Loading...
HomeMy WebLinkAbout2024-01-24 Planning Commission Special Work SessionAg enda Planning Commission Work Session City of E dina, Minnesota Com munity R oom, E dina City Hall Wednesday, Januar y 24, 2024 5:00 PM I.Ca ll To Ord er II.Roll Ca ll III.Sketch Pla n Review - 7235 Fra n ce Avenue IV.Adjournm en t The City of Edina wants all residents to be comfortable being part of the public process. If you need assistance in the way of hearing ampli*cation, an interpreter, large-print documents or something else, please call 952-927-8861 72 hours in advance of the meeting. Date: January 24, 2024 Agenda Item #: I I I. To:P lanning C ommission Work S es s ion Item Type: O ther F rom:C ary Teague, C ommunity Development Director Item Activity: Subject:S ketch P lan R eview - 7235 F ranc e Avenue Disc ussion C ITY O F E D IN A 4801 West 50th Street Edina, MN 55424 www.edinamn.gov A C TI O N R EQ U ES TED: No action requested. I N TR O D U C TI O N: P rovide the applicant non binding feedback on a potential future development application. AT TAC HME N T S: Description Staff Memo Proposed Plans Applicant Narrative Site Location, Zoning and Comp. Plan Previous sketch plan proposal (2023) City Council Res olution - Negative Declaration on the need for an EAW 2023 AFO Review (Mic Johns on) 2024 AFO Review (Mic Johns on) Concept Slides from M. Fischer and M. Schroeder Staff Pres entation Applicant Pres entation City of Edina • 4801 W. 50th St. • Edina, MN 55424 City Hall • Phone 952-927-8861 Fax 952-826-0389 • www.CityofEdina.com Date: January 24, 2024 To: Planning Commission From: Cary Teague, Community Development Director Re: Sketch Plan Review – 7235 France Avenue Enclave Companies have submitted a revised sketch plan proposal for redevelopment of the Macy’s Furniture store site at 7235 France Avenue. The plan layout and proposed uses are generally consistent with the original sketch plan. The plans still divides the site into four parcels as recommended in the Southdale Design Experience Guidelines. (See attached original sketch plan.) Revisions have been made to incorporate feedback from the Planning Commission and City Council during last year’s sketch plan review and to accommodate either a bridge over France Avenue or an underpass to connect this development to the redevelopment project at 7200 & 7250 France Avenue. The width of the public space on the south side of the site has also been increased. These sketch plans are not as detailed as the previous sketch plan, but it is worth noting that the applicant does plan to step the buildings back from the promenade as shown originally and will follow the street room typologies in the Southdale Design Experience Guidelines. The proposal is to tear down the existing structure and build the following:  Two multi-family residential buildings on the east side of the site with 6 levels above grade housing units and two levels of below grade parking. Buildings would have between 180- 220 units. Each of these buildings would also include potential first level space for retail users with a ceiling height of 16 feet.  Two mixed use office/retail buildings on the west side of the site. The northwest building would be 8 levels above grade with two levels of underground parking. (The height of this building has been reduced from 11 stories as suggested at the original sketch plan review.) the height of the southwest building would be 11 levels with two levels of underground parking. Above grade parking would be screened by liner buildings. The first-floor ceiling height of each of these buildings would be 16 feet. The request would still require the following:  Rezoning from PCD-3 to PUD. Flexibility would be requested through the PUD Ordinance to vary from existing setback requirements, building height, first floor ceiling height, building transparency on the first level, and floor area ratio (FAR) requirements. The PUD Zoning is also used to ensure 10% affordable housing on the site. City of Edina • 4801 W. 50th St. • Edina, MN 55424 The table on the last page of this report demonstrates how the proposed new buildings would comply with the Planned Commercial District. The Planning Commission is asked to provide non-binding comments focusing on the justification of the use of a PUD for this project, and the Design Experience Guidelines. Additionally, as spelled out in their project narrative (attached), the applicant has asked for feedback on the following: o Usage of Northeast exterior park area. This area has been carved out for public use – several suggestions have come from neighborhood interactions including playground infrastructure, community garden, or a water feature consistent with other moments along the promenade. o Connection of the Promenade from East to West across Gallagher Dr. – the extensions of the Promenade will interact with Gallagher Dr. as it enters the development. How this area is treated is critical to make a safe and inviting connection across the site. o Preference for location of a Retail pad at street level within one of the residential projects – the development team is flexible in terms of where a single retail pad is located in the base of the Eastern Residential buildings. Our team believes the best location for this Retail pad could be on the Southeast corner close to the confluence of East and North bound Promenade routes due to the high traffic and visibility, however, there are likely other areas to consider as alternates. Additional Considerations  CAC, Community Activity Center. The following is the land use description for CAC, Community Activity Center (which this site is guided) in the Comprehensive Plan: “Contains larger scale uses, height and coverage. Primary uses: Retail, office, lodging, entertainment, and residential uses, combined or in separate buildings. Secondary uses: Institutional and recreational. Buildings should be placed in appropriate proximity to streets to create pedestrian scale. Buildings may “step down" at boundaries with lower-density districts and upper stories “step back" from street. More stringent design standards for larger buildings. Emphasize pedestrian circulation; re-introduce finer-grained circulation patterns where feasible.”  Residential Density. This site is 7.97 acres in size. There are up to 440 units proposed. (460 units were suggested in the first sketch plan. The overall density would be 55 units per acre, or when using just the residential sites, 110 units per acre. The Comprehensive Plan allows between 90- 150 units per acre on the site.  Affordable Housing. The applicant is proposing 10% of the units (44) to be provided for affordable housing, per the City’s Affordable Housing Policy. City of Edina • 4801 W. 50th St. • Edina, MN 55424  Building Height. The proposed building height of the office buildings are 8 and 11 stories. The City Code requirement is 8 stories and 96 feet. The Southdale area design experience guidelines contemplate greater height in this area in between France and York Avenues. Edina City Code requires buildings over nine stories to be set back six times the height of the building from R-1 zoned property. The 150-foot-tall building would require a 900-foot setback to the nearest R-1 property or single-family home lot. The nearest lot is roughly 812 feet to the west.  