 837.90 203+05 836.40 ––––– 2 203+56 837.30 203+66 835.80 ––––– ROCK VANES - SEE DETAIL 2 ON D-05 1 203+14 835.90 203+30 837.90 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 205+10 835.50 205+26 837.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 205+71 835.20 205+84 837.00 ––CLASS II 18 6 3' DIAMETER BOULDERS LOG VANES - SEE DETAIL 1 ON D-01 1 203+74 835.70 203+84 837.40 ––––– 2 205+33 835.30 205+50 837.00 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 0+34 833.80 0+18 833.10 0+32 833.80 CLASS II 18 6 3' DIAMETER BOULDERS 2 3+07 832.90 2+94 831.50 3+09 832.90 CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 1+32 834.50 1+42 833.00 ––––– 2 1+51 834.50 1+57 833.00 ––––– 3 1+67 833.80 1+68 832.30 ––––– 4 1+76 833.80 1+77 832.30 ––––– 5 1+82 833.80 1+92 832.30 6 2+24 833.60 2+32 832.10 ––––– 7 2+36 833.60 2+43 832.10 ––––– 8 2+61 833.50 2+76 832.00 ––––– 9 2+71 833.40 2+94 831.90 ––––– 10 2+84 832.00 2+94 830.50 ––––– 11 5+19 831.50 5+23 830.00 ––––– 12 5+41 831.50 5+48 830.00 ––––– 13 5+75 831.50 5+80 830.00 ––––– ROCK VANES - SEE DETAIL 2 ON D-05 1 213+35 831.50 213+51 833.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 213+48 831.50 213+65 833.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 4+72 830.00 4+85 832.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 4 5+01 830.00 5+13 832.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 5 5+27 830.00 5+38 832.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 6 5+58 830.00 5+65 832.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 7 5+86 830.00 5+97 832.00 ––CLASS II 18 6 3' DIAMETER BOULDERS STREAM CROSSINGS - SEE DETAIL 3 ON D-05 1 215+19 834.50 215+33 834.30 ––––– 2 0+56 832.40 0+71 832.30 ––––– 3 1+87 831.90 2+02 831.90 ––––– 4 7+47 828.60 7+62 828.50 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 0+43 829.10 0+27 827.10 0+41 829.10 CLASS II 18 6 3' DIAMETER BOULDERS 2 3+08 828.59 2+94 826.30 3+07 828.59 CLASS II 18 6 3' DIAMETER BOULDERS 3 12+00 826.60 11+86 825.40 12+00 826.60 CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 4+71 827.80 4+81 826.30 ––––– 2 4+83 827.80 4+91 826.30 ––––– 3 4+90 827.80 4+98 826.30 ––––– 6 6+84 827.40 6+91 825.90 ––––– 7 6+95 827.40 7+01 825.90 ––––– 8 7+08 827.40 7+12 825.90 ––––– 9 7+20 827.40 7+26 825.90 ––––– 10 9+21 827.20 9+30 825.70 ––––– 11 9+35 827.20 9+43 825.70 ––––– 12 9+49 827.20 9+57 825.70 ––––– 13 10+22 827.00 10+29 825.50 ––––– 14 10+31 827.00 10+38 825.50 ––––– 15 10+43 827.00 10+49 825.50 ––––– ROCK VANES - SEE DETAIL 2 ON D-05 1 1+92 826.00 2+07 828.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 2+26 826.00 2+41 828.00 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 4+48 825.60 4+61 827.80 ––CLASS II 18 6 3' DIAMETER BOULDERS 4 8+32 825.30 8+45 827.60 ––CLASS II 18 6 3' DIAMETER BOULDERS STREAM CROSSINGS - SEE DETAIL 3 ON D-05 1 5+18 825.40 5+33 825.30 ––––– 2 9+79 825.30 9+95 825.20 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 1 ON D-06 1 246+63 826.20 246+50 824.00 246+64 826.20 CLASS II 18 6 3' DIAMETER BOULDERS 2 249+31 824.80 249+17 823.00 249+31 824.80 CLASS II 18 6 3' DIAMETER BOULDERS 3 256+62 821.40 256+47 820.60 256+62 821.40 CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 248+54 824.80 248+60 823.30 ––––– 2 248+67 824.80 248+78 823.30 ––––– 3 248+85 824.80 248+96 823.30 ––––– 4 259+40 821.50 259+50 820.00 ––––– 5 259+51 821.50 259+64 820.00 ––––– 6 259+65 821.50 259+74 820.00 ––––– 7 259+82 821.50 259+93 820.00 ––––– ROCK VANES - SEE DETAIL 2 ON D-05 1 247+86 823.00 248+02 825.