Building Materials & Facades. City Code requires new buildings to be made of natural materials (stone, brick) on the first vertical 60 feet of a building, and first floor ceiling heights must be 20 feet tall. (16-foot first floor heights are proposed.) As suggested in the Southdale Design Experience Guidelines and by City Code, all new front building facades that face the public realm must have 75 percent transparency (ability to see inside the building) at the ground level. When designing the final plans, the “street typologies” suggested in the Design Experience Guidelines should be more closely considered.  Floor Area Ratio (FAR). The proposed FAR of roughly 2.4 is high compared to the most recent project with a high FAR. The 70th and France redevelopment site is to be 2.1.  Pedestrian Connections. Pedestrian sidewalks are proposed on all sides of the building, including connections from France to the Promenade. Public use easements would be established over these areas. The plans have been reconfigured to accommodate either a bridge over France Avenue or an underpass.  Sustainability. Any formal application must meet the City’s Sustainability Policy.  Traffic & Parking Study. Would be required as part of any formal application.  Environmental Assessment Worksheet (EAW). An EAW has been considered by the City Council and determined that an EIS would not be needed. The proposed revised sketch plan is within the development parameters considered in the EAW. An EAW considers the impacts the project will have on the environment. (See attached City Council Resolution.)  The table on the last page of this memo demonstrates how the proposal would comply with the PCD-3 Zoning District standards, and the designated future land use plan in the Comprehensive Plan. Please note that variances would be required for setbacks, height, and floor area ratio. City of Edina • 4801 W. 50th St. • Edina, MN 55424 PUD The purpose and intent of a PUD is to include most or all of the following: a. provide for the establishment of PUD (planned unit development) zoning districts in appropriate settings and situations to create or maintain a development pattern that is consistent with the City's Comprehensive Plan; b. promote a more creative and efficient approach to land use within the City, while at the same time protecting and promoting the health, safety, comfort, aesthetics, economic viability, and general welfare of the City; c. provide for variations to the strict application of the land use regulations in order to improve site design and operation, while at the same time incorporate design elements that exceed the City's standards to offset the effect of any variations. Desired design elements may include: sustainable design, greater utilization of new technologies in building design, special construction materials, landscaping, lighting, stormwater management, pedestrian oriented design, and podium height at a street or transition to residential neighborhoods, parks or other sensitive uses; d. ensure high quality of design and design compatible with surrounding land uses, including both existing and planned; e. maintain or improve the efficiency of public streets and utilities; f. preserve and enhance site characteristics including natural features, wetland protection, trees, open space, scenic views, and screening; g. allow for mixing of land uses within a development; h. encourage a variety of housing types including affordable housing; and i. ensure the establishment of appropriate transitions between differing land uses. The compliance table on the following page demonstrates how the proposed new building would comply with the existing PCD-3 Standards on the lot. City of Edina • 4801 W. 50th St. • Edina, MN 55424 Compliance Table (Not exact as this is a sketch plan) City Standard (PCD-3) (Setback measured from the front building line to the curb) Proposed (Setback measured from the front building line to the curb) Building Setbacks Front – France Avenue Side – North Side – South Rear – Promenade Setback to R-1 Property 50 feet 50 feet or building height (150 feet) 50 feet or building height (150 feet) 50 feet or building height (82 feet) 900 feet 50 feet 20 & 40 feet* 50 & 100+ feet (35 feet previous plan) 35 feet* (21 feet previous plan) 812 feet* Building Height 8 stories & 96 feet 7-11 stories and 150 feet* Density 90-150 units per acre 110 units per acre (using just the residential sites) (55 units per acre overall) Floor Area Ratio (FAR) .50% 2.4%* Parking Retail/Office = 1,000 spaces Residential = 440 enclosed spaces 1,440 spaces total 1,200 574 proposed enclosed spaces 24 surface spaces 1,838 spaces total proposed *Does not meet base Zoning Standards-Flexibility would be requested through a PUD City of Edina • 4801 W. 50th St. • Edina, MN 55424 MIXED-USEMIXED-USERESIDENTIALRESIDENTIALMIXED-USERESIDENTIALPLAN NORTHScale:1" = 200'-0"7235 FRANCE AVESITE DIAGRAM - SURROUNDING CONTEXT2024/01/10EDINA, MN MIXED-USEMIXED-USERESIDENTIALRESIDENTIAL83' - 1"CITY REQ. SETBACK50' - 0"30' - 0"CITY REQ. SETBACK50' - 0"BLDG. WINDOW SETBACK 20' - 0"BLDG. WINDOW SETBACK40' - 0"CITY REQ. SETBACK50' - 0"225' - 0"120' - 0"260' - 0"152' - 8"300' - 0"175' - 0"202' - 0"291' - 1"FRANCE AVE.GALLAGHER DR.REQ. STEPBACK +60'10' - 0"PROMENADE EXTENSIONCITY REQ. SETBACK60' - 0"6' - 0"6' - 0"CANTILEVER BALCONIES SPACECANTILEVER BALCONIES SPACE19' - 9"CITY REQ. PROM SETBACK15' - 0"BURIED STORMWATER TANKSWITHIN DASHED REGION60' - 0"CITY REQ. SETBACK50' - 0"CANTILEVER BALCONIES SPACE6' - 0"BURIED STORMWATER TANKSWITHIN DASHED REGIONCITY REQ. SETBACK60' - 0"PEDESTRIAN ZONEPEDESTRIAN ZONEPROPERTY LINEMAX 36' BUILDING HEIGHT20' - 0"MAX 60' BUILDING HEIGHT20' - 0"EXISTING BIKE TRAIL55' - 0"20' - 0"PLAN NORTHScale:1/64" = 1'-0"7235 FRANCE AVESITE DIAGRAM2024/01/10EDINA, MN ESG | ARCHITECTURE & DESIGN 500 Washington Avenue South | Suite 1080 Minneapolis, Minnesota 55415 | p 612.339.5508 esgarch.com January 1, 2024 Cary Teague, AICP, Community Development Director 4801 W. 50th St. | Edina, MN 55424 RE: 7235 France Ave. | Project No: 223701.00 Enclave Companies is proposing a mixed-use, multi-building development on the current Macy’s Homestore site located at 7235 France Ave, at the corner of France Ave. and Gallagher Dr. in Edina Minnesota. The site is 8.12 Acres and is currently zoned PCD-3 Planned Commercial. The proposed program consists of 2 multi-family residential buildings on the East side of the site, with 2 mixed-use commercial buildings on the west side of the site. This building composition would require a re-zoning to a PUD in order to accommodate the mixture of uses contemplated. The general layout of the 4 buildings proposed on the site is consistent with the Design Experience Guidelines direction for organization into a smaller block pattern, with a North-South internal private drive dividing the site East and West, while an East-West running pedestrian and vehicular spine divides the site North and South. This project will also provide an extension to the Edina Promenade park system by allocating significant open space along the South and West sides of the property to accommodate additional bike and walking trails, as well as public infrastructure such as parks, seating, potential water features, or other public realm improvements. Also under consideration is a connection across France Ave. to the 7200/7250 site which would be anchored mid-block on the West side of the 7235 parcel. The proposed site plan provides ample space for further development of this considered infrastructure improvement in a way that will not impact the overall development timeline for the buildings and associated sitework. The 2 buildings located along the East side of the property will be developed as multi-family residential use, consisting of 6 total levels of above grade structure and two levels of below grade parking. Each building will contain between 180 and 220 dwelling units of various composition and size, organized around a central open space and amenity area. The first level of each building will be 16’ to accommodate a potential retail user as well as providing heightened entry and amenity experience for users. Floor to floor above the first level will be typical at 10’-6”. Each unit will be provided an exterior balcony above the first level, while units at the grade level will be treated in a walk-up condition where a stoop, stairs, and entry elements will help provide pedestrian scale articulation at the base of the building. All parking elements above grade will be ESG | ARCHITECTURE & DESIGN 1.10.24 | 7235 France Ave 2 of 3 screened either by liner units, or in conditions where parking is located along a building edge, by architectural screening. The materiality of these buildings will be consistent with the Design Experience Guidelines for lower levels, including ample glass and transparency. Upper levels will be articulated to complement the Edina Promenade system, with a material palette consisting of a mixture of punched windows, brick masonry, metal panel, as well as composite materials. Along the West side of the site the 2 buildings will be developed as mixed-use projects and will include a variety of uses including ground level active uses, architecturally screened structured parking, office space, and residential units. The Northwest structure will be a maximum of 8 levels above grade, with 2 levels of below grade parking, while the Southwest structure will be a maximum of 11 levels above grade, also with 2 levels of below grade parking. The first level of each of these buildings will be 16’ to accommodate active uses and enhanced lobby and amenity spaces. Typical floor to floor heights will be 14’ in office spaces with 10’-6” in residential spaces. Office spaces will have internal tenant balconies on each floor, while residential units will each have access to an external balcony. Above grade parking for these buildings will either be lined with retail or office uses, or architectural screening elements. The lower level of these buildings will be treated with transparent glass elements, while the upper stories will be composed of a mixture of curtainwall and punched opening glazing, brick masonry, and metal panel accents. Our team has identified the following items for review and input during the sketch plan process and would greatly appreciate feedback and comments on these items: · Usage of Northeast exterior park area. This area has been carved out for public use – several suggestions have come from neighborhood interactions including playground infrastructure, community garden, or a water feature consistent with other moments along the promenade. · Connection of the Promenade from East to West across Gallagher Dr. – the extensions of the Promenade will interact with Gallagher Dr. as it enters the development. How this area is treated is critical to make a safe and inviting connection across the site. · Preference for location of a Retail pad at street level within one of the residential projects – the development team is flexible in terms of where a single Retail pad is located in the base of the Eastern Residential buildings. Our team believes the best location for this Retail pad could be on the Southeast corner close to the confluence of East and North bound ESG | ARCHITECTURE & DESIGN 1.10.24 | 7235 France Ave 3 of 3 Promenade routes due to the high traffic and visibility, however there are likely other areas to consider as alternates. EdinaMN.gov 2 Site EdinaMN.gov 3 Site EdinaMN.gov 4 Site EdinaMN.gov 5 Site CITY OF EDINA - SKETCH PLAN SUBMISSION 7235 FRANCE AVE S EDINA, MNSubmitted 03/09/2023 TABLE OF CONTENTS 7-10 3-7 11-13 SOUTHDALE VISION EXISTING SITE AND CONTEXT ABOUT ENCLAVE 14-23 CONCEPTUAL SITE DIAGRAMS AND VISUALS 2 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 About Enclave As a unified real estate investment firm, Enclave’s development, construction, and management teams create distinct spaces and places where partners, team members, and communities thrive. By functioning as developer, contractor, and property manager, we remain hands-on in owning each phase of an asset’s lifecycle. 100+ Projects Completed Since 2011 80+ Multifamily/Mixed-Use Developments 200+ Team Members ABOUT ENCLAVE3 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 MULTIFAMILY HEALTHCARE MIXED-USE INDUSTRIAL Serving multifamily, mixed-use, industrial, healthcare and commercial industries ABOUT ENCLAVE4 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 Enclave’s Role •Property Under Contract (Buyer) •Lead Developer/Primary Applicant •Assemble Project Team: ESG Architecture & Design, Stantec, and Braun Intertec ABOUT ENCLAVE5 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 Area & Site Familiarity •Real estate brokerage and market research community •In-depth internal market analysis •Edina 2040 Comprehensive Plan •Greater Southdale District Guidelines •Preliminary discussions with City Staff ABOUT ENCLAVE6 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 The Vision Pedestrian friendly mixed-use development making strong connections between France Avenue and Centennial Lakes Promenade. The proposed design intentionally incorporates and enhances Centennial Lakes Promenade, includes various sustainable strategies, and meets the City’s goal of providing 10% of residential units at 50% AMI. ABOUT ENCLAVE7 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 EXISTING SITE CONTEXT8 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 EXISTING BIRD’S EYE LOOKING NORTHEAST LOOKING SOUTHEAST LOOKING NORTHWEST LOOKING SOUTHWEST Project Site France Ave SFrance Ave S Project SiteFrance Ave SFrance Ave S Project SiteFrance Ave SFrance Ave S Project Site France Ave SFrance Ave S9 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 EXISTING SITE IMAGES10 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 SOUTHDALE VISION PROPOSED SITE CONNECTIONS SOUTHDALE DESIGN GUIDELINES DISTRICTS SOUTHDALE DESIGN GUIDELINES FUTURE MASSING 11 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 SOUTHDALE VISION Architecture Field Office DRAFT for review –May 18, 2017 8 the vision:build upon existing assets 8DRAFT for review –May 18, 2017 Architecture Field Office DRAFT for review –May 18, 2017 9 the vision: improve access 9DRAFT for review –May 18, 2017 the vision: walkable the vision: human-scaled 12 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 SOUTHDALE VISION Architecture Field Office DRAFT for review –May 18, 2017 12 the vision: architecturally varied 12DRAFT for review –May 18, 2017 Architecture Field Office DRAFT for review –May 18, 2017 14 the vision: family friendly 14DRAFT for review –May 18, 2017 the vision: green the vision: mixed-use 13 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 OVERVIEW + PROGRAM PROJECT OVERVIEW: Enclave is pleased to present this proposal for a premier mixed-use community located at 7235 France Avenue South. Please accept this submittal for a Planned Unit Development (PUD): Schematic Plan Application. The subject property is approximately 7.97-acres in gross size and is currently operating as a Macy’s Furniture Store. Enclave has entered into a purchase agreement and sale agreement with the property owner, Macy’s. This redevelopment proposal would require the demolition/clearing of all improvements on the existing site, and relocation of the