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 257+29 819.90 257+44 821.90 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 257+63 819.90 257+80 821.90 ––CLASS II 18 6 3' DIAMETER BOULDERS LOG VANES - SEE DETAIL 1 ON D-01 1 250+07 822.20 250+17 824.10 ––––– 2 250+82 821.90 250+93 823.60 ––––– 3 251+56 821.80 251+67 823.20 ––––– 4 252+31 821.60 252+46 822.80 ––––– STREAM CROSSINGS - SEE DETAIL 3 ON D-05 1 257+02 820.10 257+20 819.90 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK VANES - SEE DETAIL 2 ON D-05 1 283+22 815.90 283+35 817.90 ––CLASS II 18 6 3' DIAMETER BOULDERS 2 283+43 815.50 283+57 817.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 3 283+65 815.50 283+79 817.50 ––CLASS II 18 6 3' DIAMETER BOULDERS 4 288+13 815.30 288+28 817.40 ––CLASS II 18 6 3' DIAMETER BOULDERS 5 288+45 814.80 288+62 817.40 ––CLASS II 18 6 3' DIAMETER BOULDERS 6 288+73 815.00 288+86 817.40 ––CLASS II 18 6 3' DIAMETER BOULDERS 7 288+97 815.00 289+09 816.80 ––CLASS II 18 6 3' DIAMETER BOULDERS 8 289+20 814.90 289+29 816.80 ––CLASS II 18 6 3' DIAMETER BOULDERS ROOT WADS - SEE DETAIL 2 ON D-01 1 283+11 817.90 283+21 816.40 ––––– 2 283+36 817.50 283+43 816.00 ––––– 3 283+59 817.50 283+62 816.00 ––––– STRUCTURE FIRST CONTROL POINT E1 SECOND CONTROL POINT E2 THIRD CONTROL POINT E3 BEDDING MATERIAL FILTER MATERIAL THICKNESS (IN) Notes STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) STATION (FT) ELEVATION (FT) TYPE THICKNESS (IN) ROCK CROSS VANES - SEE DETAIL 3 ON D-01 1 299+56 812.90 299+42 810.60 299+57 812.90 CLASS II 18 6 3' DIAMETER BOULDERS STREAM CROSSINGS - SEE DETAIL 3 ON D-01 1 297+76 812.30 297+92 812.20 ––––– TABLE OF QUANTITIES RIPRAP AT PIPE OUTLETS CLASS II d50 = 6" CLASS III d50 = 9" CLASS IV d50 = 12" DIA. OF ROUND PIPE (IN.) L (FT.) 12" DEPTH RIPRAP (CU. YD.) 6" DEPTH GRANULAR FILTER (CU. YD.) 18" DEPTH RIPRAP (CU. YD.) 9" DEPTH GRANULAR FILTER (CU. YD.) 24" DEPTH RIPRAP (CU. YD.) 12" DEPTH GRANULAR FILTER (CU. YD.) 12 8 2.8 1.4 4.1 2.1 5.5 2.8 15 8 2.9 1.5 4.4 2.2 5.8 2.9 18 10 3.9 2.0 5.9 3.0 7.8 3.9 21 10 4.2 2.1 6.3 3.3 8.4 4.2 24 12 5.5 2.8 8.3 4.2 11.0 5.5 27 12 5.8 2.9 8.7 4.4 11.6 5.8 30 14 7.3 3.7 10.9 5.5 14.5 7.3 36 16 9.2 4.6 13.8 6.9 18.3 9.2 42 18 10.9 5.5 16.3 8.2 21.7 10.9 48 20 12.9 6.5 19.4 9.7 25.8 12.9 REACH 1 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) FLOODPLAIN FORREST 28,030 6.28 4.0 UPLAND CONSTRUCTION RESTORATION 5,420 13.00 1.6 COVER CROP (OATS)33,450 25.00 19.2 COVER CROP (WINTER WHEAT)33,450 100.00 76.8 REACH 2 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)108,180 9.44 23.4 UPLAND CONSTRUCTION RESTORATION 995 13.00 0.3 COVER CROP (OATS)109,175 25.00 62.7 COVER CROP (WINTER WHEAT)109,175 100.00 250.6 REACH 1 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)6 TREES (#2 CONT.)22 LIVE STAKES DORMANT CUTTINGS 22 REACH 2 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)6 TREES (#2 CONT.)22 LIVE STAKES DORMANT CUTTINGS 22 REACH 3 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)26,375 9.44 5.7 UPLAND CONSTRUCTION RESTORATION 9,220 13.00 2.8 WET MEADOW (SOUTH AND WEST)4,490 4.99 0.5 COVER CROP (OATS)40,085 25.00 23.0 COVER CROP (WINTER WHEAT)40,085 100.00 92.0 REACH 4 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) FLOODPLAIN FORREST 21,050 6.28 3.0 UPLAND CONSTRUCTION RESTORATION 2,263 13.00 0.7 COVER CROP (OATS)23,313 25.00 13.4 COVER CROP (WINTER WHEAT)23,313 100.00 53.5 REACH 3 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)5 TREES (#2 