existing Macy’s Furniture store. In consultation with ESG Architecture & Design, Enclave has reviewed the City’s Comprehensive Plan and the Greater Southdale District Plan. Enclave has also discussed this proposed development with City staff. Based on guidance received, Enclave is proposing breaking up the subject property into four (4) developments/ blocks, as generally outlined below, and further described within the enclosed plans. PROJECT PROGRAM: • NW Block: 150K square foot office building, w/ground floor active uses, fronting France Ave • SW Block: 150K square foot office building, w/ground floor active uses, fronting France Ave • NE Block: 230-unit multifamily building, w/ground floor active uses, fronting Centennial Lakes Promenade • SE Block: 230-unit apartment building, w/ground floor active uses, fronting Centennial Lakes Promenade 14 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 SITE DIAGRAM EXISTING PROPOSED•no engagement along France•primarily surface parking (impervious) •no pedestrian connectivity •no engagement along Promenade•single story (underutilized) 15 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 •green node •pedestrian node •pedestrian node •pedestrian/plaza connectivity •connectivity•connectivity•NW Block •SW Block •NE Block •SE Block •connectivity•connectivity•engage and further activate Promenade•tie into east/west connectivity •connectivity•connectivity Submitted 03/09/2023 SITE PLAN SECTION 4 NSCALE: 1"=60'16 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 BIRDSEYE MASSING VIEWS LOOKING SW LOOKING NE LOOKING NW LOOKING SE 17 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 SECTION PERSPECTIVES SECTION 1: FRANCE AVE SECTION 2: INTERIOR Greater Southdale Area District Plan | Design Experience Guidelines DRAFT November 15, 2018 page 27 The street room experience within Typology 2 will be shaped by the following experience guidelines: • On France Avenue, a 50 foot setback is required from curb to face of building with a building podium height of 60 feet. Above the 60-foot height limit, additional height should step back 10 feet from the face of the building, to a maximum height of 84 feet. • All parking, other than short-term retail or guest parking, and building services need to be located below grade or hidden within the building. If on ground level or above, parking and/or building services must be surrounded on all sides by program space such as commercial or housing. Dimensional Characteristics of Street Room Typology 2Cornelia Overlay at France Avenue 84 Feet France Avenue 60 Feet Traffic Lanes50 Foot Setback 10 Foot Step Back Greater Southdale Area District Plan | Design Experience Guidelines DRAFT November 15, 2018 page 29 Street Typologies 60’ Wide Connector Street Typical 60’ Wide Local Street (within super-blocks) 105 Feet 20 Foot Step Back 60 Feet 2 Foot Step Back 2 Way Traffic Plus Parking 12’ Sidewalk 12’ Sidewalk It is recommended that buildings above 60 feet step back a minimum of 20 feet when there is an opposing building at the street edge Podium Heights can vary The intent is to create a street that provides a access from roads that are bordered by France and York and are connected by east /west streets such as Parklawn Ave, Parklawn Court, Hazelton Road, W 70th, W 69th, W 65th. Internal street within the supper block provide interconnections between supper block connecting residents across the district north and south supporting potential for community space. By creating pedestrians walkways with existing public and private infrastructure thereby supporting connections within and outside the block. The street width is based on the nature of the uses within the larger super block structure. They can be lined with a mix of uses, including residential and retail while providing connectivity within a neighborhood. They contain shady places to walk the dog or sit and have a coffee connecting to neighborhood parks, places of worship, and schools. Unique to the Greater Southdale District, many of the Connector Streets may become entirely devoted to landscaping. B The street room experience within Typology 3 will be shaped by the following experience guidelines: • New local streets should be 60 feet in width. Those streets which carry vehicular traffic should comprise two traffic lanes with two lanes of parking or pick-up/drop-off. Sidewalks should be located on each side of these vehicular streets as illustrated in the diagram above. • Minimizing vehicular access to provide drop off, service and parking can be planned to share the vehicular needs of blocks allowing the remaining spaces between the remaining blocks to be used in a variety of ways for the benefit of the community. This “space between” buildings can be transformed into pocket parks, gardens, play areas, plazas, wetlands, and many other activities that support the health and wellbeing of the community. • Building podium heights can vary, from 36 feet up to 60 feet. • Above the 60 foot height limit, the long sides of a rectangular or “L” shaped building need to step back 20 feet from the street room facade (as illustrated in the building at left in the diagram above), and the narrow ends need to step back 2 feet from the street room facade (building at right in diagram above). This minimizes the impact of the taller building form on sunlight at the street, and provides a lower-scale building at the street, resulting in a more cohesive and comfortable pedestrian experience. The footprint on taller residential buildings should not exceed 12,000 SF, while taller commercial buildings are permitted larger footprints of up to 24,000 SF for efficient space utilization. • All parking, other than short-term retail or guest parking, and building services need to be located below grade or hidden within the building. If on ground level or above, parking and/or building services must be surrounded on all sides by program space such as commercial or housing. Vehicular access to the buildings should be as close as possible to primary superblock streets (e.g. Typology 4 or 5). Dimensional Characteristics of Street Room Typology 3 New Local Streets Greater Southdale Area District Plan | Design Experience Guidelines DRAFT November 15, 2018 page 29 Street Typologies 60’ Wide Connector Street Typical 60’ Wide Local Street (within super-blocks) 105 Feet 20 Foot Step Back 60 Feet 2 Foot Step Back 2 Way Traffic Plus Parking 12’ Sidewalk 12’ Sidewalk It is recommended that buildings above 60 feet step back a minimum of 20 feet when there is an opposing building at the street edge Podium Heights can vary The intent is to create a street that provides a access from roads that are bordered by France and York and are connected by east /west streets such as Parklawn Ave, Parklawn Court, Hazelton Road, W 70th, W 69th, W 65th. Internal street within the supper block provide interconnections between supper block connecting residents across the district north and south supporting potential for community space. By creating pedestrians walkways with existing public and private infrastructure thereby supporting connections within and outside the block. The street width is based on the nature of the uses within the larger super block structure. They can be lined with a mix of uses, including residential and retail while providing connectivity within a neighborhood. They contain shady places to walk the dog or sit and have a coffee connecting to neighborhood parks, places of worship, and schools. Unique to the Greater Southdale District, many of the Connector Streets may become entirely devoted to landscaping. B The street room experience within Typology 3 will be shaped by the following experience guidelines: • New local streets should be 60 feet in width. Those streets which carry vehicular traffic should comprise two traffic lanes with two lanes of parking or pick-up/drop-off. Sidewalks should be located on each side of these vehicular streets as illustrated in the diagram above. • Minimizing vehicular access to provide drop off, service and parking can be planned to share the vehicular needs of blocks allowing the remaining spaces between the remaining blocks to be used in a variety of ways for the benefit of the community. This “space between” buildings can be transformed into pocket parks, gardens, play areas, plazas, wetlands, and many other activities that support the health and wellbeing of the community. • Building podium heights can vary, from 36 feet up to 60 feet. • Above the 60 foot height limit, the long sides of a rectangular or “L” shaped building need to step back 20 feet from the street room facade (as illustrated in the building at left in the diagram above), and the narrow ends need to step back 2 feet from the street room facade (building at right in diagram above). This minimizes the impact of the taller building form on sunlight at the street, and provides a lower-scale building at the street, resulting in a more cohesive and comfortable pedestrian experience. The footprint on taller residential buildings should not exceed 12,000 SF, while taller commercial buildings are permitted larger footprints of up to 24,000 SF for efficient space utilization. • All parking, other than short-term retail or guest parking, and building services need to be located below grade or hidden within the building. If on ground level or above, parking and/or building services must be surrounded on all sides by program space such as commercial or housing. Vehicular access to the buildings should be as close as possible to primary superblock streets (e.g. Typology 4 or 5). Dimensional Characteristics of Street Room Typology 3 New Local Streets Greater Southdale Area District Plan | Design Experience Guidelines DRAFT November 15, 2018 page 27 The street room experience within Typology 2 will be shaped by the following experience guidelines: • On France Avenue, a 50 foot setback is required from curb to face of building with a building podium height of 60 feet. Above the 60-foot height limit, additional height should step back 10 feet from the face of the building, to a maximum height of 84 feet. • All parking, other than short-term retail or guest parking, and building services need to be located below grade or hidden within the building. If on ground level or above, parking and/or building services must be surrounded on all sides by program space such as commercial or housing. Dimensional Characteristics of Street Room Typology 2 Cornelia Overlay at France Avenue 84 Feet France Avenue 60 Feet Traffic Lanes50 Foot Setback 10 Foot Step Back 50' 63' 20' 76' ACTIV E U S E PARKIN G L2(10')P A R K I N G L6 (15') O F F I C E L3 (10')P A R K I N G L4 (10')P A R K I N G L5 (10')P A R K I N G L7 (15') O F F I C E L8 (15') O F F I C E (L9 15') O F F I C E L10 (15' ) O F F I C E BELOW G R A D E P A R K I N G PARKIN G 63' 70'BELOW GRADE PARKING L1a (10') PARKING L1b (10') PARKING L2 (10') PARKING L3 (10') PARKING L4 (10') PARKING L5 (10') PARKING 20' 60' 12' 16' L6 (15') OFFICE L10 (15') OFFICE BELOW GRADE PARKING 12'L1 (12') RES L1 ( 2 0 ' ) 36' 32'L7 (15') OFFICE L8 (15') OFFICE L9 (15') OFFICE L2 (10.5') RES L3 (10.5') RES L4 (10.5') RES L5 (10.5') RES L6 (10.5') RES L7 (10.5') RES 3' bays 82' 150' 150' 18 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 SECTION PERSPECTIVES SECTION 4: PROMENADE Greater Southdale Area District Plan | Design Experience Guidelines DRAFT November 15, 2018 page 35 The street room experience within Typology 6 will be shaped by the following experience guidelines: • The 36 foot height along the Central Spine encourages a mix of uses focused on entertainment venues such as restaurants, gathering places or community-oriented facilities that provide destinations to come to and stay at. These lower-scale buildings that line the Promenade should reflect its stature as a special community amenity, with a rich variety of architectural experiences that front this park-like environment. • Above 36 feet, buildings shall step back 20 feet to the 60 foot podium height. Above 60 feet, buildings shall step back an additional 20 feet. • Buildings above the 60 foot height limit should be oriented to maximize the amount of sun on the Promenade. • Locations where Typology 6 intersects Typology 4 and 5 are critical to reinforce the idea of the linear public spine that connects this entire district. These intersections are the gateway to the Spine and should have a unique architectural response. • All parking, other than short-term retail or guest parking, and building services need to be located below grade or hidden within the building. If on ground level or above, parking and/or building services must be surrounded on all sides by program space such as commercial or housing. Dimensional Characteristics of Street Room Typology 6 Central Promenade Spine Street Typologies Central Promenade Spine The Central Promenade Spine is intended to connect the Greater Southdale District from the west at Highway 100, east to the heart of Centennial Lakes, along the existing Promenade north through The Galleria and Southdale Mall and north to Strachauer Park. The Central Promenade Spine transverses through different building types from 2 and 3 story Townhouses to 1 and 2 story commercial/retail buildings to 6 story office buildings. In imagining the future of the spine natural sunlight light and limited shadow will determine the experiential use of the space. Creating maximum height of 36 feet at its edges support a mix of uses fronting the spine while not limiting additional height to maximize the program of new building rising along its edges will not compromise the experience of walking and biking through a park like environment 50’ height limit Central Promenade Spine 36 Feet 60 Feet 20 Foot Step Back 20 Foot Step Back 105 Foot Maximum 15 Foot Front Yard Setback E Greater Southdale Area District Plan | Design Experience Guidelines DRAFT November 15, 2018 page 35 The street room experience within Typology 6 will be shaped by the following experience guidelines: • The 36 foot height along the Central Spine encourages a mix of uses focused on entertainment venues such as restaurants, gathering places or community-oriented facilities that provide destinations to come to and stay at. These lower-scale buildings that line the Promenade should reflect its stature as a special community amenity, with a rich variety of architectural experiences that front this park-like environment. • Above 36 feet, buildings shall step back 20 feet to the 60 foot podium height. Above 60 feet, buildings shall step back an additional 20 feet. • Buildings above the 60 foot height limit should be oriented to maximize the amount of sun on the Promenade. • Locations where Typology 6 intersects Typology 4 and 5 are critical to reinforce the idea of the linear public spine that connects this entire district. These intersections are the gateway to the Spine and should have a unique architectural response. • All parking, other than short-term retail or guest parking, and building services need to be located below grade or hidden within the building. If on ground level