CONT.)15 LIVE STAKES DORMANT CUTTINGS 22 REACH 4 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)6 TREES (#2 CONT.)22 LIVE STAKES DORMANT CUTTINGS 22 REACH 2 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)53,680 9.44 11.6 UPLAND CONSTRUCTION RESTORATION 4,640 13.00 1.4 COVER CROP (OATS)58,320 25.00 33.5 COVER CROP (WINTER WHEAT)58,320 100.00 133.9 REACH 6 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)6,340 9.44 1.4 FLOODPLAIN FORREST 8,590 6.28 1.2 UPLAND CONSTRUCTION RESTORATION 7,480 13.00 2.2 COVER CROP (OATS)22,410 25.00 12.9 COVER CROP (WINTER WHEAT)22,410 100.00 51.4 REACH 5 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)6 TREES (#2 CONT.)22 LIVE STAKES DORMANT CUTTINGS 22 REACH 6 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)6 TREES (#2 CONT.)22 LIVE STAKES DORMANT CUTTINGS 22 REACH 8 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) FLOODPLAIN FORREST 5,810 6.28 0.8 UPLAND CONSTRUCTION RESTORATION 1,285 13.00 0.4 LOW-MAINTENANCE TURF 1,430 220.00 7.2 COVER CROP (OATS)8,525 25.00 4.9 COVER CROP (WINTER WHEAT)8,525 100.00 19.6 REACH 9 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)5,550 9.44 1.2 FLOODPLAIN FORREST 59,220 6.28 8.5 LOW-MAINTENANCE TURF 1,540 220.00 7.8 COVER CROP (OATS)66,310 25.00 38.1 COVER CROP (WINTER WHEAT)66,310 100.00 152.2 REACH 8 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)5 TREES (#2 CONT.)10 LIVE STAKES DORMANT CUTTINGS 15 REACH 9 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)12 TREES (#2 CONT.)38 LIVE STAKES DORMANT CUTTINGS 30 REACH 10 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) FLOODPLAIN FORREST 37,860 6.28 5.5 SOD 3,120 NA NA COVER CROP (OATS)37,860 25.00 21.7 COVER CROP (WINTER WHEAT)37,860 100.00 86.9 REACH 11 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)50,380 9.44 10.9 FLOODPLAIN FORREST 11,740 6.28 1.7 WET MEADOW (SOUTH AND WEST)23,640 4.99 2.7 COVER CROP (OATS)85,760 25.00 49.2 COVER CROP (WINTER WHEAT)85,760 100.00 196.9 REACH 10 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)7 TREES (#2 CONT.)33 LIVE STAKES DORMANT CUTTINGS 29 REACH 11 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)12 TREES (#2 CONT.)38 LIVE STAKES DORMANT CUTTINGS 35 REACH 12 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)10,690 9.44 2.3 FLOODPLAIN FORREST 21,290 6.28 3.1 WET MEADOW (SOUTH AND WEST)57,820 4.99 6.6 LOW-MAINTENANCE TURF 9,290 220.00 46.9 COVER CROP (OATS)99,090 25.00 56.9 COVER CROP (WINTER WHEAT)99,090 100.00 227.5 REACH 13 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)15,600 9.44 3.4 FLOODPLAIN FORREST 38,230 6.28 5.5 COVER CROP (OATS)53,830 25.00 30.9 COVER CROP (WINTER WHEAT)53,830 100.00 123.6 REACH 12 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)13 TREES (#2 CONT.)39 LIVE STAKES DORMANT CUTTINGS 35 REACH 13 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)7 TREES (#2 CONT.)22 LIVE STAKES DORMANT CUTTINGS 22 REACH 14 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)24,280 9.44 5.3 COVER CROP (OATS)24,280 25.00 13.9 COVER CROP (WINTER WHEAT)24,280 100.00 55.7 REACH 15 SEEDING QUANTITIES SEED MIX AREA (SQ. FT.) APPLICATION RATE (LB./ACRE) TOTAL QUANTITY (LB.) WET MEADOW (CUSTOM MIX)28,800 9.44 6.2 COVER CROP (OATS)28,800 25.00 16.5 COVER CROP (WINTER WHEAT)28,800 100.00 66.1 REACH 14 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)0 TREES (#2 CONT.)5 LIVE STAKES DORMANT CUTTINGS 5 REACH 15 HERBACEOUS PLANT QUANTITIES TYPE QUANTITY TREES (#5 CONT.)0 TREES (#2 CONT.)5 LIVE STAKES DORMANT CUTTINGS 5