or above, parking and/or building services must be surrounded on all sides by program space such as commercial or housing. Dimensional Characteristics of Street Room Typology 6 Central Promenade Spine Street Typologies Central Promenade Spine The Central Promenade Spine is intended to connect the Greater Southdale District from the west at Highway 100, east to the heart of Centennial Lakes, along the existing Promenade north through The Galleria and Southdale Mall and north to Strachauer Park. The Central Promenade Spine transverses through different building types from 2 and 3 story Townhouses to 1 and 2 story commercial/retail buildings to 6 story office buildings. In imagining the future of the spine natural sunlight light and limited shadow will determine the experiential use of the space. Creating maximum height of 36 feet at its edges support a mix of uses fronting the spine while not limiting additional height to maximize the program of new building rising along its edges will not compromise the experience of walking and biking through a park like environment 50’ height limit Central Promenade Spine 36 Feet 60 Feet 20 Foot Step Back 20 Foot Step Back 105 Foot Maximum 15 Foot Front Yard Setback E SECTION 3: EAST-WEST STREETS 21' 36' 14' 22' 20' 22' BELOW GRADE PARKING L1 (12') RES RES L2 (10.5') RES L3 (10.5') RES L4 (10.5') RES L5 (10.5') RES L6 (10.5') RES L7 (10.5') 82' BELOW GRADE P A R K I N G PARKING ACTIVE USE L2(10')PARKIN G L3(10')PARKING L4(10')PARKING L5(10')PARKING L6(15')OFFICE L7(15')OFFICE L8(15')OFFICE L9(15')OFFICE L10(15')OFFICE PARKING L1(20') 34' 10' 10' 46' 63' 150' L11 15' OFF I C E 19 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 NE+ SE BLOCKS: • Multi-Family Residential • 82’ (excludes overruns) • Stepping down to Promenade per stepback guidelines • NE Block targeting 230 Dwelling Units/ 275 structured parking stalls/12 surface stalls/1.25 stalls per DU • SE Block targeting 230 Dwelling Units/ 275 structured parking stalls/12 surface stalls/1.25 stalls per DU • Ground floor active uses with shared auto/pedestrian plaza between buildings • Engaging Centennial Lakes Promenade with walk-up units, pathways, and active landscape nodes • NE Block dedicating portion of land for extension of Promenade • NE Block new pedestrian connection at north to connect France and Promenade • New north/south connection at midpoint of site with walkup units, landscaping, access drive, and parallel street parking • Live-Work Units with individual addresses. Ideal for startup and small businesses • Solar power on rooftops and electric vehicle charging stations • 10% of units affordable with max 50% RESIDENTIAL CONCEPTUAL MASSING IMAGES: PRECEDENT IMAGES: 20 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 OFFICE/MIXED USE CONCEPTUAL MASSING IMAGES: NW+ SW BLOCKS: • Mixed-Use Office • 150' (excludes overruns and mechanical screening) • Stepping down per New Local Streets stepback guidelines • NW Block +/-150K square foot office with ground floor active uses fronting France and plaza/+/-620 structured parking stalls • SW Block +/-150K square foot office with ground floor active uses fronting France and plaza/+/-620 structured parking stalls • Skyway connected levels for office tenants who require a 60K sf plate • 50' setback with landscaped plaza per Cornelia overlay guidelines • New north/south connection at midpoint of site with landscaping, access drive, and parallel street parking • East/West at-grade pedestrian plaza between buildings • Enhanced architectural screening at parking GARAGE SKIN OFFICE BUILDING PRECEDENT IMAGES: 21 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 PUBLIC REALM CONCEPTUAL MASSING IMAGES: GROUND FLOOR + PLAZAS + PARKS: • NE Block dedicating portion of land for extension of Promenade • 50' setback with landscaped plaza per Cornelia overlay guidelines • East/west shared auto/pedestrian plaza between buildings with ground floor active uses and possible event programming • New north/south connection at midpoint of site with walkup units, landscaping, access drive, and parallel street parking • New east/west pedestrian connection at north of site to connect France and Promenade PRECEDENT IMAGES: 22 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 THANK YOU QUESTIONS? 23 ESG | ARCHITECTURE & DESIGN | CITY OF EDINA - SKETCH PLAN SUBMISSION - 7235 FRANCE AVE S - EDINA | MAR 09, 2023 Submitted 03/09/2023 Architecture Field Office 2200 Zane Ave N | Minneapolis, MN 55422 www.archfieldoffice.com Cary: At your request, we reviewed the Sketch Plan submission for the proposed redevelopment of the Macy’s Furniture Store site based on our experience working with the Greater Southdale Work Group to craft a physical vision for how their guiding principles may translate to the built environment. The resulting vision for development in the district is to create an enhanced human experience along existing major and new connector streets, with overall experience shaped via landscape setbacks, building step backs, a hierarchy of street typologies, transparency at street level, minimizing the impact of the car, and managing storm water as an amenity. The outcome of our collaborations with the Work Group is described in the urban design chapter of the Greater Southdale District Plan and resulted in the Greater Southdale District Design Experience Guidelines. The proposed four block concept is working in important ways to meet the Design Experience Guidelines, demonstrating positive attributes as it relates the creation of an active public realm, and general consideration for the neighborhood. We note the following: 1. The proposal breaks the large site into four blocks with a simple pedestrian and vehicular circulation pattern. 2. The proposal responds to the existing context, in particular via building setbacks and stepbacks along the Promenade and France Avenue. 3. Along the Promenade the buildings are varied in both stepbacks and in their spatial configuration, working with the Promenade in providing a variety of landscape opportunities that could enhance the experience along this important pedestrian pathway. 4. The scale and general massing of the buildings align with the intention of street room typologies. 5. The concept as illustrated in the submission do es not go beyond where the development is at in this early stage, which in turn should offer plenty of time for the development team time to take into consideration comments from the community, Planning Commission and City Council before moving into more formal review and approval of the proposal. To City of Edina Cary Teague, Community Development Director 4801 W. 50th Street Edina, MN 55424 From Mic Johnson, FAIA Date March 26, 2023 Architecture Field Office We also would like to point out a few additional Opportunities noted in the current overall street plan and building massing for consideration. (Numbers on the diagram below correspond with comments.) 1. The Guidelines recognize existing super blocks comprised of major North/South Boulevards, (France and York Avenues) and East /West Streets (66th Street, 69th Street, 70th Street, Hazelton Road, Parklawn Avenue and West 76th Street). In the diagram above, the internal street that connects the proposed four blocks together helps create a small super block in collecting the transportation needs of the blocks, as noted in the dashed yellow line. There is an opportunity to arrange the vehicular and service access for each of the four buildings to be by these streets only. 2. Woonerfs are an important way to mix pedestrians and vehicles together – but we don’t need cars everywhere. Given the previous comment, the importance of creating more outdoor social space such as suggested in the Design Experience Guidelines under “The Space Between Buildings” (Pocket Parks, Recreation, Play Areas, Gardens, Stormwater Management, Wetlands, Waterways), and as a primary east/west green connection to the Promenade, the place between the proposed four buildings could become a more natural green area for peds/bikes rather than a paved plaza. 3. The intersection at Gallagher is an important part of creating a pedestrian connection between Fred Richards Park, the Promenade and Yorktown Park. New developments such Architecture Field Office as the proposed medical office building at 7200-7250 France and this proposed development on the east side of France provide an opportunity to catalyze a new design for intersections along France. 4. The Nine Mile Creek Regional Trail connects Edina from west to east. As such it is an important characteristic to acknowledge and reinforce on the south side of this proposed development, and at the intersection at Gallagher. 5. The proposed diagrams recognize the Cornelia Overlay but the building heights along the west side of France (proposed at 150 feet) do not correspond to the 84 foot height limit. In this proposal, there are significant opportunities to rebalance the stepbacks between the east and west façades of the office buildings. Reducing the stepbacks on the east side and increasing the setbacks on the west side, with a stepback at the 84 feet height limit, could help resolve the discrepancy and give greater relief from the building’s height along France and in the Cornelia Overlay District. 6. The guidelines give leeway to the depth of the stepbacks within the blocks outside of the major street typologies. In part, it is to give design teams the flexibility to shape buildings to uniquely respond to their context. It is also an opportunity to insure that any part of the façade above 60 feet helps positively shape the quality of sunlight on the internal east-west streets. In a northern climate, the north facades of buildings have the additional burden to protect the wintertime pedestrian experience; stepping those facades back would provide greater depth of sunlight into the street on the south face of the opposing building. 7. It is noted that space has been allocated for solar pan els on the apartment buildings, which is illustrated in this submission. Based on these diagrams, there is still an enormous area left on the four buildings for solar panels. As an important way to offset energy use and costs, in particular on affordable homes/apartments, reducing utility bills for everyone is both a sustainability and a diversity strategy. We would encourage the development team to consider more robust solar arrays. Thank you for the opportunity to review. Please let me know if you have any questions. Mic Architecture Field Office 2200 Zane Ave N | Minneapolis, MN 55422 www.archfieldoffice.com Cary: At your request, we reviewed the revised Sketch Plan submission for the proposed redevelopment of the Macy’s Furniture Store site based on our experience working with the Greater Southdale Work Group to craft a physical vision for how their guiding principles may translate to the built environment. The resulting vision for development in the district is to create an enhanced human experience along existing major and new connector streets, with overall experience shaped via landscape setbacks, building step backs, a hierarchy of street typologies, transparency at street level, minimizing the impact of the car, and managing storm water as an amenity. The outcome of our collaborations with the Work Group is described in the urban design chapter of the Greater Southdale District Plan and resulted in the Greater Southdale District Design Experience Guidelines. Upon our review of the initial sketch plan concept in March 2023, we were optimistic for the potential of the development and the spirit of its alignment with the community’s vision for the District— especially notable given the prominence of the site and its connectivity to important existing public realm assets. We felt the proposed four block concept was working in important ways to meet the Design Experience Guidelines, demonstrating positive attributes as it relates the creation of an active public realm, and general consideration for the neighborhood. However, we are less enthusiastic about the current iteration of the proposal. While we recognize that the primary ask from the development team is related to infrastructure improvements such as accommodations made to connect the development and Nine Mile Creek Regional Trail across France Avenue, we also note there have been significant changes made to the massing of proposed buildings that warrant consideration by the Planning Commission and City Council. The revised proposal is only presented in plan format with very limited detail—including no references to proposed building stepbacks at any location other than along France Avenue. The form of three of the four buildings has changed, in particular that of the southeast building and its relationship to the Promenade.The proposed mixed-use buildings on the east side of the site are far less integrated into the public realm asset that bisects the site from east to west, eliminating the interior public plaza in favor of a road realignment to accommodate a possible bridge across France. Locating the taller mixed-use building at the southwest corner will also cast a larger shadow over the northwest building. To City of Edina Cary Teague, Community Development Director 4801 W. 50th Street Edina, MN 55424 From Mic Johnson, FAIA Date January 19, 2024 Architecture Field Office Following is a graphic comparison between the first submittal of March 2023, illustrating characteristics as outlined in our comments from that project review memo, and the current plan of January 2024, showing the same four block, four building layout without the same detailed exploration of the qualities of the building shapes and stepped facades that was illustrated in the first submission. March 2023 January 2024 Note the shape of the residential buildings along the Promenade in the March 2023 proposal, where a rich variety of human-scaled spaces were folded into the landscape of the Promenade, creating an integrated building and landscape experience. The configuration of the southeast building from the March 2023 proposal can accommodate a park or a retail pad, or any number of things yet to be determined. It fits well in that it is on the Southeast corner of the site where it opens to great light, which is essential to providing a high-quality experience, particularly in a northern climate. There was porosity between the public realm and public spaces within the residential community, shaping a more integrated experience. There is no longer an accommodation in adjusting adjacent spatial relationships that can determine the characteristic qualities of varied facades, with low-scale building walls along pedestrian corridors that enhance human experience. It appears that the character and shape of each building has been reduced to the bare minimum. And lastly, the statement made by the development team that identifies specific infrastructure or public realm items for review at this stage in the process is somewhat disingenuous based on the current concept’s lack of detail on design attributes that would enhance the pedestrian experience. To Architecture Field Office suggest the community provide feedback on relatively inconsequential elements such as the location of a retail pad when the rest of the project needs further refinement seems premature. Based on the original scheme and further articulation of that scheme, we suggest the upcoming conversations should revolve more around how the buildings could receive amenities into them, such as a park or retail, rather than pick locations that could be anything at any time. The buildings’ massing, their relationship to one another, and material qualities that provide continuity while still providing individual expression are all important considerations in expressing the character of what these places might become. The issue of a bridge over France Avenue should not be a force that impacts these four buildings. It is infrastructure that should be addressed as a larger question affecting the whole city and the Nine Mile Creek Regional Trail corridor. A study is warranted that should look at the whole of France Avenue to determine whether a bridge is even necessary and if so, identify the right location along France. This is an important, large scale site—one of the most pivotal within the district in terms of its overall impact on shaping the characteristics of a future Greater Southdale District, the focus should be on articulation of a scheme that has strong characteristics that would accommodate all the things that have been mentioned by the developer to move the scheme forward (with the exception of a bridge) and bring it into alignment with the design goals of the Greater Southdale District. Thank you for the opportunity to review. Please let me know if you have any questions. Mic South France Avenue Crossing 01/24/2024 Concept Image for Discussion Only 1 01/24/2024 Concept Image for Discussion Only 2 01/24/2024 Concept Image for Discussion Only 3 51’ wide 13’ 7” High 96’ 17’ 01/24/2024 Concept Image for Discussion Only 4 Max. slope = 5% 01/24/2024 Concept Image for Discussion Only 5 01/24/2024 Concept Image for Discussion Only 6 01/24/2024 Concept Image for Discussion Only 7 01/24/2024 Concept Image for Discussion Only 8 Millennium Bridge in Denver 01/24/2024 Concept Image for Discussion Only 9 The CITYofEDINASketch Plan Review – 7235 France Avenue (Macy’s Furniture Store Site) The CITYofEDINAEdinaMN.gov2Site The CITYofEDINAEdinaMN.gov3Site The CITYofEDINAEdinaMN.gov4Site The CITYofEDINAEdinaMN.gov52023 SKETCH PLAN The CITYofEDINAEdinaMN.gov62024 SKETCH PLAN The CITYofEDINAThis Request Requires:EdinaMN.gov7•Rezoning from PCD-3 to PUD. Flexibility would be requested through the PUD Ordinance to vary from existing setback requirements, building height, first floor ceiling height, building transparency on the first level, and floor area ratio (FAR) requirements. The PUD Zoning is also used to ensure 10% affordable housing on the site. The CITYofEDINAEdinaMN.gov8*Does not meet base Zoning Standards-Flexibility would be requested through a PUD Proposed(Setback measured from the front building line to the curb)City Standard(PCD-3) (Setback measured from the front building line to the curb)50 feet20 & 40 feet*50 & 100+ feet(35 feet previous plan)35 feet*(21 feet previous plan)812 feet*50 feet 50 feet or building height (150 feet)50 feet or building height (150 feet)50 feet or building height (82 feet)900 feetBuilding Setbacks Front – France AvenueSide – North Side – SouthRear – PromenadeSetback to R-1 Property7-11 stories and 150 feet*8 stories & 96 feet Building Height110 units per acre (using just the residential sites) (55 units per acre overall)90-150 units per acreDensity2.4%*.50%Floor Area Ratio (FAR) 1,200574 proposed enclosed spaces24 surface spaces1,838 spaces total proposedRetail/Office = 1,000 spacesResidential = 440 enclosed spaces1,440 spaces totalParking The CITYofEDINADiscussion/Sketch Plan ReviewEdinaMN.gov9 The CITYofEDINADiscussion/Sketch Plan ReviewEdinaMN.gov10 The CITYofEDINAEdinaMN.gov11 The CITYofEDINADiscussion/Sketch Plan ReviewEdinaMN.gov12 The CITYofEDINAEdinaMN.gov132024 SKETCH PLAN DEVELOPER’S CONCEPT PLAN UPDATES Original Concept Plan (plan version #1) Neighborhood Meeting –February 2023 Neighborhood Meeting --March 2023 Planning Commission –April 2023 City Council –April 2023 EAW –August 2023 France Pedestrian Connection Process –May 2023 to January 2024 Updated Concept Plan (plan version #2) After review and feedback from the above meetings, Enclave adjusted their concept plan (plan version #2). Changes outlined within following slides. Originally Submitted Concept Site Plan Updated Concept Site Plan Changes from Original Concept Plan to Updated Concept Plan outlined on following slides ITEM #1 Expand width of regional trail. CHANGE MADE Acknowledged. Developer plans to expand width to 15’ (or follow direction provided by City). ITEM #2 Larger setback to regional trail/ extend Promenade CHANGE MADE 50’ wide promenade extension to France (previously 15’ wide and 35’ wide). Also removed all garage entrances from south side to protect this pedestrian corridor. ITEM #3 Larger setback to Promenade CHANGE MADE Was 15’ → Then 21’ → Now 35’ ITEM #4 Update this area from an exclusive private amenity for apt tenants to a public area/ expansion of the promenade CHANGE MADE Updated accordingly, now an expansion of public land/ the promenade (“public room”) ITEM #5 Add restaurant pad against promenade. CHANGE MADE Restaurant pad added ITEM #6 Center pedestrian plaza to include as much greenspace as reasonably possible. Was previously nearly all hardscape. CHANGE MADE Acknowledged. Simplistic placeholder shown here (was previously 100% paved). Will provide detailed design w next submittal. ITEM #7 Soften corner for pedestrians. Incorporate restaurant pad/ patios. Provide better sightlines for pedestrians. CHANGE MADE This corner of building will be a ground level patio for a restaurant user. ITEM #8 Better respond to/ respect 900’ setback from single family homes for any building greater that 96’ feet or 8 stories. CHANGE MADE NW building dropped to 8/9-stories, as it was the closest to nearby single family homes. Was 10/11-stories previously. ITEM #9 Work with City to study multiple potential pedestrian connection strategies across France. Ensure site design adjusted to allow flexibility for future connection. CHANGE MADE Multiple meetings w City staff and consultants to discuss various potential strategies. Adjusted site plan to accommodate multiple future France Ave pedestrian connection strategies. Additional related slides to follow. Realigned overall center plaza to have less bends/ breaks and provide a clearer line of site/ path for pedestrians. Required shifting of buildings. Increased distance from Gallagher to center plaza. This will be especially helpful if greenway underpass strategy utilized. Will allow for longer ramping/ switchbacks. As outlined in previously slides. Added secondary green corridor/ larger pedestrian connection along south side of site. Good for bikes, strollers, or anyone that doesn’t want to use a staircase. Also provides cleaner pedestrian path for anyone traveling south side of site. Next Steps •Step #1. Developer receives updated schematic plan feedback. 01/24 and 02/06. Developer revaluates project. •Step #2. Developer completes design required for formal land use applications and TIF applications. •Public Realm/ Landscaping •Full Civil •Architectural floor plans, exteriors, renderings •Step #3. Developer submits formal land use applications and TIF applications. Target for end of March.